Home / Financial Firm (Unknown - Insurer) / Determination 265505

Determination 265505

Denial of flood inundation claim under accidental damage home policy

FirmFinancial Firm (Unknown - Insurer)
Decided2012-08-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicant's East Ipswich home was inundated in January 2011 and the FSP declined the accidental damage claim as flood. AFCA found the policy wording met the Act, the claim was not handled poorly, and the water was flood as defined, so nothing was ordered.

Backflow from the overflowing Bremer River up the gully was floodwater within the policy definition, so the flood exclusion applied.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 265505 Determination Page 1 of 7 Case number: 265505 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 9 August 2012 Note: The Applicant has legal representation; accordingly throughout this Determination reference to the Applicant will include both herself and her lawyer. Background 1. The Applicant holds a Home and Contents policy with the Financial Services Provider (FSP) covering a residential property in East Ipswich, Queensland for Accidental Damage. 2. On or about 11 Janua ry 2011 the insured‟s property was damaged by water inundation. The Applicant subsequently lodged a claim with the FSP. 3. The FSP arranged for an assessor and hydrologist to inspect the property and report on the cause of loss. The FSP then declined the claim on the basis the damage arose from the excluded event of flood. 4. The Applicant disputes the declinature on the basis that the damage arose from storm which is covered by the policy. Further, the FSP failed to properly inform the Applicant of the flood exclusion. Summary of Applicant’s position 5. The Applicant instructs she took the policy out over the telephone. It is her recollection that the home insurance was more expensive and this would lead to a reasonable assumption that flood was covered. Further, the Applicant paid the first month of the insurance at the time of changing over. 6. The Applicant was not informed of the exclusion until after the contract was entered into and the first month‟s premium was paid. 7. The FSP‟s policy breaches Section 13 and 35 of the Insurance Contracts Act (1984). The Applicant contends that the flood exclusions listed on pages 12 and 25 do not reference the flood definition at page 16. Further, the definition of flood is so artificially wide as to be oppressive. The Applicant further submits that the FSP has stated water which cannot drain or runoff has been interpreted to include rainwater which is not specifically referred to in the policy. 8. The Applicant contends that the layout of the policy and the FSP‟s failure to properly inform her of the definition do not meet the requirements of Section 35 of the Act. The Applicant states that flood is a prescribed event for the Determination Case No: 265505 Determination Page 2 of 7 purposes of Section 35 of the Act, as defined by Section 14 of the Insurance Contracts Regulations 1985 (“the Regulations”). The Corporations Act 2001 further requires clear, concise and effective disclosure. The Applicant argues the policy should revert to the standard cover allowed for under the Act and Regulations. 9. At the time of making the claim the Applicant was not informed that flood was excluded. In addition the assessor did not attend until 2 weeks after the event. It then took until 28 February 2011 for the FSP to arrange a hydrologist‟s site inspection. The c laim was then rejected on 15 March 2011 and the letter informing her of this was dated 10 March 2011. This was notwithstanding that she had been told on 14 March 2011 that a claims decision had not yet been made. The Applicant contends that the sequence of the FSP‟s conduct in assessing the claim breaches Section 13 of the Act. 10. Alternatively, the Applicant notes that storm is a covered event under the policy and the damage arose from storm. 11. The Applicant states the property is usually unaffected by rainfall. There is a drainage gully at the back of the property which is normally dry unless it rains. The gully runs to a „school‟ at the end of the street which is the end furthest away from the river. 12. At 4.00pm on Tuesday 11 January 2011 the water was pooling at the school end of the street. She came back the next morning and drove to the „river‟ end of the street (opposite the school). The neighbours directly across the road had no water in their property whilst the water was up to her windows. The Applicant further observed it was raining heavily on Tuesday and raining on Wednesday but the rain was unable to drain away. The properties down the river end of the street and properties actually on the river did not get inundated. Based on this evidence the Applicant contends that it was rainfall which affected her property. 13. The Applicant is highly critical of the assessor and hydrology reports which have non- definitive statements such as „appears‟ and suggest‟. Further, the hydrologist provides no information as to how the conclusion of flood was achieved. The hydrology report further, does not consider the possibility of initial inundation by rainwater. Summary of FSP’s position 14. The FSP has enclosed its assessor‟s report dated 8 February 2011 from which the Panel notes the following:  The assessor noted the Applicant had alleged the storm water drains at the rear of the property had not coped with rainwater which resulted in localised flooding.  The assessor noted the Bremer River runs along and near the rear of the premises. Further, there was a low lying easement in this area. Case No: 265505 Determination Page 3 of 7  The water peaked at 1,700mm high throughout the single storey dwelling and remained at this level for 24 hours before receding.  Water and mud contaminated almost all areas of the premises.  The assessor opined the loss description was consistent with the Bremer River rising up to inundate the land. The assessor recommended a hydrologist be engaged. 15. The FSP has enclosed its site specific hydrology report from which the Panel has noted the following:  The building is a low set residential house which sits on concrete stumps that raise the floor level above the surrounding ground level. The exterior walls of the house are fibre cement, the interior walls are gyprock and the roof is steel. The floor level at the front of the property is 0.4m above the surrounding ground floor. The ground level falls away to the west resulting in the floor level being approximately 1.8m above the surrounding ground levels at the rear of the house.  The Bremer River is located approximately 180m to the north east of the subject property.  The Applicant evacuated the house on the afternoon of Tuesday 11 January 2011. At that time, water was rising into the property from the gully at the rear of the property. The Applicant returned at 7.30am on Wednesday 12 January 2011 to find that the water had inundated her house to the bottom of the front window sills which was approximately 1m above the dwelling‟s floor level. The Applicant returned on 13 January 2011 to find the water had receded to approximately 0.15m below the floor boards but the water was still in the carport and back garage.  The level of inundation throughout the house was approximately 1.8m.  The Bremer River peak occurred between 2.00-4.00pm on Wednesday 12 January 2011. The estimated peak time of the water inundation at the property is 3.00pm on Wednesday 12 January 2011.  Approximately 170mm-200mm of rainfall was recorded in the vicinity of the property between 12.00am on 9 January 2011 and 6.00pm on 11 January 2011.  The water overflowing onto the subject property and into the sheds was flood water from the nearby Bremer River. The water would have initially inundated the property by back flooding up the gully along the Western boundary of the property. The hydrologist concluded that the reported timing of the inundation was consistent with the expected time of inundation from the Bremer River, based on flood heights recorded at the nearby water level gauges. 16. The FSP has enclosed a property and flood level report from the local council. The report indicates the property levels range from 14.8mAHD to 17.1mAHD. The flood level was 19mAHD. Case No: 265505 Determination Page 4 of 7 17. The FSP notes that the claim was reported on 12 January 2011 and the assessor attended the property on 21 January 2011 prior to providing a report on 8 February 2011. As a hydrology report was recommended, the FSP appointed a hydrologist on 17 February 2011. The hydrologist attended on 28 February 2011 and provided a report on 7 March 2011. On 10 March 2011 a declinature was determined; however, such a declinature must first be reviewed by senior staff. The Applicant was then informed by telephone and then letter that the claim was declined as it arose from flood which is excluded. Given this, the FSP disputes that it has engaged in poor practice in relation to its claims handling of this matter. The FSP states that it acted in good faith by obtaining information and fully investigating the circumstances of loss prior to making a claims decision. 18. The FSP has produced a copy of the policy inception recording. The Panel notes that the recording does not include any representation of flood cover or any questions from the Applicant regarding flood cover. Further, there was no legal duty or obligation on the FSP to specifically advise the Applicant of the suitability of the policy for her requirements. The Applicant also had an opportunity to review the policy and cancel within 21 days if it did not suit her requirements. 19. The FSP has never offered flood cover under any circumstances including a higher premium. 20. The FSP notes that the flood exclusion is provided twice under the policy, once under General Exclusions and once under exclusions relating to section 2F of the policy. Further, the wording of the flood exclusion is very similar to the new Federal legislative definition of flood. 21. The FSP submits that it complied with the requirement of Section 35(2) of the Act to clearly inform the Applicant of the flood exclusion. The FSP forwarded the Product Disclosure Statement (PDS) to the Applicant and the Applicant had a copy of this same PDS at the time of renewal. There is no requirement to send a PDS each time the policy is renewed. The original policy provided a notice to the Applicant that she should read the supplied documentation carefully to ensure she was comfortable with the level of cover. The renewal notice also provided a notice the Applicant should read the PDS and if a new copy of the PDS was required to contact the FSP. 22. The FSP submits that the evidence demonstrates flood rather than rainwater was the cause of the water inundation giving rise to the claimed loss. In particular, the backflow of water from the gully referred to by the Applicant would fall within the policy definition of flood. Accordingly, as the policy excludes flood from cover the FSP was entitled to decline the claim. 23. Alternatively, if the damage arose from a mixture of rainwater and flood water then the Wayne Tank principle would operate to exclude it all. Case No: 265505 Determination Page 5 of 7 Issues 24. Whether the FSP progressed the claim in a poor manner. 25. Whether the FSP is entitled to rely on its policy terms and conditions. 26. Whether the FSP was entitled to decline the Applicant‟s claim for damage arising from water inundation. Reasons for decision 27. There has been an exchange of material between each party and the Panel is satisfied each party has had an opportunity to reply to the issues raised. 28. The Panel has read each party‟s submissions and materials and will only refer to the relevant submissions and materials raised. 29. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 30. The Panel considers that there are three discrete issues (listed above) which will be dealt with separately below. Whether the FSP has progressed the claim in a poor manner 31. The Panel have reviewed the time lines involved with obtaining the assessor and hydrology reports. 32. The Panel has reviewed a number of flood claims arising from the Queensland weather events of January 2011 and notes that obtaining an assessor and hydrology report within 2 months was in fact highly efficient given the volume of claims and demand for assessors/hydrologists. 33. The Panel has noted the explanatio n provided by the FSP for the delay between the internal claims decision and communicating the claim decision 4-5 days later. The explanation provided by the FSP for the delay is satisfactory. A review by senior staff was appropriate prior to providing a final claims decision particularly given the seriousness of the claim and impact upon the Applicant. 34. The Panel concludes there is no basis to suggest the FSP has progressed the claim in a poor manner as alleged by the Applicant. Whether the FSP was entitled to rely on the policy terms and conditions 35. The Applicant does not dispute receiving the PDS, only that she was not informed until after the payment of the premium of the potential flood exclusion and the wording does not satisfy the requirement to clearly inform under section 35 of the Act. Case No: 265505 Determination Page 6 of 7 36. The Panel notes the Applicant was in receipt of the PDS at the time of renewal notice which means Section 35 of the Act was complied with prior to the renewal notice being entered into. An insurance contract is an annual contract and accordingly Section 35 applies equally to the original and the renewal contracts. It is of course the renewal period covering the time of the flood which is relevant. 37. The case law supports that in most cases the provision of the policy docu ment is sufficient to discharge an insurer‟s onus under Section 35 of the Act. The document, however, must readily answer whether an event such as flood is covered for a person of average intelligence and education. 38. The Panel considers that the policy does provide information in the definition of flood as to what flood is and what flood is not. The policy is indexed and is written in plain English. The flood exclusion is mentioned multiple times across the PDS. The Panel is not of the opinion that the t erm „water‟ rather than „rainwater‟ would preclude any understanding as to what the flood definition applied to. Further, water is not always just rainwater but can be rainwater mixed with flood or riverine water. The FSP is also entitled to differentiate between stormwater run-off and water that cannot drain away due to overflow from an inland watercourse. 39. The Panel concludes the wording and structure of the policy is not such that it would fail the requirements under Section 35 of the Act or the clear, concise and effective disclosure required under the Corporations Act 2001. Whether the FSP was entitled to decline the Applicant’s claim for damage arising from water inundation 40. The Panel initially observes this is an Accidental Damage (AD) policy; according ly, as the inundation of the Applicant‟s property is encompassed within the scope of AD, prima facie she has established a policy entitlement. To the extent the FSP wishes to decline the claim by reference to a policy exclusion, it bears the onus of proof, demonstrating applicability of the exclusion. 41. The Panel notes the following policy definition of flood: “Flood means the covering of land that is not normally under water by: Water that overflows or escapes from a naturally occurring or man made inland watercourse (such as a river, creek, canal or stormwater channel) or a water pool (such as a lake, pond or dam, whether it is in its original state or has been modified; or Water released from a dam whether it be accidentally released or intentionally released to control, mitigate, regulate, or otherwise respond to excess water; or Water that cannot drain or run off as a result of water that is overflowing or escaping from an inland watercourse or water pool preventing the escape of water.” 42. The Applicant has provided evidence that water came from a gully that runs to the back of her property. Further, that the inundation commenced on the Case No: 265505 Determination Page 7 of 7 afternoon of Tuesday 11 January 2011 as water could not drain away into the gully/stormwater drains. The Applicant states water had risen up to 1m above the dwelling‟s floor level at 7.30am. The water then peaked in the property at 1.8m before receding to 0.15m below the flood boards on 13 January 2011. 43. The Applicant‟s evidence does not contradict the hydrologist‟s evidence t hat the peak of the river flood at the property occurred at approximately 3 .00pm on 12 January 2011. The inundation within the property level rose a further 800mm between 7.30am and 3.00pm from when the Applicant witnessed it last on 12 January 2011. The hydrologist also indicates the water would have first commenced inundating the property by rising out of the gully towards the rear of the property. 44. Despite criticisms of the hydrologist, it is clear the hydrologist has considered the rainfall. The hydrologist has noted the total rainfall between 9 .00am on 9 January 2011 and 6.00pm on 11 January 2011 was 170-200mm. The Panel notes the inundation was approximately 1,800mm which makes the stormwater run-off a less likely source of inundation above floor level or internally to the dwelling. This is because this level of rainwater would not have been capable of reaching the level of the floorboards. 45. The Applicant‟s description of rainwater being unable to drain away into the gully is consistent with the hydrolo gist‟s description of water surcharging up the gully from the Bremer River. Under the policy definition of flood this would be deemed floodwater because the rainwater cannot drain away due to overflowing from the river which back-flooded the gully. The Panel further notes that at common law this would be deemed flood as would the mixture of flood and rainwater. Accordingly, the Panel accepts on the balance of probability that all of the water inundating the Applicant‟s property is properly characterised as „flood‟ within the policy‟s definition; that being so, the FSP is entitled to rely upon the exclusion of flood to deny the claim. Determination 46. On the basis of the available information the Panel determines the FSP has not progressed the claim in a poor ma nner. 47. On the basis of the available information the Panel determines the FSP is entitled to rely on its policy terms and conditions. 48. On the basis of available information the Panel determines the FSP was entitled to decline the Applicant‟s claim for damag e arising from water inundation as this water constituted the policy excluded event of flood.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.