Home / Financial Firm (Unknown - Insurer) / Determination 264183
Determination 264183
Dispute over quality of contractor repairs to backyard pipes and paving and cost of re-laying pavers
Summary
After a water leak in the backyard, the FSP's contractors repaired and re-paved the area. The applicant then excavated the paving himself and sought the $3,300 cost of re-laying it. AFCA found the applicant had prejudiced the FSP's ability to assess the original work and that the FSP was not required to indemnify him.
The applicant's unauthorised excavation without referring it to the FSP breached the policy conditions and prejudiced the FSP's subrogation and assessment rights, so no further cover was owed.
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 264183 Determination Page 1 of 7
Case number: 264183
General Insurance - Domestic Insurance - Home Building - Service -
Rectification Repairs - Exploratory Work - Dissatisfaction with Work Done
23 January 2013
Background
1. This is a review of a Recommendation by the Service’s Case Manager dated
1 November 2012. The Applicant has rejected the Recommendation and in
accordance with the Terms of Reference, the matter has been referred to me
for Determination.
2. The relevant background, summaries of the parties position and issues to be
determined as set out in paragraphs 1 to 17 of the Recommendation and I
will restate same:
1. “ The Applicant held a home building insurance policy with the Financial
Services Provider (FSP) at the relevant time.
2. On or about 10 January 2011, the Applicant discovered a water problem in
the backyard of his home. He thought that this was likely due to leakage
from pipes under the property leading to and from his water tank. The
Applicant lodged a claim with the FSP in March.
3. The FSP arranged for a video camera investigation of the underground
pipes. Some damage was found and repaired, with the paving re-laid on
the Applicant’s rear porch.
4. Shortly after this, the Applicant (who was dissatisfied with the work)
removed about 50% of the pavers and excavated to locate other areas of
possible damage amongst the pipes. When finished, he asked that the
FSP relay the pavers, which were (in his opinion) not done properly the first
time. The FSP refused as it considered the work done by the Applicant
unnecessary.
5. The Applicant seeks payment for the re-laying of the pavers and for other
items of repair that were not attended to by the FSP.
Summary of Applicant’s position
6. The Applicant says that the work completed by the FSP’s contractors was
not of an acceptable standard and they failed to identify and isolate all
areas of water leakage under the property. He was reliant on water from
his tank and this was nearly empty, so it was a matter of expediency that
he needed to pull up some of the pavers and clearly identify all areas of
damage.
Determination
Case No: 264183 Determination Page 2 of 7
7. Upon excavating, he found that an outlet pipe not identified by the FSP’s
contractors was still leaking and that a concrete post supporting the
pergola had corroded at its metal base and sunk into the ground. These
were areas that required attention and were not properly attended to by the
FSP.
8. The plumber utilised a camera to investigate possible leakages in the pipes
and this was not sufficient to establish the full extent of the damage. In
addition, the removal of the inlet strainer let frogs into the water tank and
dirtied the water.
9. The FSP’s assessor agreed with him at the time that the standard of
repairs was not acceptable and invited him to prepare his own quote,
which he did. The assessor would not do this unless he agreed that the
completed work needed rectification.
10. As of June 2012, it is clear that the ground where the paving had been
completed is uneven as it was not prepared properly. The FSP’s
contractor’s “botched” the job as they did not attend to it properly from th e
outset.
Summary of FSP’s position
11. The FSP says that the work done was as quoted and completed (to the
best of its knowledge) to an acceptable standard.
12. If the Applicant was troubled by the quality of the repairs, he should have
brought this to the FSP’s attention and, if it agreed, it had the power to
direct the contractors to repair any areas where the work was deficient.
13. In removing the paving that had been laid, the Applicant made it impossible
for the FSP to properly assess if the job had been done to an acceptable
standard.
14. The FSP’s position has been compromised by the Applicant’s actions as it
was unable to obtain expert opinion as to the quality of the job after the
Applicant removed the pavers. As such, the FSP’s position has been
prejudiced by this action and it should not be liable for any further payment.
15. The FSP relies on the following policy provisions:
Page 8 of the Product Disclosure Statement (PDS)
“ General conditions
...
You must:
do everything You can to limit loss, damage or injury and to
prevent further loss, damage or injury resulting from the event
...
give Us any information and help We may need in handling the
claim.
...
What can affect your entitlements?
...
Case No: 264183 Determination Page 3 of 7
If You do not do what You are obliged to do under Your policy, We may
refuse to pay a claim or any part of it.
What we may do
...
If We have paid or agreed to pay a claim, We have the right to proceed
in Your name against any Person responsible for the loss, damage or
injury. We take this action at Our expense. You must not do anything
which limits Our right to do so.”
Page 50 of the PDS
“ Escape of Liquid
If liquid overflows, leaks or bursts from a fixed system at Your Home
during the Period of Insurance and damages or is likely to damage
insured property, We pay for the reasonable cost to investigate the
cause of damage or likely damage. We pay up to $2,500 for this benefit.
We do not pay to repair or replace a faulty part identified by the
investigation, but we pay the cost to repair damage directly caused by
the investigati on.”
Issues
16. Whether the Applicant is covered under the FSP’s policy for the re -laying of
the paving in the backyard.
17. Whether the FSP has any other obligations for cover under the policy. ”
Reasons for Decision
3. There has been a full exchange of information and each party has had an
opportunity to address the issues raised.
4. I have read all the exchanged information and I have considered the parties’
submissions including the Applicant ’s further detailed submission under
cover of email dated 2 December 2012.
5. In making his Recommendation the Service’s Case Manager set out his
reasons in paragraphs 19 to 47 and I restate same:
19. The submissions from the parties are lengthy and detailed as to the extent
and merits of the work done at the Applicant’s property. Much of it is also
technical in nature and (in some areas) involves differences of opinion as
to appropriate methods of work or interpretations of proper practice.
20. I shall restrict any commentary in this Recommendation to only those
issues I consider pertinent to the outcome.
21. It is not in dispute that the Applicant had a legitimate claim under the FSP’s
policy for apparent water damage at the rear of the property. This had
been noticed after a period of heavy rain, although the Applicant did not
consider it to be a flood event and thought it was leakage from pipes
running under the property.
Case No: 264183 Determination Page 4 of 7
22. In order to ascertain the source of a possible leak, the FSP and the
Applicant considered that the underground pipes from the Applicant’s
water tank had to be reviewed for possible signs of damage.
23. An video investigation of the pipes under the property was conducted by a
plumber, MK. MK found that inlet pipes to the home had been flattened
and some areas were not properly sealed. The cost of this exercise was
$950. Repairs were conducted at the Applicant’s expense (as these were
not covered under the policy). The FSP, through its paver (CG) filled in the
affected area and re-pave d the rear patio of the Applicant’s home.
24. The Applicant was dissatisfied with the exploration work done, noting that
the policy allocated an amount of $2,500 to detect an escape of liquid. He
considered that the FSP and its contractors should have conducted a more
extensive search to identify possible areas of water leakage and that the
camera was insufficient to discover all potential problems. The Applicant
was also unhappy with the quality of the paving work done by CG and
considers that the surface had not been prepared properly and the ground
was not levelled.
25. The FSP’s assessor, CL, was of the opinion that sufficient work had been
done to establish that the water tank and the attached pipes were the
source of water inundation for the backyard. He further considered that the
work of MK and CG was to a satisfactory standard.
26. An invoice was submitted by the Applicant for the cleanout of the water
tank and CL recommended payment. The settlement of this matter is not in
dispute.
27. The Applicant considered that there was likely additional damage under
the affected area and that the video inspection was limited in scope to
identify such problems and the equipment could not cover all of the
potentially affected areas. He felt that the investigation had not been
suitably thorough and that the paving would serve little purpose as the
problem would manifest again.
28. It is the Applicant’s position that he expressed his concerns to the
contractors and CL after the job was completed. He was subsequently
invited by CL to prepare a quote to remedy the problem. The Applicant
considers that he would not have been invited to do this if CL didn’t agree
with him. He prepared an invoice and submitted it to the FSP.
29. The Applicant subsequently excavated about 50% of the pavers and went
about searching under this area for more damage. He reportedly
discovered that another pipe leading into the water tank was damaged, as
well as an outlet pipe under the concrete edge of the paving (which the
FSP refused to repair). He further identified that one of the concrete posts
for the pergola was sinking into the earth as its metal base had been
corroded by excessive water in the soil. A settlement for the concrete post
has since been made.
30. The FSP’s contractors returned to inspect the work done and found that
the Applicant had already pulled up the pavers and set about his work.
About ten hours had been invested in his further investigations at this time.
CL determined that no fair evaluation of the paving work conducted by CG
(the principal issu e in dispute in the FSP’s view) could be made, as it had
been dug up by the Applicant.
Case No: 264183 Determination Page 5 of 7
31. As an assessment of the work done by CG cannot be done by the FSP
due to the actions of the Applicant, it contends that its position has been
compromised. The FSP has the power under its policy to direct any
appointed repairer to complete an unfinished or unsatisfactory job, if the
job had not been done to an acceptable standard. Insofar as any
rectifications were related to previous work that was not of a sufficient
standard, this work would be undertaken without cost to the FSP.
32. With this in mind, the FSP says that the Applicant should not be entitled to
recoup the costs to re-lay the pavers ($3,300) as there is no evidence to
suggest that the work was defective in the first instance and the decision to
pull the pavers up was made by the Applicant, without consulting the FSP.
33. I accept that the Applicant was unhappy with the work done by the FSP’s
contractors and that this motivated his decision to excavate and look for
damage himself. Unfortunately, I do not consider that he made sufficient
effort to bring this to the FSP’s attention. This decision made it impossible
for the FSP to fairly evaluate the standard of work done and the complaints
from the Applicant.
34. The policy outlines the right of subrogation for the FSP and the importance
of a policyholder not engaging in any action which may place this
entitlement at risk:
“If We have paid or agreed to pay a claim, We have the right to
proceed in Your name against any Person responsible for the loss,
damage or injury. We take this action at Our expense. You must not
do anything which limits Our right to do so.”
35. I am of the opinion that the actions of the Applicant affected the FSP’s
ability to assess whether the original work was to an acceptable standard.
This, in turn, affected its ability to take remedial action against the
contractors (if appropriate). On this basis, I am satisfied that the FSP has
been prejudiced by the Applicant’s work.
36. Whilst the Applicant alleges that the standard of the work by CG was not
satisfactory and that the ground where the work was done continues to
deteriorate, I am of the opinion that there could be any number of reasons
for this continued deterioration (including the subsequent work undertaken
by the Applicant).
37. The Applicant says that it was necessary to dig up the pavers and to look
further underground as the water tank was almost empty and the source of
the leak had not been properly identified. He remains adamant that the
FSP’s investigation of the cause of the water inundation of the backyard of
his home was inadequate. He found additional sources of water leakage as
a result of his own investigations.
38. The FSP has not disputed this, although I am not satisfied that it is
particularly helpful to the Applicant’s cause. It is clear from the policy that
the sources of water leakage are not covered and since the Applicant
conducted his own investigation and remedial work, the ground has
continued to sink.
39. This suggests that his efforts were no more successful than those of the
FSP’s contractors (thereby making the decision to take out the pavers
redundant) and the true reason for the backyard problem may not yet have
been ascertained.
Case No: 264183 Determination Page 6 of 7
40. I empathise with the Appl icant’s frustration with the FSP on this matter as it
appears that his problems have continued and it is arguable that a more
thorough investigation of the cause of the water problems could have been
undertaken. That said, despite the alleged water problems identified and
repaired by the Applicant, there is no persuasive evidence before me that
this in any way assisted his situation. I certainly accept that it prejudiced
the FSP as it could not objectively review the original repair work.
41. The fact that the backyard continues to subside attests to the possibility
that an additional problem exists that is yet to be found. The Applicant has
not provided any evidence to suggest that water leakage is still occurring
and therefore there is nothing further for the FSP to investigate.
42. I am not satisfied that the decision by CL to invite the Applicant to prepare
a quote was an admission of a problem. The Applicant is free to undertake
his own enquiries to prove a point to the FSP. This may have assisted him
in this instance.
43. Ultimately, I am not convinced that the FSP is obliged to provide further
cover to the Applicant, although I accept that a hitherto undiagnosed
problem may be present and that it may be covered by the FSP’s
accidental damage policy.
44. I understand that the policy provides cover for “the reasonable cost to
investigate” the cause of an escape of liquid and that this will allow “up to
$2,500”. It appears that the FSP spent $950 on this investigation and this
is not unreasonable. It is not incumbent upon the FSP to spend the extent
of the policy allotment if it believes that the source has been located, which
it apparently did. There is no evidence to suggest an ongoing water
problem.
45. Whilst the Applicant has ongoing problems with the paving in his backyard
and apparent settlement of the property, this is not specifically related to
water inundation problems. There is no “escape of liquid” that might
suggest that further investigation should be covered by the FSP’s policy.
46. On this basis, I consider that the FSP is not obliged to provide further cover
to the Applicant, pending receipt of independent evidence establishing an
entitlement to claim.
47. To this end, should the Applicant see fit, he may retain an expert at his
expense to review the property and submit an assessment of any further
damage to the FSP for consideration. The FSP may then evaluate if any of
the existing damage is claim related. As it stands, I remain unsatisfied that
the claimed damage is covered under the policy and I consider that the
FSP should not be liable for the costs of rectifying the paving. ”
6. Having considered the matter carefully, I am in agreement with the Case
Manager’s Recommendation and with the reasons he has given for the
Recommendation. I make the following further comments.
7. In his further submission under cover of email dated 2 December 2012, the
Applicant has made a further very detailed submission. The Service’s Case
Manager formed the opinion that the FSP had been prejudiced by the
Applicant’s intervention in the work which contravenes the policy conditions.
The Applicant criticises the FSP for engaging in further communication with
him over a period which he describes as something like five months to finally
determine that his actions had prejudiced its position.
Case No: 264183 Determination Page 7 of 7
8. He i s particularly critical of what he refers to as the FSP’s failure to give
proper credence to the photographs that he had produced. In my view, the
fact that the FSP further considered the matter and engaged him in
communication after the work had been carried out, does not mount to an
abrogation of its rights to rely upon the terms of the policy. In fact, further
engagement by the FSP is consistent with its obligation to deal fairly with its
policyholder. I do not accept that it was engaging in double standards as
alleged by the Applicant.
9. The Applicant relies heavily upon his position that everything was put on the
record at the relevant time with supporting evidence. This submission is
completely at variance with the fact that he entered into the process and
carried out work that was unauthorised without first referring it to the FSP.
That decision, in my opinion, was fatal to the Applicant’s claim.
10. The Applicant alleges that the “assessor” requested him to get a quote to
rectify the allegedly unsatisfactory work. This allegation is rejected by the
assessor and in my opinion; the Applicant has failed to carry the burden of
proof in respect to that allegation.
11. The Applicant also criticises the qualifications of the contractor who carried
out the work on behal f of the FSP. I do not accept that the Applicant’s
submissions in that regard carry any substantial weight and I reject those
allegations.
12. If, as alleged by the Applicant, the contractor did not have the necessary skill
or experience to carry out the work, he should have immediately informed
the FSP of his concerns but he did not do so. Rather, he adopted a self help
solution that directly contravened the requirements of the policy.
13. I have considered the Applicant’s allegations that the FSP unnecessarily
delayed finalisation of the claim, but having regarded the history of the
matter and, in particular, the complications that arose from the Applicant’s
intervention in the process, I do not accept that the FSP has acted
unreasonably nor has it unduly delayed the process.
14. In other respects, I agree with the reasoning applied by the Case Manager
and the FSP is not obliged to provide further cover to the Applicant. In this
regard, I particularly refer to paragraphs 46 and 47 of the Case Manager’s
Recommendation which I confirm.
Determination
15. The FSP is not required to indemnify the Applicant under the terms of the
policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.