Home / Financial Firm (Unknown - Insurer) / Determination 264468

Determination 264468

Claim denial - river flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-12-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

An Ipswich-area home at Moores Pocket was inundated in January 2011 and the FSP denied the claim as river flood. The applicants argued stormwater and rain damage came first and that they were misled at inception. AFCA found the PDS was dispatched, the exclusion was clear, and the inundation was Bremer River overbank flood, so the FSP is entitled to refuse the claim.

River flood is an excluded event, the insured bears the onus to prove an insured event such as storm or flash flood, and the FSP complied with its s35 clearly-informed obligation through the dispatched PDS.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 264468 Determination Page 1 of 15 Case number: 264468 General Insurance – Domestic Insurance - Home Building & ContentsInsurance - Water damage – Flood or stormwater runoff – Ss 13 & 35 Insurance Contracts Act 1984 10 December 2012 Background 1. The Applicants insured their Home building for $271,000 and contents for $81,000, with a $300 policy excess, under a Home Cover Insurance Policy. The policy incepted on 27 January 2009 and had been renewed to 27 January 2011. 2. The Applicants’ property is situated at Moores Pocke t which is located in the Ipswich LGA. Their property is approximately 300 metres from the Bremer River. 3. In early January 2011, severe weather in South-East Queensland brought widespread rain to the Applicants’ locality. 4. The Applicants have stated that the inundation of their property commenced on 11 January 2011 and continued to 12 January 2011. Their building and contents were severely damaged. 5. The Applicants submit that the damage to their property was caused by stormwater runoff which is covered under their policy. 6. After investigations into the source of the inundation, the Financial Services Provider (FSP) denied liability on the ground that the inundation was caused by a flood event which is excluded from the cover provided by the policy. The Applicants have disputed this. Summary of Applicants ‟ Position 7. The Applicants are represented; for the sake of simplicity, reference to the Applicants will include their legal representatives. Misrepresentation 8. The Applicants submitted a statutory declaration deposing that when they contacted the FSP prior to taking out the insurance policy they specifically asked the FSP’s consultant whether they would be covered for ‘everything’. Determination Case No: 264468 Determination Page 2 of 15 The consultant confirmed that they would be covered for everything but they did not specifically ask about flood cover. 9. The Applicants requested the FSP provide a copy of the transcript of the telephone conversation but it states the call was not recorded. 10. The Applicants relied upon th e consultant’s advice and thought they were covered for damage caused by flood. 11. They dispute the contents of the statutory declaration from the FSP’s consultant deposing ‘If a customer asked me whether she was covered for ‘everything’ on a Home Cover policy, I would have advised the customer that they would need to be more specific with their inquiry as our insurance policies do not cover ‘everything’. 12. The Applicants contend that their direct experience with the consultant should be preferred over a general statement concerning what is usually done which was not followed in the Applicants’ case. Non Receipt of PDS 13. In the entire time the Applicants have been insured with the FSP they have never received a copy of the Product Disclosure Statement (PDS). 14. The consequence of this pursuant to Section 35 of the Insurance Contracts Act 1984 is that standard cover (including flood cover) applies and the FSP should accept their claim for flood damage. Requirements to clearly inform – Section 35 of the Insurance Contracts Act 1984 (the Act) 15. Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to a claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. 16. Section 35 of the Act requires the FSP to clearly inform the Applicants of any exclusions from the standard policy. The Applicants submit that they did not receive a copy of the PDS. 17. They also submit that in certain circumstances, merely providing the policy document may not be enough to clearly inform a consumer of a relevant provision, such as where there is inadequate attention drawn to certain provisions. Max Hams and 1 Ors v CGU Insurance [2002] NSWSC 273 18. In order to determine whether damage caused by rainfall is covered under the policy, a consumer must examine four different events that are set out over three different sections on six different pages of the policy. Case No: 264468 Determination Page 3 of 15  The definition of ‘river flood’ is confusing and ambiguous, as it discusses water which is ‘normally contained’ in a watercourse that is ‘normally dry’.  The definition of ‘storm’ is also ambiguous as there is no direction given about what degree of ‘violent weather’ amounts to a storm. It is also unclear whether severe rain falling on its own may be considered violent weather.  The definition of ‘rain’ which only includes rain that falls directly on the Applicants’ property is unusual and onerous. Where rain is included in the policy, there is no indication that it has been defined in such a restrictive and oppressive manner. This definition is so restrictive it may in fact be illusory.  In relation to the definition of ‘flash flood’, the terms ‘usually’ and ‘short time’ are ambiguous and unclear. The definition of flash flood used is unusual to the extent that it does not include rainwater ‘mixing with floodwater’ and ‘that cannot run off’. It effectively includes what would usually be an inclusion in an exclusion. 19. The Applicants refer to a Panel decision in case 40607 in which the Panel discussed a definition which excluded ‘flood water combined with run -off and/or rainwater’. The Panel found the insurer had not complied with its obligation to clearly inform in relation to Section 35 of the Act. 20. The Panel found that with out adequate cross referencing ‘such a practice in policy drafting does not comply with the provisions of Section 35 of the Act. 21. The Applicants submit the definition of ‘flash flood’ is so restrictive that no real benefit is offered to an insured. They find that it is difficult to understand what is actually included in the meaning of ‘flash flood’. 22. The Applicants state that an insured of average intelligence and education would not have anticipated that a policy professing to cover ‘flash flood’ would only do so in very restrictive circumstances. That same reasonable insured would have great difficulty ascertaining their level of cover from the policy wording. 23. Further, in the Renewal Notice and Schedule of Endorsements the Applicants were not alerted to any exclusions or unusual terms in the policy. Damage from water is not mentioned at all. 24. Flood is a prescribed event for the purposes of section 35 of the Act as defined in the regulations. If ‘flood’ is excluded under the FSP’s policy it has a duty to clearly inform the Applicants of this exclusion. The Applicants contend that no such exclusion was drawn to their attention, nor were they aware of it. 25. The Applicants submit that the artificially enlarged definitions of ‘river flood’ and ‘water catchment system’ and the complete failure to highlight anything to do with the exclusion for flood on the Renewal Notice and Schedule of Case No: 264468 Determination Page 4 of 15 Endorsements precludes the FSP from arguing that the policy clearly sets out an exclusion of ‘river flood’, that it was clearly drawn to the Applicants’ attention as is required by Section 35 of the Act. „Clearly inform‟ conclusion 26. The policy relied on by the FSP contains language that is unclear and ambiguous and the overall framework of the provisions is complex and confusing. A person of average intelligence and education would have great difficulty understanding whether damage caused by wet weather events would be covered under the policy. 27. Therefore, the FSP has not discharged its obligation to clearly inform under Section 35 of the Act and the standard cover for flood, storm and tempest should apply. Hydrology 28. After initially relying on the generic Insurance Council of Australia hydrology report for Ipswich as a whole, the FSP eventually engaged a hydrologist to prepare a site specific report for the Applicants’ property. 29. In the hydrologist’s report dated 12 August 2 011 he stated the initial inundation of the Applicants’ property was water entering the house via the ceiling and gutters to a depth of 0.05 metres prior to any water arriving from Bremer River. Damage caused by storm 30. The Applicants dispute the assessor’s and hydrologist’s statements that the water came from the Bremer River. The Applicants also dispute that they told the assessor the water came from the river 600 metres away. 31. It is likely that prior to any riverine flooding inundating the Applicants’ home, stormwater damaged their property. This view is supported by a statutory declaration from a neighbour who deposed: ‘On the night of the flood in Ipswich in January 2011, there was a large amount of water coming down Moores Pocket Road. The gutters, kerb and channel) overflowed and water went into people’s houses before the river reached their house.’ 32. The Applicants ’ property is situated at the bottom of a number of hills and water ran from adjoining higher streets towards their property during the unusual events of the week commencing 10 January 2011. Water surged down their street and entered their property from the street-front. 33. Without specific hydrology it is impossible to determine whether and at what point water avalanching down the hill and impacting on the Applicants’ house met water which was trapped in the stormwater reserves and may/or may not have backed up. 34. The Applicants submit that clearly there was a possibility of a first event, stormwater flow from high rain, caught by the policy which would mean a pay- Case No: 264468 Determination Page 5 of 15 out and a later event that may be characterised as flood but impacted on the already damaged house. The Applicants version of events 35. The Applicants are clear that water entered their property initially through the chimney, roof and gutters. Some of this water due to gravity ran down the walls to a depth of 0.05metres. Following this, at a later time, the property was affected by stormwater and its runoff and then the property was affected by overland flow from the Bremer River. 36. The Applicants submit the chimney had storm water come down through it on the night of 10 and 11 January 2011, the damage is from water pooling around the ceiling and to the brick work which meant mould has started to grow. Summary of FSP‟s Position 37. The FSP maintains that the inundation of the Applicants’ property was a result of ‘river flood’ as that term is defined in the policy and consequently the Applicants’ claim is not covered. 38. The FSP submits that the only cause of inundation was overbank flow from the Bremer River which inundated the Applicants’ property on 12 January 2011. 39. The FSP engaged hydrologist, ‘W’, to prepare a report on the cause of damage to the Applicants’ property. The hydrologist’s report dated 12 August 2011 was site specific and stated, in part: Findings  Rainfall totals for the 24 hours to 9.00 am taken at Bundamba (Hanlon Street) Alert (540249) rainfall station, located 1.6km north- east of the Applicants’ property were: - 10 January 2011 56mm - 11 January 2011 20mm - 12 January 2011 47mm  On Tuesday, 11 January , 42mm of rainfall was recorded between 1100 hours and 1500 hours with a peak one hour intensity of 16.3mm/hr occurring at approximately 1300 hours.  Recorded rainfall intensities were not particularly severe for short durations.  Maximum stormwater runoff depths would have occurred within 30 minutes of the peak rainfall intensity. No significant rainfall was recorded at the Bundamba (Hanlon Street) Alert rainfall station after 1700 hours on Tuesday 11 January 2011. Comments  The Applicant was not able to recall the exact timing of the rainwater entry.  The maximum water level recorded at Bundamba (Hanlon Street) Alert was 19.4 above the gauge datum. Based on a maximum depth of inundation of Case No: 264468 Determination Page 6 of 15 1.8m, the estimated floor level of the Applicants’ property is 17.6m relative to the gauge datum.  Flooding from the Bremer River would have inundated the floor level after 0400 hours on Wednesday 12 January. The maximum water level in the vicinity of the Applicants’ property occurred at approximately 1500 hours on 12 January.  Given the location of the property within a shallow saddle, floodwaters from Bremer River would have inundated the property from both the north and south.  No rainfall was recorded after the Applicants had left their property (at about 2000 on 11 January 2011). Conclusions  Information provided by the Applicants indicates that rainwater overflowed the roof gutters to enter the lounge room on the morning of 11 January 2011. The reasons for water entry at this time are uncertain, as the heaviest recorded rainfall in the area at this time, approximately 16 mm/hr was not particularly intense. Similar short duration rainfall intensities would be regularly experienced in the vicinity of the subject property. The Applicants indicated that this water ponded to a maximum depth of about 0.05m above floor level at the lowest point in the lounge room.  The property was subsequently inundated by floodwaters overflowing from Bremer River to a maximum depth of approximately 1.8m above floor level.  Initial inundation by water from the Bremer River occurred approximately 11 hours after rainfall in the area ceased. Inconsistencies in the Applicants‟ version of events 40. The Applicants version of events surrounding the inundation has undergone a number of revisions since their claim for water damage was first lodged in January 2011. 41. The FSP submits that the Applicants have failed to provide a consistent or coherent description of the inundation of their home and have failed to provide satisfactory evidence in support of their claim. 42. The loss assessor’s report dated 16 February 2011 included answers to a number of questions put to the Applicants. Two of these questions and answers were:  ‘Check with the Insured as to whether there was any and what damage caused by water through the roof or by overflowing gutters and the date and time of that event – Answer None  Was there any and if so what damage caused by rainwater through the roof or by overflowing gutters? – Answer None’. 43. The Applicants further submitted on 11 May 2011 that three separate events took place:  Water damage was first experienced from stormwater entering the property through the chimney; Case No: 264468 Determination Page 7 of 15  Stormwater entered their home through the front door on 11 January in the morning during a time of heavy rain and a thunderstorm;  Water continued to rise and peaked in the property on 12 January. 44. In discussion with the FSP’s hydrologist it was reported:  Initial inundation above floor level occurred sometime after 8pm on Tuesday 11 January 2011. The insured indicated that the lounge room was affected by rainwater entering through the roof on the morning of Tuesday 11 January 2011.  On the morning of Tuesday 11 January 2011 water began entering the ceiling, despite the gutters being clear of debris. At this time, water was flowing (east) along Moores Pocket Road at about hub-cap level preventing rainwater from draining to the road.  Rainwater ran down the inside walls, ponding to a maximum depth of about 0.05m and spreading across the lounge room. The floor level of the lounge room is slightly uneven, resulting in a greater depth of water at one side. 45. The FSP states there have been a number of inconsistencies in the Applicants’ version of events, and the Applicants now believe a combination of four events contributed to the inundation: 1. Rain water entering through the chimney and pooling around the ceiling; 2. Rain water running down the interior walls in the lounge room; 3. Stormwater runoff which cascaded off the nearby hills; and 4. Overbank flow (river flood) from the Bremer River (but only after inundation by the first three sources). 46. The FSP acknowledges that the proportion of damage caused by events 1, 2, and 3 would be covered by the policy. Damage caused by stormwater entering through the chimney or running down the walls of the lounge room 47. The FSP does not accept that any of the damage was caused by stormwater entering through the chimney or running down the walls of the lounge room. The factors that mitigate against this are:  The loss assessor did not record any damage had been sustained to the Applicants’ roof ar ound the chimney or otherwise;  Photographs submitted by the loss assessor do not show any damage to the ceiling where water has pooled or run down the walls; and  In his site specific report dated 12 August 2011, the hydrologist did not accept the Applicants version of events and stated that it is incompatible with the rainfall intensity as recorded over the relevant period. Case No: 264468 Determination Page 8 of 15 48. Therefore, the FSP submits the Applicants contention should be rejected and the conclusions of the hydrologist’s site specific report be preferred. Misrepresentation of cover under the policy 49. There is no record of the telephone conversation between the Applicants and the FSP in which the Applicants state they were informed that they would be covered for ‘everything’. 50. The experienced staff member who spoke with the Applicants cannot recall the conversation but he has deposed that if he was asked whether the policy covered ‘everything’ he would have requested the customer be more specific as the FSP’s insurance policy did not cover everythi ng. 51. The FSP submits that a reasonable person in the Applicants’ position would not interpret such a comment literally and would not rely on such a casual remark without also reading the PDS to ascertain the true scope of cover under the policy. Therefore, any such remark would not amount to a misrepresentation at law. The FSP has complied with its statutory disclosure obligations 52. The FSP acknowledges that if it wishes to rely upon the flood exclusion contained in the policy, it has a statutory duty to ‘clearly inform’ the insured in writing of the operation of the exclusion prior to their entering into the contract of insurance. 53. The Applicants contend that the relevant policy schedule did not contain a reference to the flood exclusion. 54. The FSP submits that at renewal of the policy the covering letter informs the insured to refer to the PDS and Policy Wordings for information about the cover provided by the PDS and policy. The policy schedule is not the proper document in which to enumerate the multiple and various policy exclusions. Dispatch of PDS to the Applicants 55. The Applicants state that they did not receive a policy PDS. The FSP rejects this allegation and submits that it dispatched a copy of the relevant PDS to the Applicants at policy inception in 2009. 56. In support, it has submitted a statutory declaration from its business systems manager and evidence that the PDS was posted to the Applicants in 2009 and a renewal schedule was posted to the Applicants for the 2010/2011 renewal period. 57. The PDS clearly and unambiguously informs an insured of the flood exclusion. 58. The FSP submits:  The cause of inundation of the Applicants’ property was overflow from the Bremer River; Case No: 264468 Determination Page 9 of 15  This comes within the scope of the policy definition of ‘river flood’ and thereby the policy flood exclusion applies;  The FSP did not misrepresent that the policy covered ‘everything’  The FSP clearly informed the Applicants of the flood exclusion in writing before entering into the contract of insurance and is therefore entitled to rely on the flood exclusion clause. 59. The FSP relies on the following policy/contract provisions: „What you are not covered for ... Some events we may not cover include: ■ Damage caused by the seas or river flood (see Section 1.12). ... Definitions (The Meaning Of Some Words) ... “flash flood” means what occurs when there are heavy, intense bursts of rainfall, usually during thunderstorms where so much water falls in a very short time that it cannot get away quickly enough and collects and flows into your home . but does not include when rainwater on the site:  cannot run off into a water catchment system, because it is overflowing in flood; and  mixes with the flood water coming from the water catchment system and the flows into your home . ... “rain” means water that has fallen from the sky onto your home and the site but not water from flash flood. “river flood” means when water that is normally contained in a water catchment syste m increases because of rainfall or snow melt (whether in the immediate region or elsewhere) or is deliberately released by an authority, and the water overflows onto land that is not normally covered by water into your home. ... “storm” means violent weather and high winds, sometimes accompanied by rain, hail or snow including a cyclone, tornado or willy willy. ... “water catchment system” means:  a river, creek, other natural watercourse or lake, whether they are in their original state or have been modified, are named or unnamed, or normally dry that only run during period of rain;  a dam, reservoir, storm water channel or canal. ... Section 1 Insured Events Causing Loss or Damage ... Case No: 264468 Determination Page 10 of 15 1.12 Storm, Rain Or Flash Flood You are insured for damage to our contents caused by storm, rain, or flash flood. ... We will not pay for damage caused by:  the seas or tidal wave;  river flood;  erosion or earth movement. ... Issues 60. Whether the Applicants were clearly informed of the terms and conditions of their policy. 61. Whether the Applicants’ property was damaged by flash flood or storm. 62. Whether the damage was caused by ‘river flood’ which is an excluded event of the policy. Reasons for Decision 63. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service’s Terms of Reference. 64. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 65. On 4 December 2012 the Panel Chair Ombudsman attended on site where he met with the female Applicant and a representative of the FSP. 66. There has been an exchange of information between the parties and the Panel is satisfied that each party has had an opportunity to address the issues raised. Provision of PDS to the Applicants 67. The Applicants have stated the FSP did not provide them with a copy of the PDS. The FSP disputes this allegation. 68. In support of its contention that it did post a copy of the PDS to the Applicants, the FSP has submitted records confirming that a copy of the Policy Schedule and PDS was posted to the Applicants for the 2009/2010 policy year. 69. To assist FSP’s meet their obligations demonstrating despatch of relevant documents, including PDSs, to their insured clients, FOS has distributed Case No: 264468 Determination Page 11 of 15 Circular 3, outlining the preferred methodology which will permit a Panel to determine, on the balance of probabilities, that the relevant despatch took place. In this instance the FSP has satisfactorily complied with the requirements of Circular 3 and the Panel is satisfied that the FSP has complied with its obligations in this respect. Misrepresentation 70. The Applicants submit that a FSP staff member informed them that their policy would cover ‘everything’ . 71. The Applicants have submitted a statutory declaration deposing to that effect. However, the FSP’s staff member has also submitted a statutory declaration deposing that he would not have informed a customer that the FSP’s policy covered everything. 72. The Panel does n ot doubt the veracity of the Applicants’ deposition; however, the Panel must also take into consideration the staff member’s statement. 73. Further, the Applicants concede that although they wanted to have cover for everything, they did not specifically ask ab out flood cover. In the Panel’s view a reasonable person would not expect that a policy would literally provide cover for everything; every such contract would have some limitations and exclusions. 74. In the absence of any evidence that the FSP represented that the policy would provide cover for flood the Panel is unable to determine that a misrepresentation occurred. 75. In any event, on the basis that the Applicants were issued with a copy of the PDS, a reading of the PDS would have disclosed that the policy excluded loss or damage caused by ‘flood’. Whether the Applicants were clearly informed of the cover provided by their policy 76. Section 13 of the Insurance Contracts Act 1984 (the Act) provides that a contract of insurance is a contract based on the utmost good faith and there is implied in each contract, a provision requiring each party to act towards the other, in respect of any matter arising under or in relation to it, with the utmost good faith. 77. Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to a claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. 78. The Applicants have stated that they were not clearly informed of the cover provided by their policy, in particular, that the policy did not cover loss or damage caused by ‘flood’. Case No: 264468 Determination Page 12 of 15 79. Further, the Applicants submit that the FSP relies on a policy wording that is unclear and ambiguous and the framework of the provisions complex and confusing. 80. It is well established law that in most circumstances the provision of the PDS document and policy wording will be sufficient to satisfy section 35 of the Act and the obligation to clearly inform. 81. The Panel has reviewed the PDS. Whilst the wording of the PDS is quite broad, it is apparent from a reading of the document that it is indexed, has appropriate references to various definitions relied upon with respect to flash flood, rain, river flood, and storm and that it clearly identifies that it is not intended to cover river flood. 82. In the Panel’s view, a person of average intelligence and education would have no difficulty in understanding that the policy excluded damage caused by flood. 83. The Applicants also submit that the Renewal Notice and Schedule of Endorsements did not inform them of any exclusions or unusual terms in the policy. 84. However, in paragraph 2 of the invitation to renew letter accompanying the Renewal Notice it is stated: ‘ For more information about your cover please refer to your Contents Insurance product Disclosure Statement and policy Wordings (PDS & Policy) previously provided. If you need another copy, please let us know.’ 85. The onus is on the Applicants to ensure that their policy of insurance provides the cover they want. 86. The Panel is satisfied in the circumstances of this dispute the Applicants have been clearly informed in accordance with Section 35 of the Act and the FSP has not breached its obligations under Section 13 of the Act. Cause of Applicants‟ Loss 87. The Applicants contend that the damage to their property was initially caused by ‘storm, rain or flash flood’. 88. The FSP contends that the water that inundated their property came from the Bremer River which is about 320 metres to the north and 300 metres south of their property. The Applicants dispute that they informed the loss assessor that the water came from the Bremer River. 89. The Applicants submit that storm water initially inundated their property. They submit that this is supported by a neighbour in a statutory declaration where he stated; ‘On the night of the flood in Ipswich in January, there was a large amount of water coming down Moores Pocket Road. The gutters (kerb and channel) overflowed and water went into people’s houses before the river reached their house.’ Case No: 264468 Determination Page 13 of 15 90. Although the neighbour does not specify what date or time he observed the water flowing down Moores Pocket Road, the Panel assumes it was Tuesday, 11 January 2011. 91. In the Summary of Findings of the joint ICA Hydrology Report for the Ipswich Region dated 20 February 2011, it states: ‘There were four generally distinct rainfall periods across Ipswich City LGA during the period Sunday 9 January to Thursday 13 January 2011. The first rainfall event occurred from around 1000 hours to 1200 hours on Sunday 9 January; the second event from around 1500 hours to 2100 hours on Sunday 9 January; the third event, from around 0700 hours to around 1100 hours on Monday 10 January, and the fourth event, from 0600 hours to 1500 hours on Tuesday 11 January. Rainfalls were notable and significant only during the fourth event. The final three rainfall events generated small floods in the Bremer River and its tributaries, the final flood being the largest. There is no dispute that the rainfall during the morning of the 11 January 2011 was heavy over the Applicants’ locality. 92. At the Bundamba Creek (Hanlon Street) Alert, which is approximately 1.7kms north- east of the Applicants’ property, rainfall was recorded on 11 January 2011 as: 0000 to 0600 hours 7mm/hr 0600 to 1200 hours 27mm/hr 1200 to 1800 hours 28mm/hr. 93. The highest hourly intensities on the 11 January 2011 were approximately: 1100 hours 15.4mm 1300 hours 16.3mm There was no significant rainfall recorded at the Bundamba Creek (Hanlon Street) Alert after about 1400 hours on 11 January 2011. 94. The FSP’s hydrologist reported that the peak stormwater runoff at the Applicants’ property would have occurred within about 30 minutes of the peak rainfall intensity. 95. The Applicants submit that rainwater entered through the chimney on the roof and ran down the lounge room of their house to a depth of 0.05m in the morning of 11 January 2011. However, a more accurate time was not provided. The Applicants also state that water entered the ceiling and ran down the inside walls of the lounge room. 96. The Applicants also submit that stormwater entered their property through the front of their house on the morning of 11 January 2011 during a time of heavy rain. Water continued to rise and peaked in their property on 12 January 2011. Case No: 264468 Determination Page 14 of 15 97. The Applicants have not stated what period of time water had entered their house during the morning of 11 January 2011. They have also not quantified the damage caused by the entry of this stormwater runoff. 98. The Applicants evacuated their property at approximately 8.00pm on 11 January 2011 and it is not known when additional water inundated their house. However, during the onsite visit, the female Applicant advised the Panel Chair Ombudsman that they evacuated via (MP) Road and when they did, there was no water on the road or in their property. 99. The Panel notes that the evacuation time of 8.00pm is some 6 hours after any significant rainfall in the area. As such, the Panel does not accept that the property was subject to stormwater runoff. 100. Peak levels in the Bundamba Creek (Hanlon Street) Alert on 11 January 2011 were recorded as: 1800 hours 13m GH 2200 hours 15m GH 2400 hours 16m GH with a peak of 19.4m GH at 1500 hours on 12 January 2011. 101. The hydrologist has stated that based on a maximum depth of inundation of 1.8m, the estimated floor level of the Applicants’ house is 17.6m relative to the gauge datum. Therefore, inundation of flood water from the Bremer River would have commenced after 0400 hours on Wednesday 12 January 2011. 102. A map included in the report ‘Flooding in the Brisbane River Catchment, January 2011 – Ipswich City LGA’ showed the estimated flood extent at 1800 hours on Tuesday 11 January 2011. The map indicated that the Bremer River was beginning to flood at 1800 hours. 103. Although the FSP’s loss assessor reported that:  no damage was caused by water through the roof or by overflowing gutters; and  there was no damage caused by rainwater through the roof by overflowing gutters the Applicants deny that they provided such information. 104. In view of the intensity of rainfall between 0600 hours and 1400 hours on 11 January 2011, the Panel accepts that there is a possibility that water may have entered the house through the chimney or gutters. However, there is no evidence as to when these events would have occurred or to what extent damage would have occurred. 105. The Panel has considered the photographic evidence provided and has also considered the evidence in its entirety and is of the view that there is not sufficient evidence to establish any damage has occurred in this manner. Case No: 264468 Determination Page 15 of 15 106. Given the onus is on the Applicants to establish their loss was caused by an event insured against, the Panel is not persuaded that the y have met that onus. Further, the evidence indicates that on the balance of probabilities the damage to the Applicants’ home was inundated by water which is appropriately characterised as river flood, which is excluded under the policy. 107. Therefore, on the evidence submitted, the Panel finds that the Applicants ’ property was not damaged by storm, rain or flash flood but by flood waters from the Bremer River. Determination 108. Accordingly, the Panel determines the FSP has established that, on the balance of probabilities, flood was the cause of the inundation of the Applicants’ property. 109. Therefore, the FSP is entitled to rely on the flood policy exclusion to refuse the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.