Home / Financial Firm (Unknown - Insurer) / Determination 265508

Determination 265508

Denial of home building flood damage claim under flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-11-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Homeowners claimed for water inundation of their home at Jindalee during the January 2011 floods. The FSP denied the claim under the flood exclusion, and AFCA found the policy clearly excluded flood and the applicants had not shown the home was first inundated by stormwater.

The PDS clearly informed the applicants of the flood exclusion under section 35 of the Insurance Contracts Act, and the evidence did not establish initial inundation by stormwater rather than flood.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 265508 Determination Page 1 of 9 Case number: 265508 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Water Inundation - Flood 29 November 2012 Background 1. The Applicants held a home and contents policy with the Financial Services Provider (FSP) from 11 May 2001. The policy provided for complete building replacement and contents cover of $48,450. 2. On or about 12 January 2011, the Applicants‟ home in Jindalee was damaged as a result of water inundation at the time of the flood events that affected significant parts of Queensland. They subsequently lodged a claim. 3. The FSP declined the claim on the basis that it considered the cause of the loss was flooding of the nearby Jindalee Creek and the Brisbane River. 4. The Applicants disagree with the decision and consider that their home was subject to stormwater run-off and/or water emanating from the nearby drains. They also were not properly informed of the flood exclusion by the FSP. Summary of Applicants ’ position 5. The Applicants are represented; for convenience the Applicants and their representative will be referred to collectively as „the Applicants‟ throughout this Determination. 6. The Applicants say that the FSP did not provide a copy of the individual policy documents to them and that these documents did not serve to duly inform them of the flood exclusion in any event. 7. The property was inundated by overflow from the drains at the front of the property or stormwater run-off. Summary of FSP’s position 8. The FSP says that the inundation of the home was due to flooding. The policy excludes cover where this is the cause. 9. Copies of the Home Building Product Disclosure Statement (Home PDS) and the Home Contents Product Disclosure Statement (Contents PDS) were Determination Case No: 265508 Determination Page 2 of 9 provided to the Applicants. These PDS documents served to inform them about what was covered under the policy. 10. The FSP is satisfied that it met its obligations to “clearly inform” the Applicants about the flood exclusion in the policy, as required under Section 35 of the Insurance Contracts Act 1984 (the Act). 11. Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. 12. The FSP also relies upon the following policy provisions: Pages 8-13 of the Home PDS and pages 16-21 of the Contents PDS “ What we cover – insured events This section describes under the heading: Yes – the insured events you are covered for, No – the conditions and exclusions that specifically apply to particular insured events. ... Yes Storm and rainwater including stormwater runoff from areas surrounding the site or water escaping from any water main, drain, pipe, street gutter, guttering or surface. Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy fall of rain, snow or hail. ... No Damage or loss caused by flood . Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter, because it is full or has overflowed, or is prevented from entering because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. Flood does not mean stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface.” Page 14 of the Home PDS and page 22 of the Contents PDS Case No: 265508 Determination Page 3 of 9 “ What we do not cover – general exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: ... flood...” Issues 13. Whether the FSP provided copies of the Home PDS and Contents PDS to the Applicants prior to their loss. 14. Whether the Applicants were “clearly informed” that the policy did not provide cover for flooding, as required under Section 35 of the Act. 15. Whether the damage to the Applicants‟ property was caused by stormwater run-off, water from the local drains and/or floodwater. Reasons for decision 16. The Panel is satisfied that a full exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. 17. As advised to the parties, FOS has considered it appropriate to elevate the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the potential amount of the claim and the issues to be considered. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 18. This decision has been made by a Panel consisting of an Ombudsman, an insurance industry representative and a consumer representative. Provision of the PDS documents 19. The Applicants have not specifically alleged that they never received a copy of the FSP‟s PDS documents. Their solicitor, on 22 March 2012 states that a PDS was never received, although also states “In the event a PDS was received, the PDS does not meet [FSP‟s] obligations…” 20. More detailed submissions from the Applicants seek to rely on the inadequacy of the PDS wordings provided, rather than the failure to provide PDSs. 21. The FSP has provided „proof of dispatch‟ of its amended home building PDS in March 2007 and the female Applicant admitted receipt of a letter from the FSP dated 24 March 2007 to attest to a change to the building cover offered. A copy of this letter has been provided by the FSP, together with proof of dispatch documents. Case No: 265508 Determination Page 4 of 9 22. The Panel is satisfied that the letter dated 24 March 2007 enclosed a copy of the Home PDS and therefore that the Applicants received this document. 23. Although no specific proof of dispatch has been supplied to attest to the provision of the Contents PDS to the Applicants, the Applicants have not actually alleged that the PDS documents were not received (despite the singular statement from the solicitor). Further, the FSP‟s evidence of process supports its position in respect of the usual provision of relevant PDS documents within five days of policy inception or a relevant change. 24. The Contents PDS relied upon by the FSP was released on 30 April 2007, shortly after the re-issue of the Home PDS. The Panel accepts it is likely, in the absence of a specific allegation from the Applicants, that a copy of this document was also provided to them. 25. In the circumstances, the Panel is satisfied that the FSP may rely upon the terms of the policy specific in the relevant PDS documents (insofar as they serve to “clearly inform” the Applicants of the terms and conditions of the insurance contract). Whether the Applicants were “clearly informed” about the flood exclusion 26. The Applicants consider that the PDS documents relied upon by the FSP did not serve to “clearly inform” them of the limitations of the policy, particularly in relation to the flood exclusion. 27. Section 35 of the Act allows for an insurer to define and limit the level of cover offered for insurance on the basis that it “clearly informs” the policyholder. This requirement is in writing and no obligation is on the insurer to inform a policyholder of the limitations verbally. 28. A fair reading of the obligation to clearly inform under Section 35 of the Act requires that the FSP provide details of the relevant exclusions and limitation in clear and unambiguous language such that a person of average intelligence and education would have little difficulty in finding and understanding the exclusion and limitations if they read the policy. 29. The PDS documents provide a single page index on page 3 of the Home PDS and page 2 of the Contents PDS. Under the title, “Where to find”, these hi ghlight relevant sections, including “What we cover – insured events” (page 8 of Home PDS and page 16 of Contents PDS) and “What we do not cover – general exclusions” (page 14 Home PDS and page 22 of the Contents PDS). The “insured events” section describe s the circumstances under which cover is provided. In this section, under the “Storm and rainwater” event, the policy specifically identifies that cover does not extend to “loss caused by flood”. It further provides a detailed analysis of the definition of flood. The area for “general exclusions” confirms that the policy as a whole does not cover flood events. 30. The Panel considers that the definition of “flood” adequately conveys that the policy does not cover events where water “escapes or overflows... [or] Case No: 265508 Determination Page 5 of 9 cannot enter... or is prevented from entering” the normal confines of a water body. It further specifies that flood does not mean stormwater run-off or water escaping from certain areas, including drains or pipes. The definition, in the Panel‟s view, is s traightforward. 31. Accordingly, the Panel is satisfied that the FSP made the Applicants aware through the provision of the respective PDS documents, that the policy did not provide flood cover. In the circumstances, the Panel is satisfied the FSP has complied with its obligation to clearly inform the Applicants of the flood exclusion, pursuant to Section 35 of the Act. Cause of the inundation 32. The Panel accepts that the FSP‟s policy does not extend cover to circumstances where a loss is caused by a flood. The policy does extend cover in circumstances where damage is caused by stormwater run-off or where water escapes from a drain or a pipe and inundates the home. 33. The Applicants report that they evacuated their home around 9.00pm on 11 January 2011 and that the property had not been inundated by this time. Prior to leaving, they noted that water was discharging from the stormwater drains in the vicinity of their property. Their two storey home was subsequently submerged through most of the lower level: “On 11 Jan uary 2011 we observed the water levels all day and noticed it was rising over near the [Jindalee] creek. There was water gushing up from the drain next to the Jindalee swimming pool from approximately 5pm onwards. ... I think that the water came into our property from the stormwater drain located at the front or our property, and this water started to pool in our front yard...” 34. It is the FSP‟s position that the home was inundated by direct overland flow of floodwater from Jindalee Creek, which in turn was flooded by backflow overflowing from the Brisbane River. 35. After the report of the incident, the FSP appointed a loss adjuster to investigate and report on the damage caused to the Applicants‟ property. 36. The loss adjuster, CL, noted in his report that:  the home was a double storey building on a concrete slab. The Applicants had resided there for about ten years;  the Applicants noticed that the local swimming pool was flooded during the afternoon of 11 January 2011 and that water was rising in the nearby reserve. There was no water in their street at this time and they subsequently left about 9pm that night;  the property is located in a low point of the street, approximately 1km from the Brisbane River;  it was “apparent that the water had risen from the street drains [which were] set into the kerb” in front of the home; Case No: 265508 Determination Page 6 of 9  the Applicants were of the view that the water which inundated the home came from the local street gutters;  the appointment of a hydrologist was “required” to confirm CL‟s view that “the damage a rose from water rising from the street because of the inability of water to drain away because of the flooded nearby Brisbane River”. 37. A second loss adjuster report was arranged with an internal assessor for the FSP, MP. His report noted:  the home was inun dated by water that came “up/across from down the road”;  water rose to a height of 2.4m inside of the home;  there are two street drains either side of the road outside the property. The property itself is about 600mm above street level;  it was “possible and/or most likely” that any water overflowing the street drains and/or stormwater run-off entered the insured property and “pooled and/or caused damage to [the] home”;  “no discernible evidence of height of any drain water can be observed/determined”. 38. The FS P did not initially appoint a hydrologist and denied the Applicants‟ claim. It further relied upon the general reports for the flood event commissioned by the Insurance Council of Australia (ICA). 39. The ICA compiled reports into the flooding disasters in Queensland from this period. It noted that rainfall in the Brisbane city area was heaviest through the 6.00am to 4.00pm period on 11 January 2011. Page 41 of Volume 2 of the report notes: “Rain ceased over the Brisbane City area around 1800 hours on Tuesday 1 1 January, some 24-30 hours before flood levels in the Brisbane River peaked. Thus, when the Brisbane River peaked, there is no evidence that there was any „normal‟ flow of significance from the catchment areas of tributary creeks draining the Brisbane LGA [Local Government Area]. As the floodwave passed downstream along the Brisbane River, backwater flooding occurred up the tributary creeks. The peak flood level and time of peak along the tributary peaks are expected to be the same as those in the Brisbane River at the mouth of the creeks. Flooding along the mainstream of the Brisbane River and along the lower tributaries was principally caused by releases from Wivenhoe Dam (dam release flooding).” 40. This report suggests that rainfall had ceased in the local area well before the Applicants ‟ evacuation of the scene at 9.00pm on 11 January 2011, but that “backwater flooding” occurred through the Brisbane River and tributary creeks (which would include Jindalee Creek). This flooding was caused by the release of water from the Wivenhoe Dam and the FSP argues that the water in the stormwater drains was overflow from the flooding. 41. Volume 2 of the ICA report notes that: Case No: 265508 Determination Page 7 of 9 “Given that rainfall across the Brisbane City [local area] had ceased by 1800 hours on Tuesday 11 January, any flooding after this time will have been caused by waterflow inundation from the Brisbane River and its tributary creeks, it being noted that inundation along the tributaries was associated with backwater flooding from the Brisbane River (which in turn was principally caused by the dam release flood from Wivenhoe Dam).” 42. The above passage indicates that any inundation after the completion of the heaviest rainfall on 11 January 2011 was almost certainly due to flooding and not stormwater run-off. G iven that the Applicants‟ home had not been affected when they left and that this was well after rain had ceased, the Panel is satisfied that stormwater run-off did not inundate the home. 43. After the Applicants challenged the denial of the claim, the FSP retained a hydrologist (WR) to consider the cause of the loss. WR‟s subsequent report of 19 January 2012 revealed:  the Jindalee Alert rainfall station, which was about 1.7km west of the subject property, was relied upon for rainfall information. A total of 99.2mm of rainfall was recorded between 12am on 10 January 2011 and 8.00pm on 11 January 2011;  no significant rainfall was recorded at the gauge after about 3.00pm on 11 January 2011;  the peak rainfall intensity of 20.6mm per hour was recorded in the hour up to 11.00am on 11 January 2011. The peak period of stormwater run- off at the Applicants‟ property would have occurred within 15 minutes of this time;  any water that entered the property after 8.00pm on 11 January 2011 could not have been stormwater run-off as the rain had ceased;  topographic data indicates that the property ranges from about 9.3m AHD (Australian Height Datum) up to 13.4m AHD at its highest point;  overland water flow would need to reach a level of at least 8.9m AHD before it would begin to inundate the Applicants‟ street. Based on the records reviewed, this would not have occurred until around 1.00am on 12 January 2011;  based on the topographical data, initial inundation of the lower portion of the Applicants‟ property would have occurred at about 3.00am on 12 January 2011; and  the inundation was from floodwater from the Brisbane River which backed up the Jindalee Creek. 44. WR‟s conclusion was that the source of inundation at the Applicants‟ property was floodwater. She did not, however, address whether water flowing out of the drains inundated the property prior to the arrival of the overland floodwater from Jindalee Creek. 45. As the Applicants left the property around 9.00pm and the water from the creek did not inundate the home until 3.00am, there remains a six hour window in which the property may have been inundated by overflow from the stormwater drainage system (as suggested by the Applicants, CL and MP). Case No: 265508 Determination Page 8 of 9 46. The FSP‟s policy also provides cover for the event “Liquid escaping suddenly and unexpectedly” where water escapes from any: “... water main, drain, pipe, street gutter, guttering or surface.” 47. The policy contains a general exclusion in respect of flood. However, although the event “Storm and rainwater” also contains a specific flood exclusion for this event the event “Liquid escaping” is silent in this respect, but only excludes liquid escaping slowly over a period of time . 48. The Panel considers that such an open interpretatio n can only mean that any liquid (including floodwater) escaping suddenly from a drain is not captured by the flood exclusion. 49. So that these matters could be more fully explored, the Panel Chair Ombudsman with the Applicants and a FSP representative conducted a site inspection on 15 November 2012. 50. The Applicants advised that although there is a raised area at the back of the house, no water came from that direction prior to her leaving the property. Water was observed coming out of the drains near the Jinda lee pool which is lower than her property and around the corner. 51. The Applicants did not see water actually escaping from the drains in her street or water entering her property before she left. The house itself is higher than the road, with the driveway sloping up to the house, which is about 200mm to 400mm above the road height. 52. Bas ed on the evidence submitted there is no doubt in the Panel‟s mind that the property was ultimately inundated by water which is appropriately characterised as flood; as a result of backflow from the Brisbane River and Jindalee Creek. 53. The question is whethe r water escaping from the drains in the Applicants‟ street would first have at least partially inundated the home. No evidence has been provided to address the prospect of earlier inundation by this water from the drains. The anecdotal evidence from the loss adjusters and the Applicants accepts the possibility of earlier inundation, although again, no evidence has been presented to that effect. 54. Having considered the expert evidence, having noted that the home is raised slightly above the level of the road a nd drains and in the absence of any evidence of inundation from the drains in the street, the Panel is not persuaded, on the balance of probabilities, that water overflowing from the drains first inundated the home prior to the arrival of floodwater. 55. Although the Panel is sympathetic to the Applicant s‟ position, the Panel is not satisfied the information is sufficient to establish the initial inundation of the property falls within the policy terms. Case No: 265508 Determination Page 9 of 9 Determination 56. On the basis of the available information, the Panel determines that the FSP is not required to indemnify the Applicants for their loss.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.