Home / Financial Firm (Unknown - Insurer) / Determination 264264
Determination 264264
Home inundation claim denied under flood exclusion; PDS clarity and telephone advice disputed
Summary
The insured home was inundated in January 2011 and the FSP denied the claim under the flood exclusion. AFCA found the insured was clearly informed of the exclusion and the inundation was flood.
Under section 35 of the Insurance Contracts Act the PDS clearly informed the insured of the flood exclusion, and backwater flooding through drains remains flood.
Issues
- Claim denial primary · not upheld“Panel determines that the FSP is entitled to deny the Applicant's claim; inundation was backwater flooding from the Bremer River.”
- Failure to disclose secondary · not upheld“Applicant was clearly informed of the flood exclusion through the PDS, which a person of average intelligence could understand.”
- Misleading conduct secondary · not upheld“Recordings of the sales call show no statement that flood would be partly covered; FSP has not misrepresented the cover.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 264264 Determination Page 1 of 8
Case number: 264264
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim - Flood
30 July 2012
Background
1. The Applicant incepted a Home Building and Contents Insurance Policy (the
Policy) with the Financial Services Provider (FSP) on 2 July 2010.
2. The insured property (the property) located in East Ipswich, was damaged
during the significant weather events experienced in Queensland in January
2011. The Applicant lodged a claim with the FSP.
3. The FSP on concluding its investigation into the circumstances of the loss
declined the claim on the basis the damage was due to the event „Flood‟ ,
which is specifically excluded under the policy.
4. The Applicant, through her legal representative, seeks to have the FSP‟s
decision to decline the claim overturned and seeks complete indemnity
under the policy.
Summary of Applicant’s position
1. The Applicant is represented in this dispute and for the sake of convenience
this Determination will refer to the Applicant and her representative
collectively as „the Applicant‟.
2. The flood exclusion contained in the Product Disclosure Statement (PDS) is
not clearly explained and consequently she is entitled to standard cover as
per the Insurance Contracts Regulations 1985 , which includes flood cover.
3. The FSP‟s sales advice over the telephone that the policy did not provide
flood cover could be construed to mean the policy provided flood cover but
not for the first 72 hours, if the word “and” was not heard properly.
4. A storm event occurred in Ipswich on 11 January 2011 causing flash floods
that inundated the property.
Determination
Case No: 264264 Determination Page 2 of 8
Summary of FSP’s position
5. The FSP did not misrepresent the level of cover provided by the policy
during the initial telephone sales application. The Applicant has never
claimed that she misunderstood the advice given by the sales consultant.
6. The Applicant was clearly informed in writing of the nature and effect of the
flood exclusion contained in the PDS. The Applicant does not dispute having
received a copy of the PDS. Therefore the PDS conditions apply.
7. Expert hydrologists confirm the proximate cause of the loss was floodwater
inundation and that stormwater run-off did not inundate the property prior to
the floodwater.
8. The event that caused loss to the Applicant‟s proper ty is excluded under the
policy.
9. The FSP relies on the following policy provisions:
“flood – is the covering of normally dry land by water which has overflowed,
escaped or been released from the confines of any natural or artificial
watercourse, lake, rese rvoir, canal or dam.”
COVER PART 1 – INSURED EVENTS
This section describes the insured events you are covered for, and the
conditions and exclusions that specifically apply to each insured event. They
should be read with the general exclusions on pages 27-29.
Insured event
...
6. Storm and rainwater
Including loss or damage from:
the escape of rainwater from any water pipe, drain or gutter
surface run-off rainwater from surrounding areas that occurs within 24
hours of a storm or heavy rain.
Including loss or damage caused by erosion, subsidence, landslide, mudslide
or any other earth movement that occurs within 72 hours of a storm or heavy
rain and as a result of that storm or heavy rain.
We Will NOT cover:
loss or damage caused by flood
loss or damage caused by rain, hail or wind entering your home due
to:
a design fault, structural defect or faulty workmanship
lack of maintenance (a defect that you knew about or should
reasonably have known about and did not fix)
an opening that was not created by the storm
building additions, renovation or alteration work.
Case No: 264264 Determination Page 3 of 8
loss or damage to:
fences and gates and retaining walls
garden borders, driveways, paths or gardens
the liner and/or cover of a swimming pool or spa
water in a swimming pool or spa
the surface of a tennis court
jetties, wharves and pontoons.”
...
GENERAL EXCLUSIONS APPLYING TO THE WHOLE POLICY
We will not cover:
Action of the sea, high water or underground water
loss or damage caused by flood.”
Issues
10. Whether the Applicant was clearly informed of the flood exclusion contained
in the Policy; and
11. Whether the FSP is entitled to deny the Applicant‟s claim.
Reasons for decision
12. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
13. This decision has been made by a Panel consisting of a n Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
14. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this Determination except where considered
relevant.
15. It is appropriate to consider the separate issues under the various headings.
Case No: 264264 Determination Page 4 of 8
Was the Applicant clearly informed of the Flood exclusion?
16. Section 35(2) of the Insurance Contracts Act 1984 (theAct) states that when
a claim is made under a “prescribed contract” for a “prescribed event”, an
insurer cannot refuse to pay the claim unless it can establish that it clearly
informed its insured in writing that it would not cover this event. Section 34 of
th e Act has defined the terms “prescribed contract” and “prescribed event”
by referring to the Insurance Contracts Regulations 1985.
17. There is no dispute that a contract of insurance covering a person‟s home is
a “prescribed contract” and damage due to flood is a “prescribed event”.
18. The Applicant does not deny receiving or reading the PDS. She submits the
FSP has not complied with Section 35 of the Act, as:
a. A person of average intelligence and education cannot easily
understand the terms and conditions contained in the PDS;
b. The FSP failed to clearly inform the Applicant of the flood exclusion at
inception of the Policy.
The PDS
19. The Applicant submits that the flood exclusion contained in the PDS is
difficult to locate and understand.
20. The Panel has reviewed the PDS and is satisfied that a person of average
intelligence and education would be able to ascertain flood was not covered
as a result of the following:
The PDS contains an index to relevant sections, such as insured
events, general exclusions and definitions.
Flood is contained in the list under the section titled “General
Exclusions Applying to the Whole Policy”, which is where a person
would expect to find limitations and exclusions to their cover.
The Definitions section contains a flood definition that is consistent with
most policies available in the market.
The flood exclusion is also placed alongside the insured event of
“Storm” given it is most likely to be associated with this event.
21. The Panel therefore accepts the PDS clearly informs the Applicant that the
policy does not cover loss or damage resulting from flood.
Information provided at Policy inception
22. The Applicant submits that during the initial telephone conversation between
the Applicant and the FSP, the FSP‟s representative‟s advice that th e policy
did not provide flood cover could be construed to mean the policy provided
flood cover but not for the first 72 hours, if the word “and” was not heard
properly.
Case No: 264264 Determination Page 5 of 8
23. It is also stated that flood was only mentioned quickly by the FSP‟s
representative, as a part of a lengthy statement about various aspects of the
policy, which is an ineffective method of communicating the crucial flood
exclusion. The Applicant says she understood she was covered for
everything except those events itemised on her Certificate of Insurance.
24. The Panel has reviewed the relevant recording and transcript of the phone
call between the Applicant and the FSP and is satisfied that the FSP‟s
representative‟s advice was clear. Furthermore, the Applicant merely raises
the possibility of the advice being misconstrued if a word was not heard, with
no submission that she actually failed to hear the FSP‟s words and therefore
misunderstood the advice.
25. Additionally, the Panel notes that the FSP relies on the terms of the PDS to
explain the full terms and conditions of the policy. As noted above, the policy
provides clear definitions of the terms „flood‟ and „storm‟ and outlines the
policy exclusions.
26. The evidence suggests that the Applicant was provided with a PDS which
explains the terms of cover, including the definition and exclusion of flood. It
is not sufficient for the Applicant to only rely on the information contained in
the Certificate of Insurance as it is not reasonable for a Certificate of
Insurance to identify all the terms and conditions of cover. The Certificate of
Insurance forms a part of the Contract of Insurance, together with the PDS
and should not be read in isolation.
27. The FSP‟s representative clearly advised the Applicant that she would be
mailed the policy documents listing all the conditions and exclusions that
apply to the p olicy and she should “have a read over them all carefully”.
28. In this instance, the receipt of the PDS upon commencing cover provided the
Applicant the opportunity to complete her understanding of the cover and
determine whether the Policy suited her particular needs.
29. Based on the evidence, the Panel is satisfied that the Applicant was clearly
informed of the flood exclusion and the FSP is entitled to rely on the policy
exclusion for flood.
Proximate cause of the damage to the property
1. It is an accepted principle of general insurance law that an insured bears the
onus to establish, on the balance of probabilities, that they have suffered a
loss caused by an event or incident to which the policy responds. Once so
established, the onus shifts to the insurer to prove that a policy exclusion
applies for flood.
2. To be entitled to cover, the onus therefore rests with the Applicant to
establish that her loss fits within the scope of what is covered by the polic y.
The policy provides cover for a series of defined events as outlined in the
PDS. It does not provide blanket cover for all types of loss.
Case No: 264264 Determination Page 6 of 8
3. It is not in dispute that the Applicant‟s property was inundated with water as
a result of a significant weather event that affected much of Queensland in
early 2011, which caused severe damage and loss to the property.
4. The Applicant does not provide any hydrological evidence to establish that
the inundation to the property was caused by stormwater runoff.
5. The Applicant says:
It was raining heavily and continued to rain for most of the day on 11
January 2011.
There was no water visible from the property at around 0900 on 11
January 2011.
She left the property mid to late afternoon on 11 January 2011. At the
time, there was water in the stormwater drain visible from the property.
“There was a lot of storm water in the drain and it seemed to be backing
up as it had no where to go”.
She returned at 0530 on 12 January 2011 and the water was under the
house and covering the air conditioning motor. There was about a
metre gap below the floorboards at the time.
She returned at 0830 on 12 January 2011 and could not get into the
street because it was completely blocked. It is likely the house had
flooded sometime before this.
The water receded by 0630 on 13 January 2011. There were water
marks up to 40cm on the walls of the property. The floors were covered
with a fine silt but not any river mud.
6. The FSP relies on the joint hydrology report commissioned by the Insurance
Council of Australia (ICA Report) and a site specific report (Site report) to
establish that the property was inundated by flood water.
7. The Panel has considered the following relevant information:
The property is located 300m south of the Bremer River.
Using Digital E levation Models, the FSP‟s hydrologist estimated the
height of the floor level of the property to be 18.96m AHD.
The hydrological evidence suggests that the time of inundation above
floor level was approximately 06:00 on 12 January 2011, which is
consisten t with the Applicant‟s account of events.
A storm water drain is located approximately 90m west of the property,
and is connected to the Bremer River. The invert of the drain on the
northern side of Tarcoola Street is approximately 12m AHD, 470m
upstream of the confluence with the Bremer River.
At Approximately 15:30 on 11 January 2011, rising water levels of the
Bremer River would have reached the height of 12m AHD, consistent
with the Applicant‟s observations of water in the drain “ backing up as it
had nowhere to go ”.
Case No: 264264 Determination Page 7 of 8
It is appropriate to estimate the Bremer River water levels using data
from Bundamba (Hanlon Street) Alert gauge 4.8km downstream along
the river and the Ipswich Alert gauge 3.5km upstream of the river.
Based on the nearest rainfall gauge at Hanlon Street on Bundamba
Creek, there was little or no rainfall recorded in the area after 18:00 on
11 January 2011.
At the time of initial inundation, no rainfall had occurred for
approximately 12 hours.
The experts who conducted the site specific assessment conclude:
“Based on the observations during the inspection, discussions with witnesses
at the site and in the area as well as the data analysed as discussed in this
report, the event that caused the inundation at the site...is in our opinion, a
flood as described in Section 9.
We have arrived at this opinion because we believe the inundation at the site
to be caused by backwater from Bremer River and not from any localised
rainfall event that would generate sufficient localised runoff to cause
stormwa ter type inundation.”
8. The Panel notes that the ICA report supports the hydrology evidence
obtained by the FSP.
9. Based on the hydrology evidence available, which support the Applicant‟s
observations, and in the absence of any evidence to the contrary, the Panel
is satisfied that the proximate cause of the initial inundation at the property
was backwater flooding from Bremer River, backing up the drainage
systems.
10. The Applicant submits that the proximate cause of the inundation was water
coming out of stormwater drains, which should be covered by the policy.
11. The Panel has considered whether backflow flooding from a watercourse
can be considered flood water for the purposes of the policy, if it passes
through a drain before causing the loss or damage. The Panel is satisfied
that the passing of floodwater through the stormwater drains prior to
inundating the property does not break the chain of causation between the
overflow of water from the Bremer River and the ultimate inundation at the
property.
12. This view is consistent with accepted case law, including the decisions in
Peterson & Ors Union Des Assurances De Paris IARD (1997) and K Sika
Plastics Limited v Cornhill Insurance Co Limited [1982].
13. In the event that water from the Bremer River which was backing up the
drainage systems mixed with storm water runoff prior to inundating the
property, the Panel adopts the decision in Wayne Tank & Pump Co Ltd v
Employers Liability Assurance Corp Ltd [1974] QB 57 (the “Wayne Tank
principle”), where two causes can be equally attributed to an insured loss,
one which is covered by the policy and one which is not, the excluded event
takes precedence in the consideration of the claim.
Case No: 264264 Determination Page 8 of 8
14. The Panel is satisfied that the proximate cause of the initial inundation at the
property was water from the Bremer River backing up the stormwater drains.
The Panel accepts that this falls within the p olicy definition of „flood‟ and the
resulting loss or damage is therefore excluded from cover. The property was
subsequently inundated by backwater flooding from the Bremer River up to a
height of approximately 19.4m AHD, resulting in inundation above floor level
of the home of approximately 400mm.
Other Considerations
15. The Panel has considered the Applicant ‟s submission that the FSP‟s
representative advised during a telephone call that if it was found that the
damage was caused partially by flood water and partially by storm water,
then the Applicant would receive some payment. The Applicant provides no
evidence to support this statement. The FSP provides recordings of all
telephone conversations between the parties, which satisfy the Panel that no
such advice was provided.
16. The Panel finds the FSP has not misrepresented the nature of the cover. In
the event of two concurrent causes of damage, as discussed above, the
Panel accepts that the Wayne Tank Principle will apply.
Determination
17. On the basis of the available information the Panel determines that the
Applicant was clearly informed of the flood exclusion contained in the Policy.
18. The Panel determines that the FSP is entitled to deny th e Applicant‟ s claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.