Home / Financial Firm (Unknown - Insurer) / Determination 263668
Determination 263668
Flood damage denied under flood exclusion
Summary
The Applicant's Rocklea home and contents were inundated in January 2011 and the FSP denied the claim as flood. AFCA found the flood exclusion was clearly communicated and the inundation occurred outside the 24-hour flash flood window, so the denial stands.
The inundation occurred outside the 24-hour flash flood window, so the loss was flood, and the exclusion was clearly informed under section 35 of the Insurance Contracts Act.
Issues
- Claim denial primary · not upheld
“The Panel is satisfied that the most likely cause of the damage to the Applicant's property was flood, as defined by the Policy and is therefore excluded from cover.”
- Failure to disclose secondary · not upheld
“The Applicant was clearly informed of the flood exclusion contained in the Policy.”
- Misleading conduct secondary · not upheld
“The FSP did not engage in misleading conduct in accepting a prior claim.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 263668 Determination Page 1 of 10
Case number: 263668
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim - Flood
30 October 2012
Background
1. The Applicant insured his home and contents in Rocklea with the Financial
Services Provider (FSP). The relevant period of insurance operated for
twelve months beginning from 25 July 2010. On 3 December 2010 the
Applicant removed building cover from the Policy. At the relevant time of the
loss, the contents were insured for $82,000 and personal items for $4,000.
2. On 14 January 2011, the Applicant lodged a claim under the policy for
damage resulting from extensive water inundation following severe weather
events in Queensland.
3. The FSP denied the claim on the basis the damage was due to “flood”. The
Applicant, through his solicitors, has disputed this.
4. Both the Applicant and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will only summarise these
submissions given all of the material made available has been exchanged
with the other party.
Summary of Applicant’s position
5. The Applicant submits the following as alternative arguments in response to
the FSP‟s decision:
a. The FSP represented to the Applicant that his Policy covered damage
caused by flood by paying a prior claim in 2009.
b. The FSP‟s policy failed to clearly inform him that “flood” was e xcluded
as required under Section 35 of the Insurance Contracts Act 1984 (the
Act).
c. The damage was due to “Flash flood and stormwater run - off”, which is
an insured event. In particular, the inundation was due to heavy rain
that fell from 4am on 11 January 2011 which resulted in the Wivenhoe
Dam operators elevating their strategy to W4. This decision resulted in
Determination
Case No: 263668 Determination Page 2 of 10
massive discharges of water into the Brisbane River that ultimately
inundated his property.
d. The FSP is unable to discharge its onus in establishing the loss was
caused by “flood”.
6. The Applicant seeks to be indemnified for his claim.
Summary of FSP’s position
7. In response to the Applicant ‟ s arguments, the FSP submits the following:
a. The PDS is sufficient to „clearly inform‟ the Applicant about the scop e of
the flood cover. The policy structure and layout enables it to rely on the
exclusion clause of “flood” pursuant to Section 35(2) of the Act.
b. It denies any misleading conduct. Alternatively, the Applicant is unable
to establish any detriment suffered from the alleged misleading
conduct.
8. The FSP relies on a number of hydrology reports authored by SC and the
following policy provisions to deny the Applicant‟s claim :
Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off .
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightning, heavy
Case No: 263668 Determination Page 3 of 10
rain, hail or snow, but not continuous bad weather by
itself.
...”
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...”
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...”
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater run-off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher, but not exceeding your contents
sum insured.
...
...”
Case No: 263668 Determination Page 4 of 10
Issues
9. Whether the FSP engaged in misleading conduct by accepting a prior claim.
10. Whether the Applicant was “clearly informed” about what the policy did and
did not cover.
11. Whether the cause of the Applicant‟s loss was covered under the policy.
Reasons for decision
12. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‟s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
13. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
14. It is appropriate to consider the issues under the various headings.
Misleading conduct by the FSP
15. The Applicant states that the FSP accepted his 2009 claim for damage
caused during a storm when sewage came up through all the drains in the
toilet and bathroom and flooded the granny flat underneath the house,
causing damage to the home and contents.
16. The Applicant states that as a consequence of the payout of the Applicant‟s
prior claim, the FSP represented that his policy covered him for damage
caused by rainwater and floodwater.
17. It is submitted that the Applicant relied on the FSP‟s conduct to his
detriment, as he otherwise would have sought insurance elsewhere that
would have covered him for flood.
18. The FSP states the circumstances surrounding the 2009 claim were entirely
different to the subject claim and the fact that a previous claim has been
accepted by the FSP does not lead a reasonable person to conclude that all
future events they experience will be covered by the policy.
19. The Applicant does not provide details of the previous claim except to say
“sewerage backed up due to too much water in the sewer because of the
rain” and the claim was paid under the „flash - flood and stormwater runoff‟
clause of the policy.
Case No: 263668 Determination Page 5 of 10
20. In the absence of the specific circumstances surrounding the previous claim,
the Panel cannot determine whether the circumstances surrounding the
previous claim were the same as those of the subject claim.
21. The Panel notes however that the Applicant has been insured with the FSP
since 2006. There is no dispute that the Applicant received a copy of the
PDS during the time he was insured with the FSP along with his Certificates
of Insurance (COI). The PDS and COI outline the terms of cover provided
under the policy.
22. The onus is on the Applicant to carefully read the PDS and COI to determine
the extent of and limitations to the cover he has purchased. To rely on an
FSP‟s previous decision on a claim to determine the extent of the cover
provided by a policy is not determinative of a current disputed claim.
23. The Panel is therefore not satisfied the Applicant has established that the
FSP‟s acceptance of the claim in 2009 amounts to misleading conduct,
which has led him to suffer detriment.
Consideration of "Flood" Definition in PDS
24. The Applicant submits that the policy fails to clearly inform him of the
derogation from flood cover and the limitations on the extent of cover for
flash flood.
25. As noted above, the Applicant does not dispute receiving the PDS and/or
Certificate of Insurance.
26. It is established law that in order to satisfy the requirement to clearly inform,
the language of section 35 (2) allows for a proposed insured to be clearly
informed by providing the relevant documentation in writing and that the
relevant exclusion and/or limitation in this case is clear and unambiguous
and in a manner which a person of average intelligence and education is
likely to have little difficulty in finding and understanding if that person reads
the policy in question.
27. The Panel has reviewed the FSP‟s policy on a number of occasions. The
policy is indexed with relevant sections covering the insured events. The
policy sets out the definitions of storm and flash flood and stormwater runoff.
The policy clearly identifies that flood and storm surge is an optional cover
but otherwise flood is excluded from cover. The Certificate of Insurance also
clearly identifies that with respect to the Applicant‟s policy , flood and storm
surge is not covered.
28. Having cons idered the Applicant‟s submissions and the FSP‟s policy
documents, the Panel is satisfied that the FSP has met its obligations to
clearly inform the Applicant of the extent of the exclusions and limitations in
accordance with the requirements of the Act.
Case No: 263668 Determination Page 6 of 10
Water Inundation
The Evidence
29. The Applicant submits that it was raining heavily during the day on 11
January 2011. According to the Applicant‟s statutory declaration dated 23
March 2012:
At 12.00pm on 11 January 2011, the water had already reached the
end of the street.
The Applicant left the property at 3.30pm, as they were getting blocked
in by water. At this time, water had entered a property at the end of the
street and the football field at the end of the street had been completely
flooded.
The Applicant‟s property is located mid way up a slight rise in the road
and “was the last house to be affected before going up the rise in the
crest of the road.” The Applicant was the last to ge t out, as everyone
else had left already.
The Applicant‟s property is about 5 – 10m higher than the football club.
There is a creek that runs through Kookaburra Park, which the football
field backs onto. The creek is a couple of hundred metres away from
th e Applicant‟s property, to the north.
Oxley Creek lies 1.5km to the west of the Applicant‟s property.
When the Applicant returned to the property, there was still 700mm of
water in the house. Water had reached a peak level of about 1.5m.
30. The Applicant believes that his property would have been inundated shortly
after he left at 3.30pm.
31. The Applicant does not rely on any expert hydrology evidence.
32. Based on the Interim Report of the Flood Commission of Inquiry and Mr
Ayre‟s evidence regarding timing of the w ater flow from Wivenhoe Dam, the
Applicant submits that it would have taken between 16 and 22.5 hours for
water from Wivenhoe to reach Rocklea. It is submitted that the water which
inundated the Applicant‟s property was flash flood as defined by the FSP.
33. The evidence presented by the FSP in particular the hydrology statement
from SC confirms that the rainfall in the area on 11 January 2011 is unlikely
to have been sufficient to have caused stormwater inundation given the
Applicant‟s best estimate of inundat ion at some time after 3.30pm on 11
January 2011. The Panel accepts that most likely the property was not
inundated by stormwater but was inundated by waters backflowing from the
Brisbane River.
34. The policy provides cover for flash flood subject to the inundation being
caused by heavy rainfall that fell no more than 24 hours prior to the
inundation. The central issue in this dispute is therefore whether the
Case No: 263668 Determination Page 7 of 10
Applicant‟s home was inundated as a result of heavy rainfall that fell no more
than 24 hours prior to the inundation.
Releases from Wivenhoe Dam & Proximate Cause
35. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
36. At that time, the Panel noted that in relation to the approach that each
dispute would depend upon the individual and unique factors relevant to the
dispute and in that regard the parties were invited to make further
submissions in relation to disputes before FOS.
37. In view of this, the FSP provided detailed further submissions to FOS on 14
June 2012 in relation to this dispute. Included with the submissions were the
following documents:
A Reference document for disputes relating to Queensland Floods (this
is a general reference document) relating to the various submissions
the FSP makes in relation to a number of issues. Not all issues raised
in the reference document appear in the current dispute;
Letter from the FSP‟s hydrologist attaching a key information sheet for
the Applicant‟s property;
Hydrologist report “Investigations of January 2011 inundation event –
Brisbane” dated March 2011;
Statement from hydrologist dated 7 June 2012.
38. A further amended reference document was submitted on 11 July 2012.
39. In summary the FSP argues that the proximate cause of the inundation of
the property, that is the real or effective cause of the damage sustained to
the properties downstream of the Wivenhoe Dam was the heavy rainfall that
commenced from 9 January 2011 (or earlier) and not simply the rain that
occurred from 4am on 11 January 2011. The FSP maintains that on any
reasonable view, the damage sustained to the downstream properties was
the combined effect of all of the rainfall and not just the rain that had fallen
from 4.00am on 11 January 2011 leading to the implementation of the W4
strategy from 8.00am that day.
40. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment
area and in fact parts of the Brisbane River from approximately 4.00am on
11 January 2011. It is not disputed that in addition to this there was heavy
rain over the Bremer River which influenced the level of the Brisbane River
and that rain commenced at approximately 6.00am on 11 January 2011.
Case No: 263668 Determination Page 8 of 10
41. The FSP‟s hydrologist has relied on data from SEQWater dated 2 March
2011 which confirms the rapid increase in releases from the Wivenhoe Dam
from 8.00am on 11 January 2011. Examination of the SEQWater report
identifies the rapid increase in the inflows to the Wivenhoe Dam
commencing from about 4.00am, 11 January 2011. The report confirms the
inflows into the dam had been decreasing from as early as 8.00am from 10
January 2011 with steady decreases from approximately 3.00pm on 10
January 2011 to 2.00am on 11 January 2011.
42. The Queensland Flood Commission of Inquiry‟s report confirms that prior to
4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011
the dam releases were being managed at the W3 strategy. Whilst it is
accepted that the W3 strategy had led to an increase in the levels of the
Brisbane River, the W3 strategy was designed to avoid where possible
inundation of the properties below the Wivenhoe Dam by flooding from the
Brisbane River.
43. There is no dispute that there were two significant rainfall spikes with rain
that fell from 9 to 10 January 2011 being considered the first spike and rain
that commenced falling from approximately 4.00am on 11 January 2011
being the second spike.
44. There is no dispute that following the second spike that the W4 strategy was
adopted. The FSP has argued that the switch to strategy W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
W4 strategy was not taken in accordance with the Wivenhoe Dam manual.
In the Panel‟s view, the Queensland Flood Commission of Inquiry‟s final
report does not find the adoption of W4 strategy at 8.00am on 11 January
2011 was inconsistent with the manual. Although there may be issues as to
how the Wivenhoe Dam had been managed prior to this time, there is
nothing in the material that has been provided to the Panel to suggest that
the earlier management of the Wivenhoe Dam influenced to any significant
degree, the adoption of the W4 release strategy at 8.00am on 11 January
2011.
45. The IC A hydrology and the information provided by the FSP‟s hydrologist
confirms that the increased releases from the Wivenhoe Dam after the
adoption of the W4 strategy led to the development of a flood wave that
ultimately caused the flooding of many properties downstream of the
Wivenhoe Dam.
46. The question arises as to what was the proximate cause of this inundation.
In determining the proximate cause of the inundation it is necessary to look
at the effective or dominant cause of the inundation. The Panel agrees with
the FSP‟s general submission that the proximate cause is a cause
determined by common sense evaluation of the relevant facts. In the event
that there are two or more proximate causes, one within the policy and the
other excluded, the policy does not respond. The proximate cause is not
determined by identifying the last event or final trigger but by determining
what is the dominant, effective, direct or efficient cause of the loss.
Case No: 263668 Determination Page 9 of 10
47. The FSP has maintained that the impact on the Wivenhoe Dam from the
rainfall that fell in the early hours of 11 January 2011 was only 29% while
71% of the volume of the inflow came from the rain that fell on 9 and 10
January 2011 or earlier. The FSP maintains that to find the rainfall which had
fallen from 4.00am on 11 January 2011 is the proximate cause is without
foundation as such an approach produces an entirely artificial outcome.
48. With due respect to the FSP‟s argument the Panel disagrees. Whilst the
Panel accepts there has been a significant impact on the levels of the
Wivenhoe Dam by the rainfall that commenced falling on or about 9 January
2011 or earlier, the Panel is satisfied having regard to the information that
has been exchanged and the relevant legal principles, that the heavy rain
that commenced falling on or about 4.00am on 11 January 2011 was the
proximate or effective cause of the adoption of the W4 strategy.
49. The Panel is also satisfied that whilst the level of the Brisbane River may
have been increasing under the W3 strategy, it was the heavy rainfall from
approximately 4.00am on 11 January 2011 that caused the need to adopt
the W4 strategy at 8.00am on the same day.
The Applicant’s Inundation
50. For the Applicant‟s claim to succeed and fall within the definition of “flash
flood” within the terms of the policy, it is necessary for the Applicant to
establish the property was inundated within 24 hours of this heavy rainfall.
As the Panel accepts the heavy rainfall commenced at approximately
4.00am on 11 January 2011 the inundation would have to occur prior to
4.00am on 12 January 2011.
51. The parties disagree on the actual time of inundation. The Applicant
maintains that the property would have been inundated shortly after 3.30pm
on 11 January 2011. If this is accepted, the inundation would have been
caused by rain which fell within 24 hours of the inundation, attracting cover
under the Policy.
52. SC‟s statement of 7June 2012 indicates the effect of the W4 releases first
reached the vicinity of the Applicant‟s property at 2.39pm on Tuesday 11
January 2011. However, he estimated that the property was first inundated
by the Brisbane River at 2.30pm on Wednesday 12 January 2011 at
benchmark level. The benchmark level is the lowest point of the structure or
house on the land.
53. According to SC, at 4.00am on Tuesday 12 January 2011 the water level at
the vicinity of the property would have been at approximately 6.2mAHD
which is 1.9m below the benchmark level.
54. The relevant benchmark level of 8.1m AHD was SC‟s estimate of the lowest
point of the house. This evidence has not been refuted by the Applicant in
any manner.
Case No: 263668 Determination Page 10 of 10
55. The Panel accepts the possibility that SC‟s assessments may not be entirely
accurate. The Panel also notes that the Applicant‟s assumption in relation to
the timing of the inundation is based on the water levels in the vicinity of the
property at the time he evacuated. The Applicant himself notes that his
property is 5 – 10m higher than the football field. Bearing in mind the
distance from the Brisbane River, it is reasonable to expect that it would take
some time for the water to reach the height of the ground level of the
Applicant‟s home.
56. Due to the conflicting information regarding the timing of the inundation and
in the absence of hydrology evidence by the Applicant, the Panel must rely
on the best evidence available. Based on the rainfall levels, river height data
and topography of the property, the Panel is satisfied on the balance of
probabilities that the property was not inundated until the afternoon of
Wednesday 12 January 2011. This is outside the relevant 24 hour period to
attract cover under the policy for flash flood.
57. The Panel is satisfied that the most likely cause of the damage to the
Applicant‟s property was flood, as defined by the Policy and is therefore
excluded from cover.
Determination
58. On the basis of the available information the Panel determines:
The FSP did not engage in misleading conduct in accepting a prior
claim.
The Applicant was clearly informed of the flood exclusion contained in
the Policy.
The FSP is entitled to deny the Applicant‟s claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.