Determination 262995

Bathroom and study water damage claim declined; insured event not established

FirmFinancial Firm (Unknown - Insurer)
Decided2012-06-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$20,490
SourceAFCA PDF

Summary

A homeowner claimed $20,490 for bathroom and study water damage after the insurer declined because the damage was not shown to result from an insured event. AFCA found the applicant, who was away from the property, had not proved water entry, so the insurer was entitled to deny indemnity.

The onus rests on the insured to prove on the balance of probabilities that the loss was caused by an event insured under the policy, and an assumption about rising damp was not enough.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 262995 Determination Page 1 of 6 Case number: 262995 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim- No Defined Event 12 June 2012 Background 1. This is a review of a Recommendation by the Service‟s Case Manager dated 16 April 2012 in favour of the Financial Services Provider (FSP). 2. The Applicant has rejected the Recommendation and in accordance with the Terms of Reference, the matter has been referred to me for Determination. The relevant background, summaries of the parties‟ p osition and issues be determined as set out in paragraphs 1 to 18 of the Recommendation and in the interest of clarity and completeness, I will restate same. 3. The Applicant held a Home Building and Contents Insurance Policy (the policy) with the Financial Services Provider (FSP). 4. The Applicant contacted the FSP on 14 March 2011 to lodge a claim seeking indemnity for water damage to the bathroom and adjoining study/office. 5. The FSP upon completing its investigation into the extent and circumstances of the damage declined the claim on the basis the damage was not due to an event insured under the policy. 6. The Applicant remains dissatisfied with the FSP‟s decision to decline th e claim and is seeking indemnity in the amount of $20,490. Summary of Applicant’s p osition 7. The Applicant is seeking a fair and independent review of the FSP‟s decision to decline her claim subject to this dispute. She believes the FSP is relying on a misrepresentation of a policy provision to decline the claim. 8. The FSP is seeking to exclude cover based on an exclusion relating to gradual deterioration, however, the policy does provide cover for damage arising from the gradual escape of water, unless it can be established that the Applicant was reasonably aware of this occurring. 9. The FSP‟s reference to a previous claim lodged by the Applicant for a roof leak which damaged the bathroom was actually for roof damage (at the rear Determination Case No: 262995 Determination Page 2 of 6 of the property) due to a chimney fire. This has no relation to the bathroom, which is at the opposite side of the house. 10. In respect to the FSP‟s position, that it had not been allowed the opportunity to inspect the claimed damage due to the Applicant‟s builder “B” undertaking the repairs, the Applicant maintains the claim was lodged on 14 March with the repairs commenced on 16 May. Further, B contacted the Assessor on 22 May and repairs were finalised on 30 May, with the Assessor then contacting the Applicant on 16 June. Therefore, how long was the Applicant expected to remain without a non-functional bathroom. 11. The Applicant originally would have been prepared to accept indemnity by way of payment in the amount of $3,961 as quoted by the FSP‟s appointed builder “AJ”. However, now th e Applicant is seeking $20,490 to cover the full cost of repairing the bathroom and office damaged by water entering her home during a storm. Summary of FSP’ s position 12. The Applicant contacted the FSP on 14 March 2011 to lodge a claim for water damage discovered by her builder in the walls of the ensuite. The Applicant also advised the FSP that she was in the process of renovating the bathroom and adjoining study/office. 13. The FSP maintains that the Applicant‟s policy is specific in that it only provides cover for loss or damage arising from the defined events listed in the Product Disclosure Statement (PDS). 14. The policy is clear in that it provides cover for damage arising from escape of liquid from apparatus listed within the relevant policy provision and/or insured event. Holes in a shower recess are not one of the listed apparatus ; therefore it does not fall within the circumstances covered under the policy. Further, damage arising from a leaking or faulty shower recess is clearly excluded from cover under the policy. 15. The Applicant informed the FSP that B had removed the shower recess from the wall and found no signs of water damage from a leaking pipe and/or the shower recess. B was of the opinion that the damage was due to moisture rising through the floor and up the brick walls due to storms in October 2010. 16. AJ contacted B in relation to arranging a re-assessment of new findings and B was to call the Assessor back in this regard. However, B called the Assessor five days later to advise that the bathroom renovations had progressed and the damage and cause was no longer visible. Further, the damage to the study had also been repaired. 17. The FSP on the basis of the available information maintains that:  The damage was not due to a leaking pipe and/or shower recess. Case No: 262995 Determination Page 3 of 6  The Applicant has not established the loss claimed is due to an event insured under the policy.  The FSP has been prejudiced as it was not allowed the opportunity to assess B‟s new findings after having removed the shower recess from the wall.  The policy is subject to „General Exclusion” provisions in respect to wear, tear, gradual deterioration, flood damage, lack of maintenance etc. 18. The FSP relies on the following policy provisions: “Page 14 -17 Glossary of words with special meaning Event A single occurrence. … Flash flooding The overflow of any lake, river, creek, stormwater channel, canal or any other watercourse (whether natural, altered or manmade), caused by a storm, where the flooding occurs within 24 consecutive hours of the storm having commenced. Flood The inundation of normally dry land by water which has overflowed, escaped or been released from a lake, river, creek, storm water channel, canal or any other watercourse whether natural, altered or manmade. Unless the damage is caused by flash flooding, this policy does not cover flood. … Insured Event The events listed on pages 21 to 24. … Page 21-24 Events you are covered for The following insured events apply to both building and contents cover … Insured Events We will cover you for loss or damage to your building and/or contents caused by the events detailed in this section. The loss or damage must occur at the insured address. … Storm You are covered for loss or damage as a result of storm. You are not covered for storm damage to: … Case No: 262995 Determination Page 4 of 6  the building or contents where the water, wind or hail has entered the building trough an opening not created by the storm; or … Page 18-19 The policy doesn’t cover everything General exclusions – apply to the overall policy Unless included in additional cover, we will not cover loss, damage or legal liability caused by: …  gradual loss of damage of any kind  structural defects and faulty workmanship in the construction of the building or lack of maintenance to the building and/or contents; ” Issues 19. Whether the Applicant has established a loss was covered under the policy. 20. Whether the FSP is entitled to decline indemnity to the Applicant in line with the policy. Reasons for Decision 21. There has been a full exchange of information and each party has had the opportunity to address the issues raised. 22. I have read all the exchanged material and I have carefully considered the parties‟ submissions including the Applicant‟s further submission dated 20 May 2012. 23. As noted by the Service‟s Case Manager, the following matters appear to be agreed:  “ The Applicant held an active policy at the time of loss providing indemnity for loss arising from the specified insured events listed within the PDS.  The insured building has suffered water damage in the vicinity of the bathroom and adjoining study/office.  The Applicant has undertaken renovation work in these areas through her appointed builder B at the cost of $20,490.  The investigation into the cause of the loss determined that the damage was not due to escape of liquid from the shower recess and/or plumbing installed in the bathroom.  There was pre-existing damage in the bathroom which had not been repaired since the previous inundation of the bathroom e.g. swollen skirting.  Indemnity under the policy is subject to the l isted “General Exclusion” provisions. ” Case No: 262995 Determination Page 5 of 6 24. In setting out his reasons for the Recommendation, the Case Manager stated: 23. “ I am satisfied that it has been established that the introduction of moisture into the building walls in the bathroom and adjoining study/office was not due to water escaping and/or leaking from the shower recess and plumbing installed in this area of the home. Accordingly, it has not been established that this loss is due to the insured event “Escape of liquid”. 24. I note the Applicant’s referen ce to the available cover under the policy in respect to “Gradual escape of water”, however as noted above it has been established that the damage was not due to escape of liquid. Accordingly, this component of the Applicant’s submission to the Service doe s not assist her under the circumstances. 25. The Applicant’s appointed builder B has made available a report whereby he confirms that the damage is not due to escape of fluid and maintains that it is his assumption that the damage is due to rising damp through the floor and soaked up by the brick walls. Further, that this was due to the severe storms and flooding in October 2010. 26. There is no evidence made available to establish B ’s assumption in this regard and I am not satisfied that an assumption alone is sufficient to substantiate the cause for the damage and/or establish a right to indemnity under the policy. The Applicant in her email dated 23 December 2011 to the Service, also confirmed that the flash floods in the local area on 16 October 2010 and the overflow of water from Billabong Creek on 17 October 2010, did not flood the insured property 27. Further, I also note that in order to be covered for loss arising from Storm and/or flooding of the property it must be due to:  Loss arising from the event “Flash flood” and such flooding of the property occurs within 24 hours of the storm having commenced.  Loss arising from water, wind or hail entering the property through an opening created by the storm. 28. I am not satisfied that it has been established that claimed damaged has, on the balance of probabilities, occurred as a consequence of the above noted circumstances. It is an accepted principle of insurance law that the onus rests with an insured to prove, upon the balance of probabilities, that they have sustained a loss caused by an event insured for under the policy in force at the date of loss [Regina Fur Co. Ltd v Bossom (1957) 2 Lloyd’s Rep 466]. 29. Having carefully considered the available evidence I am not satisfied that the Applicant has satisfied the onus to establish that the damage claimed is due to an event insured under the policy. Accordingly, in the absence of evidence to substantiate the loss was due an insured event the Applicant has not proved an entitlement to indemnity under the policy. ” 25. The threshold issue facing the Applicant is that she is required to satisfy the onus of proof that the damage claimed is due to an insured event under the policy. As noted by the Case Manager, in my view correctly, the Applicant Case No: 262995 Determination Page 6 of 6 has not established that the damage occurred as a result of an insured event, in this case, “escape of liquid (water).” 26. It does seem that the damage to the property has been caused by a build-up of moisture. While it is accepted there was an intense period of wet weather during the period October, November and December 2011, there is no evidence before me that water passed through the property. The biggest problem facing the Applicant is that she was, on her own admission, away from the property during that period and cannot attest to the entr y of water as such into the premises. 27. As noted in her supplementary submission, she infers that water must have entered the property during that period as occurred with flooding of other properties in the area. In carrying out my function, I am unable to draw that necessary inference. The damage is consistent with the build-up of heavy moisture over an extended period. In the absence of clear evidence of water damage, I find that the Applicant has failed to prove that the damage occurred as a result of an i nsured event under the terms of the policy. Determination 28. The FSP was entitled to deny indemnity to the Applicant.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.