The applicant's property suffered stormwater inundation in January 2011, and the insurer paid $10,000 and limited cover to 150mm, citing flood. AFCA ordered indemnity for runoff inundation up to 200mm, found long-term soil movement damage not covered, and ordered statutory interest on amounts due above payments already made.

The flood exclusion was clearly expressed and the insurer met section 35 of the Insurance Contracts Act 1984, but the initial stormwater runoff up to 200mm is an insured event.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 265237 Determination Page 1 of 12 Case number: 265237 General Insurance - Domestic Insurance - Home Building - FSP Decision – Flood - Denial of claim-Exclusion/ condition – Clearly Inform - Section 35 Insurance Contracts Act 1984 23 October 2012 Background 1. The Applicant held a Home Building and Contents Insurance Policy (the policy) with the Financial Services Provider (FSP). 2. The insured property in Rosewood suffered damage arising from water inundation which occurred during the extreme weather events experienced in Queensland in January 2011. 3. The FSP accepted the Applicant‟s claim, however, limited its obligations under the policy on the basis that although stormwater runoff initially inundated the property it was subsequently inundated to a higher level due to the event “Flood”, which is specifically excluded under the policy. 4. The Applicant remains dissatisfied with the FSP‟s decision to decline the claim and is seeking complete indemnity under the policy. Summary of Applicant’s position 5. In disputing the FSP‟s decision to decline the claim, the Applicant has sought legal representation by “L”. For the purpose of this determination both these parties will be referred to as the “Applicant”. 6. On 11 January 2011, the Applicant‟s property was affected by severe storms in the area. The property was inundated after the occurrence of these storms. The insured property, including other neighbouring properties, had been affected in a similar manner previously in 2009 and for which the Applicant‟s claim with the FSP was acce pted as storm damage. 7. The Applicant remains dissatisfied with the FSP‟s response submitted to the Service. The Applicant continues to rely on the following arguments:  Although advised at inception of the policy that the policy did not include flood cover, he was assured by the FSP‟s agent that he did not require flood cover due to the location of his property. Determination Case No: 265237 Determination Page 2 of 12  The Applicant‟s suburb was not affected as part of the wider flooding event caused by the Brisbane and Bremer Rivers. The damage to the insured property was caused by stormwater runoff and rain which is an included event under the policy.  The FSP has accepted to provide indemnity for inundation up to 150mm by stormwater runoff, however, has declined cover for subsequent inundation levels claiming it was due to breakout flows from Western Creek (WC) and its tributaries.  The property was not inundated by water from a „watercourse‟ as defined within the policy.  It appears that the FSP originally proceeded to decline the claim without having obtained adequate evidence to establish it was flood damage. In relying on generic reports the FSP did not adequately investigate the claim.  The FSP, through previous decisions, caused the Applicant to assume that he held the appropriate cover under the policy and that damage of this nature to his property would be covered.  The insured property was inundated on 11 January 2011 with two major bursts of rain over the area between 8.00am-9.30am and 12.00pm-3.00pm.  The water responsible for the inundation of the property came from the north and down the hill and surrounding elevated properties before flowing away to the west.  The FSP has failed to discharge its obligations under Section 35 of the Insurance Contracts Act 1984 (the Act).  The FSP failed to act with utmost good faith, i.e. it failed to adequately inform the Applicant of the shortcomings of the policy, misrepresented that flood cover was not necessary and further misrepresented that such events were covered by accepting his previous claim for inundation of the property. 8. The Applicant is seeking indemnity under the policy for the full extent of his loss including cracking of the concrete slab. Summary of FSP’s position 9. Due to the nature of the event and in order to provide customers with a response as soon as possible the FSP initially relied upon the overall area reports in conjunction with site specific loss adjusters‟ reports. 10. In the spirit of good faith, the FSP prior to determining quantum issued a payment of $10,000 to the Applicant towards damage for initial stormwater runoff inundation up to 150mm. However, following further investigation it was determined that the quantum of the loss (up to 150mm) fell short of the Case No: 265237 Determination Page 3 of 12 $10,000 already paid and for which the FSP as a gesture of good will elect not to seek reimbursement from the Applicant. 11. The FSP refutes the Applicant‟s allegations in respect to the conduct of its agent „KP‟, at the time the policy was arranged by the Applicant. The FSP has submitted a statutory declaration from KP addressing this issue. Further, the onus rests with the Applicant to ensure the policy was suitable for his needs. 12. The FSP notes it is not in dispute that the Applicant was provided with the relevant policy documentation at inception and subsequent renewal of the policy (prior to the loss), which clearly informs that loss or damage arising from flood is not covered under the policy. 13. The FSP does not accept the Applicant‟s contention that the policy wording is unclear and/or too broad in respect to the flood exclusion. It is the FSP‟s position that the wording is clear and the onus lies with the Applicant to read the policy to ensure that it meets his needs. 14. In relation to an event which occurred in 2008 (as advised by the Applicant) the FSP notes the policy was incepted in November 2008, and its records do not indicate any claim lodged under the policy in 2008. It does, however, confirm a claim for stormwater runoff damage was lodged and accepted under the policy in 2009. 15. The FSP maintains that it has based its decision to decline the claim on the evidence made available by its commissioned hydrologist „W‟, a report submitted by the loss adjusters „C‟ and the engineers‟ report submitted by „M‟. Further, the claim in 2009 was accepted on the basis of the report submitted by the then appointed consultants who determined there were no flood issues involved in the inundation of the insured property. 16. The FSP refutes the Applicant‟s position that it failed to fulfil the onus placed upon it under Section 35 of the Insurance Contracts Act 1984 (the Act). 17. The FSP relies on the following policy provisions: “Words with special meanings …. “ flood ” means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon whether or not altered or modified or of any reservoir, canal or dam. [Note: this policy does not cover loss, liability, injury or damage caused by or arising from flood to buildings and/or contents]. ... “ rainwater ” means rain falling naturally fr om the sky onto buildings and/or ground. ... Case No: 265237 Determination Page 4 of 12 “ runoff ” means rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools or spas. … Insured events we will pay ... 9. Storm rainwater or runoff … We will pay for loss or damage caused by storm, rainwater or runoff. “ storm ” means violent wind (including cyclones and tornados), thunderstorms and hail which may be accompanied by rain or snow. „ rainwater’ means rain falling naturally from the sky onto buildings and/or ground. “ runoff ” means rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools or spas. … We will not pay for loss or damage; a caused by;  flood, or  flood water combined with runoff and/or rainwater. “ flood ” means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon whether or not altered or modified or of any reservoir, canal or dam. ... When we will not pay a claim under your policy ... 2. Unless we state differently in your policy, we will not pay for: a. flood as defined on page 5;” Issues 18. Whether the policy issued expressed to the Applicant the relevant cover and exclusion in a clear, concise and effective manner; and 19. Whether the water inundation to the Applicant‟s home was flood water as defined by the policy or rainwater runoff. Relevant Law Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the Case No: 265237 Determination Page 5 of 12 contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. Reasons for decision 20. As advised to the parties, FOS has considered it appropriate to elevate the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 21. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 22. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. In these circumstances the details contained in the relevant hydrological reports will not be recited in this Determination except where considered relevant. 23. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. 24. The Panel notes the parties do not dispute the following:  The Applicant held an active Home Insurance Policy with the FSP at the time of loss.  The FSP provided and the Applicant received the relevant policy documentation at inception and subsequent renewal periods leading up to the date of loss.  At inception of the policy the Applicant was informed that the policy did not cover loss or damage arising from the event flood.  The Applicant read the PDS and noted that it advised the policy did not cover loss or damage arising from flood.  The insured property sustained damage arising from water inundation on 11 January 2011. Further, the property previously sustained damage arising from stormwater inundation in 2009 and for which the FSP accepted a claim.  The FSP accepted to cover loss of the insured property arising from the insured event of stormwater runoff, up to the noted inundation level of 150mm. Case No: 265237 Determination Page 6 of 12  The FSP issued the Applicant with a payment of $10,000 under the claim. Misrepresentation and Inception of the policy 25. The Applicant maintains at the time of arranging the policy with the FSP‟s agent and arising from the conduct/advice of its representative KP, he felt that the policy included adequate cover for his home having regard to its location. He has submitted a Statutory Declaration dated 18 May 2012 which states in part:  He purchased the policy in the bank at which time he spoke to a representative there, who had always been helpful and good with him.  The lady advised the Applicant that he would not be covered for flood damage but also advised him that it would not be a problem due to the pro perty‟s location. 26. The FSP has rejected the Applicant‟s allegation in this regard and has submitted a Statutory Declaration by KP dated 28 December 2011 which states in part:  She did not recall the conversation with the Applicant at inception of the policy.  If asked about flood cover she would refer them to the PDS and definition of flood.  At no time would she have made recommendations to customers or advised them that they would not need flood cover. 27. The Panel acknowledges the evidence made available by the parties and notes that it is not in dispute the Applicant was both verbally informed that the policy did not include flood cover and he acknowledges having noted this whilst reading the PDS provided to him by the FSP. The matter in contention in this respect relates to the allegation that KP in addition to informing him that the policy excluded flood damage also suggested that this would not be a problem, due to the location of the property, an allegation KP has rejected. 28. There does exist an onus on the Applicant to inform himself of the scope and limitations of the policy which he acknowledges he was aware off prior to the loss. It is also noted that the policy was purchased in 2008 with the date of loss occurring in 2011. This allowed the Applicant several years to, not only read and consider whether the policy was appropriate to his needs, but to also arrange alternative cover in the instance he was not happy with the scope of cover available under the policy. 29. The Panel notes that both parties have made available statutory declarations in support of their positions relating to what was or was not discussed at inception of the policy. The fact that the Applicant was made aware of the flood exclusion remains undisputed, accordingly in the absence of any Case No: 265237 Determination Page 7 of 12 independent evidence to support either party‟s position and/or to establish the extent of flood cover was discussed between the parties, the Panel is not satisfied, that it has been established there occurred any misrepresentation arising from the conduct of KP at inception of the policy. The FSP in providing the Applicant with the relevant policy wording at inception and renewal of the policy prior to the loss fulfilled its obligations in this respect under Section 35 of the Act. Clearly inform and Policy Wording 30. The Applicant has argued the FSP‟s policy wording is in breach of Section 35 of the Act and that it is the FSP‟s responsibility to ensure the policy documents are clear, concise and effective. 31. The Panel has examined the FSP‟s PDS and Policy document . The document consists of 51 pages. A “Table of Contents” is found on the opening page and page 1 of the document (PDS) provides a number of emboldened sub headings each with a sequence of headings relevant to that sub heading. 32. A similar index is found f or the cover provided “If you have buildings cover” and “If you have contents cover” sections of the document. 33. One such sub heading is titled “Insured events we will pay” followed by a range of specified events. Included in the range of specified events is the event “Storm, rainwater or runoff ” with the page number indicating where this event is found. 34. The Panel having reviewed the event “Storm, rainwater or runoff ” in the PDS notes that it provides the definitions of relevant terms i.e. storm, rainwater, runoff and following these definitions is the statement that flood is not covered immediately followed by the definition of flood with the word “flood” in bold. 35. The index also provides the sub heading “When we will not pay a claim under your policy” referr ing the reader to page 43 of the document. Included at point 2 in this section is the wording which excludes flood as defined and refers to the page number (page 5) where the definition is found. 36. After analysis of the document the Panel is satisfied that the policy is clearly indexed and the exclusion from cover, loss or damage caused by flood is clearly expressed. 37. The Panel as noted above acknowledges the Applicant does not dispute having received and read the PDS and/or being verbally informed of the relevant flood exclusion. Accordingly, the Panel considers the FSP is entitled to rely on the terms of the policy. In light of the matters discussed and acknowledged above, the Panel is satisfied the FSP has fulfilled the obligations placed upon it under Section 35 of the Act. Utmost Good Faith Case No: 265237 Determination Page 8 of 12 38. The Panel has also considered the Applicant‟s position in respect to the FSP‟s alleged breach of its responsibility of acting with the utmost good faith in respect to its failure to draw his attention to the policy limitations. The Applicant maintains he relied upon the FSP as a reputable insurer to adequately inform him of the flood exclusion. Further, that by failing to bring the inadequacy of the cover available under the policy to the Applicant‟s attention the FSP has failed to fulfil its obligations to him. 39. Whilst the Panel can understand the Applicant‟s concern with respect to this, it is well established law that the onus is on the Applicant to identify the cover that he needed and to request of an FSP the type of cover required. In these circumstances, the Panel is satisfied there has been no breach of the duty of utmost good faith. Cause for the damage 40. The Panel has been provided with several consultants‟ reports commissioned by the FSP in respect to the cause and extent of damage to the insured property. It notes that this information has been exchanged between the parties each having had the opportunity to comment. Accordingly, in the interest of brevity the Panel will only reiterate information from these reports it finds necessary in providing this determination. C’s (loss adjusters) Report dated 18 February 2011  The dwelling was noted to be approximately 50 years old and in below average condition.  The contents stored within the lower level storage/workshop area appeared to be damaged beyond salvage.  The Applicant could not describe the origin of the water which inundated the property W’s Individual Site Flood Assessment Report dated 29 September 2011.  Site inspection was undertaken on 28 August 2011.  The property is situated approximately 1.6km from the Bremer River (the river) and 400m north of WC.  There are several drainage channels in Rosewood to facilitate drainage from the northern catchment upstream of the township down to WC and the river.  A culvert is located to the front of the property and a kerb and channel run eastward along Ipswich Rosewood Road (IR Road). Another drainage channel in front of the property starts at the intersection of School Street and IR Road which conveys flows to an open earth drain 200m east of the site. Case No: 265237 Determination Page 9 of 12  Debris marks were measured to be approximately 500mm above the concrete slab lower floor level with a peak inundation mark measured on the exterior south west corner of the ground floor at 540mm.  The concrete floor slab of the lower level appears to be lower than the surrounding ground level.  The nearest rainfall gauges to the site are Tallegalla and Rosewood gauges, 4.4km north and 0.7 west of the site, which indicated approximately 459mm of rain fell between 8-14 January. Rainfall intensities ranged between 5-100 year events, with the same for short intensity rainfall (two hour) durations.  Both gauges show there were two bursts of rainfall on 11 January, in the morning around 8.00am-9.30am and then in the afternoon between 12.00pm-3.00pm.  The closest water level gauges to the site are the Rosewood WWTP Alert located on WC (0.7km west) and Rosewood Alert on Bremer River 1.8km south of the site.  Ground levels at the site range from approximately 41.9m AHD – 42.1m AHD with ground levels immediately adjacent to the house being approximately 42m AHD.  The local stormwater catchment that drains to the east past the site is estimated to be around 4.5km 2 .  Rosewood has a history of flooding, with two major catchments contributing to the flooding of the area which drain in a south easterly direction to the Bremer River.  Having undertaken a comprehensive analysis of the flood events in Rosewood W concluded that:  The most likely cause of inundation at the site would be stormwater in the first instance and then breakout flows from WC and the Southern Drainage channel.  A conservative estimate of stormwater inundation that initially occurred between 8.00am-9.00am at the property would be 150mm, with the full inundation level of 540mm subsequently occurring due to a contribution of flows from WC and its tributaries. M’s Cause of Building Movement Damage Report dated 8 February 2012  A site inspection was undertaken on 6 February 2012 with M having undertaken a previous inspection at the site on 21 July 2009 for the previous inundation event.  The dwelling is a pre WW2 high set, pole platform style which has been raised up from its original 700mm high timber stumps and re-stumped on 1.9m rectangle concrete posts. Case No: 265237 Determination Page 10 of 12  Since M‟s previous visit in 2009 there h ave been no structural changes, with the concrete slab floor still lower than the outside ground level with there being no facility for drainage.  During heavy rainfall runoff from the road runs through the property and ponds on the concrete slab floor under the house.  The highly reactive black clay founding soil becomes saturated and loses its load bearing capacity causing the posts to sink into founding soils differentially due to the weight of the house.  About 200mm of stormwater runoff flowed under the house in January 2009. Stormwater overflows the gutter at the front of the property during a deluge and flows towards the house and under the front steps making its way under the lower level front door and down the side of the house.  The concrete slab which was cracked previously had developed into a major crack. The cause for the damage to the property was noted as:  The concrete slab floor being lower than the outside ground level with no facility for drainage.  This allows runoff during heavy storm events to run through the property.  The highly reactive soil becomes saturated and loses its load bearing capacity resulting in the sinking of the posts. M’s Cause of Earth Movement Damage dated 22 July 2009 41. The FSP has also made available a copy of the report s ubmitted by M after having undertaken an assessment of the insured property under the Applicant‟s claim lodged in 2009. The report states in part:  M noticed that most of SHS posts had blocks of wood packed on top under the bearers, which indicates the posts had sunk into the founding soils since being installed.  The Applicant advised that in the seven years he had resided at the property he had not placed blocks under the bearers.  It was apparent that the slabs, posts, piers and footings had been sinking into the founding soils, over a long period of time, with recent deluges exacerbating the situation.  The Applicant advised the property had been inundated three times since 2008, including the February 2009 event.  In M‟s opinion:  The garage concrete floor had long term cracking.  The process of building elements sinking into the foundation soils has been going on for many years. 42. The Panel has considered all of the available evidence submitted by and relied upon by the parties and having considered similar disputes in the same vicinity as the Applicant‟s property, it is satisfied that the initial Case No: 265237 Determination Page 11 of 12 inundation of the home was due to stormwater runoff, this being an event covered under the policy. 43. The Panel is also satisfied that the evidence clearly establishes Rosewood and in particular the location of the insured property is highly susceptible to water inundation after periods of intense rainfall, which on this occasion was subsequently followed by floodwater flows from WC and its tributaries. 44. The evidence clear ly establishes that the Applicant‟s home is constructed on highly reactive soils/clay, which arising from the lower level of the property compared to surrounding ground levels and in particular the road to the front, has over the years been repeatedly saturated arising from runoff inundation. This is supported by the engineers‟ observations of the raising of the home and wood packing under the bearers. 45. The Panel is satisfied that the evidence, on the balance of probabilities, establishes that the issue with the sinking of the posts/stumps and resultant damage including cracks in the brickwork and concrete slabs has been ongoing for an extended period of time (many years) and the effects have only been exacerbated by the recent storm events. Accordingly, the Panel is not satisfied that the noted structural damage including cracks in the concrete slabs is covered under the policy as it considers the proximate cause of the damage to be both long term and arising from „soil movement‟; while stormwater runoff may at some stage have been a contributor to the movement, so too was flood. In these circumstances the policy does not respond. 46. The Panel accepts that the extent of the FSP‟s obligation under the policy is to provide cover to the Applicant for the damage arising from the insured event i.e. stormwater inundation damage. The Panel notes the FSP has accepted to cover loss or damage to the Applicant‟s contents arising from the initial stormwater inundation level up to 150mm. The Panel notes this was a conservativ e calculation of the (runoff) inundation level by the FSP‟s consultant. However, the Panel is satisfied that the weather conditions experienced in January 2011 were anything but conservative including the resultant loss suffered by home owners arising from these extreme weather events. 47. M in his latest report has referred to an initial inundation level of approximately 200mm having noted markings on the front lower level door and accordingly the Panel is satisfied that the FSP is obliged under the claim to cover the Applicant for:  any loss or damage arising from the recent runoff inundation of the insured property up to 200mm, including damage to doors etc.  any loss or damage to the insured contents stored within the lower level of the insured property arising from the runoff inundation up to 200mm. Case No: 265237 Determination Page 12 of 12 48. The Panel notes that there is no assessment or Scope of Works as to the loss suffered by the Applicant. Accordingly, the parties are asked to work cooperatively together to determine the loss and therefore the FSP‟ s liability. 49. The FSP has already paid the Applicant some money under the claim and which has been noted to be $10,000. Therefore it is entitled to take into account this amount when determining any further possible sums payable to the Applicant in line with this Determination. Determination 50. On the basis of the available information the Panel determines the FSP is obliged to provide indemnity to the Applicant under the claim in accordance with the matters discussed in paragraph 47 above. 51. The FSP is to pay interest to the Applicant at the statutory rate from 10 October 2011 (date of FSP‟s final decision) to the date of final settlement of the claim for any amount (if) over and above payments already issued to the Applicant under the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.