Text of the determination
Case No: 266063 Determination Page 1 of 8
Case number: 266063
General Insurance - Domestic Insurance - Home Contents - FSP Decision -
Denial of claim – Flood – Section 35 Insurance Contracts Act 1984
19 November 2012
Background
1. The Applicants held Home Building and Contents Insurance Policies (the
policies) with the Financial Services Provider (FSP).
2. The insured property (building and contents) in Fig Tree Pocket suffered
extensive damage due to the significant weather events experienced in
Queensland (Qld) in January 2011.
3. A claim was lodged under the policy seeking cover for their loss ; however,
the FSP declined indemnity (for damage to the insured contents) on the
basis the loss was due to the excluded event “Flood”.
4. The Applicants remain dissatisfied with the FSP ‟s decision and are seeking
complete indemnity for their loss under the policy.
Summary of Applicants ’ position
5. The Applicants in disputing the FSP‟s decision to decline the claim have
sought the assistance of legal representatives “L”. For the sake of brevity
both L and the Applicants will be referred to as “the Applicants” for the
purpose of this determination.
6. The Applicants maintain:
The FSP has agreed to provide indemnity for the damage to the
insured building however, it has maintained its position to exclude from
cover damage to the insured contents.
The Applicants maintain that the FSP did not promptly and/or
adequately investigate the claim. Further, they submit that the FSP has
failed to adequately consider their submissions to the Service as well.
The FSP failed to discharge its obligations under Section 35 of the
Insurance Contracts Act 1984 (the Act).
In respect to the definitions of flood, stormwater and stormwater run-off
within the Product Disclosure Statement (PDS), the definitions are likely
to cause confusion for a reasonable consumer.
Determination
Case No: 266063 Determination Page 2 of 8
The FSP has failed to adequately discharge its obligation to show that
the initial inundation of the property was caused by the excluded event
of “Flood”. Further, it took an unreasonable length of time for the FSP
to arrange the site specific hydrological evidence.
The inundation of the insured property was due to water „backing up‟
into the Applicants‟ property, an event insured under the policy as
represented by the FSP‟s st aff member on 29 December 2010.
In the alternative, the damage to their property was caused by Storm/
Stormwater run-off and/or water escaping from a drain, fixed pipe, sink,
basin, bath, shower, toilet which is covered under the policy.
The Queensland Reconstruction Authority (QRA) maps relied upon by
the FSP merely shows the peak levels of riverine flooding. This does
not account for source and extent of the initial inundation.
They relocated their contents three times (December 2009, April 2010
and June/July 2010). They expected to receive a copy of policy terms
after contacting the FSP to advise that their contents had been
relocated to the insured property in Fig Tree Pocket, which they did not.
They did not receive the relevant Product Disclosure Statement(s) from
the FSP at inception of the policy in May 2009.
The FSP‟s hydrological evidence fails to take into account the
Applicants‟ first hand witness evidence in respect to the circumstances
leading up to the loss.
Summary of FSP’s position
7. Its policy is an insured events based contract of insurance which does not
provide cover for all events. The onus rests with the Applicants to establish
that the loss claimed falls within the scope of cover available under the
policy.
8. The FSP has confirmed that it reversed its decision to decline indemnity to
the Applicants in respect to the damage to the insured building, however,
maintains its decision to exclude from cover the damage claimed under the
contents policy.
9. Given the magnitude of the January 2011 event it was not possible for the
FSP to arrange and appoint a consultant to every property. However , arising
from the circumstance of the loss the FSP proceeded to appointed „W‟ to the
claim.
10. The Applicants have not provided any expert evidence of a possible
alternative source of water other than floodwater inundation.
11. The FSP is not obliged to provide the Applicants with a new copy of the PDS
each time they sought to change their address as they had already provided
them with a PDS at inception of the policy.
Case No: 266063 Determination Page 3 of 8
12. In providing the Applicants with the relevant PDS, which the FSP maintains
is drafted in plain English and printed in varying fonts, it has fulfilled its
obligations to clearly inform them of the scope and exclusions within the
policy.
13. The inundation of th e Applicants‟ home occurred due to floodwaters from the
Brisbane River which back flowed along Cubberla Creek. The floodwaters
overflowed the banks of the creek and travelled over normally dry land to
inundate surrounding areas including the Applicants‟ ho me.
14. The FSP is unable to locate a recording for the alleged telephone call which
the Applicants claim to have occurred on 29 December 2010. The FSP‟s
customer service representatives are trained to record contemporaneous
notes of conversations into the Policy Management system. A review has not
provided any evidence that a representative spoke with the Applicants on 29
December 2010. The Applicants have been unable to provide the full name
for the alleged representative and/or any details other than a first name.
Accordingly it is not in a position to make any further investigations in this
regard.
15. The FSP notes that the Applicants acknowledge that the representative read
out the policy terms and confirmed that the policy did not provide cover for
loss or damage arising from flood. Therefore, even if the Applicants‟
allegation is to be accepted, this establishes that they were clearly informed
by the representative that the event flood was excluded from cover and that
the policy was substantially different from the policy of the other insurer
referred to by the Applicants.
16. The Applicants have not provided any evidence to establish their allegation
of misleading information and/or misrepresentation.
17. The FSP relies on the following policy provisions:
“ Page 16 – 21 What we cover – insured events
This section describes under the heading:
Yes – the insured events you are covered for,
No – the conditions and exclusions that specifically apply to particular insured
events.
Yes
Storm and rainwater including stormwater runoff from areas surrounding the site,
or water escaping from any water main, drain, pipe, street gutter, guttering or
surface.
Storm means violent wind (including a cyclone or tornado), thunderstorm or a
heavy fall of rain, snow or hail.
NO
Damage or loss caused by flood. Flood means the inundation or covering of
normally dry land by water which:
escapes or overflows from, or
Case No: 266063 Determination Page 4 of 8
cannot enter, because it is full or had overflowed, or
is prevented from entering, because other water has already escaped or been
released from it,
the normal confines of any watercourse or lake, including any that may have been
modified by human intervention, or reservoir, canal, dam or stormwater channel.
Flood does not mean stormwater runoff from areas surrounding the site, or water
escaping from any water main, drain, pipe, street gutter, guttering or surface.
The cost of cleaning or clearing debris from any pool or spa.
…
Page 22 We do not cover – general exclusions
You are not covered under any section of the policy for damage, loss, cost
or liability caused by or arising from or involving:
flood,”
Issues
18. Whether the FSP provided the Applicants with the terms of the policy prior to
the inception of the policy.
19. Whether the FSP is entitled to rely on the terms of its policy in excluding loss
or damage arising from flood.
20. Whether the FSP was entitled to refuse the Applicants‟ claim.
Reasons for decision
21. As advised to the parties, FOS has considered it appropriate to elevate the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
22. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
23. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this determination except where considered
relevant.
24. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
25. The Panel notes the parties do not dispute the following:
Case No: 266063 Determination Page 5 of 8
The Applicants held active home building and contents insurance
policies with the FSP at the time of loss.
The insured property was significantly damaged arising from the
weather events experienced in the area during January 2011.
The property had been vacated prior to the inundation of the dwelling.
The property is in close proximity to the Brisbane River and Cubberla
Creek.
The provisions of the policy exclude from cover loss or damage arising
from the event flood.
The FSP has altered its position in respect to the damage to the
insured building and this component of the Applicants‟ los s has been
accepted by the FSP.
The FSP has maintained its position in respect to excluding cover for
loss or damage to the insured contents on the basis the damage was
due to the excluded event flood.
Home Building Cover
26. The Panel as noted above is satisfied that the FSP has agreed to cover the
Applicants for the damage to the insured building. This it notes arises from
the FSP‟s admission in its letter dated 16 March 2012 that it is unable to
provide evidence that the Applicants were provided with the relevant home
buildings PDS prior to their loss.
27. Considering the FSP has had to reverse its declinature of the building
damage component of the Applicants‟ loss due to a failure to provide the
Applicants with the relevant policy documentation, the Panel considers a
careful review of the FSP‟s evidence in respect to provision of the Home
Contents PDS is appropriate.
Home Contents Cover - Section 35 ‘Clearly inform’
28. The Applicants have raised concerns in respect to the FSP‟s submission on
proof of generation and dispatch of the home contents PDS and maintain it
was not made available to them prior to the loss. The FSP maintains that it
had provided the Applicants with the PDS at inception of the policy in May
2009. It also maintains that it was not obliged to provide additional copies of
the PDS each time the Applicants updated the policy in respect to moving
the contents to different addresses.
29. The Panel has reviewed the information made available and relied upon by
the FSP in its effort to establish that it generated and posted the relevant
(contents) PDS to the Applicants as per its obligations under Section 35 of
the Insurance Contracts Act 1984 (the Act). The FSP has relied upon a
statement and related attachments submitted by customer communications
specialist „BV‟ explaining the policy documentation production a nd dispatch
process. The Panel notes the following in respect from this statement:
Case No: 266063 Determination Page 6 of 8
A screen print shows the customers‟ transaction (Applicants‟ policy
inception documentation) was transacted to the System on 15 May
2009.
It is alleged that once the System has updated the policy information in
accordance with a customer‟s transaction, it will generate and send the
required data to a „Batch file‟, which is an electronic file that ordinarily
contains many unique data packets belonging to individual customers.
The batch file is sent electronically to the FSP‟s service provider‟s mail
house for production and dispatch of the policy document. On receipt of
the Batch file the service provider it is allotted with a unique „Document
Code‟ and printed on the policy do cument to identify the particular
document type and to provide details of the print run.
The unique code for the Applicants‟ transaction and as noted on the
policy receipt is “R30_C5_MACHINE_..../……/……/i2356”.
Record sheet titled „CCS Run # 2208‟ notes the policy HOM 225 547
891 which records inserts 99, 8 25, 26. Of note is that insert 25 refers
to New Contents Policy All States.
- 8 = Building Policy All states
- 25 = New Contents Policy All States
- 26 = My Policy Manager laptop insert
- 99 = [FSP] 2008/2009 Charter
The report refers to the process of recording (through reports) the
precise number of files within a Batch file, the precise number of policy
documents within the Batch file for which a production error occurred
and the precise date and time for when the policy document was
printed and lodged with Australia Post.
The data indicates that there were a total of 15 Policy documents for
which an error occurred during the processing of this particular Batch
file and would need to be manually corrected by the FSP before they
can be reprocessed by the service provider.
Attachments „E‟ and „F‟ list 15 transactions for which no print was
completed. The policy number attributable to the Applicants‟ policy
does not appear amongst the 15 noted. Further, BV confirms the
Applicants‟ transaction was not one of these 15 Policy Documents for
which an error occurred.
30. Having carefully considered the evidence submitted by the FSP, the Panel is
satisfied there is sufficient substantiating information to establish the link
between the subject documents and dispatch of this information to the
Applicants.
31. Section 35 of the Act provides:
“ where a claim is made under a prescribed contract and the event giving rise to
the claim is a prescribed event in relation to the contract, an insurer may not
refuse to pay an amount equal to the minimum amount of cover set out in the
Case No: 266063 Determination Page 7 of 8
regulations made pursuant to the Act unless it can prove that before the contract
was entered into, the insurer clearly informed the insured in writing of the
relevant provisions of the contract, or that the insured knew or a reasonable
person in the circumstances could be expected to have known of such
provision. ”
32. In the Panel‟s view, based on the evidence presented, the FSP has satisfied
the onus placed upon it to establish that it sent the relevant documents to the
Applicants.
33. The Panel has also considered the Applicants‟ arguments in respect of an
alleged misrepresentation made by the FSP‟s representative on 29
December 2010.
34. The evidenc e in this respect is, in the Panel‟s view, not persuasive. The
Applicants admit that they were informed the policy did not provide cover for
flood. They argue that there was some discussion concerning what would
constitute water „backing up‟ which led then to understand that the events of
January 2011 would be covered.
35. The FSP has denied that a misrepresentation occurred, however, in the
Panel‟s view even if that alleged discussion had taken place there is no
evidence that such statements were a misrepresentation of the policy cover
and in any event, the Applicants admit that they were advised that flood was
excluded.
36. In addition, even if the Applicants were still unclear as to the cover, having
received the PDS from the FSP (as determined above) a reading of that
document would have provided clarity.
37. Having considered the evidence and having reviewed the PDS, the Panel is
of the view that the FSP has complied with its obligation to clearly inform the
Applicants of the terms of its policy including its flood exclusion. It is
therefore entitled to rely on the terms and exclusions of its policy.
Cause of Loss
38. The FSP relies on reports from it assessor, the ICA Hydrology Panel report
and its site specific report provided by its expert hydrologist „W‟.
39. The assessor reported that water had entered the home by about 2.00pm on
Wednesday 12 January 2011, by about 2cm over floor level. W states that
inundation occurred about 2.30pm on 12 January 2011, which is reasonably
consistent.
40. On relevance, W reported:
42mm of rain fell in the vicinity in the 12 hours to 5.00pm on 11 January
2011
the maximum peak rainfall occurred in the 60 minutes to 11.00am on
11 January
Case No: 266063 Determination Page 8 of 8
very little rainfall was recorded after that time
the gutter level in front of the property is between 6.7 a nd 8.2m AHD.
Floodwater from the Brisbane River would have started surcharging
through the stormwater system into Thiesfield Street (in front of the
Applicants‟ property) at about 0000 hours on 12 January 2011
The river would have overflowed from the open channel into Thiesfield
Street at the same time as the water from the stormwater system was
surcharging
The estimated time the subject property was inundated above floor
level was about 2.00pm on 12 January 2011.
41. He concluded that the initial inundation of the subject property above floor
level was caused by the direct overflow of floodwater from the Brisbane
River which would have flowed up Cubberla Creek and the open channel
onto the Applicants‟ property.
42. The Applicants have not provided any expert evidence to refute the findings
of W.
43. Details of rainfall and river levels contained in the ICA report (insofar as
these are relevant to the Applicants‟ location) are generally consistent with
the information provided by W.
44. The Panel notes that the property was first inundated more than 12 hours
after rainfall in the vicinity ceased. Further, this was more than 24 hours after
the peak rainfall on 11 January 2011.
45. Having considered the evidence the Panel is persuaded, on the balance of
probabilities, that the damage to the Applicants‟ contents was caused by
water which is properly characterised as floodwater. Flood is excluded under
the policy.
46. The Panel therefore determines that the FSP was entitled to refuse the claim
for contents damage.
Determination
47. On the basis of the available information, the Panel determines that the FSP
correctly denied the claim for damage to the Applicants‟ contents on the
basis that the damage was caused by flood, which is excluded under the
policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.