Flood water inundation claim denied; dispute over flash flood cover and proximate cause
Text of the determination
Case No: 265223 Determination Page 1 of 10
Case number: 265223
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim – Flood/ Flash Flood
19 December 2012
Background
1. The Applicant insured her home and contents (located in Graceville,
Queensland) with the Financial Services Provider (FSP). The relevant period
of insurance operated for twelve months beginning from 11 August 2010.
During this period, the building was insured up to a sum of $362,000 and the
contents for $82,000.
2. On 13 January 2011, the Applicant lodged a claim under the policy due to
extensive water inundation following severe weather events in Queensland.
3. The FSP denied the claim on the basis the damage was due to “flood”. The
Applicant, through her solicitors, has disputed this.
4. Both the Applicant and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will summarise these
submissions given all of the material made available has been exchanged
with the other party.
Summary of Applicant’s position
5. The Applicant submits the following as alternative arguments in response to
the FSP‟s decision:
a. The FSP breached its duty of utmost good faith by failing to advise the
Applicant about the suitability of her insurance cover.
b. The FSP‟s policy failed to clearly inform her that “flood” was excluded
as required under Section 35 of the Insurance Contracts Act 1984 (the
Act).
c. The damage was due to “Flash flood and stormwater run - off”, which is
an insured event. In particular, the i nundation was due to heavy rain
that fell from 4am on 11 January 2011 which resulted in the Wivenhoe
Dam operators elevating their strategy to W4. This decision resulted in
massive discharges of water into the Brisbane River that ultimately
inundated her property.
Determination
Case No: 265223 Determination Page 2 of 10
d. The FSP has breached the General Insurance Code of Practice (the
Code) by failing to provide a copy of its regional hydrology report.
6. The Applicant seeks to be indemnified for her claim.
Summary of FSP’s position
7. In response to the Applicant ‟ s arguments, the FSP submits the following:
a. The duty of utmost good faith does not extend to an obligation to
ensure a policy is suitable to the Applicant‟s needs. There has been no
breach as alleged by the Applicant.
b. Its PDS and the Certificate of Insurance (COI) clearly inform the
Applicant about the scope of the flood cover and enables it to rely on
the exclusion clause of “flood” pursuant to Section 35(2) of the Act.
c. There has been no breach of the Code.
8. The FSP relies on a number hydrology reports authored by SC and the
following policy provisions to deny the Applicant‟s claim :
Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off .
...
Storm A violent disturbance of the atmosphere associated
with strong w inds including a cyclone, light ning, heavy
rain, hail or snow, but not continuous bad weather by
Case No: 265223 Determination Page 3 of 10
itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...”
Page 32 of the PDS
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater run-off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher , but not exceeding your contents
sum insured .
...
...”
Case No: 265223 Determination Page 4 of 10
Issues
9. Whether the Applicant was “clearly informed” about what the policy did and
did not cover.
10. Whether the cause of the Applicant‟s loss was cove red under the policy.
Reasons for decision
11. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‟s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
12. The Panel notes that a number of issues raised in this dispute are identical
to issues that have been extensively considered in a number of previous
Determinations. As these issues have been determined before, the Panel
does not consider it expedient to engage them at length and instead
proposes to address them summarily at the outset.
13. It is appropriate to consider the issues under the various headings.
Was the Applicant clearly informed of the Flood definition in the PDS?
14. The Applicant has also argued that the policy fails to clearly inform as to the
derogation from flood cover and/or the limitations on the extent of cover for
flash flood. There is no dispute that the Applicant had received the policy
documentation and Certificate of Insurance.
15. The Panel has reviewed the FSP‟s policy on a number of occasions. The
policy is indexed with relevant sections covering the insured events. The
policy sets out the definitions of storm and flash flood and stormwater runoff.
The policy clearly identifies that flood and storm surge is an optional cover
but otherwise flood is excluded from cover.
16. The Certificate of Insurance also clearly identifies that with respect to the
Appli cant‟s policy , flood and storm surge is not covered.
17. A fair reading of Section 35(2) of the Insurance Contracts Act 1984 require
that any relevant exclusion and/or limitation be in clear and unambiguous
language such that a person of average intelligence and understanding
would have little difficulty in finding and understanding the nature and extent
of the limitation and exclusions.
18. Having considered the FSP‟s policy, the Panel is satisfied that if the
Applicant had read the policy she would have had little difficulty in finding
and understanding the limitations and exclusions and accordingly, the Panel
is satisfied the FSP has met its obligations to clearly inform the Applicant in
accordance with Section 35 of the Act.
Case No: 265223 Determination Page 5 of 10
Proximate Cause of the Water Inundation
Initial Inundation: storm/ rain water and/or flood water?
19. The Panel notes the Applicant was not at the property at the time of the
inundation. Based on her neighbour‟s evidence, the Applicant suggests that
her property was inundated at around 4.30am o n 12 January 2011.
20. According to the Applicant:
It rained continuously during the morning of 11 January 2011. It was
pouring with rain at 2pm, when she left her house.
The Applicant‟s father, husband and father -in-law left the house around
6pm on 11 January 2011. It was still raining at this time.
The Applicant and her family returned to Brisbane the next day but
could not get into the area as the roads were heavily flooded.
The Applicant‟s neighbour „VH‟ was at her own property at the time of
the inundation and states:
At 4.30am on 12 January 2011 there was no water in the back
yard.
5 minutes later the storm water drain outside the bedroom
window started to make loud noises.
3 minutes later the wheelie bins beside the storm water drain
tipped over and there was enough water down that side of the
house to tip the bins.
21. SC‟s hydrology evidence of 11/1/12 indicates:
The ground level of the Applicant‟s property varies from 6.7m AHD to
7.5m AHD. The house at the property is at a level of approximately
7.25m AHD.
There is stormwater infrastructure on the Applicant‟s street, including a
major stormwater drain in the vicinity of the property, which drains to a
low point on the street, which continues north, where it joins an open
gully which leads directly to the Brisbane River.
There is a curb and channelling and slightly elevated footpaths along
the length of the Applicant‟s street.
The terrain information suggests that it would be unlikely that the
property would experience significant stormwater problems during
rainfall intensities experienced in January 2011.
Data from the Corinda High Alert gauge, located 3km from the property,
is representative of the rain that would have fallen at the vicinity of the
Applicant‟s property.
The gauge records show 43mm fell during the course of the day on 11
January 2011, with the most intense rainfall recorded between 10am
Case No: 265223 Determination Page 6 of 10
and 11am, during which 15mm of rain was recorded. No rainfall was
recorded after 5pm on 11 January 2011.
The intensity of the rainfall on 11 January 2011 was very low, at less
than 1 in 1 year event.
According to exhibit SQC06 to SC‟s report, the level of the Brisbane
River at 2.30am on 12 January 2011 was approximately 6.7m AHD,
which would have been sufficient to inundate the minimum level of the
property. According to the data, by 5.30am on 12 January 2011, the
Brisbane River reached 7.25m AHD, which would have been sufficient
to begin to inundate the house at the property.
22. The Panel accepts the hydrological principle that storm or rain water
inundation normally occurs within a short time of heavy rainfall. According to
the Applicant, the residence was not inundated during the afternoon of 11
January 2011, with no water in the vicinity of the property.
23. Accordingly, it appears unlikely that the heavy rainfall recorded between
10am and 11am on 11 January 2011 caused or contributed to the inundation
of the Applicant‟s property early on 12 January 2011.
24. On the balance of probabilities, the Panel is more inclined to accept that the
Applicant‟s home was likely to hav e been first inundated by water that could
appropriately be regarded as flood water.
Releases from Wivenhoe Dam & Proximate Cause
25. The central issue for Determination in this dispute is whether the inundation
of the Applicant‟s home on 12 January 2011 was d ue to flash flood as
defined within the terms of the policy; that is whether rain that fell no more
than 24 hours prior to the inundation of the Applicant‟s property was the
proximate cause of the inundation.
26. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
27. At that time, the Panel noted that in relation to the approach that each
dispute would depend upon the individual and unique factors relevant to the
dispute and in that regard the parties were invited to make further
submissions in relation to disputes before FOS.
28. In view of this, the FSP provided detailed further submissions to FOS in
relation to this dispute. Included with the submissions were the following
documents:
Case No: 265223 Determination Page 7 of 10
A Reference document (12 June 2012 and updated 11 July 2012) for
disputes relating to Queensland Floods (this is a general reference
document) relating to the various submissions the FSP makes in
relation to a number of issues. Not all issues raised in the reference
document appear in the current dispute;
Letter from the FSP‟s hydrologist, attaching a key information sheet for
the Applicant‟s proper ty;
Hydrologist report “Investigations of January 2011 inundation event –
Brisbane” dated March 2011;
Statement from hydrologist SC dated 7 June 2012.
29. The FSP maintains that on any reasonable view, the damage sustained to
the downstream properties was the combined effect of all of the rainfall and
not just the rain that had fallen from 4.00am on 11 January 2011 leading to
the implementation of the W4 strategy from 8.00am that day.
30. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment
area and in fact parts of the Brisbane River from approximately 4.00am on
11 January 2011. It is not disputed that in addition to this there was heavy
rain over the Bremer River which influenced the level of the Brisbane River
and that rain commenced at approximately 6.00am on 11 January 2011.
31. The FSP‟s hydrologist has relied on data from SEQWater dated 2 March
2011 which confirms the rapid increase in releases from the Wivenhoe Dam
from 8.00am on 11 January 2011. Examination of the SEQWater report
identifies the rapid increase in the inflows to the Wivenhoe Dam
commencing from about 4.00am, 11 January 2011. The report confirms the
inflows into the dam had been decreasing from as early as 8.00am from 10
January 2011 with steady decreases from approximately 3.00pm on 10
January 2011 to 2.00am on 11 January 2011.
32. The Queensland Flood Commission of Inquiry report confirms that prior to
4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011
the dam releases were being managed at the W3 strateg y. Whilst it is
accepted that the W3 strategy had led to an increase in the levels of the
Brisbane River, the W3 strategy was designed to avoid where possible
inundation of the properties below the Wivenhoe Dam by flooding from the
Brisbane River.
33. There is no dispute that there were two significant rainfall spikes with rain
that fell from 9 to 10 January 2011 being considered the first spike and rain
that commenced falling from approximately 4.00am on 11 January 2011
being the second spike.
34. There is no dispute that following the second spike that the W4 strategy was
adopted. The FSP has argued that the switch to strategy W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
W4 strategy was not taken in accordance with the Wivenhoe Dam manual.
In the Panel‟s view, the Queensland Flood Commission of Inquiry‟s final
Case No: 265223 Determination Page 8 of 10
report does not find the adoption of W4 strategy at 8.00am on 11 January
2011 was inconsistent with the manual. Although there may be issues as to
how the Wivenhoe Dam had been managed prior to this time, there is
nothing in the material that has been provided to the Panel to suggest that
the earlier management of the Wivenhoe Dam influenced to any significant
degree, the adoption of the W4 release strategy at 8.00am on 11 January
2011.
35. The ICA hydrology and the information provided by the FSP‟s hydrologist
confirms that the increased releases from the Wivenhoe Dam after the
adoption of the W4 strategy led to the development of a flood wave that
ultimately caused the flooding of many properties downstream of the
Wivenhoe Dam.
36. The Panel agrees with the FSP‟s general submission that the proximate
cause is a cause determined by common sense evaluation of the relevant
facts. In the event that there are two or more proximate causes, one within
the policy and the other excluded, the policy does not respond. The
proximate cause is not determined by identifying the last event or final trigger
but by determining what is the dominant, effective, direct or efficient cause of
the loss.
37. The FSP has maintained that the impact on the Wivenhoe Dam from the
rainfall that fell in the early hours of 11 January 2011 was only 29% while
71% of the volume of the inflow came from the rain that fell on 9 and 10
January 2011 or earlier. The FSP maintains that to find the rainfall which had
fallen from 4.00am on 11 January 2011 is the proximate cause is without
foundation as such an approach produces an entirely artificial outcome.
38. With due respect to the FSP‟s argument the Panel disagrees. Whilst the
Panel accepts there has been a significant impact on the levels of the
Wivenhoe Dam by the rainfall that commenced falling on or about 9 January
2011 or earlier, the Panel is satisfied having regard to the information that
has been exchanged and the relevant legal principles, that the heavy rain
that commenced falling on or about 4.00am on 11 January 2011 was the
proximate or effective cause of the adoption of the W4 strategy.
39. The Panel is also satisfied that whilst the level of the Brisbane River may
have been increasing under the W3 strategy, it was the heavy rainfall from
approximately 4.00am on 11 January 2011 that caused the need to adopt
the W4 strategy at 8.00am on the same day.
The Applicant’s Inundation – ‘Flash flood’
40. In order for the Applicant to fall within the relevant flash flood definitions of
the policy, it is necessary for the Applicant to establish that the inundation of
the property was caused by heavy rainfall that fell no more than 24 hours
previously.
41. As the Panel accepts that the heavy rainfall that commenced at
approximately 4.00am on 11 January 2011 together with the heavy rain that
Case No: 265223 Determination Page 9 of 10
commenced over the Bremer River at approximately 6.00am the same day is
the cause of the inundation of the Applicant‟s property, then in orde r for the
Applicant to succeed with the claim it will be necessary for the Applicant to
establish inundation occurred prior to 4.00am on 12 January 2011.
42. SC‟s statement of 7 June 2012 indicates the effect of the W4 releases first
reached the vicinity of th e Applicant‟s property at approximately 2.35pm on
11 January 2011. He estimated that the benchmark level of the property, as
RL 7.2m AHD, (described as „Elevated‟) was first reached by the Brisbane
River at approximately 5.22am on 12 January 2011.
43. According to SC, by approximately 4.00am on 12 January 2011, the water
level would have been approximately 6.9m AHD, which is 0.3m below the
relevant benchmark level.
44. The Panel Chair Ombudsman conducted a site inspection of the property on
16 November 2012. The Applicant and a representative from the FSP were
present.
45. The Applicant‟s property slopes gently from the front to the rear. The main
part of the residence is built on stumps to create a level floor throughout the
house. At the rear of the property there is a laundry that is built on a slab on
the ground and a back room shed/store room that is also on a slab on the
ground.
46. The laundry contained a dryer, washing machine, fridge and other things
including according to the Applicant a stored double bed. The store
room/shed included gardening equipment, lawn mower and other outdoor
items.
47. In discussions with the FSP‟s representative, it was discussed as to how the
7.2m AHD benchmark level was reached. It would appear based on the Key
Conclusion Statements in particular reference to the property being on
stumps that the 7.2m AHD benchmark was reference to the floor level
height. Assuming this to be the case, and given that the river level rose to
approximately 6.9m AHD at around 4.00am on 12 January 2011, then it is
most likely that water would have entered through the back store
room/garage/shed and laundry area prior to 4.00am as it is likely that this
area is closer to 6.7m AHD being effectively a slab on the ground. There was
also some air conditioning at ground level that had been damaged, but it is
difficult to gauge whether the air conditioning would have been at 6.9m AHD
or not.
48. Having considered all of the information available, the Panel is satisfied that
the Applicant‟s property was inundated to a level of 6.9m AHD by 4.00am on
12 January 2011. At such level, the Panel is satisfied that it is likely the
laundry and back store room/garage area would have been inundated to a
level of no more than 200mm above floor level. Further, the Panel is satisfied
that the floor level of the house which is referred to as the benchmark level in
the Key Conclusion Statement is at 7.2m AHD and that at such level, the
Case No: 265223 Determination Page 10 of 10
main residence would not have been inundated by 4.00am on 12 January
2011.
49. In view of the Panel‟s finding and as there is no accurate assessment as to
the extent of damage sustained to the laundry area or back store
room/garage area as a result of inundation to a level of 200mm above floor
height, the FSP is asked to arrange an appropriate scope of works to assess
the extent of damage sustained by such inundation. In performing such
scope of works, the FSP is to also assess the possibility of damage being
sustained to any external services including air conditioning as a result of
inundation to the Applicant‟s prop erty with the water reaching 6.9m AHD.
50. Any inundation caused by water being at the level above 6.9m AHD is in the
Panel‟s view likely to have occurred after 4.00am on 12 January 2011 and is
therefore outside the relevant terms of the policy to attract cover.
Determination
51. Accordingly the Panel determines the FSP is liable to meet the cost of loss
sustained to the Applicant as a result of inundation to a height of 200mm
above floor level within the laundry and back store room/garage area of the
property pursuant to the flash flood /stormwater runoff provisions of the
policy.
52. The Panel is satisfied that any inundation above that level throughout the
property would have occurred after 4.00am on 12 January 2011 and would
therefore be excluded from cover under the terms of the policy.
53. The FSP is to arrange an appropriate scope of works to determine the extent
of the loss and in the event that the FSP determines to cash settle the
Applicant‟s claim, the FSP is to pay interest in accordance with Section 57 of
the Act from 23 March 2011 being the date of denial of the claim to date of
payment of the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.