Determination 264870

Wall and foundation damage claim denied as earth movement and workmanship exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2013-03-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Represented applicants claimed for wall movement and foundation damage to their West End home after January 2011 rains, which the FSP declined under earth movement and workmanship exclusions. AFCA upheld the denial, finding the FSP misled them about claim approval but no loss was established, and ordered nothing.

The applicants bore the onus of showing an insured event caused the loss, and the engineering evidence made earth movement the more likely cause, which is excluded.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 264870 Determination Page 1 of 14 Case number: 264870 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 4 March 2013 Background 1. The Applicants‟ home (located in West End, Queensland) was insured with the Financial Services Provider (FSP) under a home building policy. 2. They claimed for damage to the home, alleged to have been caused by the severe weather events that occurred in Queensland in early January 2011. 3. The FSP declined liability on the basis:  The damage to the home was not caused by an event insured under the policy, but by long term rotation of one of its walls.  The loss was excluded by operation of a number of exclusions in any event. 4. The Applicants believe they are entitled to indemnity because:  The FSP delayed their claim;  The FSP previously accepted their claim;  They were not clearly informed of the limitations with respect to cover for flood, stormwater run-off and flash flood;  They were unaware of the defects allegedly present at their home; and  Their loss was caused by events covered by the policy in any event. Summary of Applicants ’ position 5. The Applicants are represented. For convenience, and unless otherwise specified, a reference to “Applicants” in this Determination will be taken to include their representative. 6. They are entitled to indemnity for the damage to their home because:  The damage to their home was caused by stormwater pooling in the relevant area.  The FSP took 6 months to decide their claim and the delay had exacerbated their loss. Determination Case No: 264870 Determination Page 2 of 14  The FSP caused them great distress by declining the claim after previously representing that it had been accepted.  The conclusions and qualifications of the FSP‟s expert have not been substantiated or established.  The FSP failed to clearly inform them of the limitations with respect to cover for flood, stormwater run-off, and flash flood. i. The FSP concealed that there were caps for (flash) flood damage. These caps were also unusual. Determination 41948 supports the view that the caps were not clearly disclosed. ii. T he policy definitions of “flood”, “flash flood” and “storm” were overlapping, contradictory and confusing. iii. The FSP has not demonstrated that a “person of average intelligence and education” would understand the PDS and the definition of “flood”. iv. Experts in consumer communication have confirmed that a person of “average intelligence and education” would not understand the PDS. v. The definition of “flood” is so wide that it is confusing. vi. Determinations 41709 and 40607 support the view that the policy definitions were unclear. vii. The FSP‟s hydrology report relies on a definition of “flood” different from the policy.  They were unaware of defects reportedly present at their home and as such, are entitled to the protection of Section 46 of the Insurance Contracts Act, 1984 (the Act). 7. The FSP‟s expert reports should be given little weight because:  It (the FSP) failed to conduct any geotechnical investigation although it was recommended.  The reports do not explain what aspects of the home‟s construction had failed to comply with building standards applicable at the time of its construction.  Their home had stood for 80 years without any problems.  Their pre-purchase inspection report did not mention any defects.  It (the FSP) fails to consider the male Applicant‟s (“AS”) comments although AS is a retired engineer. 8. AS‟s evidence as to the events that transpired are as follows:  The Applicants purchased the home in 1989. A house inspection was carried out but did not reveal any problems.  The property was renovated in 2001/2002 and the masonry walls around the basement of the property were painted. Case No: 264870 Determination Page 3 of 14  The renovation was planned and supervised by a professional building designer and any defects were repaired at that time.  There were major droughts in Queensland until 2010.  The droughts were followed by periods of heavy rainfall culminating with the flooding of the Brisbane River in January 2011.  The Applicants‟ driveway and backyard has had many incidences of flash flooding.  During the January 2011 rains, water was flowing into their property from their neighbour‟s driveway which was long, on higher ground and tilted towards their property.  The water could only accumulate in the driveway area and seep into the propert y‟s founding soils, causing the soils in the area to become extremely saturated, muddy and soft.  The ground was so soft that he was able to insert an 80cm iron rod into the ground by hand.  AS had to install two electric water pumps to pump the water to the road kerb and away from his yard and driveway. He continued to pump water out until the power was cut.  There was about 30cm of water in the yard and he has had to dig trenches to divert water away from the house.  The property‟s 5,000 litre rainwater tank had reached capacity, causing excess water to overflow into the stormwater system. AS believes some 20,000 litres of water had flowed from the neighbour‟s driveway into his property during the January 2011 rains.  As a retired engineer, AS found nothing to draw him into a professional view that his home has had issues with inherent defects or problems.  One “D” (from the FSP) contacted AS on 19 May 2011 to say that their claim was approved on the basis the damage to their home was not caused by river flooding, but by flash flooding. D also said that an FSP contractor would contact them.  AS contacted the FSP to follow up the matter on 6 June 2011. He spoke to one “B” who confirmed the claim approval and transferred him to building company “SB” to make an appoin tment with a tradesperson.  AS spoke to one “H” as SB advised that she needed to check with the FSP because “there was no approval in their system”.  AS spoke to “T” (from the FSP) on 15 June 2011 who said the claim was not approved and that the FSP “wouldn‟t be sending a letter”.  AS contacted T again to inform her that D had confirmed that their claim had been approved. T responded that she would have to search for the recording and transcript. Case No: 264870 Determination Page 4 of 14  AS never heard from the FSP again until he received the FSP‟s le tter dated 7 June 2011 on 15 June 2011, saying that their claim was denied.  AS would have commenced repairs if he had known their claim had been denied. The damage to his property was exacerbated by the FSP‟s delay in deciding the claim. 9. The Applicants refer to Sections 35 and 46 of the Act. Summary of FSP’s position 10. Its structural and civil engineer “RH” has concluded that the damage to the Applicants‟ home was due to long term rotation of one of its walls, and not ponding of stormwater. 11. The Applicants have not shown that the damage to their home was caused by flash flood and stormwater run-off. 12. In any case, their loss is excluded because the damage was caused by:  “defective or faulty workmanship”  “erosion, landslide” 13. If flash flood was a proximate cause of the Applicants‟ loss, then “defective or faulty workmanship” or “erosion or landslide” was also a proximate cause of the loss. This means the whole loss is excluded on the basis of the Wayne Tank principle. 14. It has not misled the Applicants because:  The alleged statements were not made;  The alleged statements were not relied upon by the Applicants; and  To the extent the alleged statements were relied upon, they were not causative of any loss.  The transcript of the conversation between AS and its officer (on 19 May 2011) shows: i. Its officer never said that the claim was “approved”. ii. Its officer merely said that the claim required further investigation. 15. The Applicants were clearly informed of the limitations with respect to flood, flash flood and stormwater run-off because:  They were sent the PDS and a Certificate of Insurance (COI).  The PDS clearly sets out that: i. Flood damage is not covered by the policy. Case No: 264870 Determination Page 5 of 14 ii. “Defective or faulty workmanship” and “erosion or landslide” are not covered by the policy. iii. Cover for damage arising from a “flash flood” is monetarily limited.  The suggestion that the flood definition is “too broad” has nothing to do with its obligations under Section 35 of the Act. Section 35 of the Act does not restrict insurers from setting out the scope of its cover. It only obliges insurers to inform policyholders of the terms of cover.  The format and structure of its PDS is clear and well indexed.  The Certificate of Insurance also clearly set out that the policy does not cover flood damage.  FOS has previously determined that its policy documentation satisfies its obligation to clearly inform policyholders of the terms of cover (Determination 239722). 16. The Applicants‟ allegations with respect to the lack of clarity surro unding the question of flood are irrelevant as it has not declined the claim on the basis of its flood exclusion. 17. Section 46 of the Act is inapplicable in the circumstances of the dispute. 18. The FSP relies on the following policy provisions contained in its PDS: “ Words / terms with special meanings Word / term Meaning … Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off . … Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightning, heavy rain, hail or snow but not continuous bad weather by itself. … Insured events you are covered for Damage caused by the weather …. What is covered Wh at is not covered Storm … Case No: 264870 Determination Page 6 of 14 … Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood; … … Your home … The most we will pay for home claims What is covered What is not covered Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. … When you are not covered – general exclusions Exclusions When you are not covered … defective or faulty workmanship  the inherent defect or defective or faulty workmanship, design or manufacture. … Erosion, landslide  erosion, landslide, subsidence, earth movement (except earthquake), earth shrinkage or expansion no matter how caused.” 19. The FSP also relies on the following information contained in the Certificate of Insurance: “ What optional covers are included and not included Home Contents … flood and storm surge not included not included” Case No: 264870 Determination Page 7 of 14 20. The FSP refers to Sections 35, 69 and 46 of the Act. Issues 21. Whether the FSP had inordinately delayed the Applicants‟ claim and if so, did such delay exacerbate their loss. 22. Whether the Applicants were previously informed that their claim had been accepted and if so, are they entitled to indemnity on this basis. 23. Whether the Applicants were clearly informed of the limitations with respect to flood damage and damage arising from stormwater run-off and flash flood. 24. Whether the Applicants loss was caused by rain or stormwater run-off, defective or faulty workmanship, and/or erosion or landslide. Reasons for decision Preliminaries 25. Due to the complex nature of the dispute, it has been directly referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‟s (FOS) Terms of Reference. 26. The Panel consists of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 27. The Panel is satisfied that the material has bee n exchanged and the parties have had the opportunity to respond to the issues raised. 28. The Panel notes that the Applicants are legally represented and that the various statutory provisions referred to by the parties have been set out in their respective submissions. For the sake of brevity, the Panel will not repeat these provisions here. 29. The Applicants‟ claim was lodged by the Applicants on the 16 February 2011. 30. Following lodgement of the claim, the FSP appointed an assessor who contacted the Applicants on 17 February 2011 and arranged an inspection of the Applicants‟ property on the 24 February 2011. 31. The FSP also appointed a building group “S” to assist in the assessment of the property. S appointed “RH”, structural and civil engineers who made contact with the Applicants and conducted an inspection of the Applicants‟ home on the 4 March 2011. They provided a report to S on the same day. The report concluded that in the opinion of the structural and civil engineer the front wall to the dwelling had been rotating for a considerable period of Case No: 264870 Determination Page 8 of 14 time. The site was not subject to river flood but it had been subject to ponding of very heavy rain. To facilitate a concise result a geotechnical investigation should be undertaken of the front of the property with two bore holes to 2m and at the same time epoxy examination of the foundation structure of the considered wall. 32. It is unclear from material exchanged why there was a delay in informing the Applicants of the structural and civil engineer ‟ s opinion. On 19 May, the FSP telephoned the Applicants and according to a transcript of that discussion the Applicants were advised that the building consultants‟ team and the engineer may need to do further investigations just to confirm what damage was actually as a result of the rainfall. 33. During the telephone conversation the Applicant AS referred to more cracks appearing in the wall and also to earlier conversations, making reference to additional cracks appearing. There is also reference to the appointment of a geotechnician to conduct further examinations. 34. There were further discussions between the FSP and the Applicants on 6 June 2011. According to a transcript of the discussion the Applicant AS queried why they had not heard from anybody and were referred through to the building consultant S. It is unclear what the Applicant AS was told by S at that time. 35. In a letter dated 7 June 2011, the FSP declined the claim. It has relied upon the report of RH. It determined from that report, despite not obtaining a geotechnical report and despite the report identifying that the property had been subject to ponding of heavy rain (evident during the inspection of heavy rain ponding in the west driveway area) that the exclusion, „defective or faulty workmanship or erosion and landslide‟ a pplied to the loss sustained by the Applicants. 36. In the Panel‟s view the FSP‟s conduct when discussing the matter with the Applicants on 19 May 2011 and again on 6 June 2011 was inconsistent with the decision made on the 7 June 2011. 37. The Applicants sought a review of the FSP‟s decision on 18 August 2011. The FSP provided its IDR response on the 27 September 2011 and again relied upon the report of RH the structural and civil engineer to conclude the damage to the Applicants‟ property was not due to the pondi ng of stormwater, but instead due to long term rotation of one of the building‟s walls. The FSP argues that the engineer‟s report clearly shows the damage as being caused by a long term structural issue with the building. The Panel disagrees. Whilst the Panel accepts this report identifies the wall rotation as occurring, the report also identifies that a Geotechnical investigation should be undertaken. This appears to be in reference to the fact that the engineer found the property subject to ponding of water in heavy rain evidenced by the presence on the day of rain during the inspection of the property. Case No: 264870 Determination Page 9 of 14 38. It is unclear from the information exchanged why the FSP proceeded to make an IDR decision in the absence of this additional input from a geotechnical investigation. 39. Although the FSP has not explained the delay in reaching its initial decision, given it was relying on the report of RH, the Applicants have not provided any evidence to show that this delay itself has caused additional damage or exacerbated t he Applicants‟ loss. 40. From other information on file and in particular a further report provided by RH dated 3 July 2012 it is apparent that the male Applicant (as a former engineer) had undertaken work to stabilise sections of the wall by the inclusion of wire ties to the door way of the north side of the tilt door to the garage. According to the further report of RH this was in place at the time of their inspection of the property on the 4 March 2011. These same ties were also in place at the time of the Panel Chair Ombudsman‟s inspection of the property on 14 February 2013. 41. For these reasons, whilst the Panel is concerned as to the delays in the FSP reaching its decision in this matter and the communication to the Applicants, the Panel is not persuaded that the Applicants have established that the delay has exacerbated their loss. Acceptance of the claim 42. The Applicants maintain that they were informed during discussions with the FSP on the 19 May 2011 and again on the 6 June 2011 that their claim had been approved as the damage was not caused by river flooding but flash flooding. 43. The Panel has had the opportunity of reviewing the transcript of the discussions that took place on those occasions. 44. In the conversation on the 19 May 2011, the FSP‟s representative “D” comments that there is some movement over time previously but also that there may be some damage that arose from rainfall as well. D then comments “ so we just need to, the best we can, try and find out, you know, what part comes under the claim so we can, you know, organise a payment for you.” 45. The Panel accepts given the above comments, that this could cause some confusion for an Applicant; however, it is clear later in the conversation that no decision has been made and the FSP was still looking to find out whether the cracking is the result of rainfall. 46. In the second conversation of the 6 June 2011, this time B is the FSP‟s representative. The male Applicant has claimed in this conversation that he was informed the claim was approved. B refers to having to refer the matter through to S. S was the one that handled the building. B then states “yes, they forward all the reports through. That was how we were able to come to the position of approving the claim.” Case No: 264870 Determination Page 10 of 14 47. Clearly B is making reference to the acceptance of the claim although it is unclear whether B had any real knowledge of the Applicants‟ claim. Again it is understandable in these circumstances that the Applicant believed his claim had been approved. 48. In a further submission to FOS dated the 18 January 2012 the FSP claimed, whilst acknowledging that the male Applicant still appeared to think his claim was approved during the conversation of the 6 June 2011 that the male Applicant did not ask the operator whether his claim was approved. The FSP maintained the operator said nothing to suggest that it was. Clearly the FSP has not understood the comments by B as follows. “ Yes. Yes, they forward all the reports through. That was how we were able to come to the position of approving the claim. Now with the – with the appointment of the next person to come out and things like that‟s all, that‟s all lying with S who have got that organised. So they should have got that done by now. What we‟ll do , I will get them on the line for you first of all and we‟ll pop you through so we can find out what‟s going on.” 49. The FSP have not provided any transcript of the conversation that occurred with S. 50. Contrary to the FSP‟s allegation the operator was not silent ; in fact B indicated the claim was approved. Clearly in these circumstances the Applicants have been misled into believing their claim had been approved. 51. However, as with the delay in reaching a decision, the Applicants need to establish that they have acted on this misleading information to their disadvantage. There is no evidence the Applicants had in fact acted in any way to their disadvantage following the conversation on the 6 June 2011. In fact the FSP in their correspondence to the Applicants of the 7 June 2011 clearly informed the Applicants that the claim had been rejected. 52. In the circumstances, the Panel again whilst being concerned as to the conduct of the FSP during this process, is not satisfied that the Applicants had suffered any prejudice as a result of the misleading information provided to the Applicants in particular in the conversation with the FSP‟s B on 6 June 2011. Clearly inform 53. The Applicants do not dispute receiving the PDS but maintain the PDS was unclear and confusing for a number of reasons outlined in the submissions. 54. Section 35(2) of the Insurance Contracts Act requires that the relevant exclusions and limitations contained within a policy be in clear and unambiguous language and such that a person of average education and intelligence would have little difficulty in finding and understanding should they choose to read the policy. 55. The FSP‟s policy is indexed. Within the PDS it has a section that defines words and terms with special meaning and included within the definition Case No: 264870 Determination Page 11 of 14 section are the words Flood, Flash flood and Stormwater run-off. The policy identified under the insured events covered, the cover is provided for storm, flash flood and stormwater run-off whilst policy identifies the general exclusions including flood. The po licy also identifies defective or faulty workmanship, erosion and land slide as exclusions. 56. The monetary caps for damage caused by flash flood and stormwater run-off are clearly set out. In addition, the flood exclusion is of reference in the Certificate of Insurance. 57. Having carefully reviewed the policy, the Panel is satisfied that if the Applicants had read the policy and COI, the Applicants would have had little difficulty in finding and understanding the nature and extent of the exclusions and limitations. In the circumstances, the FSP has met its obligation to clearly inform, pursuant to Section 35 of the Act. Proximate cause of damage 58. There is no dispute that the Applicants‟ property (as articulated by AS) was not impacted by river flood or flash flood. The available evidence is that localised stormwater run- off had consistently drained towards the Applicants‟ house and was pooling over parts of the Applicants‟ property during the rain events in January 2011. This is supported by the comments made by the FSP‟s structural and civil engineer RH. 59. The Applicants‟ belief is that the water had saturated the founding soils of their property. The soil became soft and muddy which, in turn, caused the home building to move, walls to separate and cracks to appear. 60. The FSP disagrees and principally relies on a number of reports issued by structural and civil engineer “RH” who essentially suggests that:  The damage claimed was old damage; and  The home building was not properly constructed. 61. As stated earlier in this Determination RH in his initial report of 4 March 2011, found that the wall to the dwelling had been rotating for a considerable period of time due to the construction of the front door jams. He noted in the report that whilst the site was not subject to river flood it had been subject to ponding of water and heavy rain and that in order to facilitate a concise result, a Geotechnical investigation should be undertaken. 62. No Geotechnical investigation has been undertaken of the property. 63. In a later report of the 3 July 2012, RH has clarified the earlier report and stated as follows: “This firm is still of the opinion that the water as ponded within the driveway should not have affected the foundations of the building had they been constructed in a workmanlike manner at a depth in controlled soil that the building would be not affected as greatly as it is, so causing the effect of cracking and separation of this building and rotation of the walls and hence Case No: 264870 Determination Page 12 of 14 the current defect is due to ground movement and not to an occurrence of the wetting of this period.” 64. RH has explained the nature of the rotation and in particular notes the following:  It was evident that work had been undertaken to stabilise sections of the wall by the inclusion of wire ties to the door way on the northern side of the tilt door to the garage.  Paint extension and opening runs have been noted and the rotation of the walls had pulled the paint. This paint was not recent and would have been done long before the storm period.  Paint over separations during inspection was stretched to its maximum. If recent it would have been flexible and not firm as at the time of the inspection. 65. In view of the uncertainties involved in this matter, the Panel Chair Ombudsman conducted a site inspection of the Applicant s‟ property on the 14 February 2013. Present during the inspection were the Applicants and the FSP‟s representative. 66. The Applicants‟ property is a Queenslander style home that has had the lower level walled in, in a type of brick. According to the Applicants the front of the wall of the lower section of the house started to fall away shortly after the heavy rain in Queensland in January 2011. 67. There is significant movement to the front of the house as described in the engineering report of RH. It can be seen when looking at the house that the left corner wall has moved significantly. There is a down pipe along this wall that drains into a stormwater drain. The Applicants explained that water was pooling in this area during the heavy rain. The male Applicant was adamant that no water from the river reached his property, no water had got inside his property. 68. The concrete footing supporting this wall is thick, at least 300mm thick at this corner. 69. When looking at the right hand side of the property there is also e vidence of damage, as if the front is starting to fall forwards. 70. The Applicants explained that the property to the right of their property is on higher land with that driveway built up. The water runs from that property through the Applicants‟ property, wh ich increases the impact and ponding on their property. 71. On looking at the gaps in the property, it is apparent that at some earlier time, the gaps in the brick work were filled with silicon. That silicon had been painted. There is paint on the inside of the silicon and on the inside of the bricks. The silicon is of a consistent thickness and suggests that this was not part of a repair process but part of the original structure or part of the painting arranged by the Applicants some years earlier. Case No: 264870 Determination Page 13 of 14 72. The Applicants confirmed that since the heavy rain in January 2011, metal bands have been put around the property to help secure it. The Applicants have also built in pits to assist with the run-off water during heavy rain. 73. The Applicants claim that the ground in front of the property was saturated during January 2011. There is no reason to doubt this. 74. There is no reason to doubt the Applicants‟ claim that they observed the additional movement in the wall following the heavy rains in January 2011. The Applicants have consistently maintained that this was discovered (and caused by) the soil at the front of the home, becoming saturated. 75. The Panel also notes the Applicants‟ insistence that the property was not inundated by flood waters. Although this was queried during the site inspection, given the proximity of the Brisbane River to the Applicants‟ home, and relevant hydrological evidence the Applicants insist they were at the property and able to observe the inundation. They observed the water flowing from the neighbouring property and observed the water ponding at the front of the property. They strongly maintain no flood water inundated the property. 76. The initial report from the FSP‟s structural and civil engineer RH, whilst identifying the rotation of the wall, reco mmends the need for a geotechnical test to positively determine the cause of the structural failure. His report does not adequately address these issues in this regard. RH‟s second report of the 3 July 2012 is much more detailed. RH concludes that his opinion was reached that the walls to the dwelling had rotated for a considerable period of time noting that the evidence of prior work to stabilise sections of the wall, paint extension and open runs with the paint stretched and firm at the time of inspection which is inconsistent with the separations occurring in recent time. Further the slabs do not appear to have been affected by heave as there is no sign of concrete slabs dislodging and cracking. 77. RH considered that the water ponding within the driveway and home should not have affected the foundations had they been constructed in a workman like manner at an appropriate depth in controlled soil. RH concluded that the current defect was due to ground movement and not the occurrence of inundation arising from the January 2011 weather events. 78. The Applicants bear the onus to establish on the balance of probabilities that they have suffered a loss that falls within the insured events under the policy. Once established the onus then shifts to the FSP. In this case whilst the Panel is satisfied there is evidence of significant movement to the wall of the Applicants‟ property, the Panel is not satisfied that the evidence as presented is sufficient to establish that such movement was on the balance of probabilities due to stormwater run-off impacting on the front of the property. 79. Whilst the Panel accepts it is possible for such inundation to cause movement of foundation walls from time to time, the Panel is not satisfied that the Applicants have established on the balance of probabilities that to be Case No: 264870 Determination Page 14 of 14 the case in this dispute. The Panel is satisfied in the absence of alternative information that the information provided by the structural and consulting engineer is sufficient to establish that it was more likely, the movement of the wall was due to earth movement which is excluded under the terms of the policy. Determination 80. Accordingly, the Panel determines that the FSP is entitled to maintain its denial of liability and that the Applicants have not established an entitlement to cover under the terms of the policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.