Text of the determination
Case No: 263648 Determination Page 1 of 11
Case number: 263648
General Insurance - Domestic Insurance - Home Building & Contents - FSP
Decision - Denial of claim
11 July 2012
Background
1. The Applicants held a Home Building and Contents Insurance Policy (the
policy) with the Financial Services Provider (FSP).
2. A claim was lodged under the policy in April 2011 seeking indemnity to repair
water/moisture damage to the insured building, associated costs for
relocation of contents in the affected area and reimbursement of costs
incurred in undertaking rectification works.
3. The FSP after having completed its investigation into the circumstances of
the loss claimed declined the claim in line with the relevant policy exclusions.
4. The Applicants remain dissatisfied with the FSP’s dec ision to decline the
claim and are seeking indemnity under the policy.
Summary of Applicant’s position
5. The Applicants have never sought to be covered for costs associated with
rect ifying their neighbours’ drainage system. These works were completed
by the relevant Council and which absorbed all associated costs in this
regard.
6. The Applicants acknowledge legal proceedings were issued against the
original builder of the insured property via VCAT, which resulted in a forced
settlement agreement between the parties in July 2006. Further, at the time
of the settlement the Applicants were not aware of the actual cause of the
water incursions causing the damage.
7. It was only in March 2007 that the Applicants became aware that the cause
was due to the neighbours’ blocked drainage system. Therefore, the
Applicants maintain that the actual cause for the damage was the blocked
drainage system and not the defective work undertaken by the builders.
Determination
Case No: 263648 Determination Page 2 of 11
8. The property was waterproofed, however the Applicants did not expect to
have to account for a flood of surface water up to a depth of 30mm and
above, neither is accounting for such in the construction of a home a legal or
insurance requirement.
9. The sole cause for the water incursions continuing for so long and resulting
in s uch extensive damage is the FSP’s failure to investigate the issue when
first contacted by the Applicants.
10. The first water incursion occurred in 2000 and the resultant damage was
completely rectified by the builders, with no further events of this nature
occurring until 9 November 2004.
11. The Applicants are seeking indemnity in the form of reimbursement of costs
incurred and those yet to be settled to return the property to the same
condition it was in prior to the 9 November 2004 event. There have been 36
instances of water incursion since (November 2004) which stopped once the
Council rectified the issue with the neighbours ’ blocked drainage system.
12. In response to the FSP’s position the Applicants maintain that all monies
paid to the council and for which they are seeking indemnity were in respect
to costs involved in the rectification and waterproofing of the insured
property.
13. The Applicants refute the FSP’s position that the ongoing issues were not
reported to it until April 2011. They maintain the FSP was contacted on
numerous occasions during this period. However on each occasion the
Applicants were advised that it was a new home and accordingly an issue to
be dealt with under the builders’ warranty.
14. The Applicants also disagree with the FSP’s position that the neighbours’
drainage system was blocked due to tree roots. They maintain there are no
trees in close proximity for this occur rather it was blocked due to crush
rocks arising from when the neighbours’ concrete driveway was constructed.
15. The Applicants ’ considered legal action against their neighbours however on
obtaining legal advice they decided not to do so, rather contacted the
Council which finally agreed to act as a mediator between the parties. This
continued until July 2009 after which urgent exterior rectification works were
completed.
16. The Applicants maintain that they have incurred over $90,000 in costs
relating to the rectification of the identified issues including a $35,000
payment to the neighbours in order to access their property to rectify the
Applicants’ wall and drains.
Summary of FSP’s position
17. The Applicants bear the onus to establish that the loss claimed falls within
the scope of cover available under the policy. The FSP maintains that the
Case No: 263648 Determination Page 3 of 11
policy is a defined events contract of insurance which does not cover all
risks.
18. The policy defines home to include the insured’s private place of residence
including domestic structural improvements built or located on the site.
19. Two of the defined events which may be relevant to the circumstances of the
claim are “Storm and Rainwater” and “Bursting, leaking, discharging or
overflowing ” (of fixed pipes used to hold, carry liquid but only if damage is
sudden and unexpected).
20. Further, the policy excludes from cover the cost of repairing or replacing the
pipe which burst, leaked, discharged or overflowed and/or loss from such
events occurring over a period of time.
21. The FSP maintains that although the policy provides cover for damage
arising from the above noted insured events, it excludes from cover damage
arising from mould, wet or dry rot and rising damp or dampness.
22. The FSP notes that the Applicants, through legal proceedings instigated
against the original builders of the insured property, negotiated and accepted
an out of court settlement in respect to the cost to remedy the defects which
allowed water to seep into the home.
23. The FSP requested the Applicants to make available the documentation in
relation to these legal proceedings and subsequent out of court settlement
however the Applicants did n ot comply. Further, if the Applicants’ claim that
they have not received payment from the builders in line with this negotiated
settlement between the parties then they need to seek recourse through the
relevant judicial body.
24. The FSP notes that the Applicants in addition to seeking cover for
rectification costs related to the noted building defects are also seeking
indemnity for costs incurred in re- routing the neighbours’ drainage pipe that
was blocked by tree roots.
25. The FSP notes that on the basis of the available evidence the costs incurred
( and which are not covered) ($80,785.52) by the Applicants in payments
made to the Council relate to works completed to rectify defective buildings
issues, to remedy stormwater runoff from the neighbouring property, re-
routing and unblocking of the neighbours’ drainage system and
compensation to the neighbours for accessing their property.
26. It is clear that the loss arising from the water ingress has been occurring
over an extended period of time spanning several years. Further, the ingress
and costs incurred to prevent the ongoing issue of water ingress are not the
result of an insured event. These repairs are essentially rectification works
and accordingly would be classed as an improvement of the home and
accordingly do not fall within the scope of cover available under the policy.
27. The FSP relies on the following policy provisions:
Case No: 263648 Determination Page 4 of 11
“ What Home means
Home means your house, flat or unit primarily used as a private place of
residence, together with domestic structural improvements built or located on
the site being: …
…
Now exactly what is covered and what is not covered by your insurance?
YES
Storm or Rainwater
NO
We do not cover you for loss or damage caused by water seeping or
otherwise entering your Home due to:
…
Structural defect in your Home
Faulty design of your Home
Faulty work in the construction of your Home
….
Yes
Bursting, Leaking, Discharging or Overflowing
No
We do not cover you for:
…
The cost of repairing or replacing the system, tank, or pipe which
burst, leaked, discharged or overflowed;
Any loss or damage caused by the leaking, discharging or overflowing
of a liquid over a period of time. For example, damage caused by
water leaking from a pipe would be covered only of the damage was
sudden and unexpected.
…
When we will not pay
You are not covered under any section of the policy for loss, damage cost or
liability caused by or arising from or involving the events or causes listed
below:
the actions of trees, plants or their roots;
wear and tear, rust, deterioration or corrosions;
mould, wet or dry rot, rising damp or dampness;
…
How to help us pay you promptly
Following an event that is likely to result in a claim you must:
take all reasonable precautions to prevent further loss, damage, cost
or liability;
Case No: 263648 Determination Page 5 of 11
tell us promptly;
give us the opportunity to inspect any damage before you carry out
repairs or reinstatement. Of course, emergency repairs may be carried
out without our written consent; ”
Issues
28. Whether the FSP is entitled to decline indemnity to the Applicants under the
policy.
29. Whether the Applicant is entitled to seek reimbursement for costs incurred in
the form of rectification costs and compensation payments.
Reasons for Decision
30. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is due to the circumstances of the dispute. This dispute has
not been the subject of a FOS Recommendation and has proceeded directly
to Determination.
31. I am satisfied that a full exchange of information has taken place between
each party and that each party has had the opportunity to address any
issues raised.
32. I have reviewed the submissions of the parties in relation to the terms and
conditions of the policy and will only refer to the relevant submissions and
materials raised.
33. I note the parties do not dispute the following:
The Applicants held an active home building and contents policy with
the FSP for the entire period subject to this dispute.
The policy is a defined events policy and which is subject to the noted
policy limitations provided within the Product Disclosure Statement
(PDS).
The FSP provided and the Applicants received the relevant policy
documentation including the PDS and Certificates of Insurance.
The issues subject to this dispute date back to the year 2000 and for
which a claim was lodged under the policy in April 2011.
During this time the Applicants have incurred significant costs in
authorising extensive rectification work and compensation payments to
their neighbours associated with accessing their property to undertake
repairs.
The Applicants have authorised and undertaken the urgent external
repair and/or rectification work necessary however internal damage
Case No: 263648 Determination Page 6 of 11
within the home remains and which forms part of the claim lodged
under the policy.
The Applicants initiated legal proceedings against the original builders
of their home and which resulted in an out of court settlement whereby
the builders accepted responsibility for the defective work undertaken
at the insured property including a lack of waterproofing of the eastern
wall (area of home in question) that abuts the neighbouring property.
The water incursion ceased to occur once the Council proceeded to
unblock and re-route t he neighbours’ drainage system piping.
The Applicant made an initial payment of $61,000 to the Council which
included $26,000 in rectification works and $35,000 by way of
compensation to the neighbours to access their property in order to
undertake rectification work.
34. I have given careful consideration to the submissions of both the parties and
am satisfied that the main issues that require consideration are:
Whether the Applicants have satisfied the onus to establish the
occurrence of an event covered under the policy.
Whether the FSP is entitled to decline indemnity to the Applicants
arising from the application of the noted policy limitations.
Whether the Applicants are entitled to seek reimbursement for costs
incurred in undertaking the required rectification works arising from the
noted buildings defects and unblocking and re-routing of drainage
system pipes.
35. I note that there has been an exchange of information between the parties
with each party having had the opportunity to comment. Accordingly, in the
interest of brevity and the easy understanding of the parties I will only
reiterate information from the available evidence where found necessary in
providing this Determination.
Insured Event(s)
36. It is an accepted principle of insurance law that the onus rests with an
insured to prove, upon the balance of probabilities, that they have sustained
a loss caused by an event insured for under the policy in force at the date of
loss [Regina Fur Co. Ltd v Bossom (1957) 2 Lloyd’s Rep 466 ].
37. Therefore, under the policy the Applicants must establish, on the balance or
probabilities, that the loss for which they are seeking indemnity is covered
under the policy.
38. I note it is not in dispute between the parties that the damage claimed is due
to the water/moisture seeping into the insured building and ultimately
inundating the storage area of the property. Further, that this water/moisture
incursion occurred only during and/or after periods of rainfalls in the area
arising from surface (stormwater) runoff and the overflowing of the
neighbours’ drainage infrastructure which was discovered to be blocked.
Case No: 263648 Determination Page 7 of 11
39. Accordingly, the introduction of moisture which caused and/or contributed to
the loss can reasonably be accepted to be due to a combination of two of the
insured events covered under the policy i.e . “ Storm and R ainwater” and
“Bursting, leaking, discharging or overflowing”.
40. Therefore, I am satisfied that the Applicants have successfully established a
prima facie claim under the policy. However, in saying that I note that the
Applicants maintained that between 2004-2007 there were 36 separate
occasions of water entering the home and accordingly for the purpose of the
policy this may well be considered 36 separate events.
Policy Limitations/Exclusions
41. Where the claimant satisfies the onus of proof as above, the burden then
shifts to the insurer to establish that the claim falls within an exclusion from
cover [Bond air Services Ltd v Hill (1955) 2 Q.B 417; Legal and General
Assurance Society Ltd v The commonwealth of Australia & Precision Cranes
ad Hoists Pty Ltd (1985) 3 ANZ Insurance cases 60-621]
42. The FSP in maintaining its position that it is not liable to provide indemnity
for the Applicants’ loss and argues that:
The damage claimed is due to building defects arising from defective
workmanship undertaken by the original builders.
The Applicants have been compensated by the builders under an out of
Court settlement agreed to between the parties in respect to the
rectification of the building defects and resultant damage.
The costs incurred and/or claimed by the Applicants are related to
rectification works which are not covered under the policy. Further, the
works undertaken through the Council include the unblocking and re -
routing of the neighbours’ drainage infrastructure which is also not
covered under the policy.
The blocking of the drain which overflowed over this period resulting in
the water flowing towa rds the Applicants’ property was due to tree roots
which fall under the exclusion pertaining to “the actions of trees, plants
or their roots”.
The water ingress occurred over a period of time.
The policy does not provide cover for payments made in compensation
to other parties by the Applicant.
The FSP has been prejudiced arising from the Applicants’ long delay
(many years) in lodging the claim under the policy.
Defective Workmanship
43. I have reviewed the available evidence and am satisfied that it is evident that
the original construction of the insured property (in respect to the area in
question) was defective i.e. insufficient waterproofing. As a result,
stormwater seeped through the Applicants’ wall abutting the neighbours’
property and entered the home causing damage.
Case No: 263648 Determination Page 8 of 11
44. The Applicants’ maintain that th e first occasion of water entering their home
occurred in 2000. Further, that the original builders subsequently completely
repaired and rectified the damage arising from this event. The property did
not suffer any further damage arising from similar circumstances until 2004.
It was after this second event that the Applicants proceeded to seek
indemnity from the builders again and which was eventually finalised by way
of an out of Court settlement between the parties.
45. I note the FSP has provided evidence of and maintains within its submission
to the Service its attempts and requests to the Applicant to make available
details of these legal proceedings and terms of the out of Court settlement.
However the Applicants have elected not to make this information available
for the purpose of the claim and/or dispute between the parties.
46. I am satisfied that the main issue identified in respect to the defect in the
original construction of the home was a lack of waterproofing utilised in the
construction of the wall in question. Further, I am also satisfied that this
defect was not corrected by the Applicants subsequent to the out of Court
settlement with the builders. The evidence establishes the rectification works
relating to the insufficient waterproofing was undertaken by the Council
contractors in addition to unblocking and re-routing of drainage pipes after
which the water incursions ceased.
47. Accordingly, I am satisfied that on the basis of the available evidence the
proximate cause for the damage to the insured property was due to a
building defect i.e. a lack of waterproofing of the wall in question and through
which surface water seeped into the dwelling. The policy excludes from
cover loss or damage arising from:
water seeping into the home due to structural defect, faulty design
and/or faulty work in the construction of the home.
water ingress of a period of time.
Overflowing Pipe
48. I am satisfied that it is not in dispute that a major contributing factor for the
surface water which accumulated in the vicinity of the wall in question and
which entered the insured property was due to an overflowing drainage pipe.
49. I note the Applicants’ mainta in that the cause for the overflowing of the
drainage pipe was that it was blocked by gravel arising from the construction
of the neighbours’ concrete driveway. This position is refuted by the FSP
which maintains that the available evidence establishes tha t the pipe was
blocked by tree roots and accordingly loss arising under such circumstances
is excluded under the policy.
50. I have considered the available evidence and note that the Applicants have
not made available any substantiating evidence to establish that the pipe in
question was blocked by gravel and/or debris from the construction of the
neighbours’ driveway. On the contrary, the evidence from the relevant
Council (letter dated 9 May 2007) establishes that CCTV footage showed
Case No: 263648 Determination Page 9 of 11
that there were tree roots in the house drain connection (drainage pipe in
question).
51. Accordingly, I am satisfied that on the basis of the available information and
in the absence of any evidence to the contrary, that the drain pipe in
question was blocked due to tree roots. Further, the policy clearly excludes
from cover loss or damage arising from the action trees, plants or their roots.
Costs incurred by the Applicants
52. It is not in dispute that the Applicants have incurred significant costs over the
years in respect to the circumstances discussed above. I am satisfied that
the available information confirms that the Applicants made payments to the
Council in the amounts of $61,000 and then $19,785.52.
53. I note that the Applicants refute the FSP’s position that these payments
included costs incurred in rectifying their neighbours’ drainage infrastructure .
However they acknowledge that a sum of $35,000 was paid to the
neighbours as compensation for accessing their property in order to
undertake necessary repairs and rectification works.
54. I have considered the available evidence and am satisfied that the payments
made b y the Applicants’ to the Council consist of:
$35,000 for the neighbours in order to access their property.
$26,000 for rectification works completed.
$19,785.52 for further rectification works in relation to Option 3 selected
by the Applicants.
55. I am satisfied that the available evidence established that the repairs
undertaken as part of the rectification scope of works include:
Investigation into and the unblocking of the drainage infrastructure
servicing the neighbours’ property.
Re-routing of this drain age pipe servicing the neighbours’ property.
Adequate waterproofing of the external wall at the Applicants’ property
in order to rectify the defective construction works undertaken by the
original builders.
56. I am satisfied that the policy limits available cover to the insured property
only. Therefore, costs incurred in the investigation, unblocking and
subsequent re- routing of the neighbours’ drainage pipe is not covered under
the policy. I acknowledge the Applicants’ position that this work was
undertaken by the Council and the costs absorbed by it, however the
available evidence does not support this position. The letters from the
Council (to whom the payments were made) clearly set out that these
rectification works were related to the drainage infrastructure servicing the
neighbours’ property.
Case No: 263648 Determination Page 10 of 11
57. The policy does not provide indemnity for loss or damage arising from faulty
work in the construction of the home. It is not in dispute that the original
construction of the wall in question lacked in adequate waterproofing and
which was rectified as part of the works undertaken by the contractors
appointed by the Council as mediator between the parties. It must also be
noted that costs incurred in rectifying this building defect and related internal
damage would in all reasonableness form part of the out of Court settlement
between the Applicants and the builders.
58. Therefore, I am satisfied that the policy does not provide indemnity for the
costs incurred by the Applicants in respect to the approved rectification
work s undertaken, costs incurred in respect to the neighbours’ and
payments made directly to the neighbours by way of compensation for
entering their property.
Prejudice arising from the delay in reporting the matter to the FSP
59. The FSP maintains that in addition to matters discussed above, it has also
been prejudiced by the Applicants’ significant delay in lodging the claim. It
notes that problems faced by the Applicants began in 2000 with a claim
lodged 11 years later in April 2011.
60. The Applicants’ refute the FSP ’s position and maintain that they contacted
the FSP on numerous occasions and repeatedly advised that they were not
covered as it was matter that would fall under the builders’ warranty. Further,
that in their opinion the FSP is responsible for the extent of loss incurred as
had it investigated the matter when initially contacted by the Applicants, the
matter may have been resolved much earlier.
61. I note there is an absence of evidence made available by both parties in this
regard. The FSP has not addressed this component of the Applicants ’
concerns in its submission to the Service except for raising the argument of
prejudice, which is essentially that it only became aware of the matter in April
2011.Further, although the Applicants’ maintain that they ha d contacted the
FSP on numerous occasion, they have not made available any evidence to
substantiate this claim.
62. I am satisfied that the Applicants went to great lengths in their effort to
address the water incursions damaging their home including the involvement
of the original builders, the builders’ insurer, the relevant Council, their
neighbours and legal proceedings initiated through VCAT. This is
substantiated by reasonable evidence in respect to communication between
the parties noted and recollection of details of these dealings such as dates,
timeframes etc. However there is no such evidence or information of this
nature in respect to contacting the FSP and it would not be unreasonable to
expect that having access the legal advice as claimed, the Applicants would
have over the 11 years taken stronger steps to include their insurer (the
FSP) in the matter.
63. Therefore, I am not satisfied that the Applicants have been able to establish
that the FSP was made aware of or requested to be involved in the issues
Case No: 263648 Determination Page 11 of 11
faced over the significant length of time they were having to deal with all the
above noted issues and/or negotiations.
Determination
64. On the basis of the available information I determine the FSP was entitled to
decline indemnity to the Applicants under the policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.