Text of the determination
Case No: 265499 Determination Page 1 of 10
Case number: 265499
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim - Flood
22 March 2013
Background
1. The Applicants commenced a Farm Insurance Policy (the Policy) with the
Financial Service Provider (FSP) on 8 January 2008. The Policy covered the
workshop contents situated in the shed, at the insured property for a sum of
$56,300, subject to an excess of $250.
2. On 18 January 2011, the Applicants lodged a claim with the FSP for damage
to the insured contents from water inundation on 11 January 2011.
3. The property is located on the banks of the Bremer River, with a localised
watercourse running across the rear of the property. This is an area that was
severely affected by the flooding of the Bremer River.
4. The FSP on concluding its investigation into the circumstances of the loss,
declined the claim on the basis the damage was due to „flood‟, which is
specifically excluded under the policy.
5. The Applicants submit that the property was inundated by stormwater runoff
prior to any flood water inundation and that the initial inundation caused at
least 50% of the damage to the property.
Summary of Applicants ’ position
6. The Applicants are represented in this dispute and for the sake of
convenience, this Determination will refer to the Applicants and their
representatives collectively as „the Applicants‟.
7. The Applicants submit that the property was inundated by stormwater runoff
and the proximate cause of the damage is the insured event of Storm,
rainwater or wind.
8. The close proximity of the insured property to both Moggill Alert and the
junction of the Bremer and Brisbane River, make Moggill Alert the more
suitable indicator of the source and time of the inundation.
Determination
Case No: 265499 Determination Page 2 of 10
9. Rainfall data from the Moggill Alert indicates that there was a storm in the
vicinity of the insured property on 11 January 2011.
10. The male Applicant observed overland flow coming downhill fast from the
direction of Tasman Court. This water was not flowing from the Bremer
River, which is to the south of the property, but was travelling from the north
and northeast.
11. The property was inundated by stormwater runoff well before the arrival of
floodwaters from the Bremer River. By the time the floodwater entered the
shed, the property had already suffered significant damage.
12. Rainfall at the property was possibly more intense than is indicated by the
data from the Moggill Gauge, which is located approximately 1.88km away.
13. The following geographical factors make the property particularly susceptible
to overland flow:
a. Soil at the property is highly reactive, meaning that water builds up
rather than being absorbed into the soil;
b. Contours of the landscape are such that during storms, water flows
down towards the shed, which is at the base of a hill. Between the shed
and the northern end of Tasman Court, a distance of approximately
200m, the elevation rises from 12m to 24m.
14. In the alternative, the Applicants submit that the FSP failed to clearly inform
them of the flood exclusion. It is submitted that th e FSP‟s Product Disclosure
Statement (PDS) fails to define „Storm‟, which implies wide coverage and
makes the policy confusing to the average consumer.
15. The Applicants have not been clearly informed of the flood exclusion and the
FSP should be estopped from excluding flood cover.
16. The female Applicant provides a statutory declaration which supports the
male Applicant‟s statements.
17. The Applicants seek full cover for their loss, plus interest on any cash
payment and compensation of $3,000, under the FOS Terms of Reference.
Summary of FSP’s position
18. The FSP refers to the independent hydrology report by the Insurance
Council of Australia (ICA report), to submit that the Ipswich suburb of
Barellan Point was flooded by water escaping from the confines of the
Bremer River and that backwater effects associated with the releases from
Wivenhoe was a major factor in the water levels along the lower reaches of
the Bremer River. According to the report:
“Any inundation that occurred after 1800 hours on Tuesday will have be en
caused by waterflow flooding” .
Case No: 265499 Determination Page 3 of 10
19. The FSP relies on several hydrology reports, include site specific hydrology
evidence from „W‟, as well as flood mapping provided by the Brisbane City
Council, to maintain that the insured shed was flooded by water escaping
from the confines of the Bremer River.
20. According to the FSP, the only source of water that inundated the insured
property was flood water or a combination of storm water and flood water,
and accordingly, all loss sustained is excluded from cover.
21. W states that data from the Bundamba Gauge, which is upstream of the site,
indicates that inundation could have commenced as early as 15.55 and
correlates better with the timing provided by the Applicants.
22. The FSP relies on the following policy provisions:
“ Words that have a special meaning in this policy
...
Flood is when water from a river, creek, lake, swamp, watercourse, reservoir,
dam or navigable canal (whether they are in their original state or have been
modified), overflows onto normally dry land. Water that escapes from an
irrigation canal is not flood.
We also regard any rainwater on your property
That cannot run off into a river, creek, lake, swamp, watercourse,
reservoir, dam or navigable canal (whether they are in their original
state or have been modified) because it is overflowing in flood, and/or
That mixes with the floodwater coming from the River, creek, lake,
swamp, watercourse, reservoir, dam or navigable canal (whether they
are in their original state or have been modified)
As water coming from a flood.”
...
“ What all sections of this policy do NOT cover
Any cover we provide is subject to the following exclusions.
We will NOT pay claims arising from the following:
...
Flood, storm surge, the action of the sea, tidal wave or high water...”
“ Section 2
Farm Property
Cover 1 – Listed Events
We will cover the farm property for the events listed below while at the
situation. There must be damage or loss from one of these events to the farm
property for you to make a claim.
...”
Case No: 265499 Determination Page 4 of 10
Issues
23. Whether the Applicants were clearly informed of the flood exclusion in the
policy.
24. Whether the FSP is entitled to deny the Applicants‟ claim.
Reasons for decision
25. As advised to the parties, FOS has considered it appropriate to refer this
dispute directly to the Panel in accordance with the Operational Guidelines
to the FOS Terms of Reference. This is because of the complex nature of
the issues. This dispute has not been the subject of a FOS Recommendation
and has proceeded directly to Determination.
26. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
27. On 26 February 2013, the Panel Chair Ombudsman attended on site where
he met with the Applicants and representatives of the FSP.
28. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment.
For the sake of brevity and conciseness, the details contained in the relevant
hydrological reports and submissions will not be recited in this determination
except where considered relevant.
Was the Applicant clearly informed of the flood exclusion?
29. The Applicants confirm receiving a copy of the PDS at the time o f inception,
but argue that the policy fails to clearly inform that flood is excluded from
cover and the definitions contained in the policy are likely to confuse a
reasonable consumer.
30. According to the male Applicant, he recalls receiving a PDS when he took
out the policy and recalls reading it closely at the time. The Applicants were
sent a renewal each year, which they filed away without reading it. From the
initial reading of the PDS, the male Applicant believed he would be covered
for flood.
31. It is established law that in order to satisfy the requirement to clearly inform,
the language of section 35(2) allows for a proposed insured to be clearly
informed by providing the relevant documentation in writing and where the
relevant exclusion and/or limitation is clear and unambiguous and detailed in
a manner which a person of average intelligence and education is likely to
have little difficulty in finding and understanding, if that person reads the
policy in question.
Case No: 265499 Determination Page 5 of 10
32. The Panel has reviewed the FSP ‟s policy on a number of occasions. The
policy is indexed with relevant sections covering the insured and excluded
events. The policy clearly sets out the definition of flood, which is consistent
with other policies available in the market.
33. Having considered the Applicants ‟ submissions and the FSP‟s policy
documents, the Panel is satisfied that the FSP has met its obligations to
clearly inform the Applicants of the extent of cover provided by the policy, in
accordance with the requirements of the Act.
The proximate cause of the inundation
34. It is an accepted principle of general insurance law that an insured bears the
onus to establish, on the balance of probabilities, that they have suffered a
loss caused by an event or incident to which the policy responds. Once so
established, the onus shifts to the insurer to prove that a policy exclusion
applies.
35. The evidence suggests that the following issues are not contested:
a. The insured property is located near the banks of the Bremer River,
1.3km from the junction of the Bremer and Brisbane Rivers;
b. The insured property is susceptible to overland flow;
c. Soil at the insured property is highly reactive;
d. The shed is built on a concrete slab which is on an elevated level, with
a residential fill pad to the north east of the shed, flow paths to the north
and south of the residential fill and a gully adjacent to the site;
e. Flood water from the Bremer River ultimately inundated the property on
11 January 2011.
36. What is in dispute is whether stormwater runoff initially inundated the shed
prior to the riverine flood inundation.
37. The Applicants rely on their own eyewitness evidence, supported by
statutory declarations and data from the Moggill Creek Alert, to establish that
the initial inundation to the property, between the hours of 3.00pm and
5.00pm on 11 January 2011, was caused by storm water runoff.
38. The Applicants submit:
There was high rainfall in the area during the week leading up to 11
January 2011.
The male Applicant was present at the insured property between
10.30am and 5.00pm on 11 January 2011. It rained moderately and
consistently during this time.
He observed water flowing towards the shed from higher lands at the
north of the property, coming from the direction of Tasman Court.
Case No: 265499 Determination Page 6 of 10
Water was flowing down the hill at a high speed and entering the gully
below the shed, which was filling up with water.
The rain and the runoff continued causing the two spoon drains in front
of the shed to become full and no longer divert the water away from the
shed.
He observed water first flowing over the fill pad in front of the shed at
about 2.30pm on 11 January 2011. There was a sheet of water of
about one or two inches going over the fill pad. The flow remained
constant from about 2.30pm until 5.00pm, when he left the property.
Water began to enter the roller door at the front of the shed between
3.00pm and 5.00pm, but closer to 3.00pm, on 11 January 2011. During
this time the roller door was open.
When he left the property at 5.00pm, the water was about half a metre
deep inside the shed and rising at a constant rate. About 50% of the
contents of the shed had been damaged by the water inundation by this
time.
Among the items damaged at this time were the quad bike, ride on
mower, drill press and lathe. This damage occurred prior to the river
breaking its banks.
It was still raining at 5.00pm, when he left the property. He recalls his
windscreen wipers were between low and intermediate at the time.
He returned to the shed about three days later. The water levels in the
area were quite high but the shed was dry. There was lots of mud
inside the shed covering the contents.
Each time it rains, water flows down Tasman Court and splits at the fill
pad and drains around the shed. There is a swale to the north of the
shed to direct these flows.
The soil at the property is highly reactive. As a result, rain has a
tendency to build up on the property and runoff from higher land.
In 1996, a large rainfall event caused water to flow down a similar path
to the area where the shed now exists.
When it rains, water has a tendency to cross the fill pad and pool inside
the roller door. The Applicants last saw a puddle in the shed in
February 2012, after it had been raining that day.
39. Based on the terms of the policy and the nature of the dispute, the Panel is
satisfied, on the balance of probabilities, that the Applicants have
established a prima facie claim for damage caused by storm, rainwater or
wind. The onus then shifts to the FSP to prove that a policy exclusion applies
to exclude the damage from cover.
40. The FSP relies on several reports from its hydrologist W, including a site
specific hydrology report and aerial photographs to conclude that the water
which inundated the shed was riverine flood water, which is excluded from
cover.
Case No: 265499 Determination Page 7 of 10
41. In response to the Applicant s‟ submissions, the FSP maintains that there
was insufficient rainfall to cause the inundation described by the Applicants
and the river height levels suggest that flood water would have inundated the
shed in the evening of 11 January 2011.
42. It is generally accepted that the height of the shed is 12.3m AHD.
43. Based on the Moggill alert, the heaviest rainfall in the area occurred between
10.00am and 11.00am on 11 January 2011, with rainfall ceasing in the area
at 6.00pm.
44. The Applicants submit that it was raini ng at 5.00pm and the male Applicant
had his wipers on as he drove away from the site.
45. W states that the rainfall in the area at the time was insufficient to cause the
level of overland flow required to inundate the shed as described by the
Applicants.
46. The Panel notes that the rainfall intensity had eased by the afternoon of 11
January 2011, although the eyewitness evidence suggests that it continued
to rain until at least 5.00pm. The Panel also accepts that the property in
general was susceptible to overland flow and stormwater was flowing into
the property from higher ground, via Tasman Court from earlier in the day.
47. While the hydrology evidence indicates that the rainfall intensity around the
time of the inundation was moderate to low, this alone does not suggest that
the water which entered the shed between the hours of 3.00pm and 5.00pm
was flood water.
48. The FSP initially relied on river height levels based on data from the Moggill
Alert, 1.8km from the property, at the confluence of Bremer River and the
Brisbane River, which indicates that inundation of the floor level of the shed
would have commenced at approximately 8.00pm on 11 January 2011.
49. According to W, river gauge data from Moggill indicates that inundation from
the Bremer River would have been occurring on the site and would have
been close to the southern face of the shed, but is unlikely to have entered
the shed in the time leading up to when the Applicants left the property, at
5.00pm that day.
50. In subsequent submissions, W relies on the river le vel data from Bundamba
Creek (Hanlon Street) Alert, located almost 8km away from the property, to
provide a better correlation between the river level height and the time of
inundation indicated by the Applicants. According to W, the river level at
Bundamba (Hanlon Street) Alert, reached the height of the flood of the shed
close to 4.30pm.
51. On this basis, the FSP excludes the possibility that any damage inside the
shed was caused between the hours of 3.00pm and 5.00pm by stormwater
runoff.
Case No: 265499 Determination Page 8 of 10
52. Overall, W accepts that the hydrology evidence is not completely consistent
with the Applicants‟ eyewitness evidence. According to W, whether the
reported timing of the inundation of the shed was inaccurate or the estimated
floor level of the shed is inaccurate, the inundation of the shed due to
riverine water was inevitable and not reliant on the presence of any
stormwater runoff from the local catchment.
53. Having considered all the material exchanged, the Panel has difficulty
accepting that the Bundamba Creek (Hanlon Street) Alert would offer a
better estimate of the height of the Bremer River at the property, than the
data from the Moggill Alert, which is less than 2km away from the property.
54. Further, it is not sufficient to attribute the anomalies between the Applicants‟
evidence and the hydrology evidence to potential errors in the reported
timing of the inundation or the floor level of the shed.
55. While, as accepted by the FSP, the river level data is inconsistent with flood
water inundation between 3.00pm and 5.00pm, it is consistent with the
Applicants‟ observations that the inundation was caused by stormwate r
approaching from Tasman Court.
56. Based on the evidence exchanged, the Panel is not satisfied that the FSP
has established on the balance of probabilities, that the damage to the
Applicants‟ shed contents was caused exclusively by floodwater as defined
by the policy.
57. Instead, the Panel agrees that it is more likely that some of the inundation
above floor level of the shed may have occurred from stormwater runoff,
which was flowing into the property continuously since the morning of 11
January 2011.
58. However, based on the hydrology evidence and topography data, the Panel
does consider it unlikely that stormwater alone would have reached 0.5m
inside the shed prior to the arrival of any flood water.
59. Given the anomalies between the Applicants‟ eyewitness evidence and the
conclusions of the FSP‟s hydrologist, the Panel Chair Ombudsman attended
on site where he met with the Applicants and representatives of the FSP.
60. Coincidently, during the course of the site visit, it was raining heavily and the
Panel Chair Ombudsman observed water flowing down Tasman Court
towards the shed.
61. The Panel Chair Ombudsman also observed that the water in fact was
flowing down Fourth Avenue and across River Side Avenue into Burke
Street and then into Tasman Court towards the shed.
62. The Panel is satisfied that these simple observations support the Applicants‟
contentions in respect to the flow of stormwater runoff.
63. During the site visit, the male Applicant also advised that water would flow in
an area behind the shed through the Applicants‟ property and down towards
Case No: 265499 Determination Page 9 of 10
the Bremer River. The Applicant detailed that the amount of water depended
upon the rainfall in the area at the time but that in January 2011, the flow of
water in this area was significant.
64. The Panel Chair Ombudsman observed this course of water which drained
from a northerly direction under Riverside Avenue, in a southerly direction
towards the Bremer Ri ver and to the rear of the Applicants‟ property behind
the Applicants‟ shed.
65. The male Applicant described the water as normally being contained within
the confines of the flow path but in January 2011, the amount of water was
so great that the water exceeded the confines and flowed up into the area of
the shed.
66. The male Applicant described this event as having occurred after the shed
had been impacted by the flow of stormwater runoff from Tasman Court.
67. The Panel has given consideration to the flow of water in the area behind the
shed and is of the view that the water was flowing through a water course as
described within the policy definition of flood. The Panel takes this view
because of the culverts which were in place under Riverside Avenue to
accommodate the flow of this water and what appeared to be a defined base
and banks at least in the area of the southern side of Riverside Avenue.
68. Having taken this view, the Panel is of the view that the water which was
flowing through this water course and escaped from the water course onto
the Applicants‟ land is properly described as flood water and is excluded
from coverage under the policy.
69. Having made this finding, the Panel is therefore required to determine to
what extent the shed was impacted by stormwater runoff from Tasman Court
prior to being affected by the breakout flow from the water course to the rear
of the shed and prior to any backflow flooding from the Bremer River.
70. In considering this question, the Panel has accepted the eyewitness
evidence of the Applicants and noted the extent of stormwater runoff on the
day of the site visit.
71. To this extent, the Panel considers it fair in the circumstances that the FSP
indemnifies the Applicants for damage caused by 250mm of water
inundation inside the shed.
Other considerations
72. The Applicants make allegations regarding the independence of the
hydrology evidence obtained by the FSP. In the absence of evidence to
indicate that W was in fact biased in his assessment of the evidence, the
Panel is satisfied that W is appropriately experienced and qualified to
provide the hydrology reports.
Case No: 265499 Determination Page 10 of 10
Determination
73. Accordingly, the Panel determines that the Applicants have established an
entitlement to cover as a result of inundation to a level of 250mm inside the
shed. The Panel is satisfied that such inundation has been caused as a
result of an insured event under the terms of the policy.
74. The Panel further determines that the inundation above 250mm throughout
the shed would be inundation as a result of flood as defined by the po licy
and therefore excluded from cover.
75. Insofar as the FSP determines to cash settle the Applicants‟ claim, the FSP
must pay interest in accordance with section 57 of the Insurance Contracts
Act from the 20 April 2011, being the date of denial of the Appli cants‟ claim
to date of payment of the claim.