Wall and foundation damage claim denied as earth movement and workmanship exclusions
Text of the determination
Case No: 264870 Determination Page 1 of 14
Case number: 264870
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
4 March 2013
Background
1. The Applicants‟ home (located in West End, Queensland) was insured with
the Financial Services Provider (FSP) under a home building policy.
2. They claimed for damage to the home, alleged to have been caused by the
severe weather events that occurred in Queensland in early January 2011.
3. The FSP declined liability on the basis:
The damage to the home was not caused by an event insured under
the policy, but by long term rotation of one of its walls.
The loss was excluded by operation of a number of exclusions in any
event.
4. The Applicants believe they are entitled to indemnity because:
The FSP delayed their claim;
The FSP previously accepted their claim;
They were not clearly informed of the limitations with respect to cover
for flood, stormwater run-off and flash flood;
They were unaware of the defects allegedly present at their home; and
Their loss was caused by events covered by the policy in any event.
Summary of Applicants ’ position
5. The Applicants are represented. For convenience, and unless otherwise
specified, a reference to “Applicants” in this Determination will be taken to
include their representative.
6. They are entitled to indemnity for the damage to their home because:
The damage to their home was caused by stormwater pooling in the
relevant area.
The FSP took 6 months to decide their claim and the delay had
exacerbated their loss.
Determination
Case No: 264870 Determination Page 2 of 14
The FSP caused them great distress by declining the claim after
previously representing that it had been accepted.
The conclusions and qualifications of the FSP‟s expert have not been
substantiated or established.
The FSP failed to clearly inform them of the limitations with respect to
cover for flood, stormwater run-off, and flash flood.
i. The FSP concealed that there were caps for (flash) flood damage.
These caps were also unusual. Determination 41948 supports the
view that the caps were not clearly disclosed.
ii. T he policy definitions of “flood”, “flash flood” and “storm” were
overlapping, contradictory and confusing.
iii. The FSP has not demonstrated that a “person of average
intelligence and education” would understand the PDS and the
definition of “flood”.
iv. Experts in consumer communication have confirmed that a person
of “average intelligence and education” would not understand the
PDS.
v. The definition of “flood” is so wide that it is confusing.
vi. Determinations 41709 and 40607 support the view that the policy
definitions were unclear.
vii. The FSP‟s hydrology report relies on a definition of “flood” different
from the policy.
They were unaware of defects reportedly present at their home and as
such, are entitled to the protection of Section 46 of the Insurance
Contracts Act, 1984 (the Act).
7. The FSP‟s expert reports should be given little weight because:
It (the FSP) failed to conduct any geotechnical investigation although it
was recommended.
The reports do not explain what aspects of the home‟s construction had
failed to comply with building standards applicable at the time of its
construction.
Their home had stood for 80 years without any problems.
Their pre-purchase inspection report did not mention any defects.
It (the FSP) fails to consider the male Applicant‟s (“AS”) comments
although AS is a retired engineer.
8. AS‟s evidence as to the events that transpired are as follows:
The Applicants purchased the home in 1989. A house inspection was
carried out but did not reveal any problems.
The property was renovated in 2001/2002 and the masonry walls
around the basement of the property were painted.
Case No: 264870 Determination Page 3 of 14
The renovation was planned and supervised by a professional building
designer and any defects were repaired at that time.
There were major droughts in Queensland until 2010.
The droughts were followed by periods of heavy rainfall culminating
with the flooding of the Brisbane River in January 2011.
The Applicants‟ driveway and backyard has had many incidences of
flash flooding.
During the January 2011 rains, water was flowing into their property
from their neighbour‟s driveway which was long, on higher ground and
tilted towards their property.
The water could only accumulate in the driveway area and seep into
the propert y‟s founding soils, causing the soils in the area to become
extremely saturated, muddy and soft.
The ground was so soft that he was able to insert an 80cm iron rod into
the ground by hand.
AS had to install two electric water pumps to pump the water to the
road kerb and away from his yard and driveway. He continued to pump
water out until the power was cut.
There was about 30cm of water in the yard and he has had to dig
trenches to divert water away from the house.
The property‟s 5,000 litre rainwater tank had reached capacity, causing
excess water to overflow into the stormwater system. AS believes
some 20,000 litres of water had flowed from the neighbour‟s driveway
into his property during the January 2011 rains.
As a retired engineer, AS found nothing to draw him into a professional
view that his home has had issues with inherent defects or problems.
One “D” (from the FSP) contacted AS on 19 May 2011 to say that their
claim was approved on the basis the damage to their home was not
caused by river flooding, but by flash flooding. D also said that an FSP
contractor would contact them.
AS contacted the FSP to follow up the matter on 6 June 2011. He
spoke to one “B” who confirmed the claim approval and transferred him
to building company “SB” to make an appoin tment with a tradesperson.
AS spoke to one “H” as SB advised that she needed to check with the
FSP because “there was no approval in their system”.
AS spoke to “T” (from the FSP) on 15 June 2011 who said the claim
was not approved and that the FSP “wouldn‟t be sending a letter”.
AS contacted T again to inform her that D had confirmed that their
claim had been approved. T responded that she would have to search
for the recording and transcript.
Case No: 264870 Determination Page 4 of 14
AS never heard from the FSP again until he received the FSP‟s le tter
dated 7 June 2011 on 15 June 2011, saying that their claim was
denied.
AS would have commenced repairs if he had known their claim had
been denied. The damage to his property was exacerbated by the
FSP‟s delay in deciding the claim.
9. The Applicants refer to Sections 35 and 46 of the Act.
Summary of FSP’s position
10. Its structural and civil engineer “RH” has concluded that the damage to the
Applicants‟ home was due to long term rotation of one of its walls, and not
ponding of stormwater.
11. The Applicants have not shown that the damage to their home was caused
by flash flood and stormwater run-off.
12. In any case, their loss is excluded because the damage was caused by:
“defective or faulty workmanship”
“erosion, landslide”
13. If flash flood was a proximate cause of the Applicants‟ loss, then “defective
or faulty workmanship” or “erosion or landslide” was also a proximate cause
of the loss. This means the whole loss is excluded on the basis of the Wayne
Tank principle.
14. It has not misled the Applicants because:
The alleged statements were not made;
The alleged statements were not relied upon by the Applicants; and
To the extent the alleged statements were relied upon, they were not
causative of any loss.
The transcript of the conversation between AS and its officer (on 19 May
2011) shows:
i. Its officer never said that the claim was “approved”.
ii. Its officer merely said that the claim required further investigation.
15. The Applicants were clearly informed of the limitations with respect to flood,
flash flood and stormwater run-off because:
They were sent the PDS and a Certificate of Insurance (COI).
The PDS clearly sets out that:
i. Flood damage is not covered by the policy.
Case No: 264870 Determination Page 5 of 14
ii. “Defective or faulty workmanship” and “erosion or landslide” are
not covered by the policy.
iii. Cover for damage arising from a “flash flood” is monetarily limited.
The suggestion that the flood definition is “too broad” has nothing to do
with its obligations under Section 35 of the Act. Section 35 of the Act
does not restrict insurers from setting out the scope of its cover. It only
obliges insurers to inform policyholders of the terms of cover.
The format and structure of its PDS is clear and well indexed.
The Certificate of Insurance also clearly set out that the policy does not
cover flood damage.
FOS has previously determined that its policy documentation satisfies its
obligation to clearly inform policyholders of the terms of cover
(Determination 239722).
16. The Applicants‟ allegations with respect to the lack of clarity surro unding the
question of flood are irrelevant as it has not declined the claim on the basis
of its flood exclusion.
17. Section 46 of the Act is inapplicable in the circumstances of the dispute.
18. The FSP relies on the following policy provisions contained in its PDS:
“ Words / terms with special meanings
Word / term Meaning
…
Flood Rising water which enters your home as a result of it running off
or overflowing from any origin or cause.
This policy does not cover flood unless we have agreed and it
is shown on your certificate of insurance
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more than 24
hours prior to the flash flood or stormwater run - off .
…
Storm A violent disturbance of the atmosphere associated with strong
winds including a cyclone, lightning, heavy rain, hail or snow
but not continuous bad weather by itself.
…
Insured events you are covered for
Damage caused by the weather ….
What is covered Wh at is not covered
Storm …
Case No: 264870 Determination Page 6 of 14
…
Flash flood and
stormwater run - off
A sudden flood caused by
heavy rain that fell no
more than 24 hours prior
to the flash flood or
stormwater run - off
Loss or damage caused:
by flood;
…
…
Your home
…
The most we will pay for home claims
What is covered What is not covered
Flash flood and stormwater
run-off
We will pay up to 50% of your
home sum insured or $25,000,
whichever is higher.
…
When you are not covered – general exclusions
Exclusions When you are not covered
…
defective or faulty
workmanship
the inherent defect or defective or faulty
workmanship, design or manufacture.
…
Erosion, landslide erosion, landslide, subsidence, earth movement
(except earthquake), earth shrinkage or expansion
no matter how caused.”
19. The FSP also relies on the following information contained in the Certificate
of Insurance:
“ What optional covers are included and not included
Home Contents
…
flood and storm surge not included not included”
Case No: 264870 Determination Page 7 of 14
20. The FSP refers to Sections 35, 69 and 46 of the Act.
Issues
21. Whether the FSP had inordinately delayed the Applicants‟ claim and if so,
did such delay exacerbate their loss.
22. Whether the Applicants were previously informed that their claim had been
accepted and if so, are they entitled to indemnity on this basis.
23. Whether the Applicants were clearly informed of the limitations with respect
to flood damage and damage arising from stormwater run-off and flash flood.
24. Whether the Applicants loss was caused by rain or stormwater run-off,
defective or faulty workmanship, and/or erosion or landslide.
Reasons for decision
Preliminaries
25. Due to the complex nature of the dispute, it has been directly referred to the
Panel for Determination in accordance with the Operational Guidelines to the
Financial Ombudsman Service‟s (FOS) Terms of Reference.
26. The Panel consists of an Ombudsman, a representative with extensive
experience in the insurance industry and a representative with extensive
experience in consumer claims.
27. The Panel is satisfied that the material has bee n exchanged and the parties
have had the opportunity to respond to the issues raised.
28. The Panel notes that the Applicants are legally represented and that the
various statutory provisions referred to by the parties have been set out in
their respective submissions. For the sake of brevity, the Panel will not
repeat these provisions here.
29. The Applicants‟ claim was lodged by the Applicants on the 16 February
2011.
30. Following lodgement of the claim, the FSP appointed an assessor who
contacted the Applicants on 17 February 2011 and arranged an inspection of
the Applicants‟ property on the 24 February 2011.
31. The FSP also appointed a building group “S” to assist in the assessment of
the property. S appointed “RH”, structural and civil engineers who made
contact with the Applicants and conducted an inspection of the Applicants‟
home on the 4 March 2011. They provided a report to S on the same day.
The report concluded that in the opinion of the structural and civil engineer
the front wall to the dwelling had been rotating for a considerable period of
Case No: 264870 Determination Page 8 of 14
time. The site was not subject to river flood but it had been subject to
ponding of very heavy rain. To facilitate a concise result a geotechnical
investigation should be undertaken of the front of the property with two bore
holes to 2m and at the same time epoxy examination of the foundation
structure of the considered wall.
32. It is unclear from material exchanged why there was a delay in informing the
Applicants of the structural and civil engineer ‟ s opinion. On 19 May, the FSP
telephoned the Applicants and according to a transcript of that discussion
the Applicants were advised that the building consultants‟ team and the
engineer may need to do further investigations just to confirm what damage
was actually as a result of the rainfall.
33. During the telephone conversation the Applicant AS referred to more cracks
appearing in the wall and also to earlier conversations, making reference to
additional cracks appearing. There is also reference to the appointment of a
geotechnician to conduct further examinations.
34. There were further discussions between the FSP and the Applicants on 6
June 2011. According to a transcript of the discussion the Applicant AS
queried why they had not heard from anybody and were referred through to
the building consultant S. It is unclear what the Applicant AS was told by S at
that time.
35. In a letter dated 7 June 2011, the FSP declined the claim. It has relied upon
the report of RH. It determined from that report, despite not obtaining a
geotechnical report and despite the report identifying that the property had
been subject to ponding of heavy rain (evident during the inspection of heavy
rain ponding in the west driveway area) that the exclusion, „defective or
faulty workmanship or erosion and landslide‟ a pplied to the loss sustained by
the Applicants.
36. In the Panel‟s view the FSP‟s conduct when discussing the matter with the
Applicants on 19 May 2011 and again on 6 June 2011 was inconsistent with
the decision made on the 7 June 2011.
37. The Applicants sought a review of the FSP‟s decision on 18 August 2011.
The FSP provided its IDR response on the 27 September 2011 and again
relied upon the report of RH the structural and civil engineer to conclude the
damage to the Applicants‟ property was not due to the pondi ng of
stormwater, but instead due to long term rotation of one of the building‟s
walls. The FSP argues that the engineer‟s report clearly shows the damage
as being caused by a long term structural issue with the building. The Panel
disagrees. Whilst the Panel accepts this report identifies the wall rotation as
occurring, the report also identifies that a Geotechnical investigation should
be undertaken. This appears to be in reference to the fact that the engineer
found the property subject to ponding of water in heavy rain evidenced by
the presence on the day of rain during the inspection of the property.
Case No: 264870 Determination Page 9 of 14
38. It is unclear from the information exchanged why the FSP proceeded to
make an IDR decision in the absence of this additional input from a
geotechnical investigation.
39. Although the FSP has not explained the delay in reaching its initial decision,
given it was relying on the report of RH, the Applicants have not provided
any evidence to show that this delay itself has caused additional damage or
exacerbated t he Applicants‟ loss.
40. From other information on file and in particular a further report provided by
RH dated 3 July 2012 it is apparent that the male Applicant (as a former
engineer) had undertaken work to stabilise sections of the wall by the
inclusion of wire ties to the door way of the north side of the tilt door to the
garage. According to the further report of RH this was in place at the time of
their inspection of the property on the 4 March 2011. These same ties were
also in place at the time of the Panel Chair Ombudsman‟s inspection of the
property on 14 February 2013.
41. For these reasons, whilst the Panel is concerned as to the delays in the FSP
reaching its decision in this matter and the communication to the Applicants,
the Panel is not persuaded that the Applicants have established that the
delay has exacerbated their loss.
Acceptance of the claim
42. The Applicants maintain that they were informed during discussions with the
FSP on the 19 May 2011 and again on the 6 June 2011 that their claim had
been approved as the damage was not caused by river flooding but flash
flooding.
43. The Panel has had the opportunity of reviewing the transcript of the
discussions that took place on those occasions.
44. In the conversation on the 19 May 2011, the FSP‟s representative “D”
comments that there is some movement over time previously but also that
there may be some damage that arose from rainfall as well. D then
comments “ so we just need to, the best we can, try and find out, you know,
what part comes under the claim so we can, you know, organise a payment
for you.”
45. The Panel accepts given the above comments, that this could cause some
confusion for an Applicant; however, it is clear later in the conversation that
no decision has been made and the FSP was still looking to find out whether
the cracking is the result of rainfall.
46. In the second conversation of the 6 June 2011, this time B is the FSP‟s
representative. The male Applicant has claimed in this conversation that he
was informed the claim was approved. B refers to having to refer the matter
through to S. S was the one that handled the building. B then states “yes,
they forward all the reports through. That was how we were able to come to
the position of approving the claim.”
Case No: 264870 Determination Page 10 of 14
47. Clearly B is making reference to the acceptance of the claim although it is
unclear whether B had any real knowledge of the Applicants‟ claim. Again it
is understandable in these circumstances that the Applicant believed his
claim had been approved.
48. In a further submission to FOS dated the 18 January 2012 the FSP claimed,
whilst acknowledging that the male Applicant still appeared to think his claim
was approved during the conversation of the 6 June 2011 that the male
Applicant did not ask the operator whether his claim was approved. The FSP
maintained the operator said nothing to suggest that it was. Clearly the FSP
has not understood the comments by B as follows.
“ Yes. Yes, they forward all the reports through. That was how we were able to
come to the position of approving the claim. Now with the – with the
appointment of the next person to come out and things like that‟s all, that‟s all
lying with S who have got that organised. So they should have got that done
by now. What we‟ll do , I will get them on the line for you first of all and we‟ll
pop you through so we can find out what‟s going on.”
49. The FSP have not provided any transcript of the conversation that occurred
with S.
50. Contrary to the FSP‟s allegation the operator was not silent ; in fact B
indicated the claim was approved. Clearly in these circumstances the
Applicants have been misled into believing their claim had been approved.
51. However, as with the delay in reaching a decision, the Applicants need to
establish that they have acted on this misleading information to their
disadvantage. There is no evidence the Applicants had in fact acted in any
way to their disadvantage following the conversation on the 6 June 2011. In
fact the FSP in their correspondence to the Applicants of the 7 June 2011
clearly informed the Applicants that the claim had been rejected.
52. In the circumstances, the Panel again whilst being concerned as to the
conduct of the FSP during this process, is not satisfied that the Applicants
had suffered any prejudice as a result of the misleading information provided
to the Applicants in particular in the conversation with the FSP‟s B on 6 June
2011.
Clearly inform
53. The Applicants do not dispute receiving the PDS but maintain the PDS was
unclear and confusing for a number of reasons outlined in the submissions.
54. Section 35(2) of the Insurance Contracts Act requires that the relevant
exclusions and limitations contained within a policy be in clear and
unambiguous language and such that a person of average education and
intelligence would have little difficulty in finding and understanding should
they choose to read the policy.
55. The FSP‟s policy is indexed. Within the PDS it has a section that defines
words and terms with special meaning and included within the definition
Case No: 264870 Determination Page 11 of 14
section are the words Flood, Flash flood and Stormwater run-off. The policy
identified under the insured events covered, the cover is provided for storm,
flash flood and stormwater run-off whilst policy identifies the general
exclusions including flood. The po licy also identifies defective or faulty
workmanship, erosion and land slide as exclusions.
56. The monetary caps for damage caused by flash flood and stormwater run-off
are clearly set out. In addition, the flood exclusion is of reference in the
Certificate of Insurance.
57. Having carefully reviewed the policy, the Panel is satisfied that if the
Applicants had read the policy and COI, the Applicants would have had little
difficulty in finding and understanding the nature and extent of the exclusions
and limitations. In the circumstances, the FSP has met its obligation to
clearly inform, pursuant to Section 35 of the Act.
Proximate cause of damage
58. There is no dispute that the Applicants‟ property (as articulated by AS) was
not impacted by river flood or flash flood. The available evidence is that
localised stormwater run- off had consistently drained towards the Applicants‟
house and was pooling over parts of the Applicants‟ property during the rain
events in January 2011. This is supported by the comments made by the
FSP‟s structural and civil engineer RH.
59. The Applicants‟ belief is that the water had saturated the founding soils of
their property. The soil became soft and muddy which, in turn, caused the
home building to move, walls to separate and cracks to appear.
60. The FSP disagrees and principally relies on a number of reports issued by
structural and civil engineer “RH” who essentially suggests that:
The damage claimed was old damage; and
The home building was not properly constructed.
61. As stated earlier in this Determination RH in his initial report of 4 March
2011, found that the wall to the dwelling had been rotating for a considerable
period of time due to the construction of the front door jams. He noted in the
report that whilst the site was not subject to river flood it had been subject to
ponding of water and heavy rain and that in order to facilitate a concise
result, a Geotechnical investigation should be undertaken.
62. No Geotechnical investigation has been undertaken of the property.
63. In a later report of the 3 July 2012, RH has clarified the earlier report and
stated as follows:
“This firm is still of the opinion that the water as ponded within the driveway
should not have affected the foundations of the building had they been
constructed in a workmanlike manner at a depth in controlled soil that the
building would be not affected as greatly as it is, so causing the effect of
cracking and separation of this building and rotation of the walls and hence
Case No: 264870 Determination Page 12 of 14
the current defect is due to ground movement and not to an occurrence of the
wetting of this period.”
64. RH has explained the nature of the rotation and in particular notes the
following:
It was evident that work had been undertaken to stabilise sections of
the wall by the inclusion of wire ties to the door way on the northern
side of the tilt door to the garage.
Paint extension and opening runs have been noted and the rotation of
the walls had pulled the paint. This paint was not recent and would
have been done long before the storm period.
Paint over separations during inspection was stretched to its maximum.
If recent it would have been flexible and not firm as at the time of the
inspection.
65. In view of the uncertainties involved in this matter, the Panel Chair
Ombudsman conducted a site inspection of the Applicant s‟ property on the
14 February 2013. Present during the inspection were the Applicants and the
FSP‟s representative.
66. The Applicants‟ property is a Queenslander style home that has had the
lower level walled in, in a type of brick. According to the Applicants the front
of the wall of the lower section of the house started to fall away shortly after
the heavy rain in Queensland in January 2011.
67. There is significant movement to the front of the house as described in the
engineering report of RH. It can be seen when looking at the house that the
left corner wall has moved significantly. There is a down pipe along this wall
that drains into a stormwater drain. The Applicants explained that water was
pooling in this area during the heavy rain. The male Applicant was adamant
that no water from the river reached his property, no water had got inside his
property.
68. The concrete footing supporting this wall is thick, at least 300mm thick at this
corner.
69. When looking at the right hand side of the property there is also e vidence of
damage, as if the front is starting to fall forwards.
70. The Applicants explained that the property to the right of their property is on
higher land with that driveway built up. The water runs from that property
through the Applicants‟ property, wh ich increases the impact and ponding on
their property.
71. On looking at the gaps in the property, it is apparent that at some earlier
time, the gaps in the brick work were filled with silicon. That silicon had been
painted. There is paint on the inside of the silicon and on the inside of the
bricks. The silicon is of a consistent thickness and suggests that this was not
part of a repair process but part of the original structure or part of the
painting arranged by the Applicants some years earlier.
Case No: 264870 Determination Page 13 of 14
72. The Applicants confirmed that since the heavy rain in January 2011, metal
bands have been put around the property to help secure it. The Applicants
have also built in pits to assist with the run-off water during heavy rain.
73. The Applicants claim that the ground in front of the property was saturated
during January 2011. There is no reason to doubt this.
74. There is no reason to doubt the Applicants‟ claim that they observed the
additional movement in the wall following the heavy rains in January 2011.
The Applicants have consistently maintained that this was discovered (and
caused by) the soil at the front of the home, becoming saturated.
75. The Panel also notes the Applicants‟ insistence that the property was not
inundated by flood waters. Although this was queried during the site
inspection, given the proximity of the Brisbane River to the Applicants‟ home,
and relevant hydrological evidence the Applicants insist they were at the
property and able to observe the inundation. They observed the water
flowing from the neighbouring property and observed the water ponding at
the front of the property. They strongly maintain no flood water inundated the
property.
76. The initial report from the FSP‟s structural and civil engineer RH, whilst
identifying the rotation of the wall, reco mmends the need for a geotechnical
test to positively determine the cause of the structural failure. His report does
not adequately address these issues in this regard. RH‟s second report of
the 3 July 2012 is much more detailed. RH concludes that his opinion was
reached that the walls to the dwelling had rotated for a considerable period
of time noting that the evidence of prior work to stabilise sections of the wall,
paint extension and open runs with the paint stretched and firm at the time of
inspection which is inconsistent with the separations occurring in recent time.
Further the slabs do not appear to have been affected by heave as there is
no sign of concrete slabs dislodging and cracking.
77. RH considered that the water ponding within the driveway and home should
not have affected the foundations had they been constructed in a workman
like manner at an appropriate depth in controlled soil. RH concluded that the
current defect was due to ground movement and not the occurrence of
inundation arising from the January 2011 weather events.
78. The Applicants bear the onus to establish on the balance of probabilities that
they have suffered a loss that falls within the insured events under the policy.
Once established the onus then shifts to the FSP. In this case whilst the
Panel is satisfied there is evidence of significant movement to the wall of the
Applicants‟ property, the Panel is not satisfied that the evidence as
presented is sufficient to establish that such movement was on the balance
of probabilities due to stormwater run-off impacting on the front of the
property.
79. Whilst the Panel accepts it is possible for such inundation to cause
movement of foundation walls from time to time, the Panel is not satisfied
that the Applicants have established on the balance of probabilities that to be
Case No: 264870 Determination Page 14 of 14
the case in this dispute. The Panel is satisfied in the absence of alternative
information that the information provided by the structural and consulting
engineer is sufficient to establish that it was more likely, the movement of the
wall was due to earth movement which is excluded under the terms of the
policy.
Determination
80. Accordingly, the Panel determines that the FSP is entitled to maintain its
denial of liability and that the Applicants have not established an entitlement
to cover under the terms of the policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.