Home / Financial Firm (Unknown - Insurer) / Determination 266123
Determination 266123
Denial of garage slab and footing storm damage as soil movement
Summary
The applicant's garage was damaged in a February storm and the FSP offered $32,533 but refused the slab and footing damage as soil movement. The Panel ordered the FSP to indemnify the garage floor and eastern wall repairs and to pay $500 for the delay.
The FSP did not establish on the balance of probabilities that the slab and footing damage was caused by excluded soil movement rather than the insured storm.
Issues
- Claim denial primary · upheld
“The FSP is to indemnify the applicant for repair of the garage floor and repair of the eastern wall including its footings.”
- Inadequate claim investigation secondary · upheld
“The facts relied on by the FSP engineer are in doubt, and the report is not conclusive; more tests were needed.”
- Delay secondary · upheld
“Time taken to make a final decision, over a year after the claim, was not reasonable for a claim that is not especially unusual or difficult.”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial loss
Text of the determination
Case No: 266123 Determination Page 1 of 7
Case number: 266123
General Insurance - Domestic Insurance - Home Building – Insured event
Claim Amount
27 September 2012
Background
1. The Applicant and his wife are insured under a home building and contents
insurance policy with the Financial Services Provider (FSP) that was
incepted on 20 December 2006. The policy was renewed annually.
2. On 6 February 2011 a claim was lodged under the policy as a result of
damage caused by a storm event that occurred on 4 February 2012. It was
reported the garage had sustained damage as a result of heavy rain. A crack
had appeared in the garage wall. Contents in the garage were also damaged
by water.
3. The FSP arranged for its loss assessor to attend the property and report on
damage. Subsequently an engineer was appointed to provide a scope of
works for the repair of the garage.
4. On 17 March 2011 the Applicant raised issue with the gas ducted heating
system that the FSP was not previously aware of. The FSP arranged for the
ducted system to be inspected.
5. On 27 May 2011 the Applicant complained to the FSP about the length of
time it was taking for it to accept liability for damage to the garage. The FSP
acknowledged there were delays and that further investigation was required.
However, it did not receive the scope of works until August 2011 and quotes
for repairs until October 2011.
6. The Applicant was provided with the FSP’s accepted scope of works but he
disagreed with it as it did take into account the repair of the garage floor slab
and garage footings that he said were not damaged prior to the storm event.
7. The FSP arranged for its appointed engineer to re -inspect the garage. Based
on the engineer’s further report the FSP advised the Applicant that damage
to the concrete slab and footings resulted from soil movement; a cause
excluded by the policy.
8. The FSP proposed to cash settle the Applicant the amount of $32,533 for
damage to the garage it accepted was related to the storm as it could not
repair it to a standard to offer a lifetime guarantee of repairs due to the
construction and soil movement issues.
Determination
Case No: 266123 Determination Page 2 of 7
9. The Applicant has referred this matter to the Service as he disagrees with
the FSP’s decision not to repair all the damage to the garage.
Summary of Applicant’s position
10. The Applicant says he has lodged a claim for storm damage caused to the
home and until the storm occurred there was no cracking in the concrete wall
or concrete slab or any part of the garage foundations.
11. He says the settlement proposed by the FSP to indemnify him for damage
sustained to the garage does not put him back in the same position prior to
the loss.
12. The Applicant says he disagrees with the FSP’s assertion that the garage
was not constructed properly. The garage is only 4 years old and passed
council inspection and approval.
13. He also says he is extremely upset about the approach of the FSP to the
claim and that the claim took too long to resolve and that delay has caused
further damage.
Summary of FSP’s position
14. The FSP says the onus is on the Applicant to establish an insured event has
caused the disputed damage.
15. It says it is relying on the expert evidence of its engineer that the damage
was not the result of an insured event, but was as a result of poor
construction and soil movement.
16. The FSP says the policy specifically excludes damage caused by soil
movement and accordingly the Applicant’s claim for damage to the concrete
slab and garage footings is not covered by the policy.
17. The FSP relies on the following policy provisions:
“ What we cover
...
Storm and rainwater including stormwater runoff from areas surrounding the
site, or water escaping from any water main, drain, pipe, street gutter,
guttering or surface.
....
What we do not cover – general exclusions
You are not covered under any section of the policy for damage, loss,
cost or liability caused by or arising from or involving:
...
soil movement or settlement,
Case No: 266123 Determination Page 3 of 7
subsidence or landslide unless caused by the insured event earthquake,”
Issues
18. Whether the FSP was entitled to exclude repairs for the concrete slab and
garage footings from settlement of the claim.
Reasons for decision
19. FOS has considered it is appropriate to expedite the dispute in accordance
with clause 8.6 of the FOS Terms of Reference. This is because of the
issues in dispute and quantum. This dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination.
20. There has been an exchange of material between the parties and each party
has had the opportunity to respond to the issues. Prior to making a finding, I
have carefully read and considered all the material and will refer to all
relevant material in this Determination.
21. When making a claim under an insurance policy, the responsibility rests with
the policyholder to establish on the balance of probabilities that the cause of
the loss falls within the terms of the policy. It then falls on the FSP, if it seeks
to rely on the terms of a clause in the policy to deny the claim, to establish
that the terms of the clause apply to the circumstances of the loss to defeat
the claim.
Has an insured event caused damage to the garage concrete slab and
footings?
22. The Applicant lodged a claim for damage caused to insured property as a
result of a storm event on 4 February 2011 storm. The FSP does not dispute
a storm event occurred. It has accepted most of the garage and contents
were damaged by the storm. The FSP obtained a scope of works to repair
the damage to the garage it says is storm related.
23. The dispute arises as the FSP has not accepted all damage for which the
Applicant is seeking repair. The disputed damage is cracking to the concrete
floor slab and garage footings.
24. The FSP says the disputed damage has not been caused by the storm
event. This is based on the report provided by its appointed engineer.
25. In rebuttal the Applicant has produced a direction and inspection record from
the local council regarding “alterations and additions to detached dwelling”
(which I presume is the garage) which notes the footings and framework
were approved on 11 November and the 13 December 2007. The footings
were not approved on the date they were inspected on 2 November 2007:
“ Notes:
Case No: 266123 Determination Page 4 of 7
NOT APPROVED – Amended engineers details required – drawings and Reg
1507 cert for the deletion of the requirement for piers and reduction in footings
depth to 400mm. Soil classification change from P to S. No soil report
provided. Provide confirmation of termite protection.”
26. As the Council finally approved the building on 14 April 2008 I presume
these requirements were met after the inspection and before final approval.
27. The Applicant also criticise the inspection by the engineer. He says it was
nothing more than a visual site inspection and they did not carry out
foundation exposure testing or soil testing.
28. He says on the day of the storm, there was 12-14cms of water in the garage
and as he did not open the doors until the next day, he says the water had
seeped away between the concrete floor and the wall.
29. The FSP has in its submission advised the policy specifically excludes loss
or damage caused by, arising from or involving:
soil movement or settlement;
subsidence or landslide unless caused by the insured event
earthquake.
30. I have considered all the material and the arguments put forward as well as
the reports relied upon.
31. I note the Applicant has taken issue with the FSP’s refe rence to construction
defects based on its engineer’s report. The FSP relies on the engineer’s
report that the possible causes of the relative settlement of the slab and
eastern garage wall include:
Bored piers not cleaned out adequately during construction;
Bored piers not founded into weathered rock as specified;
Garage infill slab sub-grade not adequately compacted.
32. The engineer says that if the concrete piers and floor slab had been properly
constructed and in accordance with plans then the piers and the slab would
probably not have moved significantly but that a more accurate
determination can be made with further investigation which has not been
done.
33. The engineer concludes the minor cracking in the floor slab is due to long
term drying shrinkage of concrete and not caused by the heavy rain.
34. The Applicant has not obtained an expert report but says the garage is only
4 years old and passed Council inspection and approval. The Applicant says
the engineer’s opinion is nothing more than that as his inspection was
nothing more than a visual site inspection and there was no foundation
exposure testing or soil testing.
Case No: 266123 Determination Page 5 of 7
35. The Applicant says there was no cracking to the garage prior to the storm
event but that the crack appeared after the storm and because the floor had
been under water.
36. I note the engineer’s report relied upon by the FSP. This report is dated 17
January 2011 following an inspection carried out on 12 December 2011. I
accept the report should be dated 17 January 2012.
37. According to this report the engineer had previously inspected the property
on 25 March 2011 and on 23 August 2011 issued a scope of works for
reinstatement of storm damage to the garage.
38. It is noted the scope of works is issued for costing purposes only. The scope
of works included the demolition and reinstatement of the eastern garage
wall. No specific site report has been provided although the scope of works
is based on a site inspection that occurred six months previously.
39. However, according to the latest report, the engi neer says he noted no
damage to the concrete floor at the time of inspection on 25 March 2011.
40. Of concern to me is that no reports are produced from that earlier
inspection(s) and that a photograph taken by the FSP’s loss assessor
contradicts this. The photograph shows there is cracking in the concrete floor
when he inspected the property prior to the appointment of the engineer.
41. I further note the loss assessor inspected the property on 12 February 2011
and the damage to the contents of the garage was also assessed. When
writing to the engineer in August 2011, the FSP asked the engineer to
prepare a scope of works, which the assessor believed to have been caused
by the storm event, and noted “stormwater has undermined the front of the
garage slab and footing to the eastern side of the garage. The storm has
damaged “the eastern brick wall to the garage (crack) and the front section
of the garage slab”. It is not clear to me why the FSP changed its position.
42. I note the preferred builder, who questioned the scope of works, noted in a
letter dated 29 September 2011 deep cracking to the concrete floor as a
result of building movement, which was consistent to the point of origin from
water ingress.
43. Therefore the facts upon which the engineer bases his opinion are in doubt
and thus the efficacy of the report is thrown into doubt and any hypotheses
of causes opined by the engineer may become therefore problematic as
other evidence suggest there was a crack in the slab on or before the
inspection by the engineer in March 2011. Further, the report is not
conclusive. More tests needed to be done. I am also concerned the engineer
has not inspected the council file or if he has, he has not commented on
those findings.
44. After analysis of the information, I am not satisfied, on the balance of
probabilities the FSP has proved to my satisfaction the garage floor was not
damaged by the claimed event but by subsidence. I determine that the FSP
Case No: 266123 Determination Page 6 of 7
indemnify the Applicant under the policy for the repairs required to the
garage floor and footings of the eastern wall.
Delay in claims process
45. When the Applicant first contacted the Service in December 2011 he was
complaining about the delay in finalising his claim as well as the refusal of
the FSP to accept the repair of all damage.
46. I note the Applicant complained to the FSP on 27 May 2011 about the delay
in the claims process, which was addressed by it in a letter, dated 24 June
2011 following a review through its internal dispute resolution process (IDR).
47. The FSP conceded there was a delay but was still seeking evidence to
establish whether the claimed damage was consistent with the insured
event.
48. The FSP noted the Applicant had not advised it of damage to the ducting
system until 17 March 2011. However I note the FSP at that time had not
received its appointed engineer’s report regarding the garage or the scope of
works until late August 2011. I am therefore not satisfied the Applicant’s late
advice of damage to the ducting system has added to the overall delay in its
decision of liability for storm damage to the garage.
49. I note the Applicant complained on several further occasions to the FSP
about the delay to his claim. This is noted in the chronology in the FSP’s
submission.
50. The FSP has not made any specific reference regarding delays in its
submission but it conceded there were delays as noted on 24 June 2011. It
would have been helpful had the FSP provided succinct reasons for the
delays in its submissions and in its reply dated 12 September 2012. When
asked to comment, all the FSP said was: “we would submit that the policy
includes no cover for compensation and as such it should not be re warded
by the Service.”
51. I consider the FOS Terms of Reference relevant to this dispute a re:
“ 9.3 Other compensation
a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial Services Provider compensate the Applicant for consequential
financial loss or damage up to a maximum amount of $3,000 per claim made
in the Dispute.
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial Services Provider compensate the Applicant for non-financial loss
but only where:
(i) an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference with the Applicant’s expectation of
enjoyment or peace of mind has occurred; or
(ii) in the case of a Dispute pertaining to an individual’s privacy rights -
injury has occurred to the Applicant’s feelings or humiliation has be en
suffered by the Applicant.
Case No: 266123 Determination Page 7 of 7
The maximum amount of compensation for non-financial loss will be $3,000
per claim made in the Dispute.
c) Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation
for:
(i) consequential financial loss; or
(ii) non-financial loss,
in a Dispute arising as a result of a claim on a General Insurance Policy that
expressly excludes such liability.
d) The cap on liability in paragraph 9.3 a) does not in any way restrict FOS’s
ability to make an interest award under paragraph 9.5. ”
52. Having regard to the Terms of Reference (TOR) of this Service to which I
have referred above, I do consider that this is a case appropriate for a
modest award of compensation for non-financial loss because of the unusual
length of time taken to resolve the situation. In my view the time taken to
make a final decision about this claim was not reasonable.
53. A claim was made on 6 February 2011 and yet it is over a year later on 1
March 2012 that the FSP made its final decision about the claim. This claim
is not especially unusual or difficult and I can’t see good reason for it to take
this long.
54. I can award up to $3,000 for this type of non-financial loss. Pursuant to
paragraph 9(3)(b)(i) of the TOR, I determine the FSP pay to the Applicant
the sum of $500 for this claim for compensation for time taken to resolve the
situation.
55. The FSP submits the policy includes no cover for compensation but this is a
claim for compensation pursuant to the TOR and not the policy. More
pertinently, the policy does not prevent an award under the TOR as the
policy does not “expressly exclude such liability”.
Determination
56. On the basis of the available information I determine the FSP indemnify the
Applicant for the repair of the garage floor and repair of the eastern wall
including its footings.
57. I also determine the FSP pay the Applicant $500 compensation pursuant to
the TOR for the time taken to resolve the situation.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.