Home / Financial Firm (Unknown - Insurer) / Determination 264466
Determination 264466
claim_denial
Summary
Insured's Jamboree Heights home was damaged by January 2011 Brisbane River flooding and the FSP declined the claim as flood. AFCA found the flood excluded and the FSP not liable.
Flood was clearly excluded under section 35 of the Insurance Contracts Act, and the inundation was Brisbane River floodwater rather than flash flood occurring within 24 hours of the rain.
Issues
- Claim denial primary · not upheld“the Panel accepts that the FSP is not liable for the Applicant's loss; the inundation was floodwater from the Brisbane River”
- Failure to disclose secondary · not upheld“the Panel is satisfied the FSP has clearly informed the Applicant of the limitations and exclusions as required under section 35 of the Act”
- Misleading conduct secondary · not upheld“payment of a previous unrelated claim does not amount to a misrepresentation of the policy”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 264466 Determination Page 1 of 11
Case number: 264466
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Inundation - Flood vs Flash Flood
17 October 2012
Background
1. The Applicant insured her home and contents in Jamboree Heights with the
Financial Services Provider (FSP). The relevant period of insurance
operated for twelve months beginning from 26 August 2010. During this
period, the building was insured up to a sum of $326,000 and the contents
for $116,000.
2. On or about 12 January 2011, the Applicant’s home suffered damage due to
extensive water inundation following severe weather events in Queensland.
She lodged a claim.
3. The FSP denied the claim on the basis the dam age was due to “flood”.
Summary of Applicant ’s position
4. The Applicant is represented by her solicitors; for the sake of simplicity,
reference to the Applicant will include her legal representatives.
5. The Applicant submits the following as alternative arguments in response to
the FSP’s decision:
She doesn’t recall ever receiving a Product Disclosure Statement
(PDS) despite being with the FSP “for around 20 years”.
The FSP misrepresented the level of cover to her through payment of a
previous claim, which led her to believe that she was covered for
“flood”.
The FSP’s policy failed to clearly inform her that “flood” was excluded
as required under Section 35 of the Insurance Contracts Act 1984 (the
Act).
The damage was due to “Flash flood and stormwater run - off”, which is
an insured event. In particular, the inundation was due to heavy rain
that fell from 4am on 11 January 2011 which resulted in the Wivenhoe
Dam operators elevating their strategy to W4. This decision resulted in
massive discharges of water into the Brisbane River that ultimately
inundated her property.
Determination
Case No: 264466 Determination Page 2 of 11
Summary of FSP’s position
6. In response to the Applicant ’ s submissions, the FSP submits the following:
The Applicant has been insured with the FSP for a long time and it
routinely issues PDS documents at inception and appropriate junctures.
There was no misrepresentation of the level of cover provided under
the policy and the payment of an unrelated claim several years earlier
has no bearing on this matter.
The policy structure and layout of the PDS satisfies its obligations to
clearly inform the Applicant of the terms of its cover and enables it to
rely on the exclusion clause of “flood” pursuant to Section 35(2) of the
Act.
The loss was caused by a flood as defined in the policy which is
excluded from cover.
7. The FSP relies on a number of hydrology reports authored by SC and DC
(both from the same company) and the following policy provisions to deny
the Applicant’s claim :
Pages 10-12 of the PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off .
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightning, heavy
rain, hail or snow, but not continuous bad weather by
itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Case No: 264466 Determination Page 3 of 11
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run - off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...”
Page 32 of the PDS
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater run-off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher, but not exceeding your contents
sum insured.
...
...”
It also relies on its Certificate of Insurance (COI), which states:
Page 4 of the Certificate of Insurance (COI)
Case No: 264466 Determination Page 4 of 11
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
Issues
8. Whether the Applicant was supplied with a PDS during the course of her
cover with the FSP and prior to the inundation, subject of this dispute.
9. Whether the FSP misrepresented the level of cover offered by the policy to
the Applicant through the payment of a previous claim.
10. Whether the Applicant was “clearly informed” about what the policy did and
did not cover.
11. Whether the cause of the Ap plicant’s loss was covered under the policy.
Reasons for decision
12. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS’s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
13. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
14. It is appropriate to consider the issues under the various headings.
Provision of the PDS
15. It is noted by the Applicant that she had cover “for around 20 years”. The
FSP suggests that cover has been in force since 2001, although this does
not rule out that the Applicant had been with the FSP for longer than this.
16. The Applicant’s solicitor alleged in its submission 25 July 2011 “Our client
does not recall receiving a copy of a Product Disclosure Statement until she
had entered into an Insurance Contract with you”.
17. This allegation is not repeated by the Applicant in her statutory declaration
regarding the cause of her loss.
Case No: 264466 Determination Page 5 of 11
18. In her submission of 4 June 2012 the Applicant does not seek to rely on the
FSP’s failure to supply a PDS, rather she relies on the structure and form of
the PDS as falling short of establishing that she was clearly informed.
19. The FSP has chosen not to specifically address the issue and has relied on
general information regarding the usual provision of PDS documents within
14 days of the inception of a policy. The Panel accepts that this is the FSP’s
standard practice, although this does not necessarily guarantee that the
documents had been sent.
20. Whilst the issue of a PDS has not been specifically addressed by the FSP,
the Panel is of the opinion that the suggestion is vague, and appears to rely
on the PDS not being received until after the contract was entered into,
rather than never having been received.
21. In the circumstances, the Panel considers that it is very unlikely that a PDS
was never provided and accepts on the balance of probabilities that the
Applicant had, at some point in the past, received a copy of the PDS.
22. In any event, receipt of the annual COI’s is not denied, and these documents
clearly contain the statement “Flood and storm surge - not included” for both
building and contents cover.
Alleged Misrepresentation of the Policy Cover
23. The Applicant alleges that the FSP misrepresented the cover to her by
payment of a clai m several years earlier relating to a “tornado like situation” .
As this claim involved damage to the home from wind and rain, the Applicant
drew the inference that “any damage caused by severe weather would be
covered” by the policy.
24. The Panel considers that such an act does not amount to a
misrepresentation of the policy: there is no evidence that the events were the
same or even similar and it is not known what the level of cover was at the
time of the previous claim. Further, an insurer is entitled to co nsider each
claim on the merits of its own unique circumstances.
Consideration of "Flood" Definition in PDS
25. As noted earlier in this Determination, the Panel is of the opinion that the
Applicant would likely have received a copy of the PDS and an annual COI
from the FSP. Therefore the issue of whether these documents were
sufficient to inform her of the limits of the policy requires consideration by the
Panel.
26. The Applicant contends that the definition of flood is too broad, too difficult to
comprehend and that the FSP has not met its obligations under section 35 of
the Act to “clearly inform” her of what is and is not covered under the policy.
27. A fair reading of Section 35(2) requires the relevant exclusions and
limitations to be in clear and unambiguous language such that a person of
Case No: 264466 Determination Page 6 of 11
average education and intelligence would have little difficulty finding and
understanding the policy if the person read the policy.
28. The PDS has an index on the inside cover which highlights the areas of the
policy to which the policyholder might find information. Included in this is
“Words/terms with special meanings” on page 9, for which definitions of
relevant terms in the policy are provided. Flood is included in this on page
10, together with the qualification that:
“... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance. ”
29. In addition to this, page 53 directs the reader to “Flood and storm surge”,
which is explained under the broader definition of “Optional covers for ext ra
peace of mind”. This section explains that:
“... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance. ”
30. The COI clearly indicates that no cover was optioned by the Applicant for
“Flood and storm surge” losses.
31. The Panel is satisfied that if the applicants read the policy they would have
little difficulty in understanding the relevant limitations and exclusions. The
Panel is satisfied the FSP has clearly informed the Applicant of the
limitations and exclusions as required under section 35 of the Act and that it
is entitled to rely upon same in determining if the policy responds to the
Applicant’s loss.
Water Inundation
The Evidence
32. The Panel accepts that the FSP’s policy does not extend cover to
circumstances where a loss is caused by a flood. The policy also
distinguishes between flood, flash flood and stormwater run-off (the latter
two of which are covered). It extends cover to damage from sudden flood
events “caused by heavy rain that fell no more than 24 hours prior” to the
flash flood.
33. The Applicant noted that she returned from work early on 11 January 2011.
There was no sign of water near her home at that time. By 8pm that evening,
water could be seen at the oval behind her home and she left at 2am the
next morning (12 January 2011). She states that there was a big stormwater
drain and creek at the back of her house and this was the origin of the water
coming across the oval and to her property. She further noted:
“We came back to the house at 9am on 1 2 January 2011 and water was
about 2/3 of the way up the yard because we have an inclining yard. We were
in the house until about 10am and the water had started to come in at that
point so we left.”
Case No: 264466 Determination Page 7 of 11
34. After the lodgement of the claim, the FSP appointed a loss adjuster (MY) to
investigate and report on the damage caused to the Applicant ’ s property.
The report estimated that there was about $50,000 worth of building damage
and $10,000 of contents damage. MY recorded the time of inundation as
3am on 11 January 2011, although the report also recorded that the date of
the loss was 12 January 2011.
35. Clearly the information provided by MY is conflicting and inconsistent, and
insofar as it is intended to provide factual information about the loss, the
Panel finds this report to be unreliable.
36. The FSP subsequently engaged a hydrologist, SC, to provide a report as to
the damage.
37. SC provided a statutory declaration dated 22 December 2011 in which he
evaluated the cause of the loss in the region surrounding , and specifically
affecting the Applicant ’ s home. He found that:
A substantial amount of rain fell in the greater Brisbane area from 9
January 2011 and over the subsequent two days, which caused
significant inflows into the Wivenhoe Dam, which peaked on the evening
of 11 January 2011.
Rain also fell in the area of the Bremer River from 6am on 11 January
2011. This rain travelled along the Bremer River to the junction of the
Brisbane River and ultimately contributed about 15-25% of its peak flow.
A “small proportion” of the overall depth of the Brisbane River “may be
partially attributable to the rain that fell in the Bremer River catchment on
11 January 2011”, although the “overwhelming influence” was the rain
that had fallen in the previous days.
The terr ain data for the Applicant’s home shows that the property varies
between 11.3m AHD (Australian Height Datum) and 13.6m AHD. The
property is situated at about 12.5m AHD. There is stormwater
infrastructure on the street where the Applicant lives and the ground level
of the home is beneath that of street level, although the footpath acts as
a barrier against stormwater run- off “during low intensity rainfall events”.
The terrain data for the Applicant’s home suggested that the home was
not “particularly vulnerable” to significant stormwater or run -off problems
during the period.
Inundation from stormwater run- off requires “intense levels of rain” which
is sufficient to overcome the stormwater drainage system. Any such run-
off generally occurs during or very shortly after such an intense period of
rainfall.
A review of the rainwater gauge at Jindalee, approximately 2.5km from
the Applicant ’s property and representative of its rainfall in the expert’s
opinion, revealed that 84mm of rain fell over 9 and 10 January 2011, with
Case No: 264466 Determination Page 8 of 11
a further 68mm falling on 11 January 2011. The most intense rainfall on
11 January 2011 (being 21mm) fell between 10am and 11am.
The overall intensity of the rainfall was “very low” and unlikely to result in
run-off or stormwater inundation to the property.
The water levels of the Brisbane River were of a sufficient height to
inundate the rear of the property by about 9am on 12 January 2011.
Approximately an hour later, it would have been sufficient to inundate the
home.
The Applicant’s property was inundated by floodwater from the Brisbane
River and not stormwater run-off or flash flooding (as defined in the
policy).
Releases from Wivenhoe Dam & Proximate Cause
38. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
39. At that time, the Panel noted that in relation to the approach that each
dispute would depend upon the individual and unique factors relevant to the
dispute and in that regard the parties were invited to make further
submissions in relation to disputes before FOS.
40. In view of this, the FSP provided detailed further submissions to FOS in
relation to this dispute. Included with the submissions were the following
documents:
Reference documents (latest dated 11 July 2012) for disputes relating
to Queensland Floods (this is a general reference document) relating to
the various submissions the FSP makes in re lation to a number of
issues. Not all issues raised in the reference document appear in the
current dispute;
Letter from the FSP’s hydrologist attaching a key information sheet for
the Applicant’s property;
Hydrologist report “Investigations of January 201 1 inundation event –
Brisbane”;
A further statement regarding the cause of inundation from hydrologist
DC.
41. In summary the FSP argues that the proximate cause of the inundation of
the properties, that is the real or effective cause of the damage caused to t he
properties downstream of the dam, was the rain that commenced falling from
9 January 2011 (or earlier) and not simply the rain that occurred from
Case No: 264466 Determination Page 9 of 11
4.00am on 11 January 2011. The FSP maintains that on any reasonable
view, the damage sustained to the downstream properties was the combined
effect of all of the rainfall and not just the rain that had fallen from 4.00am on
11 January 2011 leading to the implementation of the W4 strategy from
8.00am that day.
42. There is no dispute that heavy rain fell over the Wi venhoe Dam catchment
area and in fact parts of the Brisbane River from approximately 4.00am on
11 January 2011.
43. The FSP’s hydrologist has relied on data from SEQWater dated 2 March
2011 which confirms the rapid increase in releases from the Wivenhoe Dam
from 8.00am on 11 January 2011. Examination of the SEQWater report
identifies the rapid increase in the inflows to the Wivenhoe Dam
commencing from about 4.00am, 11 January 2011. The report confirms the
inflows into the dam had been decreasing from as early as 8.00am from 10
January 2011 with steady decreases from approximately 3.00pm on 10
January 2011 to 2.00am on 11 January 2011.
44. The Queensland Flood Commission of Inquiry report confirms that prior to
4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011
the dam releases were being managed at the W3 strategy. Whilst it is
accepted that the W3 strategy had led to an increase in the levels of the
Brisbane River, the W3 strategy was designed to avoid where possible
inundation of the properties below the Wivenhoe Dam by flooding from the
Brisbane River.
45. There is no dispute that there were two significant rainfall spikes with rain
that fell from 9 to 10 January 2011 being considered the first spike and rain
that commenced falling from approximately 4.00am on 11 January 2011
being the second spike.
46. There is no dispute that following the second spike that the W4 strategy was
adopted. The FSP has argued that the switch to strategy W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
W4 strategy was not taken in accordance with the Wivenhoe Dam manual.
In the Panel’s view, the Queensland Flood Commission of Inquiry’s final
report does not find the adoption of W4 strategy at 8.00am on 11 January
2011 was inconsistent with the manual. Although there may be issues as to
how the Wivenhoe Dam had been managed prior to this time, there is
nothing in the material that has been provided to the Panel to suggest that
the earlier management of the Wivenhoe Dam influenced to any significant
degree, the adoption of the W4 release strategy at 8.00am on 11 January
2011.
47. The ICA hydrology and the information provided by the FSP’s hydrologist
confirms that the increased releases from the Wivenhoe Dam after the
adoption of the W4 strategy led to the development of a flood wave that
ultimately caused the flooding of many properties downstream of the
Wivenhoe Dam.
Case No: 264466 Determination Page 10 of 11
48. The Panel agrees with the FSP’s general submission that the proximate
cause is a cause determined by common sense evaluation of the relevant
facts. In the event that there are two or more proximate causes, one within
the policy and the other excluded, the policy does not respond. The
proximate cause is not determined by identifying the last event or final trigger
but by determining what is the dominant, effective, direct or efficient cause of
the loss.
49. The FSP has maintained that the impact on the Wivenhoe Dam from the
rainfall that fell in the early hours of 11 January 2011 was only 29% while
71% of the volume of the inflow came from the rain that fell on 9 and 10
January 2011 or earlier. The FSP maintains that to find the rainfall which had
fallen from 4.00am on 11 January 2011 is the proximate cause is without
foundation as such an approach produces an entirely artificial outcome.
50. With due respect to the FSP’s argument the Panel disagrees. Whilst the
Panel accepts there has been a significant impact on the levels of the
Wivenhoe Dam by the rainfall that commenced falling on or about 9 January
2011 or earlier, the Panel is satisfied having regard to the information that
has been exchanged and the relevant legal principles, that the heavy rain
that commenced falling on or about 4.00am on 11 January 2011 was the
proximate or effective cause of the adoption of the W4 strategy.
The Applicant’s Inundation
51. SC’s Key Conclusions statement indicates the effect of the W4 releases first
reached the vicinity of the Applicant’s property at 1.25pm on 11 January
2011. He estimated that the property was first inundated above benchmark
(slab on ground) by the Brisbane River at 7.27am on 12 January 2011. The
property was ultimately inundated up to 1.4m above the relevant benchmark
level later that afternoon.
52. The relevant bench mark level was SC’s estimate of the lowest point of the
house on the ground. The home was a two storey construction, built on a
concrete slab. The minimum land level was 11.3m AHD, with the benchmark
level set at 11.9m AHD (although the Panel notes SC’s ea rlier estimate that
the ground level of the house was at a level of 12.5m AHD). The Panel
considers the benchmark level of 11.9m AHD to be a more likely level of the
lowest point of the floor level of the home. This evidence has not been
refuted by the Applicant in any manner.
53. The FSP’s policy allows for flash flood cover for flooding caused by hea vy
rain that commenced falling within 24 hours of the inundation. The earliest
possible point of inundation of the Applicant’s home (according to SC) was
not until 7.27am on 12 January 2011. This was more than 27 hours after the
rain had fallen. DC has confirmed the earliest inundation above benchmark
occurred at 7.38am 12 January 2011.
54. On this basis, the Panel accepts that the Applicant’s property had not been
inundated above benchmark level within 24 hours of the commencement of
the heavy rainfall. The estimate of SC is that the home was first inundated
Case No: 264466 Determination Page 11 of 11
around 7.27am is more favourable to the Applicant than her own estimate of
10.00am. Either way, the inundation did not meet elements which constitute
flash flood under the policy.
55. The Panel accepts that this is a likely explanation of the inundation and
including the backflow inundation is “flood”.
56. Accordingly, the Panel is satisfied that the Applicant’s home was inundated
by floodwater from the Brisbane River which had entered the stormwater
drainage system and subsequently inundated the Applicant’s property and
therefore does not fall within the ambit of the policy.
Determination
57. On the basis of the available evidence, the Panel accepts that the FSP is not
liable for the Applicant’s loss.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.