Denial of home unit contents claim for flood water inundation, with a conditional reassessment of ground-floor contents damaged by drain overflow
Summary
The applicants' home unit contents were damaged by inundation in January 2011 and the FSP denied the claim as flood. AFCA upheld the flood exclusion for Brisbane River overflow but directed that ground-floor contents damaged by 0.2m of drain overflow may be covered on evidence, with interest if cash settled.
Flood overflow from the Brisbane River is excluded and the policy was clearly worded under section 35 of the Insurance Contracts Act 1984, but overflow from drains is covered, so the ground-floor portion requires reassessment.
Issues
- Claim denial primary · not upheld
“The Panel determines the FSP has appropriately declined the Applicants' claim for damage to residential property contents arising from water inundation.”
- Delay secondary · not upheld
“The Panel does not consider there is evidence to support the FSP has caused an excessive delay in the handling of the claim.”
- Failure to disclose secondary · not upheld
“The Panel determines the FSP has properly informed the Applicants of the policy terms and conditions.”
- Misleading conduct secondary · not upheld
“The Panel determines the FSP did not misrepresent cover of the policy at inception or on 12 January 2011.”
Subjects and remedies
natural disasterpay interestreassess claim
Text of the determination
Case No: 264296 Determination Page 1 of 11
Case number: 264296
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
6 August 2012
Note: The Applicants had legal representation; throughout this Determination
reference to the Applicants will include both themselves and their lawyer.
Background
1. The Applicants hold a Home Contents Policy of insurance with the Financial
Services Provider (FSP). The policy covers contents up to $50,000 and
Portable Valuables Cover up to $1,000.
2. On 14 January 2011 the Applicants made a claim for loss and damage to their
contents resulting from the inundation of water into their home unit nit in
Fairfield Queensland.
3. The FSP declined the claim on the basis that the damage had arisen from
flood water which was excluded from cover under the policy.
4. The Applicants dispute the FSP‟s declinature on the basis that the inundation
was from stormwater run-off which is covered by the policy. Further, that the
FSP failed to properly inform of the flood exclusion under Section 35 of the
Insurance Contracts Act 1984 (the Act).
Summary of Applicants’ position
5. The Applicants contend that at the point of policy inception they were informed
by the FSP‟s employee that they were “….told that the cover offered was
comprehensive. It (sic) took that to mean water damage was included. I was
not told about the exclusion for flood” . The Applicants submit that this
misrepresentation was relied upon to their detriment as they would have
sought alternative insurance which did cover flood. The Applicants also say
that when calling the FSP on 12 January 2011 they were again told they had
“full flood coverage” and note this was a further misrepresentation.
6. The Applicants also allege the FSP breached its duty of good faith under
Section 13 of the Act because it failed to advise of the suitability of the policy
to the Applicants who reside near the Brisbane River.
Determination
Case No: 264296 Determination Page 2 of 11
7. The Applicants state that flood is a prescribed event for the purposes of
Section 35 of the Act, as defined by Section 14 of the Insurance Contracts
Regulations 1985. The Corporations Act 2001 further requires clear, concise
and effective disclosure.
8. The Applicants submit that the definitions of stormwater run-off and flood
water are likely to cause confusion for a reasonable consumer. This is
because a consumer cannot identify when stormwater run-off becomes water
that cannot enter a drain/watercourse because it is full or has overflowed.
There are similar issues in identifying the difference between water that has
overflowed from a stormwater drain from flood or from stormwater run-off. The
Applicants contend the distinctions between the definitions that signify cover
or exclusion are artificial and it is unreasonable to expect a consumer to
understand them or to identify circumstances of cover. Accordingly, the
requirement to clearly inform under Section 35 of the Act or to provide clear,
concise and effective disclosure under the Corporations Act has not been met.
9. The Applicants note that in certain circumstances, merely providing the policy
document may not be enough to clearly inform a consumer of the relevant
provisions, such as where there is inadequate attention drawn to certain
provisions. An insurer may be required to do more than merely provide the
policy document to discharge its obligations under Section 35 of the Act:
a. If the document provisions are complex and confusing; or
b. Where the language is unclear and ambiguous and the document is set
out in a manner which a person of average intelligence and education
is likely to have difficulty finding and understanding.
The Applicants rely on Suncorp General Insurance Australia v Cheihk [1999]
NSWCA 238, Max Hams and 1 Ors v CGU Insurance [2002] NSWSC 273 and
Marsh v CGU Insurance Ltd [2004] NTCA1 in support of its contention.
10. The Applicants have asserted the flood exclusion relied upon by the FSP is
expressed in language that is unclear and ambiguous and the overall
framework of the provision is complex and confusing. A reasonable person of
average intelligence and education would have great difficulty in
understanding the FSP‟s policy to determine whether damage caused by wet
weather events would be covered under the policy. In support of which they
have cited extracts from previous Panel determinations 40607 and 41709.
11. The Applicants therefore contend that they were not adequately informed of
the exclusions in the contract under Section 35 of the Act. Accordingly, the
policy should revert to standard cover which includes flood.
12. In the alternative, the Applicants submit that the damage to the insured
property was caused as a result of run-off from a storm and/or rainwater which
is covered by the policy. The Applicants rely on Bureau of Meteorology (BoM)
daily weather observations over the period 9-12 January 2011 inclusive. The
Applicants note rainfall of 40mm fell between 9.00am Monday 10 January
2011 to 9.00am Tuesday 11 January 2011.
Case No: 264296 Determination Page 3 of 11
13. The Applicants note their backyard was sodden following weeks of rain. On 11
January 2011 water started rising from the back of the property which is
adjacent to a park. It was around 10.30am on 12 January 2011 when the
water came towards the door and the Applicants needed to evacuate. The
Applicants then witnessed drains overflowing and run off from the road
heading towards their property towards the Brisbane River. It was not raining
when the water came up, but it had rained heavily the day before when water
started coming up. The Applicants contend that the inundation was caused as
a consequence of the severe storm, stormwater and run-off backing up
through the drainpipes and flowing overland. The Applicants have supported
this contention with a map overview outlining placement of stormwater
networks. The Panel notes there is a drain/pipe in close proximity to the
Applicants‟ property.
14. The Applicants note the FSP‟s reliance on mapping in the ICA hydrology
Reports. The Applicants dispute the FSP‟s reliance on this document which
does not take into account location specific issues, as required in order to be
in compliance with the Act or the General Insurance Code of Practice. The
Applicants similarly dispute the FSP‟s reliance on a site specific hydrology
report as the hydrologist did not attend the site or speak with witnesses.
Further, the hydrologist provided an opinion over 12 months after the event.
15. The Appl icants seek compensation due to the FSP‟s conduct of the matter.
Summary of FSP’s position
16. The FSP relies on a statement from its employee “BV” from which the Panel
notes the following:
BV is from Customer Communications and is responsible for ensuring
customer documentation is produced and distributed within the required
timeframes.
BV states the request for production of the Applicants‟ policy
documentation was received on 1 September 2007 and processed on 2
September 2007.
There were no reported errors during processing and the policy
documentation was lodged with Australia Post on 6 September 2007.
17. The FSP relies on its claim records from which the Panel notes the following:
The first recorded contact regarding the January 2011 event was received
on 14 January 2011. The notes indicate the Applicants were informed
flooding was not covered.
The Applicants were advised on 4 March 2011 that the FSP was awaiting
a hydrology report in order to review the claim. A further update was
provided on 14 March 2011 that the FSP had a hydrology report and was
currently reviewing it to make a claims decision.
Case No: 264296 Determination Page 4 of 11
Multiple contacts in April 2011 were attempted with a notation that the
telephone dial tone appeared to be international.
The Applicants were contacted in early May 2011 and advised verbally of
the denial. A claims denial letter was sent but not received by the
Applicants, so the FSP sent it again on 17 May 2011.
The FSP was informed on 1 June 2011 that the Applicants were now
represented. The FSP did not receive an IDR submission however until 2
September 2011. The FSP reviewed the material and then provided an
IDR letter dated 10 October 2011.
18. The FSP relies on a report from its assessor “C”. The Panel notes the
following from this report:
The assessor records the habitable floor level as 2m above surrounding
ground level.
The rain is recorded as being the heaviest on 12 January 2011.
The inundation of the yard commenced on the morning of 12 January
2011.
The inundation of the buildings occurred at midnight with the water level
peaking in the property late evening between 12 and 13 January 2011.
The peak inundation level in the home is 1.5m.
The peak inundation level in the yard is 2m.
The water came into the property from all sides and was dirty.
C believed flood water was the principal cause of damage.
19. The FSP relies on a „FloodWise Property Report‟ which indicates the ground
levels range from 5.8-6.8m with a habitable floor level of 8.3m. The defined
flood level is 6.7m (7.8mAHD) and the source of flooding is desig nated „River‟.
20. The FSP relies on a site specific hydrology report from “W”. The Panel notes
the following from this report:
W notes that any water that entered the property after about 8pm on 11 January
could not have been stormwater runoff because rainfall ceased at about this
time. There is only a small external stormwater catchment draining to the subject
property.
The subject property is located 560m south-east of the Brisbane River. Once
water levels in the Brisbane River exceed about 6mAHD, water is able to flow to
the subject property as direct surface flow.
Information from Brisbane City Council indicates a peak water level of 7.8mAHD
in the vicinity of the subject property. The peak water level is estimated to have
occurred around 3am on Thursday 13 January.
The initial inundation of the yard was caused by backflow of floodwaters through
the stormwater pipe drainage system. The depth of inundation of the yard
caused by backflow would have been about 0.2m above the minimum ground
level prior to direct overland flow of floodwater.
Case No: 264296 Determination Page 5 of 11
The subject property is located within the flood extent of the Brisbane River.
Inundation of the subject property above floor level on Wednesday 12 January
was caused by direct overland flow of floodwater from the Brisbane River.
Further, the initial and peak inundation of the subject property above floor level
was caused by direct overland flow of floodwaters from the Brisbane River.
21. The FSP relies on the ICA Hydrology Reports as evidence that flooding over
the period 6.00am Tuesday 11 January 2011 until 3.00am on Wednesday 12
January 2011 was caused by releases from the Wivenhoe Dam. This was
particularly so, given there was little or no rainfall in the lower Brisbane River
catchment after about 6.00pm on Tuesday 11 January 2011. The severities of
short-term rainfall events over the Lower Brisbane River and its tributaries
were generally very low (less than 1-year ARI), and it is considered unlikely
that overland flow inundation occurred in these catchments.
22. The FSP relies on the aerial flood mapping provided by the Queensland
Reconstruction Authority showing the flood lines associated with the Brisbane
River and its contributing watercourses. It can still be seen that the flood
waters spanned out past the normal boundaries of the Brisbane River and
covering the Applicants‟ property.
23. The FSP states that it has no record of the inception telephone call. However,
it operates on a „no advice‟ model and operators direct Applicants to read the
Product Disclosure Statement (PDS). The FSP again alerted the Applicants to
read the PDS in its covering letter enclosing same. The FSP further has no
record of a telephone call on 12 January 2011 noting this was the date the
Applicants evacuated the property. However, at this time if any
misrepresentations were made, the Applicants did not suffer a detriment as
they would not have been able to incept an alternative policy at that stage.
24. The FSP contends that it is not practicable for it to inform insureds over the
telephone of all policy terms and exclusions. The FSP forwarded the policy
documentation within 14 days of policy inception and there is no dispute
regarding this. The FSP has therefore complied with Sections 35 and Section
69 of the Act.
25. The FSP submits its policy provides cover for defined events but it does not
include cover for all risks. In particular the FSP does not cover flood damage.
The FSP contends that the policy wording defines what flood means and
conversely what flood does not mean. The definition of flood is necessarily
broad to ensure it covers phenomena consistent with overland floodwater
flow. The FSP does not accept the proposition of the policy wording in relation
to flood, and the separate type of inundation known as storm and rainwater, is
unclear, nor that the reader of its policy wording would be confused by the
cover available under the policy. The policy is written and presented in a clear
plain English format. The policy also draws the reader‟s attention to the
general exclusions applying to the policy.
26. The FSP rejects the proposition that its wording contravenes Section 35 of the
Act or that this fails to meet the requirements espoused under the
Corporations Act 2001 and the relevant ASIC guidelines.
Case No: 264296 Determination Page 6 of 11
27. The FSP disputes the Applicants‟ contention that the damage a rose from
stormwater run-off. The FSP relies on the hydrology report which states that
whilst there was some backflow from drains, the property itself was only
inundated from overflow from the Brisbane River. As this event falls within the
definition of the flood exclusion, the FSP contends that this damage is
excluded.
Issues
28. Whether the FSP is precluded from relying on its exclusion due to
misrepresentation of cover at policy inception or on 12 January 2011.
29. Whether the FSP breached its duty of good faith under Section 13 of the Act
30. Whether the FSP has properly informed the Applicants of the policy terms and
conditions.
31. Whether the FSP has appropriately declined the Applicants‟ claim for damage
arising from water inundation.
32. Whether the FSP is liable to pay compensation to the Applicants.
Reasons for decision
33. There has been an exchange of material between each party and the Panel is
satisfied each party has had an opportunity to reply to the issues raised.
34. The Panel has read each party‟s submissions and materials and will only refer
to the relevant submissions and materials raised.
35. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
36. The Panel considers that there are five discrete issues (listed above) which
will be dealt with separately below.
Whether the FSP is precluded from relying on its exclusion due to
misrepresentation of cover at inception or on 12 January 2011
37. The Applicants allege misrepresentation on the statement by the FSP that
cover was comprehensive, water damage was included and a failure to inform
of the flood exclusion. The Applicants do not dispute the receipt of the PDS
which provided written notice of all policy terms and conditions.
38. Even if the Panel accepts the Applicants‟ recall of the policy inception and the
information as provided, the Panel does not accept that this constituted a
misrepresentation. The policy would be considered reasonably
comprehensive and the Panel does not accept that any person would be
Case No: 264296 Determination Page 7 of 11
unaware that an insurance policy would contain some exclusions. Further, the
policy does in fact cover multiple instances of water damage so it is difficult to
deem such a statement a misrepresentation. In addition to this, the Applicants
were provided an opportunity to review the policy terms and conditions and
cancel the contract within the usual cooling off period if they deemed it
unsuitable.
39. The Panel notes that there is some dispute between the parties regarding
whether a telephone call occurred on 12 January 2011. There appears to be
no record of same with the FSP and the FSP denies its staff would have
provided representations of cover for flood at this time. The Panel notes that
on 14 January 2011 the Applicants were told there was no flood cover so it
would appear incongruous during such a time to inform consumers they had
flood cover.
40. If however the Panel were to accept that there had in fact been a
misrepresentation on 12 January 2011, it must consider whether the
Applicants acted on this misrepresentation to their detriment. The Panel has
doubts whether the Applicants could have obtained alternative insurance with
impending flood inundation. The Panel notes that most insurers will request
disclosure of such circumstances at policy inception and it was a likely
outcome that a request for insurance would be denied at such a stage. Given
this, the Panel concludes, on the balance of probabilities that no detriment can
be directly attributed to any such misrepresentation.
Whether the FSP breached its duty of good faith under Section 13 of the Act
41. The FSP is not licensed under the Corporations Act 2011 to provide specific
advice as to whether a policy is suitable to an insured‟s particular
circumstances.
42. The Panel is aware that if the FSP was to engage in providing circumstance
specific advice to an insured this could potentially constitute financial advice
under the Corporations Act 2001. This would be problematic as the FSP is not
authorised to provide such financial advice. The Panel considers that it would
be inappropriate to require the FSP to provide such advice in contravention of
the Corporations Act 2011. Accordingly, the Panel does not consider a failure
to provide circumstance specific advice a breach of Section 13 of the Act.
Whether the FSP properly informed the Applicants of the policy terms and
conditions
43. The Panel notes that the Applicants do not dispute receiving the policy
documents as required under Section 35 and Section 69 of the Act. The
Applicants dispute that the policy wording satisfies the requirements of
Section 35 of the Act or the Corporations Act 2001. The FSP denies this,
noting the construction of its policy, the plain English writing and the providing
of a definition which confirms what flood is and is not.
44. The Applicants have relied on several common law cases regarding this
particular issue including Suncorp General Insurance Australia v Cheihk
Case No: 264296 Determination Page 8 of 11
[1999] NSWCA 238 , Max Hams and 1 Ors v CGU Insurance [2002] NSWSC
273 and Marsh v CGU Insurance Ltd [2004] NTCA1 in support of its
contention.
45. The Panel has reviewed this case law and notes that in most cases the
provision of the policy document is sufficient to discharge an insurer‟s onus
under Section 35 of the Act. The document however must readily answer
whether an event such as flood is covered, for a person of average
intelligence and education. The Panel considers that the policy does provide
information in the definition of flood as to what flood is and what flood is not.
The policy wording is not particularly lengthy and is written in plain English.
Further, the policy wording is required to cover multiple potential causes of
flooding whilst still being accessible to a person of average intelligence and
wording.
46. The Applicants have further asserted the flood exclusion relied upon by the
FSP is expressed in language that is unclear and ambiguous and the overall
framework of the provision is complex and confusing. They further assert a
reasonable person of average intelligence and education would have great
difficulty in understanding the FSP‟s policy to determine whether damage
caused by wet weather events would be covered under the policy. In support
of which they have cited extracts from previous Panel determinations 40607
and 41709.
47. The Panel is aware of the finding made in Determination 40607 (and
appreciates the concerns highlighted there); the Panel is not persuaded it
assists the Applicants in this instance. In this respect, the Pa nel reiterates the
position adopted in the more recent Determination 257702:
“24. Determination 40607 should be confined to the particular facts of that
dispute. Although the Panel acknowledges the concern raised in that
Determination (with respect to a lack of distinction between concurrent and
consecutive causes of a loss in the relevant exclusion), it is of the view that
any perceived lack of clarity could be more fairly addressed by simply
reading down the relevant exclusion so as to be consistent with the
prevailing law. That is to say, to be consistent with the Wayne Tank
principle.
25. The law, as it currently stands, does not require the FSP to advise the
Applicants specifically of the impact of the Wayne Tank principle (see
Hams v CGU Insurance Limited [2002] NSWSC 273) or other relevant
case law. In the Panel’s opinion, the FSP’s attempt to inform policyholders
of the impact of Wayne Tank (when it had no obligation to do so) should be
commended and encouraged, rather than deterred and penalised.”
48. In regards to the Applicants‟ reference to Determination 41709, the Panel
observes the following extract from Determination 245671 which was recently
issued in respect of the Queensland floods of 2011:
“In any event, in all the circumstances, the Panel deter mines the relevant
clauses in the PDS dealing variously with the excluded event of “flood”, and
the listed events of storm and rainwater both as an individual listed event and
as part of the Accidental Damage menu, are couched in language that is
„clear, concise and effective‟ and accordingly the FSP is entitled to rely upon
Case No: 264296 Determination Page 9 of 11
its flood exclusion in assessing the Applicants‟ claim. As such, the Panel does
not propose to follow the conclusions referred to in the earlier Determination
of 41709. The conclusion of this Panel is that it is satisfied that the relevant
terms of the policy comply with Section 35 of the Act and the FSP is entitled to
rely upon the flood exclusion in this matter”.
49. Accordingly, the Panel concludes the FSP‟s policy wording is not such tha t it
would fail the requirements under Section 35 of the Act or the clear, concise
and effective disclosure under the Corporations Act 2001.
Whether the FSP has appropriately declined the Applicants’ claim for damage
arising from water inundation
50. The policy covers an insured for storm and rainwater run-off but not for flood.
The policy also covers water overflowing from drains and the FSP has
previously conceded such an occurrence is unaffected by the policy‟s flood
exclusion. The Applicants maintain that the water inundation arose from
stormwater run-off and drain overflow, whilst the FSP states the water
inundation arose from flood.
51. The Applicants have provided no expert evidence regarding the stormwater
run-off or back-flow of drains being of sufficient height to inundate the building
and damage contents. However, they have confirmed that although the drains
were overflowing, there was no rainfall on 12 January 2011.
52. In contrast the FSP has provided expert hydrological evidence of both a
general and speci fic nature. The Panel has noted the Applicants‟ objection to
the site specific hydrology report. The Panel does not accept that the
hydrology report has no value due to time length since the flood occurrence,
as the post event data would not alter and should not affect hydrological
modelling. The hydrologist has also reviewed information provided by the
Applicants to the assessor. The Panel is somewhat concerned that the
hydrologist did not conduct a physical site inspection and will weigh the
evidence accordingly.
53. The hydrology has generally noted that the effects of stormwater run-off from
the rainfall experienced in the locale of the Applicants‟ property would have
stopped within 15 minutes of the rainfall cessation. Based on the evidence
before it, the Panel does not accept that stormwater run-off by itself was the
cause of inundation. This is particularly so as rainfall had ceased some time
prior to the inundation.
54. The Panel has given careful consideration to the evidence of water
overflowing from the drains; such an event would be covered by the policy.
The Panel further notes the site specific hydrology report confirmed that the
yard would have been inundated up to 0.2m by overflowing drains. However,
this height would not have reached the habitable floor level of the insured
property. The hydrologist has stated the inundation above floor level was
caused by overland flow from the Brisbane River.
Case No: 264296 Determination Page 10 of 11
55. Based on the evidence before it, the Panel accepts, on the balance of
probabilities the source of inundation at the insured residential property was
water inundation from the local watercourse, the Brisbane River. However, it
is unclear based on the evidence whether the 0.2m inundation by overflowing
drains affected any contents contained on the ground floor.
56. In this regard, the Panel notes the reference within the assessor‟s report to:
“Contents
All items on the ground floor were destroyed by flood waters and discarded
prior to our attendance.”
57. The policy clearly and unambiguously excludes damage from the inundation
of normally dry land by water which has overflowed the normal confines of any
watercourse. The Panel accepts that the Brisbane River overflowed its
confines and was the sole source of inundation to the Applicants‟ residential
property above the habitable floor level; accordingly the flood exclusion
applies to that part of the claim.
58. As to the inundation to 0.2m of the ground floor, the Panel is satisfied that the
policy provides coverage for overflowing drains.
59. Coverage to this level will be subject to the Applicants providing evidence of
damage to contents on the ground floor as a result of an inundation of the
ground floor to 0.2m.
Whether the FSP is liable to make payment of compensation to the Applicants
60. The Applicants have argued that excessive dela y by the FSP in the handling
of its claim and breach of the General Insurance Code of Practice gives rise to
a claim for compensation under the Service‟s Terms of Reference.
61. The FSP has not particularly addressed this issue but it has provided file
notes which provide a general time line. In particular, the Applicants lodged a
claim on 14 January 2011 and received a verbal update on 4 March 2011 and
14 March 2011 regarding the progress of the claim. The FSP attempted many
times to contact the Applicants in April 2011 but could not obtain a response
until early May 2011, at which time the Applicants received notification of the
declinature.
62. The Panel notes that this event was deemed a catastrophe and there were
limited hydrological experts available. The ICA reports were also not
immediately available. Accordingly, the Panel does not consider it
unreasonable for the FSP to have taken 3.5- 4 months to obtain an assessor‟s
report, hydrological evidence and review the claim in order to make a
decision.
63. The next portion of the claims handling process occurred on 1 June 2011
when the FSP was informed the Applicants were represented. However, a
delay then occurs from this time until an IDR submission is received on 2
September 2011. The Panel does not deem this period a delay attributable to
the FSP.
Case No: 264296 Determination Page 11 of 11
64. The FSP then provided an IDR response by letter dated 10 October 2011.
This is within the 45 day IDR period. Accordingly, the Panel cannot find that
the FSP has delayed in handling the IDR response to the Applicants.
65. The Panel does not consider there is evidence to support the FSP has caused
an excessive delay in the handling of the claim. Accordingly, the Panel does
not accept that an award of compensation is warranted under the Terms of
Reference.
Determination
66. On the basis of the available information the Panel determines the FSP did
not misrepresent cover of the policy at inception or a misrepresentation on 12
January 2011 on which the Applicants relied to their detriment.
67. On the basis of the available information the Panel determines the FSP did
not breach its duty of good faith under Section 13 of the Act.
68. On the basis of the available information, the Panel determines the FSP has
properly informed the Applicants of the policy terms and conditions.
69. On the basis of the available information, the Panel determines the FSP has
appropriately declined the Applicants‟ claim for damage to residential property
contents arising from water inundation. The Panel notes that if any damage
was caused to contents on the ground floor which would have been inundated
by 0.2m of drain water; this should be covered by the policy. The Panel directs
that if the Applicants can provide evidence of same to the FSP then they
should do so within 21 days of accepting this Determination in order to allow
the FSP to consider this portion of the claim.
70. If any portion of this aspect of the claim is to be cash settled by the FSP, then
the FSP is to pay interest on the cash settlement as specified by the
Insurance Contracts Act 1984, from the date of denial of the claim to the date
of settlement.
71. On the basis of the available information the Panel determines the FSP is not
liable to pay compensation to the Applicants for contents damage situated
inside their home unit, nor any compensation under the Terms of Reference.