Home / Financial Firm (Unknown - Insurer) / Determination 264679
Determination 264679
claim_denial
Summary
The FSP declined a Goodna landlord's contents claim for January 2011 inundation as flood, an excluded event. AFCA found the loss was caused by floodwater from the Brisbane River, which is excluded, so the FSP was entitled to decline.
Water released from Wivenhoe Dam that escaped into the Brisbane River and then inundated the property is flood under the policy definition, and the broker-arranged policy meant section 71 excused direct section 35 notice.
Issues
- Claim denial primary · not upheld“the Panel is satisfied that the proximate cause for the Applicants' loss was floodwater inundation”
- Failure to disclose secondary · not upheld“the Applicants have not established an entitlement to indemnity arising from the FSP's alleged failure to fulfil its obligations under section 35 of the Act”
- Product terms interpretation secondary · not upheld“when a mixture of river water and rainwater causes damage to property, the FSP is entitled to rely on the clause which excludes loss or damage caused by flood water”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 264679 Determination Page 1 of 11
Case number: 264679
General Insurance - Domestic Insurance - Home Building - FSP Decision –
Flood - Denial of claim – Ss 13, 35 and 71 Insurance Contracts Act 1984.
19 October 2012
Background
1. The Applicants held a Landlord‟s Contents Policy (the policy) with the
Financial Services Provider (FSP) which provides indemnity for Accidental
loss or damage to the insured property subject to the specified exclusions.
2. In January 2011, the Applicants‟ property in Goodna was inundated wi th
water following severe weather events in Queensland.
3. The Applicants‟ claim was refused on the basis the loss was caused by
flood, which is an exclusion under the policy.
4. The Applicants dispute the FSP‟s decision on the basis they were not clearly
informed of the terms and conditions of the policy and the loss was caused
by stormwater runoff as opposed to flood.
Summary of Applicants ‟ position
5. The Applicants have sought the assistance of legal representatives “L” in
disputing the FSP‟s decision to decline the claim. For convenience and
clarity both the Applicants and L will be referred to as „the Applicants‟ for the
purpose of this determination.
6. The Applicants maintain that they were not provided with the relevant policy
documentation i.e. the product disclosure statement (PDS) and the policy
renewal documents did not alert them to the fact they were not covered for
loss or damage arising from flood.
7. The Applicants had every incentive to insure their property for flood damage
arising from its close proximity to the Brisbane River. The FSP in failing to
offer the Applicants insurance appropriate to their needs, in light of the
foreseeable flooding of Brisbane River, failed to fulfil its duty of „Utmost good
faith‟ under section 13 of the Insurance Con tracts Act 1984 (the Act).
8. Alternatively, the Applicants maintain the wording and structure of the policy
is such that it is beyond the understanding capacity of the reasonable
consumer. Further, the flood exclusion relied upon by the FSP does not
Determination
Case No: 264679 Determination Page 2 of 11
include the type of flooding suffered by the Applicants‟ property. Therefore,
the FSP is not entitled to rely on the flood exclusion to decline indemnity for
their loss under the claim.
9. It has been established that water being released from the Wivenhoe Dam
(the dam) was the dominant cause of the inundation of properties
downstream of the dam. The FSP‟s exclusion for flood does not address the
issue of dam releases rather refers to water that escapes. There is
inadequate evidence to conclude the inundation would have occurred
without the releases from the dam.
10. Accordingly, the substantial releases of water from the dam should
reasonably be considered the proximate cause of the loss. The Wayne Tank
principle referred to and relied upon by the FSP has no application to the
Applicants‟ claim as it requires two separate proximate causes whereas the
sole cause for the Applicants‟ loss was water released from the dam.
11. The dam cannot be categorised as a lake, as suggested by the FSP.
12. The FSP has not had a site-specific hydrology report done for their property.
The FSP has provided two reports for other properties in the proximity of the
insured property and assumes the whole suburb was affected in the same
way.
13. The property was affected by stormwater runoff arising from the fact it is
located in a low lying area. The policy covers loss caused by stormwater and
therefore the claim should be paid.
14. The Applicant “GR” has submitted a statutory declaration dat ed 7 March
2012 in support of the claim. It provides information in respect to the
circumstances and steps undertaken in the arrangement and subsequent
purchase of the policy.
15. The Applicants are seeking complete indemnity for their loss under the
claim.
Su mmary of FSP‟s position
16. The FSP acknowledges the Applicants‟ position that they were not provided
with the policy documentation, not made aware of the flood exclusion and
alternatively that the wording and structure of the Product Disclosure
Statement (PDS) puts it beyond the understanding of the reasonable
consumer. It maintains that the policy was not purchased directly from it or
from one of its agents rather the policy was arranged by the Applicants‟
agent who acts independently and is not under a binder with the FSP.
17. Further, the Applicants had the benefit of the services of their broker to
whom the FSP provided the PDS. Therefore although the Applicants
maintain they were unaware of the flood exclusion and had every incentive
to take out a policy that provided flood cover (due to close proximity to the
Case No: 264679 Determination Page 3 of 11
Brisbane River), these are matters that should have been discussed with
their broker and so this remains an issue between them.
18. The Applicants lodged a claim for the inundation of their property located in
Goodna next to Woogaroo Creek and its tributaries. Several properties were
inundated in Goodna during January 2011 and site specific hydrology
reports were not commissioned for each and every property. The FSP relies
upon two hydrology reports from other properties in the vicinity of the
Applicants‟ property to support its submission the loss was caused by
floodwater.
19. The FSP does not believe, having regard to the available hydrological
evidence, that it was required to obtain a site specific report for the
Applicants‟ property given the negligible size of the local catchment and
similar meteorological and topographical conditions of the properties.
20. The water that inundated the insured property came from within the confines
of the Brisbane River and not directly from the dam. While water from the
dam was a significant input into the river‟s water levels, it was not the only
source of water in the river at the time of the floods.
21. The FSP maintains that in light of the legal position established under the
„Wayne Tank principle‟ i.e. where a loss arises from two proximate causes
when one is excluded and the other included under the policy, the FSP is
entitled to decline indemnity under the policy.
22. The source of water into a watercourse is not the issue as far as the
application of the flood exclusion is concerned. The release of water from the
dam mixed with rainwater and runoff which resulted in the flooding of the
Brisbane River. It argues that the dam was built on a river and has created
an artificial lake. Both rivers and lakes fall within the wording of the
exclusion. In any case, the water that inundated the Applicants‟ property was
floodwater from the Brisbane River, which is flood as defined by the policy.
23. Once the water enters the watercourse and then eventually breaches the
normal confines and covers normally dry land, the FSP maintains such
circumstances for the purpose of the policy are considered „flood‟. The policy
excludes loss or damage caused by flood.
24. The FSP relies on the following policy p rovisions:
“ Accidental Damage Cover
We will cover your buildings and contents for any accidental damage loss or
damage.
…
Storm, rainwater or wind
We will cover your buildings or contents for loss or damage as a result of
storm, rainwater or wind.
…
Exclusions to your cover
Case No: 264679 Determination Page 4 of 11
Any cover we provide is subject to the following exclusions.
Accidental Damage cover, Additional cover and Optional cover
exclusions
We will NOT cover any loss or damage as a result of, or caused by
flood
…
General exclusions
We will NOT cover any loss or damage, or liability as a result of, or arising
from
flood or storm surge ”
Issues
25. Whether the Applicants were clearly informed of the flood exclusion?
26. Whether the loss was caused by stormwater runoff or flood?
27. Whether the FSP is entitled to refuse liability under the terms and conditions
of the policy?
Reasons for decision
28. As advised to the parties, FOS has considered it appropriate to elevate the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
29. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
30. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this determination except where considered
relevant.
31. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
32. The Panel notes the parties do not dispute the following:
The Applicants held an active landlords policy with the FSP at the time
of loss.
Case No: 264679 Determination Page 5 of 11
The policy was arranged by the Applicants‟ broker and who does not
act under a binder with the FSP.
The insured property was inundated during the significant weather
events experienced in Queensland during January 2011.
The Applicants were not present at the property at the time of
inundation and the tenants evacuated the home prior to the inundation
occurring.
The FSP has elected not to obtain a site specific hydrology report for
the insured property. It relies upon hydrological reports commissioned
for two properties in close proximity to the insured dwelling.
The property is located in close proximity to the Brisbane River,
Woogaroo Creek and its tributaries.
Section 35 and “Clearly Inform”
33. The Applicants in referring to Section 35 of the Act maintain that:
The FSP failed in its obligations under the Act to provide them with the
PDS.
The PDS itself is not clear and would prove difficult for a reasonable
consumer to understand the extent of cover and/or limitations of the
policy.
34. The Panel notes it is not in dispute that the Applicants utilised the services of
a broker/agents to incept and manage the policy and as such finds section
71 of the Act relevant to consideration of this aspect of the dispute between
the parties, it provides:
…
Section 71(1) of the Act states that where an insurance broker, not on a
binder, acts on behalf of the insured, the insurer is excused from the
requirement to provide the insured with any statutory notices et al, pursuant to
the requirements of the Insurance Contracts Act 1984 (with the sole exception
of 58(2))”
35. In line with the relevant legislation, an FSP is obliged under section 35 to first
establish it has clearly informed a policyholder in writing of any provision of
the contract which seeks to derogate from the statutory terms of „standard
cover‟. In the instance that the policyholder utilises the services of a broker,
as is the case on this occasion, section 71 establishes the FSP is not
required to so clearly inform the insured. The statutory underpinning here is
that the broker will provide such expert commentary as necessary to the
insured, in a timely fashion.
36. Accordingly, the Panel determines the Applicants have not established an
entitlement to indemnity arising from the FSP‟s alleged failure to fulfil its
obligations under section 35 of the Act.
Case No: 264679 Determination Page 6 of 11
Section 13 “Utmost Good Faith”
37. The Panel has also considered the Applicants‟ position in respect to the
FSP‟s alleged breach of its responsibility of acting with the utmost good faith
in respect to its failure to draw their attention to the policy limitations. Further,
that by failing to bring the inadequacy of the cover available under the policy
to the Applicants‟ attention the FSP has failed to fulfil its obligations under
section 13 of the Act.
38. Whilst the Panel can understand the Applicants‟ concern with respect to this,
it is well established law that the onus is on the Applicants to identify the
cover that they seek and to identify to an FSP the type of cover requested.
Further, having regard to the fact the Applicants had the benefit of the
services of their broker, in these circumstances, the Panel is satisfied there
has been no breach of the duty of utmost good faith.
Release-v- Escape of water and the “Wayne Tank Principle”
39. The Applicants have raised concerns in relation to whether the rise in the
level of Brisbane River was the result of water that “escaped” or was
“released” from Brisbane River. This argument relates to the definition of
flood provided under the policy.
40. The Panel has considered the fact that water was released from the
Wivenhoe Dam rather than escaped. The Panel acknowledges that the
terms of the policy itself draw attention to this issue under the policy‟s
definition of flood. The definition provided under the policy is:
“Flood
The covering of normally dry land with water escaping or released from the
natural confines of a watercourse or lake, whether or not it is modified. Flood
also includes water escaping from the confines of any reservoir, channel or
dam. ”
41. The use of only the word “escaping” from the sentence relevant to dam and
not the words “escaping or released” suggest that the “release” of water from
a dam will not be regarded as flood.
42. The FSP provided a further submission relating to the flood wording. This
submission has been exchanged with the Applicants and each party has had
the opportunity to address the issue.
43. The FSP‟s submission can be summarised as follows:
It is irrelevant whether the water was released or escaped from the dam
as the dam was built on the Brisbane River and was therefore a
significant modification of a watercourse. The FSP relies on the first part
of the definition to argue the flood was due to the escape or release of
water from a natural watercourse either in its natural or modified state.
The Panel does not accept this argument. The definition in the policy
clearly distinguished between a modified natural watercourse and a
dam. The second part of the definition relates specifically to a dam. It
Case No: 264679 Determination Page 7 of 11
only describes the escape of water from a dam as flood, not the release.
In this respect if there is any ambiguity that ambiguity should be
determined on the basis of the contra proferentum rule, i.e. against the
party which proposed or drafted the clause.
The water released from the Wivenhoe Dam indisputably mixed with
water in the river and as such clearly became indistinguishable in fact
and law. The FSP relies on the “Wayne Tank” principle to argue that
there are two proximate or competing causes that led to the loss, dam
release arguably not excluded and, water from the river escaping its
bank (flood) which is excluded.
The Panel agrees that where there are two perils, in this case dam
release and water escaping the river operating contemporaneously to
produce a loss, the exclusion prevails and the resultant loss is not
covered. This is the effect of the “Wayne Tank” principle.
44. Ev en if it could be said that the water which inundated the Applicants‟
property initially was released from the Wivenhoe Dam, the Panel is not
satisfied that this assists the Applicants.
45. The Panel is satisfied that where water from the Wivenhoe Dam (either
escaped or released from the Dam) enters a water course (for example, the
Brisbane River), then escapes the natural confines of that water course and
inundates a property, that inundation is properly categorised as flood, under
the terms of the policy.
46. The FSP is therefore entitled to exclude coverage for inundation in those
circumstances.
47. The Panel is also satisfied that while the intense rainfall may be regarded as
the initial cause for the rivers and creek flooding, along with the release of
water from the dam, it is accepted law that when rainwater mixes with river
water or water overflowing from a river or creek, then that mixture of rain
water with other ground sourced waters is all deemed to be flood water. As
such, when a mixture of river water and rainwater causes damage to
property, the FSP is entitled to rely on the clause which excludes loss or
damage caused by flood water.
Proximate Cause for the loss
48. The Panel acknowledges the Applicants‟ contention that the property would
have been inundated by stormwater prior to the arrival and subsequent peak
inundation of the property due to floodwater. It also notes the FSP‟s
evidence in respect to the peak level of inundation at the insured property,
however, it is important not to overlook the question as to what the cause for
the initial inundation may have been and whether this may have been due to
stormwater inundation prior to the arrival of floodwaters.
49. The Panel has been provided with multiple hydrology reports, however,
notes the FSP elected not to commission a site specific report for the
Applicants‟ property. The FSP has also referred to the relevant ICA
Case No: 264679 Determination Page 8 of 11
hydrology reports. As there has been an exchange of material between the
parties and both have had the opportunity to comment, information from t he
various reports relied on will only be reiterated, where considered relevant.
Assessor‟s Report (the only site specific report available)
The house was affected by floodwaters.
The water inundated the home above habitable floor level by
approximately 1200mm. The approximate difference between floor level
and surrounding ground level being 150mm with the property
approximately 400mm higher than street level.
The home is constructed on a slab and is a lowset dwelling.
The tenants advised it was raining heavily when they evacuated the
home at around 11.30am on 11 January 2011; however, the inundation
had not occurred at this stage.
Whilst evacuating they just made it out as access into the area is
through a low point under the highway which was filling up with water.
The water that inundated the property was dirty and filthy.
„W‟s‟ Hydrology Report relating to the January 2011 Storm dated 31 May 2012
50. The Panel notes that this report was prepared for a neighbouring property on
the same street and in close proximity to the insured property. The report
states in part:
At the time of inspection no one was available for comment and there
was little evidence of inundation, which was attributed to the time
between the event and inspection.
The available terrain information indicates that the approximate ground
level at the dwelling ranges from between 15.7m AHD and 16m AHD.
The ground level of „P‟ street is approximately 15.3m AHD immediately
adjacent to the dwelling.
There is an unnamed tributary located about 150m east of the site. Also,
there is an area of low lying ground to the east of the site and drains to
Brisbane River 1.5km downstream of the property.
Pooling occurs in the low lying areas after periods of rain (150m east of
the property). However the elevation of this low lying area is
approximately 3m lower than ground level at the dwelling itself. Given
the low intensity of the rainfall in the local area it would not have pooled
sufficiently to inundate the home.
Available data indicates the peak level of inundation in the area as
approximately 16.2m AHD. Data (rainfall and river levels) was obtained
from the Jindalee and Moggill Alert gauges.
There was continuous rainfall from 10am on 9 January delivering
approximately 60mm over a 24hr period. A further 80mm was
Case No: 264679 Determination Page 9 of 11
accumulated on 11 January between 1.00am-2.40pm with a peak
intensity ARI of between 1-2 years.
Given the negligible size of the local catchment draining to the site it is
unlikely that inundation would have occurred due to stormwater runoff
from local rain.
Interpolation of the above noted gauges estimates peak level inundation
at the property to 16.1m AHD at around 3.30pm on 12 January.
Inundation occurred approximately 24hrs after the end of the intense
rainfall in the upper catchment of Brisbane. The report concludes that
the property on P street was inundated by flows exceeding the natural
confines of Brisbane River and backing up the unnamed tributary to the
east of the property and towards the dwelling itself.
„W‟s‟ Hydrology Report relating to the January 2011 Storm dated 5 April 2012
51. The Panel notes that this report was prepared for a property in the same
suburb and a few streets away from the insured property subject to this
dispute. The report states in part:
The housing development is recent and has been achieved by filling of a
low lying area adjacent to a previous land filling operation. The
approximate ground level for the property is 15.8m AHD.
Brisbane River level information was obtained from Moggill Alert gauge
and Jindalee Bridge gauge located 8km upstream and 11km
downstream of the confluence of Woogaroo Creek and the Brisbane
River.
The data indicates levels of the river were affected by catchment inflows
from as early as 9 January. From 4pm on 11 January both gauges show
a steeper rise in the river flood levels with eventual peaks of around
17.8m at around 3pm on 12 January at Moggill and about 12.6m at 5pm
on 12 January at Jindalee.
The occupant advised the flooding followed approximately six weeks of
not stop rain and the drains were not able to cope with the volume of
rain.
The occupants evacuated the property at approximately 5pm on 11
January and returned to the property on 13 January to find the
approximate peak inundation of 0.84m AGL (840mm).
Due to the limited size of the local catchment 1km 2 and the low rainfall
intensity between 2-5 ARI it is unlikely that there was sufficient local
stormwater runoff for this to be a major contributing factor in the
inundation of the insured property.
The inundation was caused by flows e xceeding the normal capacity of
Brisbane River backing up Woogaroo Creek and its tributaries.
Case No: 264679 Determination Page 10 of 11
52. The Applicants maintain that the release of water from the dam was the
dominant cause of the loss and this would not form part of the flood
exclusion.
53. The Panel has considered this position, however, it is persuaded that if the
water which inundated the property escaped from the Brisbane River, then
this would constitute flood irrespective of the water originating as release of
water from the dam.
54. The Panel notes this policy provides „Accidental Damage‟ (AD) cover, albeit
subject to exclusions, in this instance relevantly flood. So from the
perspective of onus of proof, it can be assumed the Applicants have prima
facie suffered a loss pursuant to AD. Accordingly, the onus of proof now
rests exclusively with the FSP of demonstrating that the policy excluded
event of flood caused the AD and as a result they are entitled to decline
indemnification. The Applicants were not present at the insured property
and the tenant confirmed that she evacuated the home at around 11.30am
on 11 January 2011 at which time the property had not been inundated.
55. The FSP has provided two hydrology reports for properties within reasonably
close proximity to the insured property. The Panel notes that no site specific
hydrology assessment was undertaken for the Applicants‟ property,
however, an in house (FSP) assessor had attended the property and
completed an inspection as well as spoken to the tenant.
56. The first hydrology report (property a few streets away) for a property in the
Goodna area says that the occupants of that home evacuated around
5:00pm on 11 January 2011. A neighbour (of the property a few streets
away) provided a statement to the occupant which said water was coming
out of the drains at 6:30am on 12 January 2011 and floodwater entered at
11:00am.
57. In the second hydrology report for another (neighbouring) property in the
area the hydrologist has estimated P Street to be at a level of 15.3m AHD.
Further, he estimated on the basis of the available data and topographical
evidence that this property suffered its peak inundation with the peak
flooding of the Brisbane River at approximately 3:30pm on 12 January 2011.
58. The Panel has considered the two hydrology reports and the FSP‟s
asse ssor‟s report which provides that the property is around 400mm higher
than (P) street level and the floor level is a further 150mm higher than the
surrounding ground level. This in the Panel‟s opinion places the insured
property‟s floor level at approximat ely 15.8m AHD, which is at par with the
level of the neighbouring property subject to the site specific hydrology report
(31 May 2012) noted above.
59. The Panel acknowledges the Applicants‟ concerns in respect to the data
made available in the hydrology reports. However, it is satisfied that, on the
balance of probabilities, the data in respect to the amount of rainfall (in the
local and Brisbane River catchments), the flood levels of Brisbane River and
subsequent inundation of the Applicants‟ suburb is relevant to an
Case No: 264679 Determination Page 11 of 11
assessment as to whether the insured property was inundated by floodwater
and/or stormwater runoff.
60. As noted above, the Applicants‟ prop erty is located in reasonably close
proximity to the Brisbane River, Woogaroo Creek and its tributaries.
61. The water inundation to the Applicants‟ property is consistent with the timing
of the Wivenhoe Dam releases commencing on 11 January 2011 and
resultant down river flooding. In considering the evidence as a whole, the
Panel is of the opinion that the water which gave rise to the claim was water
from Brisbane River backing up the creek in close proximity of the insured
property.
62. In light of the matters discussed previously, the Panel is satisfied that the
proximate cause for the Applicants‟ loss was floodwater inundation. The
Panel notes that the policy excludes cover for loss arising from flood within
the “Accidental Damage” as well as the “General Exclusion” provisions which
apply to all sections of the policy.
Determination
63. On the basis of the available information the Panel determines that the FSP
was entitled to deny liability for the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.