Determination 264381
Extent of building repair and contents settlement after cyclone and rain ingress
Summary
Applicants disputed the insurer's repairs to a cyclone-damaged roof and the extent of later water-ingress and contents losses. AFCA found the insurer acted reasonably, is not required to make further building offers unless access is given for reinspection, and has no contents liability beyond its settlement offer.
The insurer is entitled to access and reinspection as a party to the claim, the building authority found defects in the contractor's work, and contents not shown to be lost were not payable.
Issues
- Claim amount dispute primary · not upheld
“In respect of the contents claim the Panel considers that the FSP has no liability beyond the offer of settlement it has made.”
- Repairs or contractors secondary · not upheld
“The Panel is satisfied that the FSP has acted reasonably in this matter. The neutral third party, the BSA, has made a finding about the performance of the work.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 264381 Determination Page 1 of 6
Case number: 264381
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
22 January 2013
Background
1. The Applicants arranged a home building and contents insurance policy with
the Financial Services Provider (FSP) on 1 December 2010. The policy
provided cover for loss or damage caused by insured events as described in
the policy. The building was insured for the sum of $280,000 and contents
for $60,000.
2. On 14 February 2011 the Applicants lodged a claim under the policy as a
result of damage caused to insured property from Cyclone Yasi on 5
February 2011.
3. The FSP accepted the claim and settled the Applicants for damage caused
to desk, light fittings and food loss.
4. The FSP authorised repair of the building which included full replacement of
the asbestos sheeting roof. Variations to the scope of works were accepted
by the FSP. Repair of the property commenced on 14 November 2011.
5. Whilst replacement of the roof was being undertaken a rain event occurred
and water ingressed into the home. Consequently, the Applicants claimed for
additional internal water damage to the home and damage to contents.
6. The FSP does not dispute it is liable for the additional water ingress damage.
Replacement of the roof was completed.
7. What has been disputed is the extent of damage caused by the water
ingress. The Applicants have also complained of the roof repairs undertaken
by the FSP’s appointed builder. The Applicants say rectificatio n work is
required as well as a building certificate has not been obtained to establish
the roof replacement is compliant with the necessary building requirements.
The Applicants also complained of damage caused to fencing and a culvert
outside the property.
8. The Applicants arranged for a building consultant via a loss adjusting
company to attend the property and to report on damage for which they hold
the FSP liable for. A copy of the report obtained by the Applicants was
provided to the FSP but it considered that it included damage and repairs it
Determination
Case No: 264381 Determination Page 2 of 6
was not liable for and that it required further inspection to determine the
extent of its liability.
9. Attempts to resolve this matter have proven to be unsuccessful. The FSP
says the Applicants have refused access to the property to enable it to
determine what repairs it is to meet.
10. Although the FSP has offered to make a cash settlement for already
identified damage and rectification, it believes the best course of action to
resolving this matter would be for a reinspection of the property with all
relevant parties in attendance.
Summary of Applicants ’ position
11. The dispute between the parties falls into two aspects – the building and the
contents.
12. In respect of the building they contend that the correct procedure in relation
to the roof was not followed and that work done was sub-standard even after
three visits by the contractor.
13. They wish to have their own repairer complete the work that has been
identified by the Building Services Authority (BSA) at the expense of the
FSP’s contractor. They ask that if the matter is still unable to be resolved
following the reinspection the Service accept the report they obtained and
costings.
Damaged contents
14. In respect of the claim for damage to contents by the ingress of water many
items are beyond repair. The FSP has paid only $500 for linen and $3,000
emergency.
15. Most of the contents, e.g. bookshelves, lounge, TV cabinet, paintings,
kitchen appliances are positioned against the walls in the home. These walls
had water running down them from the cornices and over benches and floor.
16. Mattresses in the bedrooms were damaged by water that was released from
light fitting and fans.
17. The floor rug and curtains could not be cleaned. Appliances are tripping the
safety switch in the meter box. Mattresses, linen, books, clothes and much
more are beyond repair. Photographs clearly show dried water stains on
walls and contents.
18. If the FSP believes only a model airplane was damaged it would not have
paid $500 for linen and $5,000 for partial settlement of contents. The FSP
provided a loss schedule of contents for them to complete.
Case No: 264381 Determination Page 3 of 6
19. They seek an assessment of the FSP’s liability on the evidence provided as
the contents were neither rusting nor mouldy prior to the claimed event.
Summary of FSP’s position
20. It is concerned whether the report relied upon by the Applicants actually
reflects the findings of the building consultant. It is unsure also about the
value of that report. The Applicants have outlined their proposed progression
of the dispute. It made offers on 31 May 2012 and 13 June 2012 to
undertake an inspection of the property with the Applicants, their building
consultant , one of its staff representatives, a building contractor
representative and loss adjuster. The FSP says this offer remains open for
acceptance by the Applicants.
21. It is imperative that it be granted access to the property along with its
representatives, given the fact that it is a party to the dispute and it is bound
by any determination made by the Service; providing the Applicants accept
the determination.
22. The FSP relies on the following policy provisions:
“ Your home
Settling your claim
If your certificate of insurance shows that you have home insurance we will
cover your home for loss or damage as a result of an insured event occurring
during the period of insurance.
We may choose at our option to:
rebuild or repair your home as new; or
pay you the cost to us of rebuilding or repairing your home as new
including any additional cost (relating to that part of the home that was
damaged) necessary to comply with government or local government
laws existing at the time of damage occurring, provided that at the time
of original construction the laws and by-laws prevailing then were
complied with; or
pay the home sum insured; or
settle, when allowance for wear and tear or lack of maintenance of the
property is made, as explained in “Claims settlement other than on an
as new basis” on page 26.
We will pay up to the home sum insured shown in your certificate of insurance
less any applicable excess.
If we choose to pay the cost to us of rebuilding or repairing your home or the
home sum insured, we may first pay to a mortgage or credit provider who is
identified on your certificate of insurance, the amount owing by you to the
mortgage or credit provider in respect of the mortgage of your home up to the
home sum insured.
The terms and conditions of this policy apply to a mortgage or credit provider
in the same manner as they apply to you.
Case No: 264381 Determination Page 4 of 6
We will pay for materials of a similar kind and quality if the original materials
are not readily available in Australia.
...
Claims settlement other than on an as new basis
The amount we pay for rebuilding or repairing damage will be reduced from
an as new basis to an amount that would place you in the same position you
were in immediately before the loss or damage occurred with due allowance
for age, wear, tear and where applicable, lack of maintenance of the property
in the following circumstances:
...
If the rebuilding or repairs of your home are not commenced by you
within 12 months from the date of loss, unless you can demonstrate a
longer period of time is reasonable;
if you do not cooperate with us in exercising our option to rebuild or
repair your home.
...
When you are not covered – general exclusions
These exclusions apply to all sections of your policy. We will not pay for loss
or damage or the incurring of a liability caused by:
Exclusions When you are not covered
... ...
wear, tear, rust, mould wear, tear, rust, corrosion, rot,
mould, action of light or atmospheric
or climatic conditions including
damage caused by wind, rain or sand
happening over an extended period
of time. ”
Issues
23. Whether the FSP is liable for the repairs sought by the Applicants.
24. The extent of the FSP’s liability in respect of the contents claim.
Reasons for decision
25. Due to the nature of the dispute, this matter has been referred to the Panel
for a Determination in line with the Operational Guidelines to the Financial
Ombudsman Service’s Terms of Reference.
26. The Panel consists of an Ombudsman, a representative with extensive
experience in insurance industry matters and a representative with extensive
experience in consumer claims.
Case No: 264381 Determination Page 5 of 6
27. An exchange of the information submitted by the parties has taken place
between each party and each has had the opportunity to address any issues
raised.
28. The Panel does not intend to recite details of the information in this
Determination except where considered relevant.
29. This matter has been difficult to resolve due in no small measure to the
Applicants’ reluctance to co -operate with the FSP. It is a fundamental
principle of the insurance relationship that the parties owe each other a duty
to act with utmost good faith. Failure to co-operate verges close to a breach
of that duty.
30. It is not disputed that the property was initially damaged by a cyclone which
is an insured event covered by the policy. However, during the replacement
of the cyclone damaged roof a rain event occurred which resulted in water
ingress. It was reported there was internal water damage to the home and
contents. The FSP does not dispute that the home and contents suffered
water ingress damage.
31. What is at issue is the extent of the FSP’s liability for repairs resulting from
Cyclone Yasi and the November 2011 event. The Applicants also took issue
with rectification of repairs undertaken and the workmanship of the FSP’s
building contractor. Under the terms of the policy loss or damage as a result
of mould is excluded by the policy as well as loss or damage caused by
atmospheric conditions including rain happening over a period of time.
32. The FSP has argued that it is imperative that it be granted access to the
property along with the building contractor given it is a party to the dispute
and is bound by any determination made by the Service to which the
Applicants may accept.
33. The Panel agrees with that argument; the FSP is a party to the dispute and
is entitled to have representation. The FSP is entitled to request the
Applicants to cooperate as part of the claim process as well as requesting to
inspect claimed damaged.
34. The Panel is satisfied that the FSP has acted reasonably in this matter. The
neutral third party – the BSA- has made a finding about the performance of
the work. It is up to the Applicants to allow the contractor to enter the
property to make good the defects that have been identified.
35. On the subject of the damaged culvert the Panel agrees with the FSP that
the culvert does not warrant removal and reinstatement.
Contents
36. The Applicants are also seeking settlement of damaged contents and there
is a list of the items said to have been damaged. The loss adjuster’s report
dated 28 November 2011 noted he had inspected every item listed by the
Applicants. He reported the items were not inundated with water and that
Case No: 264381 Determination Page 6 of 6
many of the items were fabric where a dry clean may result in a desired
result in place of replacement. Other items such as a couch, mattresses and
rugs may be satisfactorily restored by professionals.
37. The loss adjuster also reported that the kitchen appliances had sign of water
splashing from water drips from the roof. It was his opinion that a wipe of the
items would rectify the problem.
38. The FSP undertook a review of sixty nine of the contents items. It has
agreed to make a further settlement of $10,256 which takes account of the
$5000 already made available as emergency payment.
39. Some of the items for which the FSP has not offered a settlement are
because there is insufficient evidence to demonstrate a loss; the other items
are regarded as not claimable.
40. The Applicants have acknowledged the offer of settlement by saying “…that
will go a long way to helping replace our items” but have made no effort to
provide the necessary evidence to demonstrate a loss.
Determination
41. The Panel determines that i n respect of the building claim the FSP is not
required to make any further offer of settlement unless the Applicants agree
to allow it and its contractor access to the property.
42. The FSP has no liability beyond the sum of $450 in respect of the culvert.
43. In respect of the contents claim the Panel considers that the FSP has no
liability beyond the offer of settlement it has made.