Determination 265730
Claim denied under flood exclusion
Summary
Homeowner's flood claim from January 2011 was denied under the flood exclusion. AFCA found the home was ultimately flooded by river water but accepted earlier stormwater inundation to 150mm, ordered the FSP to indemnify that loss, and ordered interest if it cash settles.
The flood exclusion was clearly communicated, but stormwater runoff preceding the river flood attracts cover to a fair estimated level under the policy.
Issues
- Claim denial primary · upheld“The FSP is required to indemnify the Applicant for any loss arising from any inundation ... to a level of 150mm above ground level”
- Inadequate claim investigation secondary · unclear“The Panel notes that the FSP has not provided a site specific assessment of the Applicant's property”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 265730 Determination Page 1 of 7
Case number: 265730
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim - Flood
23 January 2013
Background
1. The Applicant held a Home Cover Insurance Policy (the Policy) with the
Financial Services Provider (FSP) since April 2004. The building was insured
for $315,000 and contents for $73,500 subject to a $250 excess.
2. The insured property (the property) located in Woodend, in Ipswich
Queensland was damaged during the significant weather events
experienced in Queensland in January 2011. The Applicant lodged a claim
with the FSP on 15 January 2011.
3. The FSP declined the claim on the basis the damage was due to the event
„Flood‟, which is specifically excluded under the policy.
4. The Applicant, through h er legal representative, seeks to have the FSP‟s
decision to decline the claim overturned and seeks complete indemnity
under the policy.
5. The Applicant is assisted by legal representation; therefore all reference to
the Applicant herein includes both the Applicant and her representative.
Summary of Applicant’s position
6. The FSP cannot rely on the flood exclusion pursuant to Section 35 of the
Insurance Contracts Act 1984 (the Act).
7. The proximate cause of the damage to the Applicant‟s property was „storm,
ra inwater or wind‟, which is covered by the policy.
8. The FSP has failed to discharge its burden of proof and has not established
on the balance of probabilities that the damage was caused by „flood‟ as
opposed to a „flash flood‟ or „storm‟ event.
9. The FSP failed to properl y assess the Applicant‟s claim.
Determination
Case No: 265730 Determination Page 2 of 7
Summary of FSP’s position
10. The Applicant was clearly informed of the flood exclusion contained in the
Policy.
11. Based on its assessor‟s report and the report obtained by the Insurance
Council of Australia (ICA), the proximate cause of the inundation to the
Applicant‟s property is flood, as defined by the policy. As such, it is entitled to
rely on the following provisions to deny the Applicant‟s claim:
“ Exclusions to your cover
Any cover we provide is subject to the following exclusions.
…
flood
…‟
“ General Exclusions
We will not cover any loss or damage, or liability as a result of, or arising from
...
flood or storm surge
erosion, the action of the sea, tidal wave or high water, unless
- the loss or damage is the result of a tsunami.. .”
Glossary of words with a special meaning …
flood
the covering of normally dry land by water escaping or released from the
normal confines of a watercourse or lake, whether or not it is altered or
modified. Flood also includes water escaping from the confines of any
reservoir, channel, canal or dam.”
Issues
12. Whether the Applicant was clearly informed of the flood exclusion contained
in the Policy.
13. Whether the FSP is entitled to deny the Applicant‟s claim.
Reasons for decision
14. As advised to the parties, FOS has considered it appropriate to refer this
dispute direct to the Panel in accordance with the Operational Guidelines to
the FOS Terms of Reference. This is because of the complex nature of the
issues. This dispute has not been the subject of a FOS Recommendation
and has proceeded directly to Determination.
Case No: 265730 Determination Page 3 of 7
15. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
16. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant reports will not be
recited in this determination except where considered relevant.
17. On 15 January 2013, the Panel Chair Ombudsman attended on site where
he met with the Applicant and a representative of the FSP.
18. The Panel has considered the Applicant‟s submissions and notes that a
number of concerns raised are identical to issues previously raised by the
Applicant‟s representatives in separate disputes referred to the Service.
Accordingly, in the interest of brevity and having previously considered these
concerns, the Panel will only briefly reiterate its position in respect to these
matters.
19. The Panel notes the parties do not dispute the following:
The Applicant held an active Policy with the FSP at the time of the loss.
The Applicant‟s property is located within 150m of the Bre mer River.
The Applicant‟s property was inundated on 12 January 2011.
Was the Applicant clearly informed of the flood exclusion?
20. The Applicant argues that the policy fails to clearly inform that flood is
excluded from cover and the definitions contained in the policy are likely to
confuse a reasonable consumer.
21. The Applicant does not dispute receiving the policy documentation within the
time she was insured with the FSP.
22. It is established law that in order to satisfy the requirement to clearly inform,
the language of Section 35(2) of the Act allows for a proposed insured to be
clearly informed by providing the relevant documentation in writing and that
the relevant exclusion and/or limitation in this case is clear and unambiguous
and in a manner which a person of average intelligence and education is
likely to have little difficulty in finding and understanding if that person reads
the policy in question.
23. The Panel has reviewed the FSP‟s policy on a number of occasions. The
policy is indexed with relevant sections covering the insured and excluded
events. The policy clearly sets out the definition of flood, which is consistent
with other policies available in the market.
24. Having considered the Applicant‟s submissions and the FSP‟s policy
documents, the Panel is satisfied that the FSP has met its obligations to
Case No: 265730 Determination Page 4 of 7
clearly inform the Applicant of the extent of cover provided by the policy in
accordance with the requirements of the Act.
Proximate Cause of the Inundation
25. It is an accepted principle of general insurance law that an insured bears the
onus to establish, on the balance of probabilities, that they have suffered a
loss caused by an event or incident to which the policy responds. Once so
established, the onus shifts to the insurer to prove that a policy exclusion
applies.
26. To be entitled to cover, the onus therefore rests with the Applicant to
establish that her loss fits within the scope of what is covered by the policy.
The policy provides cover for a series of defined events as outlined in the
PDS. It does not provide blanket cover for all types of loss.
27. It is not in dispute that the Applicant‟s property was inundated with water as
a result of a significant weather event that affected much of Queensland in
early 2011, which caused severe damage and loss to her property.
28. In a statutory declaration dated 26 March 2012, the Applicant states:
a. She remained at the property throughout the period of the flooding.
b. Both ends of Macgregor Street were closed during that period due to
the inundation of water.
c. The water inundation level reached over the back deck of the property,
which is 6 – 7 feet. It did not reach into the upstairs area of the
property.
29. While the parties appear to accept generally that the inundation of the
property occurred on 12 January 2011, the time of inundation is unclear. No
evidence of the exact time of inundation is provided and the parties disagree
as to whether inundation occurred in the morning or evening of 12 January
2011.
30. The Applicant submits that the water which inundated the property was
stormwater runoff and/or rainwater. However, the Applicant provides no
hydrology evidence to support this proposition.
31. The FSP relies on its assessor‟s report dated 21 June 2011, the joint
hydrology report commissioned by the Insurance Council of Australia (ICA
report) and aerial flood mapping to establish that the property was inundated
by flood water from the Bremer River.
32. The Panel has considered the evidence and accepts that the property was
ultimately inundated by floodwater from the Bremer Ri ver. What needs to be
considered is whether there was any initial inundation from stormwater runoff
that would attract cover under the Policy.
33. According to the assessor‟s report:
Case No: 265730 Determination Page 5 of 7
the water entered the property from the rear, where the Bremer River is
located.
The heaviest rain fell on the morning of 12 January 2011.
34. Several other details relating to the inundation contained in the assessor‟s
report have been crossed out or amended. However, the FSP does not
clarify when these amendments were made, by whom a nd why. The Panel
therefore has difficulty considering this evidence.
35. The Panel has considered the hydrology evidence contained in the ICA
report, particularly relating to rainfall data and notes heavy and intense rain
fell over the south west and western parts of the Bremer River catchment
between 06:00 & 18:00 on Tuesday 11 January 2011. The data also
indicates that rainfall effectively ceased in Ipswich at 18:00 on Tuesday 11
January 2011.
36. The Bureau of Meteorology records from One Mile Bridge station,
approximately 3km from Woodend, indicates that the peak rainfall in the area
fell on 10 January 2011. No rainfall was recorded in the 24 hours
commencing at 9.00am on 12 January 2011.
37. Noting the location of the property and the evidence that water approached
the property from the direction of the Bremer River, the Panel accepts on the
balance of probabilities that the cause of the ultimate inundation of the
property on 12 January 2011 was floodwater from the Bremer River.
38. In the alternative, the Applicant says that water released from the Wivenhoe
Dam cannot be considered flood water as defined by the policy. The Panel
has previously considered this question and is satisfied that water which was
released from the Wivenhoe Dam and subsequently escaped the confines of
a watercourse, such as the Bremer River, can appropriately be considered
flood, as defined.
39. As flood is expressly excluded from cover by the policy, the resultant
damage to the Applicant‟s property from the ultimate inundation is excluded
from cover.
40. However, consideration needs to be given as to whether the Applicant‟s
property was initially inundated by stormwater runoff.
41. The evidence as presented by the FSP in this regard, including the
assessor‟s report and the ICA hydrology reports together wi th the aerial flood
mapping does not assist the Panel in an assessment as to whether the
Applicant‟s property was initially impacted by stormwater runoff.
42. As detailed previously, the Panel Chair Ombudsman on 15 January 2013
attended on site where he met with the Applicant and a representative of the
FSP and had the opportunity to observe the topography of the area and
discuss the events with the Applicant.
Case No: 265730 Determination Page 6 of 7
43. The Panel Chair Ombudsman was advised by the Applicant that on Australia
Day 2011, she suffered a mental breakdown as it appeared that it was about
to rain and this resulted in her reliving the traumatic events earlier in January
2011.
44. The Panel is certainly sympathetic to the Applicant‟s position and
consequently given the trauma suffered by her, is satisfied that in the
circumstances the Applicant may not be able to provide a full or complete
description of events as would otherwise be expected.
45. That aside, the Applicant was able to confirm with the Panel Chair
Ombudsman that she remained on site during the inundation events and a
considerable amount of rain was experienced. After considering all of the
evidence, the Panel is satisfied that the Applicant‟s reference to a
considerable amount of rain is in respect to the day and afternoon of
Tuesday 11 January 2011.
46. During the site inspection, the Panel Chair Ombudsman observed that the
home itself consists of two levels which are situated on a steep block. The
land slopes steeply down from the road towards the rear of the block where
it levels out. The two storey home sits on the steep portion of the block and
at the rear (flatter) portion is a double garage together with two patio or
decking areas.
47. The Panel Chair Ombudsman also noted that on the other side of the road,
the land slopes upwards away from the road.
48. Given the slope of the land, on the other side of the road and on the
Applicant‟s own property, the Panel is satisfied that the topography is one
which lends itself to the significant likelihood of stormwater runoff.
49. The main portion of the home itself is on the second level and the Applicant
confirmed that the inundation of water did not reach this upper level. The
lower portion of the house consists of two bedrooms and a store room plus a
toilet together with the laundry and bathroom. The Applicant advised that
since the inundation, the lower portion of the home has taken on a much
more open plan structure. The Applicant also confirmed that the double
garage on the flatter portion of the property is essentially used for storage.
50. Given the evidence concerning the significant rainfall on Tuesday 11
January 2011, the Panel Chair‟s on - site observations and the Panel‟s
experience in having dealt with numerous claims arising from the weather
events in Brisbane of January 2011, the Panel is satisfied that the
Applicant‟s home was subject to stormwater runoff prior to the inundation
from the Bremer River.
51. Whilst it is not possible to precisely establish the extent of the initial
stormwater runoff, the Panel in using its mandate for what is fair in all the
circumstances, and its experience arising from having dealt with numerous
similar matters, determines that an initial inundation to the level of 150mm
through the lower portion of the home and the double garage represents a
Case No: 265730 Determination Page 7 of 7
reasonable estimate of the coverage required by the FSP under the terms of
the policy.
52. The Panel is also aware that there is insufficient evidence to establish the
extent of any loss or damage arising from inundation to the level of 150mm
through the lower home area and the double garage and thus urges the
parties to work together to establish the extent of the loss arising from this
level of inundation.
53. The Applicant also argues that the FSP has failed to properly consider the
Applicant‟s claim, which caused the Applicant great stress. The P anel notes
that the FSP has not provided a site specific assessment of the Applicant‟s
property and appreciates that the entire claims process following the flood
event would have caused great distress to the Applicant.
54. However, bearing in mind the nature of catastrophes such as a large flood
event, the Panel does not consider that the FSP has acted in a manner
which warrants an award of compensation pursuant to the relevant
provisions of the FOS Terms of Reference.
Determination
55. On the basis of the available information the Panel determines:
a. The Applicant was clearly informed of the flood exclusion contained in
the Policy.
b. The FSP is required to indemnify the Applicant for any loss arising from
any inundation through the property to a level of 150mm above ground
level, including the lower portion of the home, the double garage and
the decking areas.
c. Should the FSP elect to cash settle any part of the claim, the FSP is
required to pay interest at the rate specified by the Insurance Contracts
Act 1984, from the date of denial of the claim to the date of settlement.