Home / Financial Firm (Unknown - Insurer) / Determination 265499

Determination 265499

Claim denial - flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2013-04-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants' farm workshop contents were damaged by water inundation, and the FSP declined the claim as flood. AFCA found stormwater runoff caused initial inundation and ordered cover for damage up to 250mm inside the shed, with interest, while flood damage above that level remained excluded.

The insured established a prima facie storm claim and the FSP did not prove on the balance of probabilities that the inundation was exclusively floodwater, so cover applies to the stormwater portion.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 265499 Determination Page 1 of 10 Case number: 265499 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim - Flood 22 March 2013 Background 1. The Applicants commenced a Farm Insurance Policy (the Policy) with the Financial Service Provider (FSP) on 8 January 2008. The Policy covered the workshop contents situated in the shed, at the insured property for a sum of $56,300, subject to an excess of $250. 2. On 18 January 2011, the Applicants lodged a claim with the FSP for damage to the insured contents from water inundation on 11 January 2011. 3. The property is located on the banks of the Bremer River, with a localised watercourse running across the rear of the property. This is an area that was severely affected by the flooding of the Bremer River. 4. The FSP on concluding its investigation into the circumstances of the loss, declined the claim on the basis the damage was due to „flood‟, which is specifically excluded under the policy. 5. The Applicants submit that the property was inundated by stormwater runoff prior to any flood water inundation and that the initial inundation caused at least 50% of the damage to the property. Summary of Applicants ’ position 6. The Applicants are represented in this dispute and for the sake of convenience, this Determination will refer to the Applicants and their representatives collectively as „the Applicants‟. 7. The Applicants submit that the property was inundated by stormwater runoff and the proximate cause of the damage is the insured event of Storm, rainwater or wind. 8. The close proximity of the insured property to both Moggill Alert and the junction of the Bremer and Brisbane River, make Moggill Alert the more suitable indicator of the source and time of the inundation. Determination Case No: 265499 Determination Page 2 of 10 9. Rainfall data from the Moggill Alert indicates that there was a storm in the vicinity of the insured property on 11 January 2011. 10. The male Applicant observed overland flow coming downhill fast from the direction of Tasman Court. This water was not flowing from the Bremer River, which is to the south of the property, but was travelling from the north and northeast. 11. The property was inundated by stormwater runoff well before the arrival of floodwaters from the Bremer River. By the time the floodwater entered the shed, the property had already suffered significant damage. 12. Rainfall at the property was possibly more intense than is indicated by the data from the Moggill Gauge, which is located approximately 1.88km away. 13. The following geographical factors make the property particularly susceptible to overland flow: a. Soil at the property is highly reactive, meaning that water builds up rather than being absorbed into the soil; b. Contours of the landscape are such that during storms, water flows down towards the shed, which is at the base of a hill. Between the shed and the northern end of Tasman Court, a distance of approximately 200m, the elevation rises from 12m to 24m. 14. In the alternative, the Applicants submit that the FSP failed to clearly inform them of the flood exclusion. It is submitted that th e FSP‟s Product Disclosure Statement (PDS) fails to define „Storm‟, which implies wide coverage and makes the policy confusing to the average consumer. 15. The Applicants have not been clearly informed of the flood exclusion and the FSP should be estopped from excluding flood cover. 16. The female Applicant provides a statutory declaration which supports the male Applicant‟s statements. 17. The Applicants seek full cover for their loss, plus interest on any cash payment and compensation of $3,000, under the FOS Terms of Reference. Summary of FSP’s position 18. The FSP refers to the independent hydrology report by the Insurance Council of Australia (ICA report), to submit that the Ipswich suburb of Barellan Point was flooded by water escaping from the confines of the Bremer River and that backwater effects associated with the releases from Wivenhoe was a major factor in the water levels along the lower reaches of the Bremer River. According to the report: “Any inundation that occurred after 1800 hours on Tuesday will have be en caused by waterflow flooding” . Case No: 265499 Determination Page 3 of 10 19. The FSP relies on several hydrology reports, include site specific hydrology evidence from „W‟, as well as flood mapping provided by the Brisbane City Council, to maintain that the insured shed was flooded by water escaping from the confines of the Bremer River. 20. According to the FSP, the only source of water that inundated the insured property was flood water or a combination of storm water and flood water, and accordingly, all loss sustained is excluded from cover. 21. W states that data from the Bundamba Gauge, which is upstream of the site, indicates that inundation could have commenced as early as 15.55 and correlates better with the timing provided by the Applicants. 22. The FSP relies on the following policy provisions: “ Words that have a special meaning in this policy ... Flood is when water from a river, creek, lake, swamp, watercourse, reservoir, dam or navigable canal (whether they are in their original state or have been modified), overflows onto normally dry land. Water that escapes from an irrigation canal is not flood. We also regard any rainwater on your property  That cannot run off into a river, creek, lake, swamp, watercourse, reservoir, dam or navigable canal (whether they are in their original state or have been modified) because it is overflowing in flood, and/or  That mixes with the floodwater coming from the River, creek, lake, swamp, watercourse, reservoir, dam or navigable canal (whether they are in their original state or have been modified) As water coming from a flood.” ... “ What all sections of this policy do NOT cover Any cover we provide is subject to the following exclusions. We will NOT pay claims arising from the following: ...  Flood, storm surge, the action of the sea, tidal wave or high water...” “ Section 2 Farm Property Cover 1 – Listed Events We will cover the farm property for the events listed below while at the situation. There must be damage or loss from one of these events to the farm property for you to make a claim. ...” Case No: 265499 Determination Page 4 of 10 Issues 23. Whether the Applicants were clearly informed of the flood exclusion in the policy. 24. Whether the FSP is entitled to deny the Applicants‟ claim. Reasons for decision 25. As advised to the parties, FOS has considered it appropriate to refer this dispute directly to the Panel in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 26. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 27. On 26 February 2013, the Panel Chair Ombudsman attended on site where he met with the Applicants and representatives of the FSP. 28. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. For the sake of brevity and conciseness, the details contained in the relevant hydrological reports and submissions will not be recited in this determination except where considered relevant. Was the Applicant clearly informed of the flood exclusion? 29. The Applicants confirm receiving a copy of the PDS at the time o f inception, but argue that the policy fails to clearly inform that flood is excluded from cover and the definitions contained in the policy are likely to confuse a reasonable consumer. 30. According to the male Applicant, he recalls receiving a PDS when he took out the policy and recalls reading it closely at the time. The Applicants were sent a renewal each year, which they filed away without reading it. From the initial reading of the PDS, the male Applicant believed he would be covered for flood. 31. It is established law that in order to satisfy the requirement to clearly inform, the language of section 35(2) allows for a proposed insured to be clearly informed by providing the relevant documentation in writing and where the relevant exclusion and/or limitation is clear and unambiguous and detailed in a manner which a person of average intelligence and education is likely to have little difficulty in finding and understanding, if that person reads the policy in question. Case No: 265499 Determination Page 5 of 10 32. The Panel has reviewed the FSP ‟s policy on a number of occasions. The policy is indexed with relevant sections covering the insured and excluded events. The policy clearly sets out the definition of flood, which is consistent with other policies available in the market. 33. Having considered the Applicants ‟ submissions and the FSP‟s policy documents, the Panel is satisfied that the FSP has met its obligations to clearly inform the Applicants of the extent of cover provided by the policy, in accordance with the requirements of the Act. The proximate cause of the inundation 34. It is an accepted principle of general insurance law that an insured bears the onus to establish, on the balance of probabilities, that they have suffered a loss caused by an event or incident to which the policy responds. Once so established, the onus shifts to the insurer to prove that a policy exclusion applies. 35. The evidence suggests that the following issues are not contested: a. The insured property is located near the banks of the Bremer River, 1.3km from the junction of the Bremer and Brisbane Rivers; b. The insured property is susceptible to overland flow; c. Soil at the insured property is highly reactive; d. The shed is built on a concrete slab which is on an elevated level, with a residential fill pad to the north east of the shed, flow paths to the north and south of the residential fill and a gully adjacent to the site; e. Flood water from the Bremer River ultimately inundated the property on 11 January 2011. 36. What is in dispute is whether stormwater runoff initially inundated the shed prior to the riverine flood inundation. 37. The Applicants rely on their own eyewitness evidence, supported by statutory declarations and data from the Moggill Creek Alert, to establish that the initial inundation to the property, between the hours of 3.00pm and 5.00pm on 11 January 2011, was caused by storm water runoff. 38. The Applicants submit:  There was high rainfall in the area during the week leading up to 11 January 2011.  The male Applicant was present at the insured property between 10.30am and 5.00pm on 11 January 2011. It rained moderately and consistently during this time.  He observed water flowing towards the shed from higher lands at the north of the property, coming from the direction of Tasman Court. Case No: 265499 Determination Page 6 of 10  Water was flowing down the hill at a high speed and entering the gully below the shed, which was filling up with water.  The rain and the runoff continued causing the two spoon drains in front of the shed to become full and no longer divert the water away from the shed.  He observed water first flowing over the fill pad in front of the shed at about 2.30pm on 11 January 2011. There was a sheet of water of about one or two inches going over the fill pad. The flow remained constant from about 2.30pm until 5.00pm, when he left the property.  Water began to enter the roller door at the front of the shed between 3.00pm and 5.00pm, but closer to 3.00pm, on 11 January 2011. During this time the roller door was open.  When he left the property at 5.00pm, the water was about half a metre deep inside the shed and rising at a constant rate. About 50% of the contents of the shed had been damaged by the water inundation by this time.  Among the items damaged at this time were the quad bike, ride on mower, drill press and lathe. This damage occurred prior to the river breaking its banks.  It was still raining at 5.00pm, when he left the property. He recalls his windscreen wipers were between low and intermediate at the time.  He returned to the shed about three days later. The water levels in the area were quite high but the shed was dry. There was lots of mud inside the shed covering the contents.  Each time it rains, water flows down Tasman Court and splits at the fill pad and drains around the shed. There is a swale to the north of the shed to direct these flows.  The soil at the property is highly reactive. As a result, rain has a tendency to build up on the property and runoff from higher land.  In 1996, a large rainfall event caused water to flow down a similar path to the area where the shed now exists.  When it rains, water has a tendency to cross the fill pad and pool inside the roller door. The Applicants last saw a puddle in the shed in February 2012, after it had been raining that day. 39. Based on the terms of the policy and the nature of the dispute, the Panel is satisfied, on the balance of probabilities, that the Applicants have established a prima facie claim for damage caused by storm, rainwater or wind. The onus then shifts to the FSP to prove that a policy exclusion applies to exclude the damage from cover. 40. The FSP relies on several reports from its hydrologist W, including a site specific hydrology report and aerial photographs to conclude that the water which inundated the shed was riverine flood water, which is excluded from cover. Case No: 265499 Determination Page 7 of 10 41. In response to the Applicant s‟ submissions, the FSP maintains that there was insufficient rainfall to cause the inundation described by the Applicants and the river height levels suggest that flood water would have inundated the shed in the evening of 11 January 2011. 42. It is generally accepted that the height of the shed is 12.3m AHD. 43. Based on the Moggill alert, the heaviest rainfall in the area occurred between 10.00am and 11.00am on 11 January 2011, with rainfall ceasing in the area at 6.00pm. 44. The Applicants submit that it was raini ng at 5.00pm and the male Applicant had his wipers on as he drove away from the site. 45. W states that the rainfall in the area at the time was insufficient to cause the level of overland flow required to inundate the shed as described by the Applicants. 46. The Panel notes that the rainfall intensity had eased by the afternoon of 11 January 2011, although the eyewitness evidence suggests that it continued to rain until at least 5.00pm. The Panel also accepts that the property in general was susceptible to overland flow and stormwater was flowing into the property from higher ground, via Tasman Court from earlier in the day. 47. While the hydrology evidence indicates that the rainfall intensity around the time of the inundation was moderate to low, this alone does not suggest that the water which entered the shed between the hours of 3.00pm and 5.00pm was flood water. 48. The FSP initially relied on river height levels based on data from the Moggill Alert, 1.8km from the property, at the confluence of Bremer River and the Brisbane River, which indicates that inundation of the floor level of the shed would have commenced at approximately 8.00pm on 11 January 2011. 49. According to W, river gauge data from Moggill indicates that inundation from the Bremer River would have been occurring on the site and would have been close to the southern face of the shed, but is unlikely to have entered the shed in the time leading up to when the Applicants left the property, at 5.00pm that day. 50. In subsequent submissions, W relies on the river le vel data from Bundamba Creek (Hanlon Street) Alert, located almost 8km away from the property, to provide a better correlation between the river level height and the time of inundation indicated by the Applicants. According to W, the river level at Bundamba (Hanlon Street) Alert, reached the height of the flood of the shed close to 4.30pm. 51. On this basis, the FSP excludes the possibility that any damage inside the shed was caused between the hours of 3.00pm and 5.00pm by stormwater runoff. Case No: 265499 Determination Page 8 of 10 52. Overall, W accepts that the hydrology evidence is not completely consistent with the Applicants‟ eyewitness evidence. According to W, whether the reported timing of the inundation of the shed was inaccurate or the estimated floor level of the shed is inaccurate, the inundation of the shed due to riverine water was inevitable and not reliant on the presence of any stormwater runoff from the local catchment. 53. Having considered all the material exchanged, the Panel has difficulty accepting that the Bundamba Creek (Hanlon Street) Alert would offer a better estimate of the height of the Bremer River at the property, than the data from the Moggill Alert, which is less than 2km away from the property. 54. Further, it is not sufficient to attribute the anomalies between the Applicants‟ evidence and the hydrology evidence to potential errors in the reported timing of the inundation or the floor level of the shed. 55. While, as accepted by the FSP, the river level data is inconsistent with flood water inundation between 3.00pm and 5.00pm, it is consistent with the Applicants‟ observations that the inundation was caused by stormwate r approaching from Tasman Court. 56. Based on the evidence exchanged, the Panel is not satisfied that the FSP has established on the balance of probabilities, that the damage to the Applicants‟ shed contents was caused exclusively by floodwater as defined by the policy. 57. Instead, the Panel agrees that it is more likely that some of the inundation above floor level of the shed may have occurred from stormwater runoff, which was flowing into the property continuously since the morning of 11 January 2011. 58. However, based on the hydrology evidence and topography data, the Panel does consider it unlikely that stormwater alone would have reached 0.5m inside the shed prior to the arrival of any flood water. 59. Given the anomalies between the Applicants‟ eyewitness evidence and the conclusions of the FSP‟s hydrologist, the Panel Chair Ombudsman attended on site where he met with the Applicants and representatives of the FSP. 60. Coincidently, during the course of the site visit, it was raining heavily and the Panel Chair Ombudsman observed water flowing down Tasman Court towards the shed. 61. The Panel Chair Ombudsman also observed that the water in fact was flowing down Fourth Avenue and across River Side Avenue into Burke Street and then into Tasman Court towards the shed. 62. The Panel is satisfied that these simple observations support the Applicants‟ contentions in respect to the flow of stormwater runoff. 63. During the site visit, the male Applicant also advised that water would flow in an area behind the shed through the Applicants‟ property and down towards Case No: 265499 Determination Page 9 of 10 the Bremer River. The Applicant detailed that the amount of water depended upon the rainfall in the area at the time but that in January 2011, the flow of water in this area was significant. 64. The Panel Chair Ombudsman observed this course of water which drained from a northerly direction under Riverside Avenue, in a southerly direction towards the Bremer Ri ver and to the rear of the Applicants‟ property behind the Applicants‟ shed. 65. The male Applicant described the water as normally being contained within the confines of the flow path but in January 2011, the amount of water was so great that the water exceeded the confines and flowed up into the area of the shed. 66. The male Applicant described this event as having occurred after the shed had been impacted by the flow of stormwater runoff from Tasman Court. 67. The Panel has given consideration to the flow of water in the area behind the shed and is of the view that the water was flowing through a water course as described within the policy definition of flood. The Panel takes this view because of the culverts which were in place under Riverside Avenue to accommodate the flow of this water and what appeared to be a defined base and banks at least in the area of the southern side of Riverside Avenue. 68. Having taken this view, the Panel is of the view that the water which was flowing through this water course and escaped from the water course onto the Applicants‟ land is properly described as flood water and is excluded from coverage under the policy. 69. Having made this finding, the Panel is therefore required to determine to what extent the shed was impacted by stormwater runoff from Tasman Court prior to being affected by the breakout flow from the water course to the rear of the shed and prior to any backflow flooding from the Bremer River. 70. In considering this question, the Panel has accepted the eyewitness evidence of the Applicants and noted the extent of stormwater runoff on the day of the site visit. 71. To this extent, the Panel considers it fair in the circumstances that the FSP indemnifies the Applicants for damage caused by 250mm of water inundation inside the shed. Other considerations 72. The Applicants make allegations regarding the independence of the hydrology evidence obtained by the FSP. In the absence of evidence to indicate that W was in fact biased in his assessment of the evidence, the Panel is satisfied that W is appropriately experienced and qualified to provide the hydrology reports. Case No: 265499 Determination Page 10 of 10 Determination 73. Accordingly, the Panel determines that the Applicants have established an entitlement to cover as a result of inundation to a level of 250mm inside the shed. The Panel is satisfied that such inundation has been caused as a result of an insured event under the terms of the policy. 74. The Panel further determines that the inundation above 250mm throughout the shed would be inundation as a result of flood as defined by the po licy and therefore excluded from cover. 75. Insofar as the FSP determines to cash settle the Applicants‟ claim, the FSP must pay interest in accordance with section 57 of the Insurance Contracts Act from the 20 April 2011, being the date of denial of the Appli cants‟ claim to date of payment of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.