Home / Financial Firm (Unknown - Insurer) / Determination 265730

Determination 265730

Claim denied under flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2013-02-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Homeowner's flood claim from January 2011 was denied under the flood exclusion. AFCA found the home was ultimately flooded by river water but accepted earlier stormwater inundation to 150mm, ordered the FSP to indemnify that loss, and ordered interest if it cash settles.

The flood exclusion was clearly communicated, but stormwater runoff preceding the river flood attracts cover to a fair estimated level under the policy.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 265730 Determination Page 1 of 7 Case number: 265730 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim - Flood 23 January 2013 Background 1. The Applicant held a Home Cover Insurance Policy (the Policy) with the Financial Services Provider (FSP) since April 2004. The building was insured for $315,000 and contents for $73,500 subject to a $250 excess. 2. The insured property (the property) located in Woodend, in Ipswich Queensland was damaged during the significant weather events experienced in Queensland in January 2011. The Applicant lodged a claim with the FSP on 15 January 2011. 3. The FSP declined the claim on the basis the damage was due to the event „Flood‟, which is specifically excluded under the policy. 4. The Applicant, through h er legal representative, seeks to have the FSP‟s decision to decline the claim overturned and seeks complete indemnity under the policy. 5. The Applicant is assisted by legal representation; therefore all reference to the Applicant herein includes both the Applicant and her representative. Summary of Applicant’s position 6. The FSP cannot rely on the flood exclusion pursuant to Section 35 of the Insurance Contracts Act 1984 (the Act). 7. The proximate cause of the damage to the Applicant‟s property was „storm, ra inwater or wind‟, which is covered by the policy. 8. The FSP has failed to discharge its burden of proof and has not established on the balance of probabilities that the damage was caused by „flood‟ as opposed to a „flash flood‟ or „storm‟ event. 9. The FSP failed to properl y assess the Applicant‟s claim. Determination Case No: 265730 Determination Page 2 of 7 Summary of FSP’s position 10. The Applicant was clearly informed of the flood exclusion contained in the Policy. 11. Based on its assessor‟s report and the report obtained by the Insurance Council of Australia (ICA), the proximate cause of the inundation to the Applicant‟s property is flood, as defined by the policy. As such, it is entitled to rely on the following provisions to deny the Applicant‟s claim: “ Exclusions to your cover Any cover we provide is subject to the following exclusions.  …  flood …‟ “ General Exclusions We will not cover any loss or damage, or liability as a result of, or arising from ...  flood or storm surge  erosion, the action of the sea, tidal wave or high water, unless - the loss or damage is the result of a tsunami.. .” Glossary of words with a special meaning … flood the covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir, channel, canal or dam.” Issues 12. Whether the Applicant was clearly informed of the flood exclusion contained in the Policy. 13. Whether the FSP is entitled to deny the Applicant‟s claim. Reasons for decision 14. As advised to the parties, FOS has considered it appropriate to refer this dispute direct to the Panel in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. Case No: 265730 Determination Page 3 of 7 15. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 16. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. In these circumstances the details contained in the relevant reports will not be recited in this determination except where considered relevant. 17. On 15 January 2013, the Panel Chair Ombudsman attended on site where he met with the Applicant and a representative of the FSP. 18. The Panel has considered the Applicant‟s submissions and notes that a number of concerns raised are identical to issues previously raised by the Applicant‟s representatives in separate disputes referred to the Service. Accordingly, in the interest of brevity and having previously considered these concerns, the Panel will only briefly reiterate its position in respect to these matters. 19. The Panel notes the parties do not dispute the following:  The Applicant held an active Policy with the FSP at the time of the loss.  The Applicant‟s property is located within 150m of the Bre mer River.  The Applicant‟s property was inundated on 12 January 2011. Was the Applicant clearly informed of the flood exclusion? 20. The Applicant argues that the policy fails to clearly inform that flood is excluded from cover and the definitions contained in the policy are likely to confuse a reasonable consumer. 21. The Applicant does not dispute receiving the policy documentation within the time she was insured with the FSP. 22. It is established law that in order to satisfy the requirement to clearly inform, the language of Section 35(2) of the Act allows for a proposed insured to be clearly informed by providing the relevant documentation in writing and that the relevant exclusion and/or limitation in this case is clear and unambiguous and in a manner which a person of average intelligence and education is likely to have little difficulty in finding and understanding if that person reads the policy in question. 23. The Panel has reviewed the FSP‟s policy on a number of occasions. The policy is indexed with relevant sections covering the insured and excluded events. The policy clearly sets out the definition of flood, which is consistent with other policies available in the market. 24. Having considered the Applicant‟s submissions and the FSP‟s policy documents, the Panel is satisfied that the FSP has met its obligations to Case No: 265730 Determination Page 4 of 7 clearly inform the Applicant of the extent of cover provided by the policy in accordance with the requirements of the Act. Proximate Cause of the Inundation 25. It is an accepted principle of general insurance law that an insured bears the onus to establish, on the balance of probabilities, that they have suffered a loss caused by an event or incident to which the policy responds. Once so established, the onus shifts to the insurer to prove that a policy exclusion applies. 26. To be entitled to cover, the onus therefore rests with the Applicant to establish that her loss fits within the scope of what is covered by the policy. The policy provides cover for a series of defined events as outlined in the PDS. It does not provide blanket cover for all types of loss. 27. It is not in dispute that the Applicant‟s property was inundated with water as a result of a significant weather event that affected much of Queensland in early 2011, which caused severe damage and loss to her property. 28. In a statutory declaration dated 26 March 2012, the Applicant states: a. She remained at the property throughout the period of the flooding. b. Both ends of Macgregor Street were closed during that period due to the inundation of water. c. The water inundation level reached over the back deck of the property, which is 6 – 7 feet. It did not reach into the upstairs area of the property. 29. While the parties appear to accept generally that the inundation of the property occurred on 12 January 2011, the time of inundation is unclear. No evidence of the exact time of inundation is provided and the parties disagree as to whether inundation occurred in the morning or evening of 12 January 2011. 30. The Applicant submits that the water which inundated the property was stormwater runoff and/or rainwater. However, the Applicant provides no hydrology evidence to support this proposition. 31. The FSP relies on its assessor‟s report dated 21 June 2011, the joint hydrology report commissioned by the Insurance Council of Australia (ICA report) and aerial flood mapping to establish that the property was inundated by flood water from the Bremer River. 32. The Panel has considered the evidence and accepts that the property was ultimately inundated by floodwater from the Bremer Ri ver. What needs to be considered is whether there was any initial inundation from stormwater runoff that would attract cover under the Policy. 33. According to the assessor‟s report: Case No: 265730 Determination Page 5 of 7  the water entered the property from the rear, where the Bremer River is located.  The heaviest rain fell on the morning of 12 January 2011. 34. Several other details relating to the inundation contained in the assessor‟s report have been crossed out or amended. However, the FSP does not clarify when these amendments were made, by whom a nd why. The Panel therefore has difficulty considering this evidence. 35. The Panel has considered the hydrology evidence contained in the ICA report, particularly relating to rainfall data and notes heavy and intense rain fell over the south west and western parts of the Bremer River catchment between 06:00 & 18:00 on Tuesday 11 January 2011. The data also indicates that rainfall effectively ceased in Ipswich at 18:00 on Tuesday 11 January 2011. 36. The Bureau of Meteorology records from One Mile Bridge station, approximately 3km from Woodend, indicates that the peak rainfall in the area fell on 10 January 2011. No rainfall was recorded in the 24 hours commencing at 9.00am on 12 January 2011. 37. Noting the location of the property and the evidence that water approached the property from the direction of the Bremer River, the Panel accepts on the balance of probabilities that the cause of the ultimate inundation of the property on 12 January 2011 was floodwater from the Bremer River. 38. In the alternative, the Applicant says that water released from the Wivenhoe Dam cannot be considered flood water as defined by the policy. The Panel has previously considered this question and is satisfied that water which was released from the Wivenhoe Dam and subsequently escaped the confines of a watercourse, such as the Bremer River, can appropriately be considered flood, as defined. 39. As flood is expressly excluded from cover by the policy, the resultant damage to the Applicant‟s property from the ultimate inundation is excluded from cover. 40. However, consideration needs to be given as to whether the Applicant‟s property was initially inundated by stormwater runoff. 41. The evidence as presented by the FSP in this regard, including the assessor‟s report and the ICA hydrology reports together wi th the aerial flood mapping does not assist the Panel in an assessment as to whether the Applicant‟s property was initially impacted by stormwater runoff. 42. As detailed previously, the Panel Chair Ombudsman on 15 January 2013 attended on site where he met with the Applicant and a representative of the FSP and had the opportunity to observe the topography of the area and discuss the events with the Applicant. Case No: 265730 Determination Page 6 of 7 43. The Panel Chair Ombudsman was advised by the Applicant that on Australia Day 2011, she suffered a mental breakdown as it appeared that it was about to rain and this resulted in her reliving the traumatic events earlier in January 2011. 44. The Panel is certainly sympathetic to the Applicant‟s position and consequently given the trauma suffered by her, is satisfied that in the circumstances the Applicant may not be able to provide a full or complete description of events as would otherwise be expected. 45. That aside, the Applicant was able to confirm with the Panel Chair Ombudsman that she remained on site during the inundation events and a considerable amount of rain was experienced. After considering all of the evidence, the Panel is satisfied that the Applicant‟s reference to a considerable amount of rain is in respect to the day and afternoon of Tuesday 11 January 2011. 46. During the site inspection, the Panel Chair Ombudsman observed that the home itself consists of two levels which are situated on a steep block. The land slopes steeply down from the road towards the rear of the block where it levels out. The two storey home sits on the steep portion of the block and at the rear (flatter) portion is a double garage together with two patio or decking areas. 47. The Panel Chair Ombudsman also noted that on the other side of the road, the land slopes upwards away from the road. 48. Given the slope of the land, on the other side of the road and on the Applicant‟s own property, the Panel is satisfied that the topography is one which lends itself to the significant likelihood of stormwater runoff. 49. The main portion of the home itself is on the second level and the Applicant confirmed that the inundation of water did not reach this upper level. The lower portion of the house consists of two bedrooms and a store room plus a toilet together with the laundry and bathroom. The Applicant advised that since the inundation, the lower portion of the home has taken on a much more open plan structure. The Applicant also confirmed that the double garage on the flatter portion of the property is essentially used for storage. 50. Given the evidence concerning the significant rainfall on Tuesday 11 January 2011, the Panel Chair‟s on - site observations and the Panel‟s experience in having dealt with numerous claims arising from the weather events in Brisbane of January 2011, the Panel is satisfied that the Applicant‟s home was subject to stormwater runoff prior to the inundation from the Bremer River. 51. Whilst it is not possible to precisely establish the extent of the initial stormwater runoff, the Panel in using its mandate for what is fair in all the circumstances, and its experience arising from having dealt with numerous similar matters, determines that an initial inundation to the level of 150mm through the lower portion of the home and the double garage represents a Case No: 265730 Determination Page 7 of 7 reasonable estimate of the coverage required by the FSP under the terms of the policy. 52. The Panel is also aware that there is insufficient evidence to establish the extent of any loss or damage arising from inundation to the level of 150mm through the lower home area and the double garage and thus urges the parties to work together to establish the extent of the loss arising from this level of inundation. 53. The Applicant also argues that the FSP has failed to properly consider the Applicant‟s claim, which caused the Applicant great stress. The P anel notes that the FSP has not provided a site specific assessment of the Applicant‟s property and appreciates that the entire claims process following the flood event would have caused great distress to the Applicant. 54. However, bearing in mind the nature of catastrophes such as a large flood event, the Panel does not consider that the FSP has acted in a manner which warrants an award of compensation pursuant to the relevant provisions of the FOS Terms of Reference. Determination 55. On the basis of the available information the Panel determines: a. The Applicant was clearly informed of the flood exclusion contained in the Policy. b. The FSP is required to indemnify the Applicant for any loss arising from any inundation through the property to a level of 150mm above ground level, including the lower portion of the home, the double garage and the decking areas. c. Should the FSP elect to cash settle any part of the claim, the FSP is required to pay interest at the rate specified by the Insurance Contracts Act 1984, from the date of denial of the claim to the date of settlement.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.