Denial of flood-related contents claim under flash flood and stormwater run-off cover
Text of the determination
Case No: 263502 Determination Page 1 of 13
Case number: 263502
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
10 October 2012
Background
1 The Applicant insured her home contents in Goodna with the Financial
Services Provider (FSP). The relevant period of insurance operated for
twelve months beginning from 9 November 2010. During this period, the
contents were insured up to a sum of $97,000 with selected personal items
cover up to a sum of $4,300.
2 On 14 January 2011, the Applicant lodged a claim under the policy due to
extensive water inundation following severe weather events in Queensland.
3 The FSP denied the claim on the basis the damage was due to ―flood‖. The
Applicant, through her solicitors, has disputed this.
4 For the sake of simplicity, reference to the Applicant will include her legal
representatives.
5 Both the Applicant and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will summarise these
submissions given all of the material made available has been exchanged
with the other party.
Summary of Applicant’s position
6 The Applicant submits the following as alternative arguments in response to
the FSP‘s decision:
a. The FSP‘s policy failed to clearly inform her that ―flood‖ was exclude d
as required under Section 35 of the Insurance Contracts Act 1984 (the
Act).
b. The FSP breached its duty of utmost good faith by failing to ensure the
policy the Applicant had taken out was suitable to her needs.
c. The damage was due to ―Flash flood and stormwater run- off‖, which is
an insured event. In particular, the inundation was due to heavy rain
that fell from 4.00am on 11 January 2011 which resulted in the
Wivenhoe Dam operators elevating their strategy to W4. This decision
Determination
Case No: 263502 Determination Page 2 of 13
resulted in massive discharges of water into the Brisbane River that
ultimately inundated her property.
7 The Applicant seeks to be indemnified for her claim.
Summary of FSP’s position
8 In response to the Applicant‘s arguments, the FSP submits the following:
The policy structure and layout enables it to rely on the exclusion
clause of ―flood‖ pursuant to Section 35(2) of the Act.
The duty of utmost good faith does not extend to an obligation to
ensure a policy is suitable to the Applicant‘s needs.
9 The FSP relies on a number of hydrology reports authored by SC and the
following policy provisions to deny the Applicant‘s claim:
Page 4 of the Certificate of Insurance (COI)
― What optional covers are included and not included
Contents
...
Flood and storm surge not included...‖
Pages 10-12 of the PDS
― Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off .
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightning, heavy
rain, hail or snow, but not continuous bad weather by
itself.
...‖
Pages 17-18 of the PDS
― Insured events you are covered for
Damage caused by weather...
Case No: 263502 Determination Page 3 of 13
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run - off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...‖
Page 32 of the PDS
― Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater run-off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher, but not exceeding your contents
sum insured.
...
...‖
Issues
10 Whether the Applicant was ―clearly informed‖ about what the policy did and
did not cover.
11 Whether the FSP breached its duty of utmost good faith in allowing the
Applicant to incept this type of policy.
12 Whether the cause of the Applicant‘s loss was covered under the policy.
Reasons for decision
13 Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‘s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
Case No: 263502 Determination Page 4 of 13
14 This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
15 It is appropriate to consider the issues under the various headings.
Clearly informed
16 The Applicant says she does not recall receiving the Product Disclosure
Statement (PDS) at policy inception, stating that it was not received prior to
the first premium payment.
17 This issue would only be relevant in the event a claim had occurred in t he
period of alleged non-provision of the PDS — this claim falls well outside that
potentially disputed time and is therefore of no consequence. It is not in
dispute that the Applicant subsequently received a PDS and an annual COI
from the FSP, being the documents provided by the FSP.
18 The Applicant contends that the definition of flood is too broad, too difficult to
comprehend and that the FSP has not met its obligations under Section 35
of the Act to ―clearly inform‖ her of what is and is not covered unde r the
policy.
19 The Panel has previously considered this issue for the FSP‘s policy. It is
satisfied that the two events (―flood‖ and ―flash flood and stormwater run - off‖)
can be distinguished.
20 The Applicant has raised issue with the placing of definitions throughout the
policy and the difficulty a ‗reasonable person‘ would have in evaluating it.
The Panel is satisfied that the PDS should be read in its entirety and that
(should this be done) the interpretation of same should not be difficult for a
―reasonable person‖.
21 The PDS has an index on the inside cover which highlights the areas of the
policy in which the policyholder might find information. Included in this is
―Words/terms with special meanings‖ on page 9, for which definitions of
relevant terms in the policy are provided. Flood is included in this, together
with the qualification that:
―... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance. ‖
22 In addition to this, page 53 directs the reader to ―Flood and storm surge‖,
which is explained under the broader definition of ―Optional covers for extra
peace of mind‖. This section explains that:
―... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance.‖
23 The Panel is satisfied that no cover was optioned by the Applicant for ―Flood
and storm surge‖ and therefore she was not covered for it under the policy.
Case No: 263502 Determination Page 5 of 13
24 Accordingly, the Panel is satisfied that the FSP has satisfactorily defined the
events in the policy as required under Section 35 of the Act and that it is
entitled to rely upon same in determining whether the policy responds to the
Applicant‘s loss.
Utmost Good Faith
25 The Applicant has alleged the FSP breached its duty of utmost good faith by
failing to ensure the policy provided adequate coverage or was suitable to
her needs.
26 The Panel considers the Applicant‘s arguments regarding the duty of utmost
good faith are misconceived. There is no legal principle that supports the
Applicant‘s argument that an insurer‘s duty of utmost good faith extends to
enquiring and ensuring its policy is appropriate to the insured‘s needs. Such
a duty is generally associated with insurance brokers or other authorised
parties where case law makes it clear these professionals have a d uty to
ensure the policy they procure is suitable to their client‘s needs.
27 Further the FSP‘s policy:
Is a standard home contents insurance policy that appears to be
available to the general public as opposed to being tailored to the
Applicant‘s needs, and
Had a 21 day cooling off period which provided the Applicant ample
opportunity to review the contract and obtain advice on it to ensure it
was suitable to her needs.
28 Given this, the Panel does not accept the FSP breached its duty of utmost
good faith with respect to offering its standard home insurance policy to the
Applicant.
Water Inundation
The Evidence
29 The Panel accepts that the FSP‘s policy does not extend cover to
circumstances where a loss is caused by a flood. The policy also
distinguishes between flood, flash flood and stormwater run-off (the latter
two of which are covered). Flash flood extends cover to damage from
sudden flood events ―caused by heavy rain that fell no more than 24 hours
prior‖ to the flash flood.
30 It rained heavily on the morning of Tuesday 11 January 2011 and heeding
the flood warnings that were being issued, the Applicant commenced
sandbagging her home and moving portable items to the homes of family
and friends. Progressively throughout the day, the trips to and from her
home were becoming more protracted as roads were cut off by flooding.
Case No: 263502 Determination Page 6 of 13
31 Alongside the Applicant‘s townhouse complex there is a gully which is
normally dry but was raging early in the afternoon of 11 January 2011.
32 When she finally left her home at 5.00pm she couldn‘t see any water in the
street or the yard and there was no water at the boundary fence which
adjoins the footpath that runs along the gully.
33 Neighbours advised that clear water began entering the townhouse complex
at approximately 7.00pm and quickly covered homes on the lower side of the
complex. By 7.30pm, the water reached the floor level of homes on the
higher side of the complex and by 9.00pm, water was chest deep throughout
the complex.
34 The Applicant believes that her townhouse was inundated with water
primarily because the adjacent gully backed up at several points on its
course to Woogaroo Creek.
35 After the lodgement of the claim, the FSP appointed a loss adjuster (MY) to
investigate and report on the damage caused to the Applicant ‘ s property.
Amongst the factual information, MY suggested that water first entered the
property late in the evening of 11 January 2011. The report estimated that
there was about $50,000 of contents damage.
36 After obtaining hydrology reports about the inundation of properties in the
Ipswich region, the FSP denied the Applicant‘s claim on the basis that the
damage was caused by flood.
37 As a result of the Applicant disputing the FSP‘s decision, the FSP engaged
hydrologist ―SC‖ to provide a detailed report as to the cause of the damage.
38 SC provided a statement dated 19 December 2011 in which he attests to the
cause of the loss in the region surrounding and specifically affecting the
Applicant‘s home. He found that:
a substantial amount of rain fell in the greater Brisbane area from 9
January 2011 and over the subsequent two days, which caused
significant inflows into the Wivenhoe Dam, which peaked on the evening
of 11 January 2011;
rain also fell in the area of the Bremer River from 6.00am on 11 January
2011. This rain travelled along the Bremer River to the junction of the
Brisbane River and ultimately contributed about 15-25% of its peak flow;
a ―small proportion‖ of the overall depth of the Brisbane River ―may be
partially attributable to the rain that fell in the Bremer River catchment on
11 January 2011‖, although the ―overwhelming influence‖ was the rain
that had fallen in the previous days.
the terrain data for the Applicant‘s home suggested that it was unlikely
that the Applicant would have experienced significant stormwater or run-
off problems during the period;
Case No: 263502 Determination Page 7 of 13
inundation from stormwater run- off requires ―intense levels of rain‖ which
is sufficient to overcome the stormwater drainage system. Any such run-
off generally occurs during or very shortly after such an intense period of
rainfall;
a review of the rainwater gauge at Wacol, approximately 3.7km from the
Applicant‘s property and according to SC , representative of its rainfall,
revealed that 86mm of rain fell over 9 and 10 January 2011, with a further
56mm falling on 11 January 2011. The most intense rainfall on 11
January 2011 fell between 10.00am and 11.00am, during which time
22mm of rain was recorded;
the overall intensity of the rainfall was very low and unlikely to result in
run-off or stormwater inundation to the property;
according to SC, the water level of the Brisbane River at the mouth of
Woogaroo Creek was indicative of water level at the Applicant‘s property
and at 5.00pm on 11 January 2011, was not of a sufficient height to
inundate the Applicant‘s home;
at 9.00pm on 11 January 2011, the Brisbane River water level in the
vicinity of the Applicant‘s home was approximately 12m AHD, sufficient to
inundate the western side of the Applicant‘s townhouse comp lex to
approximately 1 metre.
the Brisbane River water level peaked in the vicinity of the Applicant‘s
home at about 4.00pm on 12 January 2011, although this estimate is not
consistent with the Applicant‘s belief that the water peaked at 11 .00pm
on 11 January 2011.
the Applicant‘s property was inundated by bac kflow from the Brisbane
River up Woogaroo Creek and into the drainage channel (gully) which
runs alongside the townhouse complex. It was not stormwater run-off or
flash flooding (as defined in the policy).
39 Since the matter has been referred to the Service, the Applicant has
suggested that the releases of water from the Wivenhoe Dam on 11 January
2011 were a significant factor in the increased water levels in the Brisbane
River and that this was a major influence in the inundation of the Applicant‘s
home. This is largely now agreed by the parties, although the dispute
centres on whether such an event is covered under the policy.
Releases from Wivenhoe Dam & Proximate Cause
40 The Panel accepts that the policy excludes cover for damage caused by
flood. However, the policy does provide cover for a particular type of flood,
being ―Flash flood‖. The central issue for Determination in this dispute is
whether the inundation of the Applicant ‘ s home on 11 January 2011 was due
to flash flood as defined within the terms of the policy, that is, whether rain
Case No: 263502 Determination Page 8 of 13
that fell no more than 24 hours prior to the inundation of the Applicant‘s
property was the proximate cause of the inundation.
41 In order for the Applicant ‘ s to be entitled to this limited cover, the following
elements must be established:
there was a sudden flood;
there was a heavy rain that occurred within 24 hours prior to that flood;
the sudden flood was caused by that heavy rain.
42 The Panel suspended issuing Determinations relating to this question after
the Queensland Flood Commission of Inquiry had been recalled to hear
further evidence from the Wivenhoe Dam operating engineers. Once the
final report was released, all relevant stakeholders were invited to put further
submissions to the Panel relating to the impact of the heavy rainfall that
commenced falling over the Wivenhoe Dam around 4.00am on 11 January
2011 and in particular the impact this had on the decision to adopt the W4
release strategy.
43 On 21 May 2012 FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
44 At that time, the Panel noted that in relation to the approach taken in each
dispute would depend upon the individual and unique factors relevant to the
dispute and in that regard the parties were invited to make further
submissions in relation to disputes before FOS.
45 In view of this, the FSP provided detailed further submissions to FOS o n 19
June 2012 in relation to this dispute. Included with the submissions were the
following documents:
A Reference document for disputes relating to Queensland Floods (this
is a general reference document) relating to the various submissions
the FSP makes in relation to a number of issues. Not all issues raised
in the reference document appear in the current dispute. The reference
document has been updated.
Letter from the FSP‘s hydrologist attaching a key information sheet for
the Applicant ‘ s property;
H ydrologist report ―Investigations of January 2011 inundation event –
Brisbane‖ dated March 2011;
Statement from hydrologist dated 7 June 2012.
Case No: 263502 Determination Page 9 of 13
46 The Panel has reviewed the reference documents. Insofar as the reference
documents relate to the current issues in dispute, those matters have been
considered.
47 In summary, the FSP argues that the proximate cause of the inundation of
the properties, that is, the real or effective cause of the damage caused to
the properties downstream of the dam, is not simply the rain that occurred
from 4.00am on 11 January 2011. The FSP maintains that on any
reasonable view, the damage sustained to the downstream properties was
the combined effect of all of the rainfall and not just the rain that had fallen
from 4.00am on 11 January 2011 leading to the implementation of the W4
strategy from 8.00am that day.
48 There is no dispute that heavy rain fell over the Wivenhoe Dam catchment
area and in fact parts of the Brisbane River from approximately 4.00am on
11 January 2011. It is not disputed that in addition to this there was heavy
rain over the Bremer River which influenced the level of the Brisbane River
and that rain commenced at approximately 6.00am on 11 January 2011.
49 The FSP‘s hydrologist has relied on data from SEQWater dated 2 March
2011 which confirms the rapid increase in releases from the Wivenhoe Dam
from 8.00am on 11 January 2011. Examination of the SEQWater report
identifies the rapid increase in the inflows to the Wivenhoe Dam
commencing from about 4.00am, 11 January 2011. The report confirms the
inflows into the dam had been decreasing from as early as 8.00am from 10
January 2011 with steady decreases from approximately 3.00pm on 10
January 2011 to 2.00am on 11 January 2011.
50 The Queensland Flood Commission of Inquiry report confirms that prior to
4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011
the dam releases were being managed at the W3 strategy. Whilst it is
accepted that the W3 strategy had led to an increase in the levels of the
Brisbane River, the W3 strategy was designed to avoid where possible
inundation of the properties below the Wivenhoe Dam by flooding from the
Brisbane River.
51 There is no dispute that there were two significant rainfall spikes with rain
that fell from 9 to 10 January 2011 being considered the first spike and rain
that commenced falling from approximately 4.00am on 11 January 2011
being the second spike.
52 There is no dispute that following the second spike the W4 strategy was
adopted. The FSP has argued that the switch to strategy W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
W4 strategy was not taken in accordance with the Wivenhoe Dam manual.
In the Panel‘s view, the Queensland Flood Commission of Inquiry final report
does not find the adoption of W4 strategy at 8.00am on 11 January 2011
was inconsistent with the manual. Although there may be issues as to how
the Wivenhoe Dam had been managed prior to this time, there is nothing in
the material that has been provided to the Pane l to suggest that the earlier
Case No: 263502 Determination Page 10 of 13
management of the Wivenhoe Dam influenced to any significant degree, the
adoption of the W4 release strategy at 8.00am on 11 January 2011.
53 The Insurance Council of Australia (ICA) hydrology reports and the
information provided by the FSP‘s hydrologist confirms that the increased
releases from the Wivenhoe Dam after the adoption of the W4 strategy led to
the development of a flood wave that ultimately caused the flooding of many
properties downstream of the Wivenhoe Dam.
54 The question arises as to what was the proximate cause of this inundation.
In determining the proximate cause of the inundation it is necessary to look
at the effective or dominant cause of the inundation. The Panel agrees with
the FSP‘s general submission that t he proximate cause is a cause
determined by common sense evaluation of the relevant facts. In the event
that there are two or more proximate causes, one within the policy and the
other excluded, the policy does not respond. The proximate cause is not
determined by identifying the last event or final trigger but by determining
what is the dominant, effective, direct or efficient cause of the loss.
55 The FSP has maintained that the impact on the Wivenhoe Dam from the
rainfall that fell in the early hours of 11 January 2011 was only 29% while
71% of the volume of the inflow came from the rain that fell on 9 and 10
January 2011 or earlier. The FSP maintains that to find the rainfall which had
fallen from 4.00am on 11 January 2011 is the proximate cause is without
foundation as such an approach produces an entirely artificial outcome.
56 The Panel disagrees. Whilst the Panel accepts there has been a significant
impact on the levels of the Wivenhoe Dam by the rainfall that commenced
falling on or about 9 January 2011 or earlier, the Panel is satisfied having
regard to the information that has been exchanged and the relevant legal
principles, that the heavy rain that commenced falling on or about 4.00am on
11 January 2011 was the proximate or effective cause of the adoption of the
W4 strategy.
57 The Panel is also satisfied that whilst the level of the Brisbane River may
have been increasing under the W3 strategy, it was the heavy rainfall from
approximately 4.00am on 11 January 2011 that caused the need to adopt
the W4 strategy at 8.00am on the same day.
The Applicant’s Inundation
58 SC‘s Key Conclusions statement indicates the effect of the W4 releases first
reached the vicinity of the Applicant‘s property at 12.50pm on 11 January
2011. He estimated that the property was first inundated at benchmark level
by the Brisbane River at 8.57pm on 11 January 2011 and by 4.00am on 12
January 2011, the property was inundated up to 2.7m above the relevant
benchmark level.
59 The relevant benchmark level was SC‘s estimate of the lowest point of the
structure of the house on the land, which in the Applicant‘s case is the floor
slab. This evidence has not been refuted by the Applicant in any manner.
Case No: 263502 Determination Page 11 of 13
60 The Panel notes that the ultimate inundation of the property was 4.8m above
the benchmark level. SC identified this peak inundation occurred at
approximately 4.56pm on 12 January 2011.
61 The Panel accepts the possibility that these assessments may not be
entirely accurate.
62 The FSP ‘s hydrologist has speculated that if the W3 strategy had been
maintain ed, then, according to the key conclusion statement, the Applicant‘s
property would still have been inundated by approximately 10.44pm on 11
January 2011 and by 4.00am on 12 January 2011 would have been
inundated to a level of 1.1 metres above the benchmark level.
63 The Panel is concerned, however, that to reach such a conclusion it must be
speculated that the releases from the dam would have continued at the
same rate at the W3 level in the absence of any additional rainfall. The
report does not address the possibility of the inflow into the Wivenhoe Dam
decreasing.
64 The available information indicates the W3 strategy that was in place prior to
8.00am on 11 January 2011 had been successful in limiting the outflows and
flooding below the Wivenhoe Dam. Whether the outflows would have
continued at the same rate had the inflows continued to reduce, is not
known.
65 Instead, the Panel is satisfied that on the facts of what actually occurred on
11 January 2011, it was the heavy rainfall from approximately 4.00am on 11
January 2011 that caused the need to adopt the W4 strategy at 8.00am on
the same day. This led to the inundation of the Applicant‘s property.
66 To this extent, the Panel is satisfied that the inundation of the Applicant‘s
property to the level of 2.7 metres above benchmark was caused by flood
that occurred within 24 hours of the heavy rainfall.
Quantum
67 The Renewal COI for the relevant period provides a sum insured of $97,000
for contents in the home with a further $4,300 accidental damage cover for
selected personal items. Pursuant to the policy cap for the insured event of
―Flash flood and stormwater runoff‖, the FSP is liable up to an amount of
$48,500 for the damage to the contents in the home. The FSP is also liable
up to the amounts listed on the COI fo r the Applicant‘s selected personal
items.
68 Although the Applicant has stated that she removed some portable items to
the homes of friends and family, the Panel accepts that the extent of the
inundation would have resulted in the complete loss of the Applic ant‘s
contents items which remained in the home.
69 In the Panel‘s view, it is reasonable for the FSP to indemnify the Applicant
for:
Case No: 263502 Determination Page 12 of 13
$48,500, being 50% of the contents sum insured for contents in the
home; and
subject to the Applicant providing proof of loss of or damage to any of
the selected personal items listed on the COI, up to amounts specified
on the COI for those items.
70 The Panel notes that the FSP has paid the Applicant $2,500 from its
compassionate fund. FOS does not have jurisdiction to deal with this
payment but acknowledges that the FSP, given the terms on which the
compassionate payment was made, may be entitled to deduct this payment
from any settlement sum.
71 The Panel has also considered the issue of interest.
72 The FSP has argued that interest is only payable from the date from which it
was unreasonable to withhold payment. The FSP maintains that it is entitled
to a reasonable period to investigate and determine its position, and given
the complex nature of the flood disputes, the delays are not unreasonable.
Further complex situations require substantial periods of time for
independent bodies such as the Queensland Flood Commission of Inquiry
and FOS, to make conclusions on the issues in dispute.
73 The FSP maintains that it did not act unreasonably in this dispute and
therefore interest is not payable. Alternatively if some period of interest is to
be awarded it should be reduced to account for the substantial delays
through the course of the process which were not the FSP‘s fault.
74 Section 57 of the Insurance Contracts Act requires interest be paid when it
becomes ―unreasonable for the insurer to have withheld payment‖. An
examination of relevant case law indicates that most probably, interest will
be awarded from either when an insurer first emphatically denied liability or
disputed a matter, or from when in the normal course of events the claim
should have been paid if liability had not been disputed.
75 In this dispute the Panel accepts that the FSP was entitled to withhold
payment of the settlement monies until such time as it had properly
investigated the dispute and made its decision as to liability.
76 The FSP made its original decision to deny the claim after receiving relevant
assessment reports, hydrology reports and other information. The FSP was
aware of the terms of its policy and aware of the relevant provisions under
which liability might arise and chose to deny the claim having reviewed those
relevant provisions and the evidence available to it.
77 In the Panel‘s view, at that point the FSP has made its decision on the claim
and it is appropriate that from that time interest be paid unless it can be
established that the Applicant had withheld information from the FSP that
would have led to an alteration of its decision.
Case No: 263502 Determination Page 13 of 13
78 Accordingly, the Panel determines that it is appropriate that the FSP in this
dispute pay interest from the day upon which the FSP determined to deny
liability of the Applicant‘s claim, until payment of the claim.
Determination
79 The FSP is to meet the cost of the replacement of items damaged as a result
of the inundation of the property. Any payment is subject to the limitations
expressed in paragraph 69 of this Determination.
80 Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from
12 April 2011 (being the date of rejection of the claim) to date of payment of
the claim, in accordance with Section 57 of the Act.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.