Text of the determination
Case No: 265224 Determination Page 1 of 13
Case number: 265224
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
7 December 2012
Background
1. The Applicant held home and contents policies with the Financial Services
Provider (FSP). The policy covered the home up to $295,000 and contents
up to $88,000.
2. Her home in Fig Tree Pocket was inundated with water in January 2011,
following severe weather events in Queensland.
3. The Applicant lodged a claim for the resultant damage which was .denied by
the FSP on the basis that the damage was caused by river flood, which is
specifically excluded under the policy
4. The Applicant disputes the claim declinature on the basis the inundation
arose from an insured event.
Summary of Applicant’s position
5. The Applicant is represented, and for convenience hereafter throughout this
Determination, the Applicant and her representative will be referred to as
“the Applicant”.
6. The Applicant is a self refunded retiree. Originally she purchased the policy
of insurance through National Seniors. She describes her purchase of the
original policy as follows:
“I followed up on an add (sic) in the National Seniors magazine. At the time
[FSP name] had a dedicated phone number for National Seniors members,
called the „National Seniors hotline‟ which handled any enquiries. I assumed
that if [FSP name] advertised in the magazine that National Seniors
recommended them as a reputable company. After the flood in January, when
my interaction with [FSP name] was not looking good, I contacted National
Seniors Association to see if they could help with my claim. I was then told
they no longer used [FSP name] as an insurer and therefore were not
interested in my claim...I chose [FSP name] because National Seniors were
supposedly looking after seniors and they seemed a reasonable company to
have insurance with. I guess I took the recommendation of the National
Seniors. I can‟t remember back that far whether I inquired about other
companies or not, I suspect I did as that is usually how I operate....I believe
Determination
Case No: 265224 Determination Page 2 of 13
that I was sent a PDS originally but have not had a PDS sent to me for many
years.”
7. The FSP has breached its duty of utmost good faith by providing a product
that was unsuitable to her needs. The Applicant has suffered a loss due to
the poli cy‟s inadequate coverage of her circumstances.
8. The Applicant submits that as she was not informed of the policy terms and
conditions as required, that the policy should revert to standard cover which
includes flood cover. This is because flood is a prescribed event for the
purposes of Section 35 of the Insurance Contracts Act 1984, as defined by
Section 14 of the Insurance Contracts Regulations 1985. The Corporations
Act 2001 further requires clear, concise and effective disclosure.
9. The Applicant says the policy is confusing with respect to the definitions for
river flood, storm and flash flood. The Applicant submits the definitions are
oppressive or unusual. As a result, the FSP has not fulfilled its obligations
under the Insurance Contracts Act 1984 (the Act) to clearly inform her of the
flood exclusion, and should not be able to rely on it. Further, there is
common law that holds the provision of the document may not be sufficient
to clearly inform an insured of relevant provisions if inadequate attention is
drawn to certain provisions or if the document is complex and confusing. The
Applicant contends that the policy language is unclear and unambiguous and
the framework of the provisions is complex and confusing. A person of
average intelligence and education would have great difficulty in
understanding whether damage caused by wet weather events would be
covered under the policy.
10. The Applicant says that the evidence relied upon by the FSP is inadequate
to prove that the damage to her home was caused by river flood. Further, the
hydrologist report ignores the eyewitness version of events and bases
conclusions on an alternative version of events. The hydrologist assumes
that the home was inundated by sewerage backflow at the same time as the
flood water inundation.
11. The Applicant contends that there is evidence that a storm occurred on the
morning of Tuesday 11 January 2011, which caused flash flooding in the
local area. The FSP should pay her claim under the insured event of „Storm,
Rain or Flash Floo d‟. The Applicant describes the occurrence as follows:
“The weather on the Tuesday was very heavy rain most of the day, with I think
some thunder. I left my house late afternoon Tuesday 11 th January taking with
me a few clothes, my computer, my passport and some tinned food. I left at
this stage as the accommodation that I could go to was through roads in low
lying areas.
My neighbours tell me that water originally flowed from Biambi Yumba Park
when water in the lake in the Biambi Yumba Park backed up because of the
inflows from the surrounding areas and were unable to escape. The water
entered my property from the front yard which faces the park. The property
has a slight slope towards the road. I left the house late on Tuesday afternoon
and there was no water in my property though water was flowing towards the
park and the man made lake had already increased its normal level”
Case No: 265224 Determination Page 3 of 13
12. In the alternative, the Applicant submits the claim should be paid under the
insured event of „Water and Other liquid‟, and notes th at the exclusions
which apply to this insured event do not include „river flood‟. There is
evidence in the form of watermarks that the water already sitting in the pipes
overflowed on the second level of the home. Further, the evidence is that the
Applican t‟s property was inundated by water escaping from pipes, road
gutter or curbing and accordingly it falls within the insured event under the
policy. A reasonable consumer would understand a stormwater drain to be
part of a pipe, water main, road gutter and curbing. The group of words is in
the same genus as a stormwater drain as a stormwater drain is an
underground pipe connected to road guttering and curbing. Further, there is
no exclusion of river flood to the Water or Other Liquid event.
13. The Applicant relies on the following policy terms and conditions:
“You are insured for damage to your home caused when water or another
liquid suddenly escapes from:
...
the
Road gutter or curbing
Water main or pipe.”
Summary of FSP’s position
14. The FSP relies on the following policy provisions:
“ This document contains important information to help you understand this
insurance. It is up to you to choose the cover you need. Any advice in
this document is of a general nature only and has not considered your
objectives, financial situation or needs. You should carefully consider
the information provided having regard to your personal circumstances
and decide if this insurance is right for you.
...
What you are not covered for
There are certain times when this insurance may not provide cover.
Some events we may not cover include:
Damage caused by the seas or tidal wave or river flood (see Section
1.12).
...
Definitions (The Meaning of Some Words)
Some words and expressions in this policy have a specific meaning which
are given below. Each word is printed in bold where it appears.
…
“flash flood” means what occurs when there are heavy, intense
bursts of rainfall, usually during thunderstorms where so much water
falls in a very short time that it cannot get away quickly e nough and
Case No: 265224 Determination Page 4 of 13
collects and flows into your home.
but does not include when rainwater on the site :
cannot runoff into a water catchment system , because it is
overflowing in flood; and
mixes with flood water coming from the water catchment
syste m and then flows into your home.
…
“rain” means water that has fallen from the sky on to your building and the
site but not water from flash flood .
...
“river flood” means when water that is normally contained in a
water catchment system increases because of rainfall or snow
melt (whether in the immediate region or elsewhere) or is
deliberately released by an authority, and the water overflows onto
land that is not normally covered by water into your home.
For example water may be deliber ately released by an authority from a dam
or reservoir.
...
“storm” means violent weather and high winds, sometimes accompanied by
rain, hail or snow including a cyclone, tornado or willy willy.
...
“water catchment system” means:
a river, creek, or other natural watercourse or lake, whether or not they
are in their original state or have been modified, are named or unnamed,
or normally dry that only run during periods of rain;
a dam, reservoir, stormwater channel or canal.
…
1.12 Storm, Rain or Flash flood
You are insured for damage to your home caused by storm, rain or flash
flood.
We will not pay for water damage caused by storm or rain
- seeping or otherwise entering your home unless the water entered
through an opening in the wall or roof that had been made directly by
the storm or rain or as a direct result of it.
...
We will not pay for damage caused by:
the seas or tidal wave;
river flood ;
erosion or earth movement . ”
15. The FSP notes the proposal form contains:
A statement that “please ensure you read your Home and /or Contents
Insurance Policy booklet(s) thoroughly before completing this form”
Case No: 265224 Determination Page 5 of 13
A declaration signed and dated by the Applicant that she had read and
understood the Policy Disclosure Statement.
16. The FSP has enclosed a document which appears to have been issued
about November 2003 entitled „INVITATION TO RENEW & TAX INVOICE‟
with an expiry date of 29 November 2003 for cover to 29 November 2004 or
29 May 2004, (being for 6 months or 12 months cover, subject to the
insured‟s election. This d ocument is 5 pages long and contains a statement
regarding (inter alia) the definition of flash flood, river flood, water catchment
system and rain and exclusions regarding (inter alia) river flood.
17. The assessor report from “C” notes::
The lower floor was completely inundated and the upper floor was
inundated up to 0.5m.
The lower level of the home rests on a slab and is approximately level
with the surrounding grounds.
The home is approximately 1m higher than street level.
The Applicant informed C that there was heavy rain on Tuesday and
she was evacuated around 4pm on Tuesday 11 January 2011.
The Applicant is unaware of what time the rain stopped or when the
property was inundated.
The Applicant did not know what direction the water came from but
notes it was dirty and reached a level of 3-4m in the yard.
18. The FSP relies on its hydrologist report dated 9 October 2011 from “W which
found:
The Applicant left the property at approximately 4pm on Tuesday 11
January 2011. The initial inundation of the property above floor level
occurred after the Applicant left. At the time of the Applicant‟s departure
it was still raining and there was no water in the house at that time.
Further, the water level in the pond had not exceeded its banks.
Watermarks on wooden furniture in the house clearly showed the
maximum depth of the inundation (measured to be 0.4m above the
upper floor level by W. Water marks on the upstairs toilet indicated that
it had overflowed.
The maximum stormwater runoff depth at the subject property would
have occurred within 10-30 minutes of the maximum rainfall intensity.
Very little rainfall was recorded at the Corinda High Alert rainfall station
after 5pm on Tuesday 11 January 2011.
The subject property is situated adjacent to Biambi Yumba Park. It is
located approximately 300m from the Brisbane River to the south-west
and 570m to the north-east. Biambi Yumba Park is lower than the
surrounding areas and contains a pond that overflows to the Brisbane
River via a piped stormwater system. The Brisbane Ri ver also has a
Case No: 265224 Determination Page 6 of 13
threshold level for Brisbane River overbank flooding of the park of
approximately 9m AHD.
Prior to Biambi Yumba Park and the surrounding area being inundated
by overbank flooding, the Brisbane River flood water would have
backed up through the piped stormwater system and caused significant
inundation in this area. Later floodwater from the Brisbane River to the
north-west of the subject property would have flowed east and south
toward Biambi Yumba Park.
Rainfall in the area had ceased more than 8 hours prior to initial
inundation of the subject property above the lower floor level.
Where flood water is able to enter the piped sewer system, it is
possible for water to back up through the sewer system and surcharge
from toilets, and bath and shower drains. The timing and depth of the
inundation from water backing up through the sewer system is not able
to be accurately estimated based on available information. However, if
the upstairs toilet overflowed, it is likely to have occurred at
approximately the same time as inundation of the upper level by
floodwater.
Initial inundation of the lower floor level at the insured property occurred
after approximately 1am on Wednesday 12 January 2011. Inundation
of the lower floor level to a depth of approximately 1.2m resulted from
Brisbane River floodwater backing up through the piped stormwater
system and flowing overland to the house, prior to the arrival of
overbank flooding some 5 hours later. Stormwater run-off did not
contribute to inundation of the subject property above the lower floor
level.
The timing and depth of inundation from water backing up through the
sewer system is not able to be accurately estimated based on available
information. However, if it occurred, it is likely to have been at
approximately the same time as the floodwater inundated the property.
19. The FSP rejects that Applicant‟s allegation that it breached its duty of utmost
good faith, saying that its duty does not extend to assessing whether the
Applicant lived in a flood prone area, or providing advice on the suitability of
a particular policy to the risks faced by the Applicant. Further the Applicant
does not assert that she was under the belief the policy provided flood cover.
20. The FSP submits the Applicant actually acknowledges receiving the Product
Disclosure Statement (PDS) in her statement, by signing the insurance
proposal form and would not have renewed in 2004 if she did not receive the
document outlining the definitions of those relevant clauses.
21. It says its policy wording is clear and unambiguous regarding the exclusion
of river flood. Further, the document provides cross-referencing that a
person of average intelligence and education would have little difficulty in
locating the „river flood‟ exclusion clause. The FSP clear ly informed the
Applicant of the exclusion of river flood from cover through the provision of a
PDS.
Case No: 265224 Determination Page 7 of 13
22. The hydrological evidence available shows that the inundation of the
Applicant‟s home was caused by the rising of the river water levels not
stormwater run-off. Further, as river flood is excluded from cover, it was
entitled to deny liability for the damage resulting from this inundation.
23. The FSP also says that the rising level of the river resulted in back flow
through the stormwater drainage system. This means that regardless of
whether or not the water which inundated the property came up through the
stormwater drain, the proximate cause of the inundation was river flood,
which is excluded under the policy. Alternatively, the Wayne Tank rule would
apply as flood water has mixed with any water already sitting in the pipes.
24. There were insufficient levels of stormwater runoff to inundate the property.
25. The FSP notes the Applicant‟s contention that this matter should fall under
the insured event of escape of water or liquid. The FSP responds as follows:
The water mains and pipes are specific structures which carry water to
and from residential areas and are entirely distinguishable from
stormwater drains.
A road gutter or curbing is again a specific part of the road structure,
being the edge where a raised footpath meets an unraised roadway.
This is distinguishable from a stormwater drain.
The interpretation of these words, to assert a stormwater drain is in the
same genus as water mains and road curbing, should not be accepted.
To do so would result in every flood being classified as „escape‟ since
in most residential flood water passes through or over guttering. This
would render the flood exclusion meaningless.
The cover for „water or other liquid‟ is directe d to damage caused by a
sudden leak in a specific water carrying system. The section also refers
to finding the source of a leak in the relevant system and fixing it.
Issues
26. Whether the FSP breached its duty of utmost good faith.
27. Whether the FSP was entitled to rely on its policy terms and conditions.
28. Whether the FSP was entitled to decline the Applicant‟s claim.
Reasons for decision
29. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‟s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
Case No: 265224 Determination Page 8 of 13
30. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
31. There has been an exchange of material between each party and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
32. The Panel considers there are three discrete issues (listed above) which will
be dealt with separately.
Whether the FSP has breached its Duty of Utmost Good Faith
33. The Applicant has alleged the FSP breached its duty of utmost good faith by
failing to ensure the policy provided adequate coverage or was suitable to
their needs.
34. There is no legal principle that supports the Applicant ‟ s argument that an
insurer‟s duty of utmost good faith extends to enquiring and ensuring its
policy is appropriate to the insured‟s needs The FSP does not have the
relevant licensing under the Corporations Act 2001 to provide such financial
service advice and it would be a breach of the relevant legislation had it
done so.
35. Further the FSP‟s polic y:
Is a standard home insurance policy that appears to be available to the
general public as opposed to being tailored to the Applicant‟s needs,
and
Had a 21 day cooling off period which provided the Applicant‟s ample
opportunity to review the contract and obtain advice on it to ensure it
was suitable to their needs.
36. There is no indication that the Applicant received any representation that the
policy would cover flood. Further, the Applicant was encouraged to read the
PDS prior to applying for the policy to allow her to assess whether it met her
needs.
37. Given this, the Panel does not accept the FSP breached its duty of utmost
good faith with respect to offering its standard home insurance policy to the
Applicant.
Whether the FSP is entitled to rely on its Policy Terms and Conditions
38. The Applicant has alleged that she has no recollection of receiving her PDS.
The Panel considers this position difficult to sustain in light of the Applicant‟s
admission of receiving the policy at inception in 2000, the signed
acknowledgment of receiving/reading the PDS and the renewal notice of
November 2003 which also contained PDS terms.
Case No: 265224 Determination Page 9 of 13
39. The Panel accepts that the Applicant has in fact received the PDS. It should
also be noted that the FSP is not required to send a new PDS on each
renewal.
40. The Panel has reviewed the submissions from both parties on the matter,
and has examined the policy wording.
41. The Panel accepts that the definition of „flash flood‟ is clear and
unambiguous, and does not accept the Applicant‟s argument that the terms
„usually‟ and „short time‟ within the definition are ambiguous and unclear.
42. Further, in the Panel‟s view, the statement within the definition that „flash
flood‟ does not include when rainwater on the site:
Cannot run off into a water catchment system because it is overflowing
in flood; and
Mixes with flood water coming from the water catchment system and
then flows into (your) home
is consistent with established law authorities on these matters, and
appropriately clarifies what is meant by „flash flood‟.
43. The Panel accepts that the policy definition of „river flood‟ is clear and
unambiguous, and is satisfied that „river flood‟ is excluded from coverage
under the insured event of „storm, rain or flash flood‟.
44. However, the section of the policy titled „What you are not covered for‟
states:
“There are certain times where this insurance may not provide cover.
Some events we may not cover include:
Damage caused by the seas or river flood (see Section 1.12).
...
There are only some of the events that are not covered by this insurance.
Please read the Home Cover part of this document which sets out the
exclusions to make sure the cover we provide matches your expectations.
...”
45. The Panel accepts that the „river flood‟ exclusion only applies to the „Storm,
Rain or Flash flood‟ insured event under Section 1.12. As there is no
reference to „river flood‟ under other insured events of the policy the „river
flood‟ exclusion has no application to other insured events under the policy.
46. The Applicant has argued that other aspects of the policy are unclear and
ambiguous, however the Panel does not consider that any of these
arguments to be relevant to the dispute.
Case No: 265224 Determination Page 10 of 13
Whether the FSP was entitled to decline the Applicant’s claim
47. It is an accepted principle of general insurance that an insured bears the
onus to prove, on the face of the facts, that they have suffered a loss caused
by an event to which the policy responds. Once so established, the onus
shifts to the insurer to prove that exclusion applies if it seeks to limit or deny
the claim.
48. The FSP‟s hydrologist has indicated that the stormwater drains likely
commenced surcharging around 1.00am on Wednesday 12 January 2011
prior to the overland flooding 5 hours later. However, he also stated that if
the upstairs toilet overflowed, it is likely to have occurred at approximately
the same time as inundation of the upper level by floodwater (which he
estimates to be 6.00am on 12 January 2011).
49. The Applicant has submitted the toilet and stormwater drain fall with the
intention of the FSP‟s policy “Water Or Other Liquid” which provides cover
for escape from such things as a pipe, water main or part of the road gutter
and curbing. The Applicant points to the several of the terms within the
description of the insured event of „Water and Other Liquid‟, including “pipe”,
“toilet” and “plumbing system” which are consistent with what a reasonable
consumer would regard as a sewer. Further, she says that these words are
in the same genus as a stormwater drain, which is an underground pipe
connected to road guttering and curbing.
50. The Applicant has argued that the wording of the policy under 1.7 provides
for cover for water discharging from stormwater drains (regardless of the
source). The Applicant maintains that a stormwater drain is a pipe, water
main or other part of the road gutter and curbing and therefore falls within
the definition of damage by “water or other liquids” under 1.7 of the policy.
51. The FSP on the other hand argues that FOS should not accept that a
stormwater drain fits into the description of water main or pipe, as water
mains and pipes are specific structures that carry water to and from
residential areas. Further, the FSP submits that a road gutter or curbing is
again a specific part of the road structure being the edge, where a raised
meets an unraised roadway, and it is distinguishable from a stormwater
drain.
52. In order to gain a more comprehensive understanding of the dispute the
Panel Chair Ombudsman attended a site visit on 15 November 2012.The
Applicant and a representative from the FSP were present.
53. It is apparent that although the Applicant‟s property is only about 300m from
the Brisbane River the banks of the river are higher than the property.
54. The Ombudsman also noted that there are two parts to the inundation. The
hydrologist says that the first inundation occurred about 1.00am on 12
January 2011 to the lower floor, and this was caused by the Brisbane River
backing up through piped water systems and flowing towards the house.
Case No: 265224 Determination Page 11 of 13
55. The second inundation appears to be as a result of direct overland from the
Brisbane River which occurred some 5 hours later inundating the home up to
the second level.
56. It was noted that the initial backflow would have backed up through the
stormwater system to the drains adjacent to the property and also to a pond
situated in a park across the road from the Applicant‟s home.
57. The distinction is critical to this matter given the argument as to whether the
water which caused the first inundation would be covered by the event
“water or other liquids”. As noted, the FSP has argued that a stormwater
system does not fit into the description of water main or pipe.
58. The FSP has addressed this issue in another Determination before the
Service at the request of the Panel. Essentially the argument by the FSP is
that it is the intention of the policy to exclude any damage by river flood and
that where river flood is the cause of the water escaping from the stormwater
drains then that should be excluded under the terms of the policy. The FSP
also argues that there is a distinction between a drain and a water main or
pipe; the intention of the policy is to cover a sudden leak in specific domestic
water carrying systems.
59. With due respect to the FSP‟s argument, the Panel finds the extension of the
cover to include water suddenly escaping from road, gutter or kerbing, water
main or pipe extends cover beyond that suggested by the FSP. In the
Panel‟s view, whilst a stormwater drain should not be classified as a water
main or pipe, where water escapes from a stormwater drain and proceeds to
fill a road gutter or kerbing leading to the inundation of a property then that
would fit within the definition of water suddenly escaping from road gutter or
kerbing and would therefore be covered under the insured event 1.7 of
„water or other liquid‟.
60. The evidence presented in this dispute supports the finding that the initial
inundation of the A pplicant‟s property was as a result of river flood water
back flowing through the stormwater drains and then escaping the drains
into the road and gutters and inundating the ground floor of the Applicant‟s
property.
61. Whilst it is correct to say that the proximate cause of this inundation would
be the river flood, the Panel notes that the river flood exclusion is limited to
the defined event under 1.12 of „storm, rain or flash flood‟. The defined event
under 1.7 of „water or other liquid‟ contains no such ref erence or exclusion.
62. Accordingly, the Panel determines on the balance of probabilities that the
initial inundation of the ground floor of the residence falls within the defined
events under 1.7 of the policy – „water or other liquid‟.
63. The hydrologist‟s rep ort indicates that the property was ultimately inundated
to a depth of 10.9m AHD which resulted in complete inundation of the
ground floor and the second floor of the property was inundated to a depth of
0.4m above floor level. The Panel is satisfied that whilst the initial inundation
Case No: 265224 Determination Page 12 of 13
may have occurred through the insured event under 1.7 of the defined
events policy, the subsequent inundation to the ultimate depth of 10.9m AHD
would have been due to river flood and is therefore excluded under the
terms of the policy.
64. The Panel accepts the Applicant‟s home was ultimately inundated by river
flood for which cover is excluded under the policy. The Panel accepts
however that the property was initially inundated to a level of 1.2m by
floodwater backing up through the piped stormwater system and flowing
overland to the Applicant‟s property before the arrival of the overbank
floodwaters. Such initial inundation is in the Panels view covered under 1.7
of the policy.
65. Although this initial water would likely have emanated from the river, this is
not excluded under the policy cover provided for “water or other liquid”.
66. Once the direct overland flow of water from the river arrived and mixed with
this other water, the resultant mixture is properly characterised as flood and
therefore excluded from cover. The home was ultimately inundated to a
height of approximately 0.4m abo ve the floor of the upper level.
67. The Applicant has also argued that the upper level of their home was
inundated by overflow from the upstairs toilet. The FSP‟s hydrologist has
stated that although this may well be the case, this would likely have
occurred simultaneously with the inundation of the overland flow from the
river.
68. On this basis, the resultant impact of the two sources combined would also
be excluded from cover as being flood.
69. The Panel therefore determines that the FSP is required to indemnify the
Applicant for the damage to their building and contents caused by the initial
inundation of water under its cover of “water or other liquids” to a hei ght of
1.2m in the lower floor.
70. Any damage above that level is excluded from cover and the FSP is not
required to indemnify the Applicant for any loss above that height.
71. All payments by the FSP are subject to the policy limits on the building of
$295,000 and contents sum insured of $88,000.
72. The Panel has insufficient evidence before it to determine quantum. Given
the passage of time it may be difficult to accurately assess the extent of
damage. The parties are requested to work together cooperatively to
determine the amount of loss. The FSP is required to carry out an
assessment of the property and provide a scope of works for rectification of
any damage caused by the inundation of the lower level of the property to a
height of 1.2m.
73. In the event the FSP elects to cash settle the Applicant, it is required to pay
interest at the statutory rate.
Case No: 265224 Determination Page 13 of 13
Determination
74. The Panel determines the FSP was not in breach of its duty of good faith
and was entitled to rely on the policy terms and conditions.
75. The Panel determines the FSP indemnify the Applicant for the initial
inundation of the lower level of the property to a height of 1.2metre above
floor level. Any subsequent inundation a bove that level is in the Panel‟s view
flood and the FSP is entitled to rely on the policy exclusion for flood to deny
liability for that part of the claim.
76. The Panel further determine that the FSP is to pay interest in accordance
with Section 57 of the Act from 31 March 2011being the date of the decision
to deny the claim, to date of payment of the claim.