Home / Financial Firm (Unknown - Insurer) / Determination 263834

Determination 263834

Denial of claim

FirmFinancial Firm (Unknown - Insurer)
Decided2012-12-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Contents damage from Brisbane floodwaters in January 2011 was declined under the flood exclusion. AFCA found the policy clearly informed the applicants of the flood exclusion and that the property was inundated by river flood rather than stormwater runoff.

Section 35 of the Insurance Contracts Act 1984 was satisfied by the clear, indexed policy, and the timing of inundation after rainfall ceased showed the loss was flood.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 263834 Determination Page 1 of 6 Case number: 263834 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 11 December 2012 Background 1. The Applicants held a contents policy covering the contents in their residence in Taringa, Queensland with the Financial Services Provider (FSP) for the sum of $54,275. The property was inundated with water following the heavy rains over the Brisbane area. The Applicants left the property late on January 11, 2011 shortly prior to the inundation. 2. The FSP declined liability for the Applicants claim on the basis the damage was caused by flood which is excluded under the policy. 3. The Applicants believe they are entitled to indemnity because:  The FSP failed to advise them that the cover they obtained was unsuitable to their needs.  The FSP failed to clearly inform them that flood damage was not covered by the policy.  Their loss was caused by events covered by the policy in any event. Summary of Applicants’ position 4. The Applicants are represented and it is the female Applicant who has provided the relevant information on behalf of both insured’s. For convenience, and unless stated otherwise, the expression “Applicant” will jointly refer to the Applicants and their representative. 5. The Applicants were unaware of the limitations with respect to cover for flood and stormwater runoff because:  The FSP failed to draw their attention to the fact that Riverina flooding was excluded when the policy was incepted and at each renewal. Otherwise, they would have sought cover elsewhere.  The FSP failed to alert them as to the adequacy of the insurance cover to their needs.  The FSP failed to act with utmost good faith as it did not inform them that the cover they had was unsuitable.  The FSP has not de monstrated that a “person of average intelligence and education” would understand the FSP’s product disclosure statement (PDS) and the definition of “flood”. Determination Determination Determination Case No: 263834 Determination Page 2 of 6  Experts in consumer communication have confirmed that a “person of “average intelligence and education” would not understand the PDS. 6. Their property was damaged by storm and rainwater runoff because:  The Bureau of Meteorology (BOM) had issued warnings of heavy rains and flash flooding shortly before 9am on 11 January 2011.  The Brisbane area was affected by numerous lightning strikes between 11pm on 10 January 2011 and 11pm on 11 January 2011.  There were winds with speeds of 41km/h and 33km/h on 10 and 11 January 2011 respectively.  Their solicitors have many clients living in the area along the river in Brisbane who have specifically recalled experiencing thunderstorms and heavy rains.  Radar images in the hydrology report commissioned by the Insurance Council of Australia (ICA report) show that the western suburbs of Brisbane had experienced storms and heavy rains on the morning of 11 January 2011.  The stormwater drain in the park across the road always struggled to cope with stormwater runoff.  The Brisbane LGA area was subjected to 3 distinct and significant rainfall periods.  Their property is in a low lying area which receives runoff from surrounding areas. 7. The Applicants’ evidence as to the events that occurred is as f ollows:  She and MOF had to leave at 9.00pm on 11 January 2011.  They did not see when the initial inundation occurred and where the water came from.  There was water across the road from Perrin Park and stormwater drains in the park had started to overflow.  A culvert in the park (that ordinarily drains into the Brisbane River) had overflowed, causing water to fill the park and start flowing across the road.  Stormwater drains across the road on Indooroopilly Road were also overflowing. The water was just coming across the road when they left the property.  The stormwater drains in the park has been flooding for years. 8. The Applicants refer to Sections 13 and 35 of the Insurance Contracts Act, 1984 (the Act). Summary of FSP’s position 9. Its evidence shows that the Applicants’ loss was not caused by an insured event, but by flood. Case No: 263834 Determination Page 3 of 6 10. It has clearly informed the Applicants that the policy excluded flood damage because:  The male Applicant was verbally informed that the policy does not cover flood when he incepted the policy on 20 December 2006.  A certificate of insurance and product disclosure statement (PDS) was sent to the Applicants on 21 December 2006. 11. It has no duty to advise the Applicants as to the suitability of its insurance cover to their needs. 12. To the extent the Applicants’ loss is caused by an insured event, the loss is also caused by flood concurrently. The loss is therefore excluded on the basis of the Wayne Tank principle. 13. The FSP relies on the following policy provisions: “ Storm If your … contents suffer loss or damage caused by …  a sudden, excessive run - off of water as a direct result of a storm in your local area we will under contents insurance  replace or repair your damaged contents … however  we will NOT cover loss or damage caused by flood … … What you are not covered for – general exclusions we will NOT cover  loss, damage… that occurs as a result of  flood … flood is the covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir, channel, canal or dam. Flood is not covered by this Policy. … Storm Case No: 263834 Determination Page 4 of 6 a violent wind, cyclone, tornado, thunderstorm or hail which may be accompanied by rain or snow, or a sudden, excessive run-off of water as a direct result of a storm in your local area. It does not include persistent rain by itself.” Issues 14. Whether the Applicants were clearly informed that the policy does not cover flood damage. 15. Whether the Applicants property was damaged in circumstances covered by the policy. Reasons for decision Preliminaries 16. Due to the nature of the dispute, it has been directly referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service’s (FOS) Terms of Reference. 17. The Panel is satisfied that the material has been exchanged and the parties have had the opportunity to respond to the issues raised. 18. The Panel notes that the Applicants are legally represented and that the intended operation of the various statutory provisions referred to by the parties have been set out in their respective submissions. For the sake of brevity, the Panel will not repeat these provisions here. Clearly informed 19. The Applicants do not deny receiving a PDS but nonetheless maintains that they were not clearly informed that they were not covered for flood damage for a number of reasons outlined in their submissions. 20. The obligation to clearly inform is provided by Section 35 of the Insurance Contracts Act 1984. A fair reading of Section 35(2) of the Act requires that the relevant exclusions and limitations be in clear and unambiguous language and in a manner that a person of average education and intelligence would have little difficulty in finding and understanding should they chose to read the policy. 21. The relevant policy is indexed with clear reference to what is covered and what is not. The definition of flood is set out in plain language. There is reference to the flood exclusion on no less than three pages, at pages 15, 35 and 70. 22. Having carefully read the PDS, the Panel is satisfied that if the Applicants had read the policy they would have had little difficulty in finding and understanding the nature and extent of the exclusions and limitations. Case No: 263834 Determination Page 5 of 6 23. In the circumstances, the Panel is satisfied that the FSP has met its obligation to clearly inform, pursuant to Section 35 of the Act. Proximate cause of loss 24. The Applicants evacuated their home at 9.00pm on 11 January 2011 and at that time:  Water had not yet entered their home.  The drains and culverts in the park across the road (from their home) were overflowing, causing the park to flood and water to start coming across the road. 25. The Panel has reviewed the exchanged material and has observed as follows:  The Applicants ’ property is situated about 250m to the west/south-west of the Brisbane River. There is a park across the road, in front of the property. The property is apparently elevated between 4.0m AHD and 10.4m AHD.  The residence that sits on the property is a 2 storey semi-detached building, with a double garage situated on the ground level. There is no specific information with respect to the elevation of the ground level of the Applicants’ residence, but it would not be unreasonable to say that it is likely to be higher than 4.0m AHD. In this respect, a photograph of the property appears to indicate that floor level of the garage is higher than the front of the property.  Toowong Creek runs through the park and is a tributary of the Brisbane River,  After interpolating the Brisbane River levels at the Brisbane City and Oxley Creek Mouth alert gauges, the FSP’s hydrologist estimates that the Brisbane River level near the Ap plicants’ residence was likely to have reached 4.0m AHD at about 12.00am on 12 January 2011.  The FSP’s hydrologist also estimates that the “peak flow rate” in Toowong Creek in the vicinity of the Applicants’ property (caused by rains in the local catchment area on 11 January 2011) would be about 160 cubic metres per second. He further states that such a flow rate would cause water levels to only rise to a peak level of 3.5m AHD “based on standard hydraulic calculations”; which is insufficient to cause an in undation of the residence.  According to rainfall records captured at the Toowong alert gauge (see page 85, volume 2 of the Insurance Council of Australia’s report): i. It was generally raining all day on 11 January 2011. ii. The most intense rainfall occurred between 10.00am and 11.00am, with rain falling at the rate of just under 20mm/hr. iii. Rain continued to fall after 11.00am (at rates of under 10mm/hr) until 4.00pm. Case No: 263834 Determination Page 6 of 6 iv. There appeared to be minimal to no rains after 4.00pm on 11 January 2011. The Toowong alert gauge is approximately 1.6km from the Applicants’ residence, so rain activity in that area on 11 January 2011 is likely to be representative of the rain activity at the Applicants’ location. 26. Considering these matters, the Panel is satisfied on the balance of pro babilities that the Applicants’ home was likely to have been:  First inundated at some time after 12.00am on 12 January 2011; and  Inundated by waters that could appropriately be regarded as flood water. 27. It is a generally accepted hydrological principle that localised stormwater inundation tends to occur within a relatively short time following an intense period of rainfall. 28. The evidence shows that the Applicants’ home was not yet inundated when they evacuated it at 9.00pm on 11 January 2011. This was some 10 hours after the most intense rain on 11 January 2011 fell, and some 5 hours after the rains had essentially fallen to minimal levels (if not stopped altogether). This makes it unlikely that their loss was caused by stormwater runoff. 29. There was also hardly any rain of significant intensity between 9.00pm on 11 January 2011 and 12.00am on 12 January 2011 (i.e. the time the Brisbane River level was estimated to have reached a level sufficient to inundate the lowest level of the Applicants’ land). The absence of significant rains in this period makes it is more likely than not that, on the balance of probabilities the Applicants’ home was inundated by the rising level of the Brisbane River, which is flood for purposes of the policy. 30. In the absence of any evidence to establish stormwater runoff as the cause of inundation the Panel is satisfied the FSP is entitled to deny the claim on the basis of the flood exclusion contained within the policy. Determination 31. The Panel determines on the balance of probabilities the Applicants ’ property was inundated by flood and the FSP is entitled to decline liability relying on the flood exclusion.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.