Home / Financial Firm (Unknown - Insurer) / Determination 264477

Determination 264477

Driveway washout denied as flood rather than stormwater runoff

FirmFinancial Firm (Unknown - Insurer)
Decided2012-06-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$3,605
Non-financial loss—
Amount claimed$6,137
SourceAFCA PDF

Summary

The applicant's driveway washed away in a January 2011 storm, and the FSP denied the claim as flood damage from Coal Creek. AFCA found stormwater runoff played a role, that the FSP had not discharged its onus on the flood exclusion, and ordered indemnity.

The insurer bears the onus of proving the flood exclusion, and stormwater runoff excluded from the flood definition was found to have contributed, so the exclusion was not established.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 264477 Determination Page 1 of 5 Case number: 264477 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Stormwater/Flood Damage 25 May 2012 Background 1. The Applicant held a home and contents policy with the Financial Services Provider (FSP) from 11 December 2001. The policy provided for complete building replacement and contents cover of $59,500. 2. On 14 January 2011, the Applicant’s driveway sustained damage as a result of water inundation after a series of storms that affected the local area. She lodged a claim after her driveway was partially washed away. 3. The FSP declined the claim on the basis that it considered the cause of the loss to be the flooding of the nearby Coal Creek. 4. The Applicant disagrees with the decision and seeks indemnity to fully repair the driveway, the cost of which was estimated at $6,136.90. Summary of Applicant’s position 5. The Applicant says that her driveway was washed away as a result of the record rainfall and stormwater run-off. This occurred prior to the area being inundated with floodwater. Summary of FSP’s position 6. The FSP says that the driveway was inundated by water from the overflowing Coal Creek and this caused it to wash away. It attributes the cause of the loss to flooding, which is excluded from cover. 7. The FSP relies upon the following policy provisions: Pages 8-13 of the Product Disclosure Statement (PDS) “ What we cover – insured events This section describes under the heading: Yes – the insured events you are covered for, Determination Case No: 264477 Determination Page 2 of 5 No – the conditions and exclusions that specifically apply to particular insured events. ... Yes Storm and rainwater including stormwater runoff from areas surrounding the site or water escaping from any water main, drain, pipe, street gutter, guttering or surface. Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy fall of rain, snow or hail. ... No Damage or loss caused by flood . Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter, because it is full or has overflowed, or is prevented from entering because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. Flood does not mean stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface.” Page 14 of the PDS “ What we do not cover – general exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: ... flood...” Issue 8. Whether the damage to the Applicant’s driveway was caused by stormwater run-off, water from the drains or flooding. Reasons for decision 9. I am satisfied that a full exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. 10. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Case No: 264477 Determination Page 3 of 5 Reference. This is because of the issues to be considered. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 11. It is not in dispute that the FSP’s policy does not extend cover to circumstances where a loss is caused by a flood. The policy does extend cover in circumstances where the home is subject to stormwater run-off. 12. The Applicant later reports that her driveway was inundated with stormwater run-off due to extremely heavy rainfall on 14 January 2011. 13. The FSP contends that floodwater from Coal Creek, which runs under the driveway, was responsible for the entire loss. 14. After the report of the incident, the FSP appointed a loss adjuster to investigate and report on the damage caused to the Applicant’s property. 15. The assessor CL attended the property o n 27 January 2011. According to CL the Applicant’s property is situated on a hillside. A sealed driveway approximately 300 meters long leads to the property from the main road. The Coal Creek passes under the driveway approximately half way up the hill. During the violent rains Coal Creek filled rapidly and was unable to disburse the storm water pipes installed under the driveway were sufficient under normal circumstances however, when the creek filled rapidly the water flooded over the driveway causing erosion along both sides of the driveway and the embankment. 16. A number of photographs accompanied the report. The photographs show the erosion of the bank caused by the water, the location of Coal Creek on the right side of the driveway and the damaged driveway. 17. The FSP then engaged a hydrologist, FM, to provide site-specific analysis of the damage. FM visited the property on 2 March 2011 and noted in his subsequent report dated 15 April 2011 that:  the road had been cut into a hill, which was moderately sloped above the road and more steeply sloped below it;  two small (150mm) drainage pipes were located under the road to account for run-off rainwater;  the rainfall in the area was the “highest on record”;  the highest single day concentration of rainfall was in the 24 hours prior to 9am on 13 January 2011;  the pipes under the road were not capable of coping with a 1 in 1 year ARI event and runoff will overflow and pass over the access road.  the cause of t he loss was “riverine flooding” Case No: 264477 Determination Page 4 of 5  riverine flooding has inundated the access road at the location of the stormwater pipes culvert crossing. 18. The Applicant disputed the findings of FM and clarified that the two pipes referenced in the report were 600mm and 300mm in diameter respectively. This contrasts markedly with the 150mm reported by FM. 19. Further to this, the Applicant states that the road had been constructed 27 years earlier, with the pipes inserted underneath, pursuant to approval from the local council. There had never previously been a problem at the site. 20. The relatively brief response the engineer FM has noted as follows: “the culvert crossing is located on a water course. The local catchment stormwater runoff identified in the report is four litres per second is insufficient to cause the damage. The road way was inundated by water from the watercourse, this water is therefore flood under the definition. The matter of the culvert pipe size is not clear, but this is not critical to the finding. The fact is that the culvert could not carry the flow which overtopped the road way and led to the damage.” 21. I am concerned that FM has specifically stated a measurement for the culvert pipes in one report, in part to illustrate their ineffectiveness in handling the run-off, and then asserted in a second report (after being informed that his estimates of size were wrong) that the size of the culvert pipes was not “critical to the finding” . 22. The first report clearly implies that the pipes were of insufficient size to cope with the water inundation. The subsequent assertion applies a generic statement suggesting simply that the damage was clearly due to flood. 23. I am of the opinion that the inaccuracy arising out of the first report calls into question the merits of the conclusions drawn by FM and the FSP. I am further concerned that no strong evidence has been provided to suggest that the road was not damaged during the period of “ record ” rainfall and run-off prior to the inundation of the area. 24. I also note that whilst the engineer has made comment as to the flood definition the engi neer has not taken into account the provisions of the FSP’s policy that provide flood does not mean storm water runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. Arguably the engineer in concluding that the piping was unable to cope is concluding that the water escaped from the drain, pipe, street gutter, guttering or surface. 25. Whilst I accept that the area was eventually inundated by floodwater, I am of the opinion that stormwater run-off played a role. I am not satisfied that the FSP has discharged its onus to prove the exclusion should apply to allow it to avoid the claim. Case No: 264477 Determination Page 5 of 5 26. With respect to the Applicant’s quantum, I note that she paid $3,605.03 to attend to temporary repairs to the road. I consider that these costs should be met by the FSP, which should also attend to whatever additional work is required to fully repair the structure and surrounds as appropriate. Determination 27. On the basis of the available information, I determine that the FSP must indemnify the Applicant for her loss. 28. The FSP must pay the sum of $3,605.03 for the temporary repairs paid for by the Applicant, plus the further remedial work required to bring the road back to its pre-incident condition. 29. In relation to any payment made, the FSP must attend to payment of interest at the statutory rate from 5 May 2011 until the date of settlement.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.