Home / Financial Firm (Unknown - Insurer) / Determination 266123

Determination 266123

Denial of garage slab and footing storm damage as soil movement

FirmFinancial Firm (Unknown - Insurer)
Decided2012-10-02
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$500
Amount claimed—
SourceAFCA PDF

Summary

The applicant's garage was damaged in a February storm and the FSP offered $32,533 but refused the slab and footing damage as soil movement. The Panel ordered the FSP to indemnify the garage floor and eastern wall repairs and to pay $500 for the delay.

The FSP did not establish on the balance of probabilities that the slab and footing damage was caused by excluded soil movement rather than the insured storm.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 266123 Determination Page 1 of 7 Case number: 266123 General Insurance - Domestic Insurance - Home Building – Insured event Claim Amount 27 September 2012 Background 1. The Applicant and his wife are insured under a home building and contents insurance policy with the Financial Services Provider (FSP) that was incepted on 20 December 2006. The policy was renewed annually. 2. On 6 February 2011 a claim was lodged under the policy as a result of damage caused by a storm event that occurred on 4 February 2012. It was reported the garage had sustained damage as a result of heavy rain. A crack had appeared in the garage wall. Contents in the garage were also damaged by water. 3. The FSP arranged for its loss assessor to attend the property and report on damage. Subsequently an engineer was appointed to provide a scope of works for the repair of the garage. 4. On 17 March 2011 the Applicant raised issue with the gas ducted heating system that the FSP was not previously aware of. The FSP arranged for the ducted system to be inspected. 5. On 27 May 2011 the Applicant complained to the FSP about the length of time it was taking for it to accept liability for damage to the garage. The FSP acknowledged there were delays and that further investigation was required. However, it did not receive the scope of works until August 2011 and quotes for repairs until October 2011. 6. The Applicant was provided with the FSP’s accepted scope of works but he disagreed with it as it did take into account the repair of the garage floor slab and garage footings that he said were not damaged prior to the storm event. 7. The FSP arranged for its appointed engineer to re -inspect the garage. Based on the engineer’s further report the FSP advised the Applicant that damage to the concrete slab and footings resulted from soil movement; a cause excluded by the policy. 8. The FSP proposed to cash settle the Applicant the amount of $32,533 for damage to the garage it accepted was related to the storm as it could not repair it to a standard to offer a lifetime guarantee of repairs due to the construction and soil movement issues. Determination Case No: 266123 Determination Page 2 of 7 9. The Applicant has referred this matter to the Service as he disagrees with the FSP’s decision not to repair all the damage to the garage. Summary of Applicant’s position 10. The Applicant says he has lodged a claim for storm damage caused to the home and until the storm occurred there was no cracking in the concrete wall or concrete slab or any part of the garage foundations. 11. He says the settlement proposed by the FSP to indemnify him for damage sustained to the garage does not put him back in the same position prior to the loss. 12. The Applicant says he disagrees with the FSP’s assertion that the garage was not constructed properly. The garage is only 4 years old and passed council inspection and approval. 13. He also says he is extremely upset about the approach of the FSP to the claim and that the claim took too long to resolve and that delay has caused further damage. Summary of FSP’s position 14. The FSP says the onus is on the Applicant to establish an insured event has caused the disputed damage. 15. It says it is relying on the expert evidence of its engineer that the damage was not the result of an insured event, but was as a result of poor construction and soil movement. 16. The FSP says the policy specifically excludes damage caused by soil movement and accordingly the Applicant’s claim for damage to the concrete slab and garage footings is not covered by the policy. 17. The FSP relies on the following policy provisions: “ What we cover ... Storm and rainwater including stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. .... What we do not cover – general exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: ... soil movement or settlement, Case No: 266123 Determination Page 3 of 7 subsidence or landslide unless caused by the insured event earthquake,” Issues 18. Whether the FSP was entitled to exclude repairs for the concrete slab and garage footings from settlement of the claim. Reasons for decision 19. FOS has considered it is appropriate to expedite the dispute in accordance with clause 8.6 of the FOS Terms of Reference. This is because of the issues in dispute and quantum. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 20. There has been an exchange of material between the parties and each party has had the opportunity to respond to the issues. Prior to making a finding, I have carefully read and considered all the material and will refer to all relevant material in this Determination. 21. When making a claim under an insurance policy, the responsibility rests with the policyholder to establish on the balance of probabilities that the cause of the loss falls within the terms of the policy. It then falls on the FSP, if it seeks to rely on the terms of a clause in the policy to deny the claim, to establish that the terms of the clause apply to the circumstances of the loss to defeat the claim. Has an insured event caused damage to the garage concrete slab and footings? 22. The Applicant lodged a claim for damage caused to insured property as a result of a storm event on 4 February 2011 storm. The FSP does not dispute a storm event occurred. It has accepted most of the garage and contents were damaged by the storm. The FSP obtained a scope of works to repair the damage to the garage it says is storm related. 23. The dispute arises as the FSP has not accepted all damage for which the Applicant is seeking repair. The disputed damage is cracking to the concrete floor slab and garage footings. 24. The FSP says the disputed damage has not been caused by the storm event. This is based on the report provided by its appointed engineer. 25. In rebuttal the Applicant has produced a direction and inspection record from the local council regarding “alterations and additions to detached dwelling” (which I presume is the garage) which notes the footings and framework were approved on 11 November and the 13 December 2007. The footings were not approved on the date they were inspected on 2 November 2007: “ Notes: Case No: 266123 Determination Page 4 of 7 NOT APPROVED – Amended engineers details required – drawings and Reg 1507 cert for the deletion of the requirement for piers and reduction in footings depth to 400mm. Soil classification change from P to S. No soil report provided. Provide confirmation of termite protection.” 26. As the Council finally approved the building on 14 April 2008 I presume these requirements were met after the inspection and before final approval. 27. The Applicant also criticise the inspection by the engineer. He says it was nothing more than a visual site inspection and they did not carry out foundation exposure testing or soil testing. 28. He says on the day of the storm, there was 12-14cms of water in the garage and as he did not open the doors until the next day, he says the water had seeped away between the concrete floor and the wall. 29. The FSP has in its submission advised the policy specifically excludes loss or damage caused by, arising from or involving:  soil movement or settlement;  subsidence or landslide unless caused by the insured event earthquake. 30. I have considered all the material and the arguments put forward as well as the reports relied upon. 31. I note the Applicant has taken issue with the FSP’s refe rence to construction defects based on its engineer’s report. The FSP relies on the engineer’s report that the possible causes of the relative settlement of the slab and eastern garage wall include:  Bored piers not cleaned out adequately during construction;  Bored piers not founded into weathered rock as specified;  Garage infill slab sub-grade not adequately compacted. 32. The engineer says that if the concrete piers and floor slab had been properly constructed and in accordance with plans then the piers and the slab would probably not have moved significantly but that a more accurate determination can be made with further investigation which has not been done. 33. The engineer concludes the minor cracking in the floor slab is due to long term drying shrinkage of concrete and not caused by the heavy rain. 34. The Applicant has not obtained an expert report but says the garage is only 4 years old and passed Council inspection and approval. The Applicant says the engineer’s opinion is nothing more than that as his inspection was nothing more than a visual site inspection and there was no foundation exposure testing or soil testing. Case No: 266123 Determination Page 5 of 7 35. The Applicant says there was no cracking to the garage prior to the storm event but that the crack appeared after the storm and because the floor had been under water. 36. I note the engineer’s report relied upon by the FSP. This report is dated 17 January 2011 following an inspection carried out on 12 December 2011. I accept the report should be dated 17 January 2012. 37. According to this report the engineer had previously inspected the property on 25 March 2011 and on 23 August 2011 issued a scope of works for reinstatement of storm damage to the garage. 38. It is noted the scope of works is issued for costing purposes only. The scope of works included the demolition and reinstatement of the eastern garage wall. No specific site report has been provided although the scope of works is based on a site inspection that occurred six months previously. 39. However, according to the latest report, the engi neer says he noted no damage to the concrete floor at the time of inspection on 25 March 2011. 40. Of concern to me is that no reports are produced from that earlier inspection(s) and that a photograph taken by the FSP’s loss assessor contradicts this. The photograph shows there is cracking in the concrete floor when he inspected the property prior to the appointment of the engineer. 41. I further note the loss assessor inspected the property on 12 February 2011 and the damage to the contents of the garage was also assessed. When writing to the engineer in August 2011, the FSP asked the engineer to prepare a scope of works, which the assessor believed to have been caused by the storm event, and noted “stormwater has undermined the front of the garage slab and footing to the eastern side of the garage. The storm has damaged “the eastern brick wall to the garage (crack) and the front section of the garage slab”. It is not clear to me why the FSP changed its position. 42. I note the preferred builder, who questioned the scope of works, noted in a letter dated 29 September 2011 deep cracking to the concrete floor as a result of building movement, which was consistent to the point of origin from water ingress. 43. Therefore the facts upon which the engineer bases his opinion are in doubt and thus the efficacy of the report is thrown into doubt and any hypotheses of causes opined by the engineer may become therefore problematic as other evidence suggest there was a crack in the slab on or before the inspection by the engineer in March 2011. Further, the report is not conclusive. More tests needed to be done. I am also concerned the engineer has not inspected the council file or if he has, he has not commented on those findings. 44. After analysis of the information, I am not satisfied, on the balance of probabilities the FSP has proved to my satisfaction the garage floor was not damaged by the claimed event but by subsidence. I determine that the FSP Case No: 266123 Determination Page 6 of 7 indemnify the Applicant under the policy for the repairs required to the garage floor and footings of the eastern wall. Delay in claims process 45. When the Applicant first contacted the Service in December 2011 he was complaining about the delay in finalising his claim as well as the refusal of the FSP to accept the repair of all damage. 46. I note the Applicant complained to the FSP on 27 May 2011 about the delay in the claims process, which was addressed by it in a letter, dated 24 June 2011 following a review through its internal dispute resolution process (IDR). 47. The FSP conceded there was a delay but was still seeking evidence to establish whether the claimed damage was consistent with the insured event. 48. The FSP noted the Applicant had not advised it of damage to the ducting system until 17 March 2011. However I note the FSP at that time had not received its appointed engineer’s report regarding the garage or the scope of works until late August 2011. I am therefore not satisfied the Applicant’s late advice of damage to the ducting system has added to the overall delay in its decision of liability for storm damage to the garage. 49. I note the Applicant complained on several further occasions to the FSP about the delay to his claim. This is noted in the chronology in the FSP’s submission. 50. The FSP has not made any specific reference regarding delays in its submission but it conceded there were delays as noted on 24 June 2011. It would have been helpful had the FSP provided succinct reasons for the delays in its submissions and in its reply dated 12 September 2012. When asked to comment, all the FSP said was: “we would submit that the policy includes no cover for compensation and as such it should not be re warded by the Service.” 51. I consider the FOS Terms of Reference relevant to this dispute a re: “ 9.3 Other compensation a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for consequential financial loss or damage up to a maximum amount of $3,000 per claim made in the Dispute. b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for non-financial loss but only where: (i) an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant’s expectation of enjoyment or peace of mind has occurred; or (ii) in the case of a Dispute pertaining to an individual’s privacy rights - injury has occurred to the Applicant’s feelings or humiliation has be en suffered by the Applicant. Case No: 266123 Determination Page 7 of 7 The maximum amount of compensation for non-financial loss will be $3,000 per claim made in the Dispute. c) Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation for: (i) consequential financial loss; or (ii) non-financial loss, in a Dispute arising as a result of a claim on a General Insurance Policy that expressly excludes such liability. d) The cap on liability in paragraph 9.3 a) does not in any way restrict FOS’s ability to make an interest award under paragraph 9.5. ” 52. Having regard to the Terms of Reference (TOR) of this Service to which I have referred above, I do consider that this is a case appropriate for a modest award of compensation for non-financial loss because of the unusual length of time taken to resolve the situation. In my view the time taken to make a final decision about this claim was not reasonable. 53. A claim was made on 6 February 2011 and yet it is over a year later on 1 March 2012 that the FSP made its final decision about the claim. This claim is not especially unusual or difficult and I can’t see good reason for it to take this long. 54. I can award up to $3,000 for this type of non-financial loss. Pursuant to paragraph 9(3)(b)(i) of the TOR, I determine the FSP pay to the Applicant the sum of $500 for this claim for compensation for time taken to resolve the situation. 55. The FSP submits the policy includes no cover for compensation but this is a claim for compensation pursuant to the TOR and not the policy. More pertinently, the policy does not prevent an award under the TOR as the policy does not “expressly exclude such liability”. Determination 56. On the basis of the available information I determine the FSP indemnify the Applicant for the repair of the garage floor and repair of the eastern wall including its footings. 57. I also determine the FSP pay the Applicant $500 compensation pursuant to the TOR for the time taken to resolve the situation.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.