Home / Financial Firm (Unknown - Insurer) / Determination 265223

Determination 265223

Flood water inundation claim denied; dispute over flash flood cover and proximate cause

FirmFinancial Firm (Unknown - Insurer)
Decided2013-01-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insured's Graceville home was damaged by flooding in January 2011 and the FSP denied the claim as flood. AFCA found the laundry and store room were inundated by flash flood before 4.00am on 12 January 2011 and ordered the FSP to cover that damage, with the main house excluded, a scope of works, and interest if cash settled.

Flash flood cover applies only to inundation occurring within 24 hours of the heavy rain that proximately caused it, and the evidence shows only limited inundation fell within that window.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 265223 Determination Page 1 of 10 Case number: 265223 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim – Flood/ Flash Flood 19 December 2012 Background 1. The Applicant insured her home and contents (located in Graceville, Queensland) with the Financial Services Provider (FSP). The relevant period of insurance operated for twelve months beginning from 11 August 2010. During this period, the building was insured up to a sum of $362,000 and the contents for $82,000. 2. On 13 January 2011, the Applicant lodged a claim under the policy due to extensive water inundation following severe weather events in Queensland. 3. The FSP denied the claim on the basis the damage was due to “flood”. The Applicant, through her solicitors, has disputed this. 4. Both the Applicant and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicant’s position 5. The Applicant submits the following as alternative arguments in response to the FSP‟s decision: a. The FSP breached its duty of utmost good faith by failing to advise the Applicant about the suitability of her insurance cover. b. The FSP‟s policy failed to clearly inform her that “flood” was excluded as required under Section 35 of the Insurance Contracts Act 1984 (the Act). c. The damage was due to “Flash flood and stormwater run - off”, which is an insured event. In particular, the i nundation was due to heavy rain that fell from 4am on 11 January 2011 which resulted in the Wivenhoe Dam operators elevating their strategy to W4. This decision resulted in massive discharges of water into the Brisbane River that ultimately inundated her property. Determination Case No: 265223 Determination Page 2 of 10 d. The FSP has breached the General Insurance Code of Practice (the Code) by failing to provide a copy of its regional hydrology report. 6. The Applicant seeks to be indemnified for her claim. Summary of FSP’s position 7. In response to the Applicant ‟ s arguments, the FSP submits the following: a. The duty of utmost good faith does not extend to an obligation to ensure a policy is suitable to the Applicant‟s needs. There has been no breach as alleged by the Applicant. b. Its PDS and the Certificate of Insurance (COI) clearly inform the Applicant about the scope of the flood cover and enables it to rely on the exclusion clause of “flood” pursuant to Section 35(2) of the Act. c. There has been no breach of the Code. 8. The FSP relies on a number hydrology reports authored by SC and the following policy provisions to deny the Applicant‟s claim : Certificate of Insurance (COI) “ What optional covers are included and not included Home Contents ... Flood and storm surge not included not included...” PDS “ Words / terms with special meanings Word / term Meaning ... Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off . ... Storm A violent disturbance of the atmosphere associated with strong w inds including a cyclone, light ning, heavy rain, hail or snow, but not continuous bad weather by Case No: 265223 Determination Page 3 of 10 itself. ...” Pages 17-18 of the PDS “ Insured events you are covered for Damage caused by weather... What is covered What is not covered Storm Loss or damage:  caused by rain, hail or snow after it has reached the ground... ... Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood... ...” Page 27 of the PDS “ Your home The most we will pay you for home claims What is covered What is not covered Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. ... ...” Page 32 of the PDS “ Your contents The most we will pay you for contents claims What is covered What is not covered ... ... Flash flood and stormwater run-off We will pay up to 50% of your contents sum insured or $25,000, whichever is higher , but not exceeding your contents sum insured . ... ...” Case No: 265223 Determination Page 4 of 10 Issues 9. Whether the Applicant was “clearly informed” about what the policy did and did not cover. 10. Whether the cause of the Applicant‟s loss was cove red under the policy. Reasons for decision 11. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to FOS‟s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 12. The Panel notes that a number of issues raised in this dispute are identical to issues that have been extensively considered in a number of previous Determinations. As these issues have been determined before, the Panel does not consider it expedient to engage them at length and instead proposes to address them summarily at the outset. 13. It is appropriate to consider the issues under the various headings. Was the Applicant clearly informed of the Flood definition in the PDS? 14. The Applicant has also argued that the policy fails to clearly inform as to the derogation from flood cover and/or the limitations on the extent of cover for flash flood. There is no dispute that the Applicant had received the policy documentation and Certificate of Insurance. 15. The Panel has reviewed the FSP‟s policy on a number of occasions. The policy is indexed with relevant sections covering the insured events. The policy sets out the definitions of storm and flash flood and stormwater runoff. The policy clearly identifies that flood and storm surge is an optional cover but otherwise flood is excluded from cover. 16. The Certificate of Insurance also clearly identifies that with respect to the Appli cant‟s policy , flood and storm surge is not covered. 17. A fair reading of Section 35(2) of the Insurance Contracts Act 1984 require that any relevant exclusion and/or limitation be in clear and unambiguous language such that a person of average intelligence and understanding would have little difficulty in finding and understanding the nature and extent of the limitation and exclusions. 18. Having considered the FSP‟s policy, the Panel is satisfied that if the Applicant had read the policy she would have had little difficulty in finding and understanding the limitations and exclusions and accordingly, the Panel is satisfied the FSP has met its obligations to clearly inform the Applicant in accordance with Section 35 of the Act. Case No: 265223 Determination Page 5 of 10 Proximate Cause of the Water Inundation Initial Inundation: storm/ rain water and/or flood water? 19. The Panel notes the Applicant was not at the property at the time of the inundation. Based on her neighbour‟s evidence, the Applicant suggests that her property was inundated at around 4.30am o n 12 January 2011. 20. According to the Applicant:  It rained continuously during the morning of 11 January 2011. It was pouring with rain at 2pm, when she left her house.  The Applicant‟s father, husband and father -in-law left the house around 6pm on 11 January 2011. It was still raining at this time.  The Applicant and her family returned to Brisbane the next day but could not get into the area as the roads were heavily flooded.  The Applicant‟s neighbour „VH‟ was at her own property at the time of the inundation and states:  At 4.30am on 12 January 2011 there was no water in the back yard.  5 minutes later the storm water drain outside the bedroom window started to make loud noises.  3 minutes later the wheelie bins beside the storm water drain tipped over and there was enough water down that side of the house to tip the bins. 21. SC‟s hydrology evidence of 11/1/12 indicates:  The ground level of the Applicant‟s property varies from 6.7m AHD to 7.5m AHD. The house at the property is at a level of approximately 7.25m AHD.  There is stormwater infrastructure on the Applicant‟s street, including a major stormwater drain in the vicinity of the property, which drains to a low point on the street, which continues north, where it joins an open gully which leads directly to the Brisbane River.  There is a curb and channelling and slightly elevated footpaths along the length of the Applicant‟s street.  The terrain information suggests that it would be unlikely that the property would experience significant stormwater problems during rainfall intensities experienced in January 2011.  Data from the Corinda High Alert gauge, located 3km from the property, is representative of the rain that would have fallen at the vicinity of the Applicant‟s property.  The gauge records show 43mm fell during the course of the day on 11 January 2011, with the most intense rainfall recorded between 10am Case No: 265223 Determination Page 6 of 10 and 11am, during which 15mm of rain was recorded. No rainfall was recorded after 5pm on 11 January 2011.  The intensity of the rainfall on 11 January 2011 was very low, at less than 1 in 1 year event.  According to exhibit SQC06 to SC‟s report, the level of the Brisbane River at 2.30am on 12 January 2011 was approximately 6.7m AHD, which would have been sufficient to inundate the minimum level of the property. According to the data, by 5.30am on 12 January 2011, the Brisbane River reached 7.25m AHD, which would have been sufficient to begin to inundate the house at the property. 22. The Panel accepts the hydrological principle that storm or rain water inundation normally occurs within a short time of heavy rainfall. According to the Applicant, the residence was not inundated during the afternoon of 11 January 2011, with no water in the vicinity of the property. 23. Accordingly, it appears unlikely that the heavy rainfall recorded between 10am and 11am on 11 January 2011 caused or contributed to the inundation of the Applicant‟s property early on 12 January 2011. 24. On the balance of probabilities, the Panel is more inclined to accept that the Applicant‟s home was likely to hav e been first inundated by water that could appropriately be regarded as flood water. Releases from Wivenhoe Dam & Proximate Cause 25. The central issue for Determination in this dispute is whether the inundation of the Applicant‟s home on 12 January 2011 was d ue to flash flood as defined within the terms of the policy; that is whether rain that fell no more than 24 hours prior to the inundation of the Applicant‟s property was the proximate cause of the inundation. 26. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders advising that after considerable deliberation of all material available to it, the Panel formed a view that the heavy rain occurring from approximately 4.00am on 11 January 2011 and in particular the heavy rain between 4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4 strategy being invoked and therefore a proximate cause or trigger that led to the flooding of many of the properties along the Brisbane River. 27. At that time, the Panel noted that in relation to the approach that each dispute would depend upon the individual and unique factors relevant to the dispute and in that regard the parties were invited to make further submissions in relation to disputes before FOS. 28. In view of this, the FSP provided detailed further submissions to FOS in relation to this dispute. Included with the submissions were the following documents: Case No: 265223 Determination Page 7 of 10  A Reference document (12 June 2012 and updated 11 July 2012) for disputes relating to Queensland Floods (this is a general reference document) relating to the various submissions the FSP makes in relation to a number of issues. Not all issues raised in the reference document appear in the current dispute;  Letter from the FSP‟s hydrologist, attaching a key information sheet for the Applicant‟s proper ty;  Hydrologist report “Investigations of January 2011 inundation event – Brisbane” dated March 2011;  Statement from hydrologist SC dated 7 June 2012. 29. The FSP maintains that on any reasonable view, the damage sustained to the downstream properties was the combined effect of all of the rainfall and not just the rain that had fallen from 4.00am on 11 January 2011 leading to the implementation of the W4 strategy from 8.00am that day. 30. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment area and in fact parts of the Brisbane River from approximately 4.00am on 11 January 2011. It is not disputed that in addition to this there was heavy rain over the Bremer River which influenced the level of the Brisbane River and that rain commenced at approximately 6.00am on 11 January 2011. 31. The FSP‟s hydrologist has relied on data from SEQWater dated 2 March 2011 which confirms the rapid increase in releases from the Wivenhoe Dam from 8.00am on 11 January 2011. Examination of the SEQWater report identifies the rapid increase in the inflows to the Wivenhoe Dam commencing from about 4.00am, 11 January 2011. The report confirms the inflows into the dam had been decreasing from as early as 8.00am from 10 January 2011 with steady decreases from approximately 3.00pm on 10 January 2011 to 2.00am on 11 January 2011. 32. The Queensland Flood Commission of Inquiry report confirms that prior to 4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011 the dam releases were being managed at the W3 strateg y. Whilst it is accepted that the W3 strategy had led to an increase in the levels of the Brisbane River, the W3 strategy was designed to avoid where possible inundation of the properties below the Wivenhoe Dam by flooding from the Brisbane River. 33. There is no dispute that there were two significant rainfall spikes with rain that fell from 9 to 10 January 2011 being considered the first spike and rain that commenced falling from approximately 4.00am on 11 January 2011 being the second spike. 34. There is no dispute that following the second spike that the W4 strategy was adopted. The FSP has argued that the switch to strategy W4 was not the natural and ordinary consequence of the rain that fell and in fact the move to W4 strategy was not taken in accordance with the Wivenhoe Dam manual. In the Panel‟s view, the Queensland Flood Commission of Inquiry‟s final Case No: 265223 Determination Page 8 of 10 report does not find the adoption of W4 strategy at 8.00am on 11 January 2011 was inconsistent with the manual. Although there may be issues as to how the Wivenhoe Dam had been managed prior to this time, there is nothing in the material that has been provided to the Panel to suggest that the earlier management of the Wivenhoe Dam influenced to any significant degree, the adoption of the W4 release strategy at 8.00am on 11 January 2011. 35. The ICA hydrology and the information provided by the FSP‟s hydrologist confirms that the increased releases from the Wivenhoe Dam after the adoption of the W4 strategy led to the development of a flood wave that ultimately caused the flooding of many properties downstream of the Wivenhoe Dam. 36. The Panel agrees with the FSP‟s general submission that the proximate cause is a cause determined by common sense evaluation of the relevant facts. In the event that there are two or more proximate causes, one within the policy and the other excluded, the policy does not respond. The proximate cause is not determined by identifying the last event or final trigger but by determining what is the dominant, effective, direct or efficient cause of the loss. 37. The FSP has maintained that the impact on the Wivenhoe Dam from the rainfall that fell in the early hours of 11 January 2011 was only 29% while 71% of the volume of the inflow came from the rain that fell on 9 and 10 January 2011 or earlier. The FSP maintains that to find the rainfall which had fallen from 4.00am on 11 January 2011 is the proximate cause is without foundation as such an approach produces an entirely artificial outcome. 38. With due respect to the FSP‟s argument the Panel disagrees. Whilst the Panel accepts there has been a significant impact on the levels of the Wivenhoe Dam by the rainfall that commenced falling on or about 9 January 2011 or earlier, the Panel is satisfied having regard to the information that has been exchanged and the relevant legal principles, that the heavy rain that commenced falling on or about 4.00am on 11 January 2011 was the proximate or effective cause of the adoption of the W4 strategy. 39. The Panel is also satisfied that whilst the level of the Brisbane River may have been increasing under the W3 strategy, it was the heavy rainfall from approximately 4.00am on 11 January 2011 that caused the need to adopt the W4 strategy at 8.00am on the same day. The Applicant’s Inundation – ‘Flash flood’ 40. In order for the Applicant to fall within the relevant flash flood definitions of the policy, it is necessary for the Applicant to establish that the inundation of the property was caused by heavy rainfall that fell no more than 24 hours previously. 41. As the Panel accepts that the heavy rainfall that commenced at approximately 4.00am on 11 January 2011 together with the heavy rain that Case No: 265223 Determination Page 9 of 10 commenced over the Bremer River at approximately 6.00am the same day is the cause of the inundation of the Applicant‟s property, then in orde r for the Applicant to succeed with the claim it will be necessary for the Applicant to establish inundation occurred prior to 4.00am on 12 January 2011. 42. SC‟s statement of 7 June 2012 indicates the effect of the W4 releases first reached the vicinity of th e Applicant‟s property at approximately 2.35pm on 11 January 2011. He estimated that the benchmark level of the property, as RL 7.2m AHD, (described as „Elevated‟) was first reached by the Brisbane River at approximately 5.22am on 12 January 2011. 43. According to SC, by approximately 4.00am on 12 January 2011, the water level would have been approximately 6.9m AHD, which is 0.3m below the relevant benchmark level. 44. The Panel Chair Ombudsman conducted a site inspection of the property on 16 November 2012. The Applicant and a representative from the FSP were present. 45. The Applicant‟s property slopes gently from the front to the rear. The main part of the residence is built on stumps to create a level floor throughout the house. At the rear of the property there is a laundry that is built on a slab on the ground and a back room shed/store room that is also on a slab on the ground. 46. The laundry contained a dryer, washing machine, fridge and other things including according to the Applicant a stored double bed. The store room/shed included gardening equipment, lawn mower and other outdoor items. 47. In discussions with the FSP‟s representative, it was discussed as to how the 7.2m AHD benchmark level was reached. It would appear based on the Key Conclusion Statements in particular reference to the property being on stumps that the 7.2m AHD benchmark was reference to the floor level height. Assuming this to be the case, and given that the river level rose to approximately 6.9m AHD at around 4.00am on 12 January 2011, then it is most likely that water would have entered through the back store room/garage/shed and laundry area prior to 4.00am as it is likely that this area is closer to 6.7m AHD being effectively a slab on the ground. There was also some air conditioning at ground level that had been damaged, but it is difficult to gauge whether the air conditioning would have been at 6.9m AHD or not. 48. Having considered all of the information available, the Panel is satisfied that the Applicant‟s property was inundated to a level of 6.9m AHD by 4.00am on 12 January 2011. At such level, the Panel is satisfied that it is likely the laundry and back store room/garage area would have been inundated to a level of no more than 200mm above floor level. Further, the Panel is satisfied that the floor level of the house which is referred to as the benchmark level in the Key Conclusion Statement is at 7.2m AHD and that at such level, the Case No: 265223 Determination Page 10 of 10 main residence would not have been inundated by 4.00am on 12 January 2011. 49. In view of the Panel‟s finding and as there is no accurate assessment as to the extent of damage sustained to the laundry area or back store room/garage area as a result of inundation to a level of 200mm above floor height, the FSP is asked to arrange an appropriate scope of works to assess the extent of damage sustained by such inundation. In performing such scope of works, the FSP is to also assess the possibility of damage being sustained to any external services including air conditioning as a result of inundation to the Applicant‟s prop erty with the water reaching 6.9m AHD. 50. Any inundation caused by water being at the level above 6.9m AHD is in the Panel‟s view likely to have occurred after 4.00am on 12 January 2011 and is therefore outside the relevant terms of the policy to attract cover. Determination 51. Accordingly the Panel determines the FSP is liable to meet the cost of loss sustained to the Applicant as a result of inundation to a height of 200mm above floor level within the laundry and back store room/garage area of the property pursuant to the flash flood /stormwater runoff provisions of the policy. 52. The Panel is satisfied that any inundation above that level throughout the property would have occurred after 4.00am on 12 January 2011 and would therefore be excluded from cover under the terms of the policy. 53. The FSP is to arrange an appropriate scope of works to determine the extent of the loss and in the event that the FSP determines to cash settle the Applicant‟s claim, the FSP is to pay interest in accordance with Section 57 of the Act from 23 March 2011 being the date of denial of the claim to date of payment of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.