Home / Financial Firm (Unknown - Insurer) / Determination 263140
Determination 263140
Flood exclusion relied on to decline contents damage after Oxley inundation
Summary
The applicant's Oxley home was inundated in January 2011 and the FSP declined the contents claim under its flood exclusion. AFCA accepted that stormwater run-off damaged goods stored at ground level in the garage, so the FSP must meet that loss up to 100mm, with the quantum to be agreed, and the rest of the flood loss was excluded.
The policy wording clearly excluded flood, but stormwater run-off that reached the garage before the flood was covered.
Issues
- Claim denial primary · upheld
“the FSP is liable to meet the loss sustained by the Applicant as a result of the inundation of the garage to a level of 100mm as a result of stormwater run-off”
- Inadequate claim investigation secondary · upheld
“It would appear that the FSP has failed to recognise this at that time”
- Failure to disclose secondary · not upheld
“The Panel concludes the wording is not such that it would fail the requirements under Section 35 of the Act”
Subjects and remedies
natural disasterpay claimreassess claim
Text of the determination
Case No: 263140 Determination Page 1 of 10
Case number: 263140
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
27 April 2012
Background
1. The Applicant holds a Home Contents Insurance Policy with the Financial
Services Provider (FSP). The policy was first incepted on 8 October 2003.
The policy covers the contents up to $42,000 for listed events.
2. On 12 January 2011 the Applicant‟s home in Oxley Queensland was
damaged by water inundation.
3. The FSP declined the claim on the basis that the inundation arose from flood
which is excluded from cover under its policy terms and conditions.
4. The Applicant disputes the declinature on the basis the dominant cause of
loss was stormwater run-off which is covered. Further, the Applicant alleges
she did not receive the Product Disclosure Statement (PDS) and the policy
wording is not clear, concise and effective.
5. The Applicant was assisted in this dispute by a legal aid service; for ease of
reference, hereinafter any reference to the Applicant will be taken to include
both herself and her legal representative.
Summary of Applicant’s position
6. The Applicant relies on Sections 13 and 35 of the Insurance Contracts Act
(1984) “the Act”. The Panel has summarised these Sections as follows:
Section 13 of the Insurance Contracts Act 1984 provides that a contract
of insurance is a contract based on the utmost good faith, and there is
implied in each contract, a provision requiring each party to act towards
the other party, in respect of any matter arising under or in relation to it,
with the utmost good faith.
Section 35 of the Act provides that, where a claim is made under a
prescribed contract and the event giving rise to the claim is a
prescribed event in relation to the contract, an insurer may not refuse to
pay an amount equal to the minimum amount of cover set out in the
regulations made pursuant to the Act unless it can prove that before the
contract was entered into, the insurer clearly informed the insured in
Determination
Case No: 263140 Determination Page 2 of 10
writing of the relevant provisions of the contract, or that the insured
knew or a reasonable person in the circumstances could be expected
to have known of such provision.
7. The Applicant provided a Statutory Declaration declared on 12 January 2012
from which the Panel notes the following:
On 11 January 2011 the Applicant commenced walking to her local
railway station to go to work but she saw water spilling onto Oxley
Road.
The Applicant returned home and packed a suitcase prior to travelling
to her son‟s house in Chelmer.
The Applicant does not know how the water entered the property. A
neighbour informed her that the council had been trying to clear the
storm water drain to unblock it on 10 January 2011. Further, that water
had been coming through the storm water drain.
8. The Applicant provided a statement from her neighbour “K” from which the
Panel notes the following:
At approximately 10.30am on 11 January 2011 K witnessed water
rising at a moderate to fast rate from the storm water drains directly
outside the Applicant‟s residence. At this stage the creek had not
broken its banks.
At approximately 5.30am on 12 January 2011 K returned and observed
the water level had risen to the window sills throughout her property.
On 16 January 2011 K was able to access the property but noted this
was long after riverine flooding had receded.
9. The Applicant states that she was unaware Oxley was in a flood zone when
she moved there.
10. The Applicant held the policy of insurance for 8-10 years but did not at first
realise she held the policy with the FSP as she obtained the insurance as a
member of an organisation.
11. The Applicant submits the FSP breached its duty of utmost good faith by
failing to inform her of the unsuitability of the policy for an area close to a
watercourse.
12. The Applicant did not receive the Product Disclosure Statement (PDS) dated
September 2009 on which the FSP relies. Accordingly, the Applicant submits
that the FSP has breached the requirement outlined under Section 35 of the
Act.
13. The Applicant contends the definitions of flood, rainwater and run-off and the
placement of the terms in the PDS is capable of creating confusion about
what damage is covered or excluded. This breaches Section 35 of the Act
and the Corporations Act 2001 as the policy does not constitute „clear,
concise and effective‟ disclosure.
Case No: 263140 Determination Page 3 of 10
14. The FSP‟s previous schedules did not confirm that flo od was not covered.
15. Accordingly the Applicant contends that the FSP should not be entitled to
rely on the exclusion and should cover the claim.
16. The Applicant maintains that she had only recently moved to the property in
Oxley. A lot of her contents had been in storage and were in fact still in the
garage at the property, the Applicant not having had the opportunity of
unpacking them since moving them from storage.
17. The Applicant maintains that the damage occurred to these contents before
the combined flood – stormwater run-off impacted on the property.
18. Alternatively, the Applicant submits that the water inundation was caused by
storm and/or rainwater run-off. The Applicant notes there was heavy rainfall
over South-East Queensland on Monday 10 January 2011 and Tuesday 11
January 2011.
19. As a consequence stormwater run- off inundated the Applicant‟s property. As
this event is covered by the policy the FSP should make payment to the
Applicant for her damaged contents.
20. The Applicant maintains that she had only recently moved to the property in
Oxley. A lot of her contents had been in storage and were in fact still in the
garage at the property, the Applicant not having had the opportunity of
unpacking them since moving them from storage.
21. The Applicant maintains that the damage occurred to these contents before
the combined flood – stormwater run-off impacted on the property.
22. Alternatively the Applicant is entitled to payment under the defined event of
„bursting, leaking, discharging or overflowing from a fixed pipe‟. The
Applicant contends that the stormwater drain is a fixed pipe which takes
stormwater, rainwater or run- off away from the Applicant‟s residence. The
evidence from K indicates that the water was overflowing from the
stormwater drains which affected properties in the area. As this is an insured
event the Applicant is entitled to payment from the FSP.
Summary of FSP’s position
23. The FSP relies on the following additional Sections from the Act:
Section 69 provides that Section 22 will be deemed to have been
complied with if it is not reasonably practicable to give the information
in writing before the contract is entered into but it is reasonably
practical to give the information orally. If the insurer gives the
information orally, the insurer is deemed to have complied with Section
22 if the information is given in writing within 14 days after the contract
of insurance (including an interim contract) has been entered into.
Provided the oral information is confirmed in writing within 14 days,
Case No: 263140 Determination Page 4 of 10
compliance with Section 22 will be established. Where a loss occurs
after the contract was entered into but before written confirmation of the
duty of disclosure has been provided, the insurer will only be able to
avail itself of the remedies set out in Section 28, if it can prove that the
information was given orally.
Section 77 of the Act provides that a notice or other document that is by
the Act required or permitted to be given, may be given to a body
corporate in any way in which documents may be served on that body
corporate, and to a natural person, personally or by post to that person
at his last known address.
24. The FSP relies on the assessor report from C from which the Panel notes
the following:
The insured residence has become flooded with water when the river
broke its banks approximately 1km away.
Water has reached the ceiling height from ground level (about 4m)
during the flood.
25. The FSP relies on a hydrologist report from hydrologist “W”. The Panel notes
the following information was provided:
The property was inundated to a depth of approximately 3.2m above
floor level. The floor level of the house is about 0.9m higher than the
surrounding ground level.
The peak rainfall recorded (from a gauge 1.6kms from the property)
indicates a peak 1 hour rainfall of 14.8mm at 11am on 11 January
2011. The rainfall was not severe for the duration and higher peak
rainfall intensities are regularly experienced in Brisbane.
Oxley Creek is approximately 0.43km to the east of the insured
property.
Ground contours in the vicinity of the p roperty indicate that the ground
level adjacent to the house is approximately 5.1mAHD. The house is
0.9m above ground level which indicates the floor level of the house on
the subject property is approximately 6mAHD.
Based on the observed depth of inundation and the estimated floor
level of the house, it is likely the subject property was inundated above
floor level at approximately 2.30am on 12 January 2011.
The water which came from the drains was floodwater from Oxley
Creek flowing back up the underground stormwater drainage network.
The subject property is within the extent of backwater flooding from the
Brisbane River.
The Applicant‟s version of events is inconsistent with the known data.
The Applicant states she turned away from the railway station due to
her knowledge of the Grantham and Toowoomba flooding. However,
these areas were not flooded until Monday afternoon/evening.
Case No: 263140 Determination Page 5 of 10
The eyewitness accounts from residents in the immediate vicinity of the
subject property confirm the houses in Oxley received i nundation late
on Tuesday 11 January 2011 and early Wednesday 12 January 2011.
This is consistent with the rising water levels in Oxley Creek.
Given the low intensity rainfall recorded at the subject property and the
fact that the flood level of the house is 0.9m above the surrounding
ground level, the subject property could not have been inundated by
storm water run-off.
Inundation of approximately 3.2m above floor level was caused by
floodwaters backing up from the Brisbane River along Oxley Creek.
26. The FSP relies on a Floodwise Property Report from which the Panel notes
the following:
The minimum ground level is 4.8m and the maximum height was 6m.
The interim residential flood level was 9.2m and the source of same
was the river.
The minimum habitable flood level was 9.7m.
27. The FSP relies on a number of letters and data reports to evidence the PDS
documentation was sent to the Applicant. The documents appear to indicate
the following:
The renewal date for the relevant period of insurance was 8 October
2010. The document refers to the PDS but does not enclose one. The
letter confirms if the Applicant required another copy of the PDS to
notify it of same.
The mail outs of policy schedules or PDS documents is backdated to
2005 and indicates that there has been no returned mail which matches
the Applicant‟s policy.
The mail out schedule suggests that in 2005 and 2006 a policy booklet
was enclosed with the schedule and letter to the insured.
The policy schedules outline details of the home insurance cover which
includes the statement “Please note: Flood is not covered by this
policy” . The statement appears in the earliest schedule for a renewal
due on 8 October 2005.
The Panel notes the data is provided without an explanatory statement from
an appropriately qualified employee to put the data into context.
28. The FSP relies on a letter from the Applicant dated 29 March 2011 and one
date stamped 20 April 2011 from which the Panel notes the following:
The Applicant accepted it was her responsibility to ensure wherever
she lived was suitably insured.
The policy was originally obtained over the telephone and it was not
disclosed that flood was excluded. The Applicant received the policy a
number of days later and realised the FSP was the insurer.
Case No: 263140 Determination Page 6 of 10
29. The FSP states that the PDS wording is clear and confirms on multiple
pages that flood is not covered. The FSP submits that a copy of the PDS
was sent at inception in 2005 and at renewal when the PDS was altered.
This together with the fact the policy schedule states flood is not covered,
meets the requirements of Section 35 of the Act.
30. The onus is on the Applicant to determine whether the policy was suitable for
her needs. The PDS and schedule both encourage the Applicant to ensure
this is the case.
31. The FSP contends that the material submitted confirms that it discharged its
obligations under Sections 69 and 77 of the Act.
32. The FSP notes the Applicant has acknowledged that she received the
relevant policy documents a couple of days later and that she failed to
ensure the policy met her requirements.
33. The hydrological evidence demonstrates the damage to the insured property
arose from flood. W‟s report rules out stormwater run -off as the source of
inundation.
34. The re is no available cover under the event of „bursting, leaking, discharging
or overflowing of fixed pipes‟ as the floodwaters backflowed to inundate the
property.
Issues
35. Whether the FSP is entitled to rely on the policy terms and conditions .
36. Whether the FSP was entitled to decline the claim.
Reasons for decision
37. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
38. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
39. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment.
40. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
Case No: 263140 Determination Page 7 of 10
41. The Panel notes there are two discrete issues to be considered and will deal
with each issue separately.
Whether the FSP is entitled to rely on the policy terms and conditions
42. The Applicant has disputed receiving the PDS relied on by the FSP (being
the PDS dated September 2009). The data provided by the FSP indicates
documentation was sent to the Applicant but the codes involved do not
explain what documentation was sent to the Applicant.
43. The Applicant‟s letter date stamped 20 April 2011 suggests she did in fact
receive the original policy document.
44. The Applicant does not appear to dispute receipt of the renewal notices and
the data schedule and letter copies do demonstrate this document was sent.
The Panel accepts that at a minimum the Applicant has received the renewal
notices.
45. The Panel notes that Section 35 allows the FSP to rely on the exclusion if
the FSP has informed the insured of the terms and conditions or a
reason able person in the Applicant‟s position would have been expected to
be aware of same.
46. Based on the evidence before it the Panel accepts the FSP forwarded the
original PDS document to the Applicant in accordance with the Act.
47. The Applicant has claimed the structure of the PDS and the definitions of
flood, rainwater and run-off are unclear. The FSP disputes same. Both
parties have relied on the common law case of Marsh v CGU Insurance Ltd
[2004] NTCA1.
48. In the Marsh case the Court held that whether the policy wording in fact
"clearly informed" the insured that there was no cover for flood is a question
of fact to be determined by an examination of the document in question. It
was not considered necessary for the relevant exclusion to be prominently
displayed in bold capitals over the front cover in order for the insurer to
succeed on this question.
49. Accordingly, the case law supports that in most cases the provision of the
policy document is sufficient to discharge an insurer‟s onus under Section 35
of the Act. The document however must readily answer whether an event
such as flood is covered, when read by a person of average intelligence and
education.
50. The Panel considers that the policy does provide information in the definition
of flood as to what flood is and what flood is not. The policy wording is not
particularly lengthy and is written in plain English.
51. The Panel further notes that the exclusion is mentioned multiple times
throughout the document which should increase the likelihood a consumer
Case No: 263140 Determination Page 8 of 10
would be aware of same. Further, the PDS confirms that the mingling of
flood and rainwater will not be covered; this reflects court decisions.
52. The Panel concludes the wording is not such that it would fail the
requirements under Section 35 of the Act or the clear, concise and effective
disclosure obligation mandated under the Corporations Act 2001.
53. The Panel does not accept the FSP has breached its duty of utmost good
faith under the Act by failing to inform the Applicant whether the policy was
suitable for her needs. This is because the FSP‟s licensing only allows it to
provide general advice regarding its policy and it would be improper for it to
provide specific personal advice without appropriate licensing. It is also
noted the FSP is aware it was her responsibility to ensure the policy met her
needs.
Whether the FSP was entitled to decline the claim
54. The Applicant has sought cover under two Sections of the policy, the first
being the event of storm and the second the event of discharging water from
a pipe et al.
Declinature of cover under storm
55. The only site specific expert evidence the Panel has in relation to this claim
is from the hydrologist W.
56. W has clearly indicated that the rainwater run-off could not have inundated
the house due to the low intensity of rainfall recorded. Further, W concluded
that the inundation of approximately 3.2m above floor level was caused by
floodwaters backing up from the Brisbane River along Oxley Creek.
57. The Panel accepts the evidence of the hydrologist and that the rainfall was
insufficient to cause inundation of the residence given that the residence was
approximately 0.9 of a metre above ground level. The Panel accepts that the
most likely cause of inundation of the residence was water backing from the
Brisbane River and from Oxley Creek.
58. A site inspection was conducted of the property by the Panel Chair
Ombudsman on 18 April 2012. Present were the Applicant and the FSP‟s
hydrologist. Whilst it is apparent given the height of the property that it is
unlikely it was inundated by stormwater run-off, the garage where the
Applicant had stored significant number of her contents is at ground level.
The garage is built on a concrete slab. The concrete slab is at ground level
at the back and slightly elevated at the front. This is to cater for the slope in
the property which runs from the backyard down towards the front of the
property. The properties behind the Applicant‟s property are elevated as is
the road behind the Applicant‟s property. In discussions with the FSP‟s
hydrologist, it was agreed that it is possible that stormwater run-off would
flow through the property from the properties at the back and in doing so,
would flow through the garage on its way to the front of the Applicant‟s
Case No: 263140 Determination Page 9 of 10
property and ultimately into the stormwater drains or as no doubt occurred in
the Applicant‟s case the water that was overflowing from the Brisbane River.
59. The Panel Chair Ombudsman queried with the hydrologist why this had not
been addressed in the original hydrology report. The hydrologist advised that
this was not something that they were asked to deal with. I note that the
issue of the property being stored in the garage was raised with the FSP by
correspondence on 12 August 2011. It would appear that the FSP has failed
to recognise this at that time.
60. In any event, the hydrologist has been able to now address this in
discussions with the Panel Chair Ombudsman, and the Panel is satisfied that
it is likely that stormwater run-off consistent with the terms of the policy has
inundated the garage flowing through the garage prior to the inundation of
the main residence of the property by flood waters. In this regard, the Panel
is satisfied that the Applicant has suffered damage to the items stored in the
garage although given the information that has been exchanged, it is
impossible for the Panel to assess the quantum of that loss.
61. During the course of the site inspection the Applicant advised there were
items stored in boxes at ground level and items that were also stored on top
of these boxes. The Panel accepts that only the items stored in the boxes
that were stored at ground level would be damaged by the stormwater run-
off. The Panel accepts that at its height, the stormwater run-off would at best
have inundated the garage to a level of no more than 100mm.
62. In the absence of any information to enable an accurate assessment as to
the loss, the Panel believes it is appropriate for the parties to work
cooperatively together to estimate the extent of such loss. In the event that
the parties are unable to resolve this aspect of the dispute between
themselves then the parties are invited to make further submissions to the
Panel as to the extent of loss suffered to the items stored in the garage.
63. The Applicant has also claimed in the alternative that there was water
discharging from pipes which was the cause of the event that led to the
inundation of the property.
64. There is evidence from neighbour K that the stormwater drains were
overflowing with water prior to the creek breaking its banks.
65. The hydrologist W states that the water which came from these drains was
floodwater from Oxley Creek flowing back up the underground stormwater
drainage network.
66. In this regard the Panel notes the water coming through the drains is on the
balance of probabilities surcharging floodwater. That is, water that
commences backing up through the drainage system because it cannot
enter the creek. This water is still deemed to constitute floodwater.
67. Insofar as there was damage sustained to the principal residence, the Panel
accepts that such damage would have been due to flood water. Insofar as
Case No: 263140 Determination Page 10 of 10
there was damage sustained to the garage as a result of any backflow of
flood waters through the stormwater drains, the Panel also accepts that such
damage would have been flood water. As stated earlier however, the Panel
is of the view that the initial inundation was due to stormwater run-off in
accordance with the policy and such inundation would have affected
contents items stored within the garage.
Determination
68. Based on the available information, the Panel determines the FSP is liable to
meet the loss sustained by the Applicant as a result of the inundation of the
garage to a level of 100mm as a result of stormwater run-off. The parties are
asked to work cooperatively together to determine the extent of such loss as
particulars of such loss have not been provided to the Panel.
69. Insofar as the balance of the Applicant‟s loss is concerned, the Panel
accepts that the FSP is entitled to rely upon the flood exclusion and deny
liability for the balance of the loss.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.