Home / Financial Firm (Unknown - Insurer) / Determination 264856
Determination 264856
Flood exclusion relied on to decline water inundation claim; PDS notice not established
Summary
The Applicants' Yeronga home was damaged by water inundation in January 2011 and the FSP declined the claim as flood. AFCA found the FSP was not entitled to decline, so the flood exclusion does not apply and the parties must settle the loss, with interest on any cash settlement.
The FSP could not prove the PDS was dispatched, so the Section 35 notice of the flood exclusion was not established and the cover reverts to the prescribed contract which includes flood.
Issues
- Claim denial primary · upheld
“The Panel determines the FSP was not entitled to decline the Applicants' claim.”
- Inadequate claim investigation secondary · not upheld
“A physical inspection three months after notification is not good industry practice but does not in itself breach section 13 of the Act.”
- Failure to disclose secondary · upheld
“The onus of demonstrating dispatch of the PDS rests with the FSP, which did not provide evidence it was received, so the flood exclusion notice under s35 is not established.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Case No: 264856 Determination Page 1 of 7
Case number: 264856
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
10 September 2012
Note: The Applicants have legal representation; accordingly throughout this
Determination reference to the Applicants will include both entities.
Background
1. The Applicants hold a Home Building policy for their residence in Yeronga
Queensland with the Financial Services Provider (FSP). The home building
policy covers the building up to $752,400 and is designated as providing
cover against Accidental Damage.
2. Over 11-12 January 2011 the insured property was damaged by water
inundation and the Applicants subsequently lodged a claim for same.
3. The FSP declined the claim on the basis that the damage had arisen from
flood water which was excluded from cover under the policy.
4. The Applicants dispute the FSP’s declinature on the basis that the flood
arose from dam releases or stormwater run-off which should be covered by
the policy. Further, the FSP failed to properly inform them of the flood
exclusion under Section 35 of the Insurance Contracts Act 1984.
Summary of Applicants’ position
1. The Applicants rely on a Statutory Declaration provided by the male
Applicant from which the Panel notes the following:
At the time of incepting the policy the Applicants informed the FSP that
he wanted the same cover as he had previously.
The water entered the property from the back which has several drains
placed there. There is a recreation reserve at the back of the property
and more than one stormwater outlet exists on that reserve.
The property is 3 streets away from the river and those streets between
the Applicants’ street and the river were not flooded.
The water commenced entering the property on 11 January 2011 and
had reached the first level of the living space by approximately
10.00am on 12 January 2011. The river level did not peak until 5.00am
on 13 January.
Determination
Case No: 264856 Determination Page 2 of 7
The first level of the home is approximately 2 metres above the ground
and the water inundated this first level.
The existing drainage system is clogged with debris and weeds which
reduces its capacity to operate for stormwater purposes. An area near
the property is usually affected in heavy rainfall due to the stormwater
drains.
2. The Applicants incepted the policy 3 years ago at the recommendation of the
mortgagee. The Applicants stated they wanted the same cover as the policy
they held with another insurer (which provided flood cover).
3. When the Applicants lodged their claim with the FSP they were asked
questions but no site visit was undertaken by an assessor. The Applicants
submit this was a breach of the FSP’s duty of utmost good faith under
Section 13 of the Insuranc e Contracts Act 1984 (“the Act”). Further, the
Applicants seek compensation for non-financial loss due to the time taken to
resolve the situation or interference with the Applicants’ expectation or peace
of mind.
4. The Applicants state that flood is a prescribed event for the purposes of
Section 35 of the Act, as defined by Section 14 of the Insurance Contracts
Regulations 1985. The Corporations Act 2001 further requires clear, concise
and effective disclosure.
5. The Applicants contend the distinctions between the definitions that signify
cover or exclusion are artificial and it is unreasonable to expect a consumer
to understand them or to identify circumstances of cover. In particular, the
definition of flood clearly distinguishes between water that escapes and
water that is released from a dam. The flood definition does not cover water
released from a dam. Accordingly, the requirement to clearly inform under
Section 35 of the Act or to provide clear, concise and effective disclosure
under the Corporations Act has not been met.
6. The Applicants submit that they do not recall receiving a Product Disclosure
Statement (PDS) after policy inception. The FSP has produced no evidence
that shows the document was provided to or sent to them. The FSP has
further failed to co mply with the Service’s proof of dispatch requirements and
has provided insufficient evidence regarding what process they have in
place. As there is no evidence the PDS was provided to the Applicants the
FSP has failed to inform of the flood exclusion under Section 35 of the Act.
Accordingly, the policy should revert to standard cover which includes flood.
7. The PDS also provides cover for water or liquid and does not state that it
cannot be flood water. Accordingly, the Applicants contend that they are
entitled to cover under this insured event.
8. In the alternative, the Applicants submit that the damage to the insured
property was caused as a result of releases from the Wivenhoe Dam which
does not form part of the flood exclusion. The Wivenhoe water releases
resulted in the overtopping of the river and is the effective cause of the loss.
Case No: 264856 Determination Page 3 of 7
9. In the alternative, the Applicants submit that the damage to the insured
property was caused as a result of run-off from a storm and/or rainwater.
10. The insured property was built in 2007 in accordance with the Q100 level.
11. The Applicants note that water entered their property from the back. The
stormwater drainage system that runs through the area at the back of their
property was choked with water, grass and sludge. The drainage system
was unable to cope with the continued rain.
12. The Applicants contend the evidence supports that the rain was the
proximate cause of damage to the insured property.
Summary of FSP’s position
13. The FSP has enclosed computer policy records. The policy records indicate
that an insurance agent incepted the policy. There is a notation indicating the
schedule was dispatched but a further notation indicates “THE ACTIVITY
LIST AND THE AGENS (sic) COPY OF SCHEDULE WILL NOT PR”. The
record indicates that under the renewal schedule a notation was included
which suggested if the Applicants would like a copy of the PDS they should
contact the FSP directly. The Panel notes that the policy renewal documents
appear to have been sent directly to the Applicants’ address .
14. The FSP relies on rainfall data provided by the Bureau of Meteorology
showing rainfall for Archerfield and Brisbane on 11 January 2011 was
substantially less than 10 and 12 January 2011.
15. The FSP relies on a FloodWise Report which demonstrates that the
minimum habitable floor level was between 4.4m and 7.8m. The property is
located within an overland flow path and waterway corridor.
16. The FSP has enclosed correspondence between itself and the Applicants’
representatives. The Panel notes that the Applicants’ representatives have
provided minimal information regarding the FSP’s request for relevant facts
regarding the inundation.
17. The FSP relies on a telephone conversation on 3 February 2011 between
the female Applicant and its Flood Team Claims Consultant and the report of
its internal Home Assessor (sic) Ms E who attended the property on 3 May
2011 in establishing the following:
The Applicants advised water peaked at 6 metres and was brown;
water entered the bottom level of the two storey home to a height of
600mm.
The habitable floor level above surrounding ground was 2.5m as
judged from the veranda height in the backyard.
Case No: 264856 Determination Page 4 of 7
The front door is even with street level however the property slopes
downhill at the rear so the yard is lower than street level by
approximately 3 metres.
Pursuant to legal advice the Applicants would not provide answers
regarding where the water came from.
The Applicants’ son is a builder who has arranged repairs.
The Applicants were originally with another FSP but were informed by
t he broker that they would get the same cover with this FSP’s policy.
18. The FSP’s insurance agency with another company provides insurance
options for those clients. The PDS is readily available from their officers and
website. The FSP contends it met its obligations to provide a PDS at the
time of completing the insurance. Further, the Applicants did not request
flood cover from the FSP and were not informed by the FSP or its agent that
flood was covered. The FSP notes that the Applicants did not confirm non-
receipt of the PDS in the statutory declaration.
19. The FSP’s offices were flooded and resources to respond to the claims were
limited. The FSP immediately identified claims that arose from flood and
provided a claims decision on these matters. The descriptio n provided by the
Applicants indicated that the damage arose from flood and accordingly the
claim was declined on this basis.
20. The FSP was asked to review the claim and arranged for an assessment. As
part of the review the FSP sought more information regarding the inundation.
The Applicants provided unsatisfactory responses through their
representative and the FSP considers this a breach of the utmost good faith.
21. The FSP notes that ICA Hydrology Panel report indicated flooding after 6pm
on Tuesday 11 January 2011 was due to riverine flooding as the rainfall had
stopped some time earlier.
22. No storm water entered the property prior to the property being flooded
through the drains. If storm water/rain water is the sole source of inundation,
the damage occurs quickly around the same time as the peak rainfall falls.
The water rises quickly and drains away quickly once the rainfall slows or
stops. However, there was a delay from the time the rainfall occurred to the
time the water inundated their home and the water level in the suburb
remained elevated for an extended period; further evidence that the source
of the inundation was flood water.
23. The Wivenhoe releases are still classified as flood as it entered the river
mingling with stormwater and floodwater prior to overtopping the banks.
24. The exclusion of flood would still apply to escape of liquid from a fixed pipe
or drain.
Case No: 264856 Determination Page 5 of 7
Issues
25. Whether the FSP has breached Section 13 of the Act.
26. Whether the FSP is entitled to rely on the policy terms and conditions.
27. Whether the FSP has appropriately declined the Applicants ’ claim for
damage arising from water inundation.
Reasons for decision
28. Due to the nature of the dispute, the Financial Ombudsman Service (FOS)
has considered it appropriate to elevate the dispute in accordance with the
Operational Guidelines to the FOS Terms of Reference. Thus, this dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination. The parties have been previously advised that a
Determination will be issued in this case.
29. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
30. There has been an exchange of material between each party and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
31. The Panel has read each party’s submissions and materials and will only
refer to the relevant submissions and materials raised.
32. The Panel considers that there are three discrete issues (listed above) which
will be dealt with separately below.
Whether the FSP has breached Section 13 of the Act
33. The Applicants have alleged that the FSP did not properly investigate their
claim which is a breach of Section 13 of the Act. Further, the Applicants state
significant time elapsed due to the FSP’s handling of the claim and seeks
compensation for same.
34. The Panel notes that the FSP was unable to enter its offices for several days
after the flood due to inundation of same. The FSP had to deal with a high
volume of claims and opted to make decisions based on descriptions
provided by the Applicants in order to provide efficient responses on claims.
35. It was only when claim declinature by the FSP occurred, that a physical
inspection of the risk address was carried out by an internal assessor of the
FSP’s, some 3 months after claim notification. Even allowing for the
dislocation caused by the floods to the FSP’s operations, this does not
constitute good industry practice; however in and of itself this does not
constitute a breach of Section 13 of the Act.
Case No: 264856 Determination Page 6 of 7
Whether the FSP is entitled to rely on the policy terms and conditions
36. The FSP has indicated in its submissions that the agent which incepted the
policy acts for it. There is no indication that the agent was an independent
broker on behalf of the Applicants and indeed the website for this mortgagee
company indicates it operates “under an agreement with the insurer [FSP].
[FSP home insurance policy] is issued by [FSP name].”
37. It is clear that an agent on behalf of the FSP is not an intermediary as
contemplated by Section 71 of the Act. Accordingly, the provision of the PDS
to the FSP’s agent will not be effective notice under Section s 35 and 71 of
the Act in respect of the Applicants.
38. The Applicants have given evidence that they do not recall receiving the
PDS from the FSP or its agent. The Applicants have also noted that the FSP
has not provided proof of dispatch as outlined in the FOS Circulars.
39. To this end, the Case Manager contacted the FSP to determine whether
there was proof of dispatch which had not been presented to FOS. The FSP
responded by repeating its earlier submission that the Applicants received
the PDS and did not declare within their Statutory Declaration that they had
not received this document. The FSP noted it was not required to provide
evidence on the provision of the PDS in such circumstances.
40. With respect, the Panel disagrees with the FSP’s position on this issue. The
Applicants have provided submissions that they do not recall receiving the
PDS from the FSP or its agent. The Panel notes that the fact the male
Applicant did not place such a statement in his Statutory Declaration is not
evidence that the Applicants did in fact receive the PDS.
41. The onus of demonstrating dispatch of documents rests with the FSP. The
FSP has, despite requests from FOS and the Applicants, not provided
documentary or witness evidence that the PDS was received.
42. The Panel cannot be satisfied that the Applicants did in fact receive notice of
the flood exclusion as required by Section 35 of the Act. The cover therefore
reverts to the prescribed contract under the Insurance Regulations which
does provide flood cover.
43. The Panel notes it is unnecessary to consider the third issue of whether
flood or storm caused the damage as the prescribed contract operates in this
matter. However, even a preliminary review of the FSP’s submissions in
respect of the evidence supporting a finding of the policy excluded event of
flood, leaves the Panel in considerable doubt in that respect. As the policy
covers Accidental Damage, the Applicants have a prima facie claim;
accordingly, the onus of proof demonstrating the application of the flood
exclusion lies wholly to the FSP’s account. By relying upon its assessor’s
site report (3 months after inundation) and generic documents like the ICA’s
Hydrology Panel Report, in lieu of an expert hydrologist’s examination of the
data specific to the risk address, discharging the proof of onus establishi ng
Case No: 264856 Determination Page 7 of 7
the applicability of the flood exclusion, on the balance of probabilities,
becomes highly problematic for the Panel.
Determination
44. On the basis of the available information the Panel determines the FSP was
not entitled to decline the Applicants’ claim. The parties are asked to work
cooperatively to determine the extent of the loss caused by inundation.
Should the parties not be able to agree on a monetary settlement, the matter
can be remitted to the Panel for further assistance.
45. The Panel determines that in the event of a cash settlement, the FSP is
required to pay interest at the rate specified by the Insurance Contracts Act
1984, from the date of denial of the claim, to the date of settlement.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.