Home / Financial Firm (Unknown - Insurer) / Determination 263668

Determination 263668

Flood damage denied under flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-10-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicant's Rocklea home and contents were inundated in January 2011 and the FSP denied the claim as flood. AFCA found the flood exclusion was clearly communicated and the inundation occurred outside the 24-hour flash flood window, so the denial stands.

The inundation occurred outside the 24-hour flash flood window, so the loss was flood, and the exclusion was clearly informed under section 35 of the Insurance Contracts Act.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 263668 Determination Page 1 of 10 Case number: 263668 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim - Flood 30 October 2012 Background 1. The Applicant insured his home and contents in Rocklea with the Financial Services Provider (FSP). The relevant period of insurance operated for twelve months beginning from 25 July 2010. On 3 December 2010 the Applicant removed building cover from the Policy. At the relevant time of the loss, the contents were insured for $82,000 and personal items for $4,000. 2. On 14 January 2011, the Applicant lodged a claim under the policy for damage resulting from extensive water inundation following severe weather events in Queensland. 3. The FSP denied the claim on the basis the damage was due to “flood”. The Applicant, through his solicitors, has disputed this. 4. Both the Applicant and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will only summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicant’s position 5. The Applicant submits the following as alternative arguments in response to the FSP‟s decision: a. The FSP represented to the Applicant that his Policy covered damage caused by flood by paying a prior claim in 2009. b. The FSP‟s policy failed to clearly inform him that “flood” was e xcluded as required under Section 35 of the Insurance Contracts Act 1984 (the Act). c. The damage was due to “Flash flood and stormwater run - off”, which is an insured event. In particular, the inundation was due to heavy rain that fell from 4am on 11 January 2011 which resulted in the Wivenhoe Dam operators elevating their strategy to W4. This decision resulted in Determination Case No: 263668 Determination Page 2 of 10 massive discharges of water into the Brisbane River that ultimately inundated his property. d. The FSP is unable to discharge its onus in establishing the loss was caused by “flood”. 6. The Applicant seeks to be indemnified for his claim. Summary of FSP’s position 7. In response to the Applicant ‟ s arguments, the FSP submits the following: a. The PDS is sufficient to „clearly inform‟ the Applicant about the scop e of the flood cover. The policy structure and layout enables it to rely on the exclusion clause of “flood” pursuant to Section 35(2) of the Act. b. It denies any misleading conduct. Alternatively, the Applicant is unable to establish any detriment suffered from the alleged misleading conduct. 8. The FSP relies on a number of hydrology reports authored by SC and the following policy provisions to deny the Applicant‟s claim : Certificate of Insurance (COI) “ What optional covers are included and not included Home Contents ... Flood and storm surge not included not included...” PDS “ Words / terms with special meanings Word / term Meaning ... Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off . ... Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightning, heavy Case No: 263668 Determination Page 3 of 10 rain, hail or snow, but not continuous bad weather by itself. ...” “ Insured events you are covered for Damage caused by weather... What is covered What is not covered Storm Loss or damage:  caused by rain, hail or snow after it has reached the ground... ... Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood... ...” “ Your home The most we will pay you for home claims What is covered What is not covered Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. ... ...” “ Your contents The most we will pay you for contents claims What is covered What is not covered ... ... Flash flood and stormwater run-off We will pay up to 50% of your contents sum insured or $25,000, whichever is higher, but not exceeding your contents sum insured. ... ...” Case No: 263668 Determination Page 4 of 10 Issues 9. Whether the FSP engaged in misleading conduct by accepting a prior claim. 10. Whether the Applicant was “clearly informed” about what the policy did and did not cover. 11. Whether the cause of the Applicant‟s loss was covered under the policy. Reasons for decision 12. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to FOS‟s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 13. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 14. It is appropriate to consider the issues under the various headings. Misleading conduct by the FSP 15. The Applicant states that the FSP accepted his 2009 claim for damage caused during a storm when sewage came up through all the drains in the toilet and bathroom and flooded the granny flat underneath the house, causing damage to the home and contents. 16. The Applicant states that as a consequence of the payout of the Applicant‟s prior claim, the FSP represented that his policy covered him for damage caused by rainwater and floodwater. 17. It is submitted that the Applicant relied on the FSP‟s conduct to his detriment, as he otherwise would have sought insurance elsewhere that would have covered him for flood. 18. The FSP states the circumstances surrounding the 2009 claim were entirely different to the subject claim and the fact that a previous claim has been accepted by the FSP does not lead a reasonable person to conclude that all future events they experience will be covered by the policy. 19. The Applicant does not provide details of the previous claim except to say “sewerage backed up due to too much water in the sewer because of the rain” and the claim was paid under the „flash - flood and stormwater runoff‟ clause of the policy. Case No: 263668 Determination Page 5 of 10 20. In the absence of the specific circumstances surrounding the previous claim, the Panel cannot determine whether the circumstances surrounding the previous claim were the same as those of the subject claim. 21. The Panel notes however that the Applicant has been insured with the FSP since 2006. There is no dispute that the Applicant received a copy of the PDS during the time he was insured with the FSP along with his Certificates of Insurance (COI). The PDS and COI outline the terms of cover provided under the policy. 22. The onus is on the Applicant to carefully read the PDS and COI to determine the extent of and limitations to the cover he has purchased. To rely on an FSP‟s previous decision on a claim to determine the extent of the cover provided by a policy is not determinative of a current disputed claim. 23. The Panel is therefore not satisfied the Applicant has established that the FSP‟s acceptance of the claim in 2009 amounts to misleading conduct, which has led him to suffer detriment. Consideration of "Flood" Definition in PDS 24. The Applicant submits that the policy fails to clearly inform him of the derogation from flood cover and the limitations on the extent of cover for flash flood. 25. As noted above, the Applicant does not dispute receiving the PDS and/or Certificate of Insurance. 26. It is established law that in order to satisfy the requirement to clearly inform, the language of section 35 (2) allows for a proposed insured to be clearly informed by providing the relevant documentation in writing and that the relevant exclusion and/or limitation in this case is clear and unambiguous and in a manner which a person of average intelligence and education is likely to have little difficulty in finding and understanding if that person reads the policy in question. 27. The Panel has reviewed the FSP‟s policy on a number of occasions. The policy is indexed with relevant sections covering the insured events. The policy sets out the definitions of storm and flash flood and stormwater runoff. The policy clearly identifies that flood and storm surge is an optional cover but otherwise flood is excluded from cover. The Certificate of Insurance also clearly identifies that with respect to the Applicant‟s policy , flood and storm surge is not covered. 28. Having cons idered the Applicant‟s submissions and the FSP‟s policy documents, the Panel is satisfied that the FSP has met its obligations to clearly inform the Applicant of the extent of the exclusions and limitations in accordance with the requirements of the Act. Case No: 263668 Determination Page 6 of 10 Water Inundation The Evidence 29. The Applicant submits that it was raining heavily during the day on 11 January 2011. According to the Applicant‟s statutory declaration dated 23 March 2012:  At 12.00pm on 11 January 2011, the water had already reached the end of the street.  The Applicant left the property at 3.30pm, as they were getting blocked in by water. At this time, water had entered a property at the end of the street and the football field at the end of the street had been completely flooded.  The Applicant‟s property is located mid way up a slight rise in the road and “was the last house to be affected before going up the rise in the crest of the road.” The Applicant was the last to ge t out, as everyone else had left already.  The Applicant‟s property is about 5 – 10m higher than the football club.  There is a creek that runs through Kookaburra Park, which the football field backs onto. The creek is a couple of hundred metres away from th e Applicant‟s property, to the north.  Oxley Creek lies 1.5km to the west of the Applicant‟s property.  When the Applicant returned to the property, there was still 700mm of water in the house. Water had reached a peak level of about 1.5m. 30. The Applicant believes that his property would have been inundated shortly after he left at 3.30pm. 31. The Applicant does not rely on any expert hydrology evidence. 32. Based on the Interim Report of the Flood Commission of Inquiry and Mr Ayre‟s evidence regarding timing of the w ater flow from Wivenhoe Dam, the Applicant submits that it would have taken between 16 and 22.5 hours for water from Wivenhoe to reach Rocklea. It is submitted that the water which inundated the Applicant‟s property was flash flood as defined by the FSP. 33. The evidence presented by the FSP in particular the hydrology statement from SC confirms that the rainfall in the area on 11 January 2011 is unlikely to have been sufficient to have caused stormwater inundation given the Applicant‟s best estimate of inundat ion at some time after 3.30pm on 11 January 2011. The Panel accepts that most likely the property was not inundated by stormwater but was inundated by waters backflowing from the Brisbane River. 34. The policy provides cover for flash flood subject to the inundation being caused by heavy rainfall that fell no more than 24 hours prior to the inundation. The central issue in this dispute is therefore whether the Case No: 263668 Determination Page 7 of 10 Applicant‟s home was inundated as a result of heavy rainfall that fell no more than 24 hours prior to the inundation. Releases from Wivenhoe Dam & Proximate Cause 35. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders advising that after considerable deliberation of all material available to it, the Panel formed a view that the heavy rain occurring from approximately 4.00am on 11 January 2011 and in particular the heavy rain between 4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4 strategy being invoked and therefore a proximate cause or trigger that led to the flooding of many of the properties along the Brisbane River. 36. At that time, the Panel noted that in relation to the approach that each dispute would depend upon the individual and unique factors relevant to the dispute and in that regard the parties were invited to make further submissions in relation to disputes before FOS. 37. In view of this, the FSP provided detailed further submissions to FOS on 14 June 2012 in relation to this dispute. Included with the submissions were the following documents:  A Reference document for disputes relating to Queensland Floods (this is a general reference document) relating to the various submissions the FSP makes in relation to a number of issues. Not all issues raised in the reference document appear in the current dispute;  Letter from the FSP‟s hydrologist attaching a key information sheet for the Applicant‟s property;  Hydrologist report “Investigations of January 2011 inundation event – Brisbane” dated March 2011;  Statement from hydrologist dated 7 June 2012. 38. A further amended reference document was submitted on 11 July 2012. 39. In summary the FSP argues that the proximate cause of the inundation of the property, that is the real or effective cause of the damage sustained to the properties downstream of the Wivenhoe Dam was the heavy rainfall that commenced from 9 January 2011 (or earlier) and not simply the rain that occurred from 4am on 11 January 2011. The FSP maintains that on any reasonable view, the damage sustained to the downstream properties was the combined effect of all of the rainfall and not just the rain that had fallen from 4.00am on 11 January 2011 leading to the implementation of the W4 strategy from 8.00am that day. 40. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment area and in fact parts of the Brisbane River from approximately 4.00am on 11 January 2011. It is not disputed that in addition to this there was heavy rain over the Bremer River which influenced the level of the Brisbane River and that rain commenced at approximately 6.00am on 11 January 2011. Case No: 263668 Determination Page 8 of 10 41. The FSP‟s hydrologist has relied on data from SEQWater dated 2 March 2011 which confirms the rapid increase in releases from the Wivenhoe Dam from 8.00am on 11 January 2011. Examination of the SEQWater report identifies the rapid increase in the inflows to the Wivenhoe Dam commencing from about 4.00am, 11 January 2011. The report confirms the inflows into the dam had been decreasing from as early as 8.00am from 10 January 2011 with steady decreases from approximately 3.00pm on 10 January 2011 to 2.00am on 11 January 2011. 42. The Queensland Flood Commission of Inquiry‟s report confirms that prior to 4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011 the dam releases were being managed at the W3 strategy. Whilst it is accepted that the W3 strategy had led to an increase in the levels of the Brisbane River, the W3 strategy was designed to avoid where possible inundation of the properties below the Wivenhoe Dam by flooding from the Brisbane River. 43. There is no dispute that there were two significant rainfall spikes with rain that fell from 9 to 10 January 2011 being considered the first spike and rain that commenced falling from approximately 4.00am on 11 January 2011 being the second spike. 44. There is no dispute that following the second spike that the W4 strategy was adopted. The FSP has argued that the switch to strategy W4 was not the natural and ordinary consequence of the rain that fell and in fact the move to W4 strategy was not taken in accordance with the Wivenhoe Dam manual. In the Panel‟s view, the Queensland Flood Commission of Inquiry‟s final report does not find the adoption of W4 strategy at 8.00am on 11 January 2011 was inconsistent with the manual. Although there may be issues as to how the Wivenhoe Dam had been managed prior to this time, there is nothing in the material that has been provided to the Panel to suggest that the earlier management of the Wivenhoe Dam influenced to any significant degree, the adoption of the W4 release strategy at 8.00am on 11 January 2011. 45. The IC A hydrology and the information provided by the FSP‟s hydrologist confirms that the increased releases from the Wivenhoe Dam after the adoption of the W4 strategy led to the development of a flood wave that ultimately caused the flooding of many properties downstream of the Wivenhoe Dam. 46. The question arises as to what was the proximate cause of this inundation. In determining the proximate cause of the inundation it is necessary to look at the effective or dominant cause of the inundation. The Panel agrees with the FSP‟s general submission that the proximate cause is a cause determined by common sense evaluation of the relevant facts. In the event that there are two or more proximate causes, one within the policy and the other excluded, the policy does not respond. The proximate cause is not determined by identifying the last event or final trigger but by determining what is the dominant, effective, direct or efficient cause of the loss. Case No: 263668 Determination Page 9 of 10 47. The FSP has maintained that the impact on the Wivenhoe Dam from the rainfall that fell in the early hours of 11 January 2011 was only 29% while 71% of the volume of the inflow came from the rain that fell on 9 and 10 January 2011 or earlier. The FSP maintains that to find the rainfall which had fallen from 4.00am on 11 January 2011 is the proximate cause is without foundation as such an approach produces an entirely artificial outcome. 48. With due respect to the FSP‟s argument the Panel disagrees. Whilst the Panel accepts there has been a significant impact on the levels of the Wivenhoe Dam by the rainfall that commenced falling on or about 9 January 2011 or earlier, the Panel is satisfied having regard to the information that has been exchanged and the relevant legal principles, that the heavy rain that commenced falling on or about 4.00am on 11 January 2011 was the proximate or effective cause of the adoption of the W4 strategy. 49. The Panel is also satisfied that whilst the level of the Brisbane River may have been increasing under the W3 strategy, it was the heavy rainfall from approximately 4.00am on 11 January 2011 that caused the need to adopt the W4 strategy at 8.00am on the same day. The Applicant’s Inundation 50. For the Applicant‟s claim to succeed and fall within the definition of “flash flood” within the terms of the policy, it is necessary for the Applicant to establish the property was inundated within 24 hours of this heavy rainfall. As the Panel accepts the heavy rainfall commenced at approximately 4.00am on 11 January 2011 the inundation would have to occur prior to 4.00am on 12 January 2011. 51. The parties disagree on the actual time of inundation. The Applicant maintains that the property would have been inundated shortly after 3.30pm on 11 January 2011. If this is accepted, the inundation would have been caused by rain which fell within 24 hours of the inundation, attracting cover under the Policy. 52. SC‟s statement of 7June 2012 indicates the effect of the W4 releases first reached the vicinity of the Applicant‟s property at 2.39pm on Tuesday 11 January 2011. However, he estimated that the property was first inundated by the Brisbane River at 2.30pm on Wednesday 12 January 2011 at benchmark level. The benchmark level is the lowest point of the structure or house on the land. 53. According to SC, at 4.00am on Tuesday 12 January 2011 the water level at the vicinity of the property would have been at approximately 6.2mAHD which is 1.9m below the benchmark level. 54. The relevant benchmark level of 8.1m AHD was SC‟s estimate of the lowest point of the house. This evidence has not been refuted by the Applicant in any manner. Case No: 263668 Determination Page 10 of 10 55. The Panel accepts the possibility that SC‟s assessments may not be entirely accurate. The Panel also notes that the Applicant‟s assumption in relation to the timing of the inundation is based on the water levels in the vicinity of the property at the time he evacuated. The Applicant himself notes that his property is 5 – 10m higher than the football field. Bearing in mind the distance from the Brisbane River, it is reasonable to expect that it would take some time for the water to reach the height of the ground level of the Applicant‟s home. 56. Due to the conflicting information regarding the timing of the inundation and in the absence of hydrology evidence by the Applicant, the Panel must rely on the best evidence available. Based on the rainfall levels, river height data and topography of the property, the Panel is satisfied on the balance of probabilities that the property was not inundated until the afternoon of Wednesday 12 January 2011. This is outside the relevant 24 hour period to attract cover under the policy for flash flood. 57. The Panel is satisfied that the most likely cause of the damage to the Applicant‟s property was flood, as defined by the Policy and is therefore excluded from cover. Determination 58. On the basis of the available information the Panel determines:  The FSP did not engage in misleading conduct in accepting a prior claim.  The Applicant was clearly informed of the flood exclusion contained in the Policy.  The FSP is entitled to deny the Applicant‟s claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.