Text of the determination
Case No: 262967 Determination Page 1 of 12
Case number: 262967
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Inundation - Policy Interpretation - Flood vs Flash Flood
29 November 2012
Background
1. The Applicants insured their home and contents with the Financial Services
Provider (FSP). The relevant period of insurance operated for twelve months
beginning from 8 June 2010. At the time of the loss, the building was insured
up to a sum of $354,000 and the contents for $53,000.
2. On or about 12 January 2011, the Applicants‟ home in Chelmer was subject
to extensive water inundation following severe weather events in
Queensland. They lodged a claim.
3. The FSP denied the claim on the basis the damage was due to “flood”. The
Applicants, through their solicitors, have disputed this.
4. For the sake of simplicity, reference to the Applicants will include their legal
representatives.
5. The Applicants and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will summarise these
submissions given all of the material made available has been exchanged
with the other party.
Summary of Applicants ’ position
6. The Applicants submit the following as alternative arguments in response to
the FSP‟s decision:
The FSP breached its obligations to them under the General Insurance
Code of Practice, as it denied them access to the reports obtained
regarding the cause of inundation.
The FSP‟s policy failed to clearly inform them that “flood” was excluded
as required under Section 35 of the Insurance Contracts Act 1984 (the
Act).
The cellar in the home was inundated by as early as 10 January 2011.
A secondary event occurred on 12 January 2011 due to “Flash flood
and stormwater run- off”, which is an insured event. In particular, the
Determination
Case No: 262967 Determination Page 2 of 12
inundation was due to heavy rain that fell from 4am on 11 January
2011 which resulted in the Wivenhoe Dam operators ele vating their
strategy to W4. This decision resulted in massive discharges of water
into the Brisbane River that ultimately inundated their property.
Summary of FSP’s position
7. In response to the Applicants‟ arguments, the FSP submits the following:
There was no breach of the Code of Practice as the relevantly
requested documents were supplied.
There is no dispute that a PDS was sent to the Applicants prior to the
claim. The policy structure and layout of this document enables the
FSP to rely on the exclusion clause of “flood” pursuant to Section 35(2)
of the Act.
The loss occurred as a result of backflow flooding of the Brisbane
River, which caused floodwater to emerge from the drainage
surrounding the Applicants‟ home.
8. The FSP relies on a number hydrology reports authored by SC and the
following policy provisions to deny the Applicant‟s claim :
Page 3 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not inc luded...”
Pages 10-12 of the PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off .
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightning, heavy
Case No: 262967 Determination Page 3 of 12
rain, hail or snow, but not continuous bad weather by
itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...”
Page 32 of the PDS
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater run-off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher, but not exceeding your contents
sum insured.
...
...”
Case No: 262967 Determination Page 4 of 12
Issues
9. Whether the FSP breached its obligations under the General Insurance
Code of Practice.
10. Whether the Applicants were “clearly informed” about what the policy did and
did not cover.
11. Whether the cause of the Applicants‟ loss was covered under the policy.
Reasons for decision
12. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‟s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
13. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer c laims.
14. It is appropriate to consider the issues under the various headings.
15. Although the Applicants argue the FSP breached the General Insurance
Code of Practice in not originally providing the expert evidence it relied upon,
the Panel notes this evidence has now been exchanged and consistent with
the FOS Terms of Reference will be considered as part of this dispute.
Consideration of "Flood" Definition in PDS
16. It is not in dispute that the Applicants received a PDS, and an annual COI
from the FSP, noting that the policy was first incepted in or around 2008.
17. The Applicants contend that the definition of flood is too broad, too difficult to
comprehend and that the FSP has not met its obligations under section 35 of
the Act to “clearly inform” them of what is a nd is not covered under the
policy. It was reported from one of the Applicants that:
“I read the policy but I didn‟t have a good understanding of it... it doesn‟t tell
you what you are covered for, it only talks about what [the FSP doesn‟t] pay
for...”
18. The Panel has previously considered this issue for the FSP‟s policy. It is
satisfied that the two events (“flood” and “flash flood and stormwater run - off”)
can be suitably distinguished.
19. The Applicants have raised issue with the placing of definitions throughout
the policy and the difficulty a “reasonable person” would have in evaluating
it. The Panel is satisfied that the PDS should be read in its entirety and that
Case No: 262967 Determination Page 5 of 12
(should this be done) the interpretation of same should not be difficult for a
“reasonable person”.
20. A fair reading of Section 35(2) of the Act requires the relevant exclusions
and limitations be in clear and unambiguous language such that a person of
average intelligence and education would have little difficulty in finding and
understanding the policy if they read the policy.
21. The PDS has an index on the inside cover which highlights the areas of the
policy in which the policyholder might find information. Included in this is
“Words/terms with special meanings” on page 9, for which definitions of
relevant terms in the policy are provided. Flood is included in this on page
10, together with the qualification that:
“... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance. ”
22. In addition to this, page 53 directs the reader to “Flood and storm surge”,
which is explained under the broader definition of “Optional covers for extra
peace of mind”. This section explains that:
“... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance. ”
23. It is not in dispute that additional cover was not optioned by the Applicants
for “Flood and storm surge” as shown in the COI and therefore they were not
covered for it under the policy.
24. The Panel is satisfied that if the Applicants read the policy they would have
been clearly informed as to the extent of the cover and the relevant
exclusions and limitations. The Panel is satisfied the FSP has met its
obligation to clearly inform pursuant to Section 35 of the Act.
Water Inundation
The Evidence
25. The Panel accepts that the FSP‟s policy does not extend cover to
circumstances where a loss is caused by a flood. The policy also
distinguishes between flood and flash flood and stormwater run-off (the latter
two of which are covered). Under flash flood, it extends cover to damage
from sudden flood events “caused by heavy rain that fell no more than 24
hours prior” to the flash flood.
26. The Applicants noted that the wine cellar in the basement of their home took
in water on 10 January 2011 „from the water table‟, which damaged the rugs
and other items prior to the arrival of the major inundation two days later.
This basement is “at least [one] metre under the ground”. It is not clear what
the circumstances of this were, whether it was water seeping from the level
of the water table, or whether there was some stormwater run-off; neither
party has addressed this.
Case No: 262967 Determination Page 6 of 12
27. The Applicants noted:
“We sometimes have problems with the storm water drains as they really
struggle when it rains... sometimes with the heavy rain the drains/creek back
up.”
28. A video showing the water overflowing and exiting the drains in the
Applicants‟ street has been provided. This is relied upon by the Applicants as
evidence that the home was not inundated by floodwater. Whilst the Panel
concedes that this demonstrates that water in the area emanated from the
drains, it does not rule out that the escaping water was in fact flood water.
29. After the lodgement of the claim, the FSP appointed a loss adjuster (MY) to
investigate and report on the damage caused to the Applicants ‟ property.
The report estimated that there was about $150,000 worth of building
damage and $40,000 of contents damage. Amongst the factual information,
MY suggested that water first entered the property on 12 January 2011.
30. MY considered that the cause of the loss was the “Flood - River” and that this
related to “Rainwater”.
31. No reference was made to whether the home was situated on a slab or on
stumps and no mention of the basement or any possible prior inundation
was made.
32. The FSP subsequently engaged a hydrologist, SC, to provide a report as to
cause of the damage at the Applicants‟ home .
33. SC provided a statutory declaration dated 20 January 2012 to evaluate the
cause of the loss in the region surrounding and specifically affecting the
Applicants ‟ home. He found that:
A substantial amount of rain fell in the greater Brisbane area from 9
January 2011 and over the subsequent two days, which caused
significant inflows into the Wivenhoe Dam, which peaked on the evening
of 11 January 2011.
Rain also fell in the area of the Bremer River from 6am on 11 January
2011. This rain travelled along the Bremer River to the junction of the
Brisbane River and ultimately contributed about 15-25% of its peak flow.
A “small proportion” of the overall depth of the Brisbane River “may be
partially attributable to the rain that fell in the Bremer River catchment on
11 January 2011”, although the “overwhelming influence” was the rain
that had fallen in the previous days.
The terrain data for the App licants‟ home shows that the property varies
between 7m AHD (Australian Height Datum) and 7.7m AHD. The
property is situated at about 7.25m AHD. There was stormwater
infrastructure on the street, including stormwater inlet pits on either side
of the road and a stormwater inlet in the backyard of the home.
Case No: 262967 Determination Page 7 of 12
The terrain information for the Applicants‟ home suggested that it was not
“particularly vulnerable” to significant stormwater or run -off problems
during the period.
Inundation from stormwater run-off requ ires “intense levels of rain” which
is sufficient to overcome the stormwater drainage system. Any such run-
off generally occurs during or very shortly after such an intense period of
rainfall.
A review of the rainwater gauge at Toowong, approximately 3.4km from
the Applicants‟ property and representative of its rainfall in the expert‟s
opinion, revealed that 82mm of rain fell on 9 January 2011and a further
39mm the next day. Approximately 72mm fell on 11 January 2011, with
the most intense rainfall on this day being 19mm between 10.00am and
11.00am. No rainfall was recorded after 8pm on this date and only 1mm
recorded over 12 January 2011 (between 3.00am and 4.00am).
The overall intensity of the rainfall was low and unlikely to result in run-off
or stormwater inundation to the property.
The water levels of the Brisbane River were consistent with the
Applicants‟ report of events and the inundation of the property. The
inundation of the yard would have begun about 4.00am on 12 January
2011 and been sufficient to inundate the home at about 5.30am.
Stormwater inundation generally occurs within one hour of intense falls
and no such rain was present at the time of inundation. There had been
no significant rainfall (only 1mm) since 8.00pm the night before.
The records of the height of the Brisbane River compare favourably with
the timing of inundation for the property. The data is consistent with the
“rising levels of the Brisbane River causing water to backflow into the
stormwater drainage system and onto the Subject Property”.
The Applicants‟ property was inundated by this backflow from the
Brisbane River and not stormwater run-off or flash flooding (as defined in
the policy).
34. As a result of the report from SC, the FSP denied the claim on the basis that
it considered the cause of the loss to be flooding from the Brisbane River,
which occurred through the backflow of floodwater through the local
stormwater drainage system.
35. None of the loss adjuster (MY), the hydrologist (SC) or the FSP addressed
the issue of the flooding of the basement level of the home from 10 January
2011, situated “at least” one metre under the ground. This shall be
addressed later.
36. Since the matter has been referred to the Service, the Applicants have
suggested that the releases of water from the Wivenhoe Dam on 11 January
2011 were a significant factor in the increased water levels in the Brisbane
Case No: 262967 Determination Page 8 of 12
River and that this was a major influence in the inundation of the Applicants‟
home.
Releases from Wivenhoe Dam & Proximate Cause
37. A major consideration for this dispute is whether the inundation of the
Applicants‟ home on 12 January 2011 was due to flash flood as defined
within the terms of the policy, that is whether rain that fell no more than 24
hours prior to the inundation of the Applicants‟ proper ty was the proximate
cause of the inundation.
38. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
39. At that time, the Panel noted that in relation to the approach that each
dispute would depend upon the individual and unique factors relevant to the
dispute and in that regard the parties were invited to make further
submissions in relation to disputes before FOS.
40. In view of this, the FSP provided detailed further submissions to FOS in
relation to this dispute. Included with the submissions were the following
documents:
A Reference document (dated 12 June 2012 and ame nded 11 July
2012)for disputes relating to Queensland Floods (this is a general
reference document) relating to the various submissions the FSP
makes in relation to a number of issues. Not all issues raised in the
reference document appear in the current dispute;
Letter from the FSP‟s hydrologist attaching a key information sheet for
the Applicants‟ property;
Hydrologist report “Investigations of January 2011 inundation event –
Brisbane” dated March 2011;
Further statement from SC to address the timing and cause of the loss.
41. The FSP maintains that on any reasonable view, the damage sustained to
the downstream properties was the combined effect of all of the rainfall and
not just the rain that had fallen from 4.00am on 11 January 2011 leading to
the implementation of the W4 strategy from 8.00am that day.
42. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment
area and in fact parts of the Brisbane River from approximately 4.00am on
11 January 2011.
43. The FSP‟s hydrologist has relied on data from SEQWater dated 2 March
2011 which confirms the rapid increase in releases from the Wivenhoe Dam
Case No: 262967 Determination Page 9 of 12
from 8.00am on 11 January 2011. Examination of the SEQWater report
identifies the rapid increase in the inflows to the Wivenhoe Dam
commencing from about 4.00am, 11 January 2011. The report confirms the
inflows into the dam had been decreasing from as early as 8.00am from 10
January 2011 with steady decreases from approximately 3.00pm on 10
January 2011 to 2.00am on 11 January 2011.
44. The Queensland Flood Commission of Inquiry report confirms that prior to
4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011
the dam releases were being managed at the W3 strategy. Whilst it is
accepted that the W3 strategy had led to an increase in the levels of the
Brisbane River, the W3 strategy was designed to avoid where possible
inundation of the properties below the Wivenhoe Dam by flooding from the
Brisbane River.
45. There is no dispute that there were two significant rainfall spikes with rain
that fell from 9 to 10 January 2011 being considered the first spike and rain
that commenced falling from approximately 4.00am on 11 January 2011
being the second spike.
46. There is no dispute that following the second spike that the W4 strategy was
adopted. The FSP has argued that the switch to strategy W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
W4 strategy was not taken in accordance with the Wivenhoe Dam manual.
In the Panel‟s view, the Queensland Flood Commission of Inquiry final report
does not find the adoption of W4 strategy at 8.00am on 11 January 2011
was inconsistent with the manual. Although there may be issues as to how
the Wivenhoe Dam had been managed prior to this time, there is nothing in
the material that has been provided to the Panel to suggest that the earlier
management of the Wivenhoe Dam influenced to any significant degree, the
adoption of the W4 release strategy at 8.00am on 11 January 2011.
47. The ICA hydrolog y and the information provided by the FSP‟s hydrologist
confirms that the increased releases from the Wivenhoe Dam after the
adoption of the W4 strategy led to the development of a flood wave that
ultimately caused the flooding of many properties downstrea m of the
Wivenhoe Dam.
48. The Panel agrees with the FSP‟s general submission that the proximate
cause is a cause determined by common sense evaluation of the relevant
facts. In the event that there are two or more proximate causes, one within
the policy and the other excluded, the policy does not respond. The
proximate cause is not determined by identifying the last event or final trigger
but by determining what is the dominant, effective, direct or efficient cause of
the loss.
49. The FSP has maintained that the impact on the Wivenhoe Dam from the
rainfall that fell in the early hours of 11 January 2011 was only 29% while
71% of the volume of the inflow came from the rain that fell on 9 and 10
January 2011 or earlier. The FSP maintains that to find the rainfall which had
Case No: 262967 Determination Page 10 of 12
fallen from 4.00am on 11 January 2011 is the proximate cause is without
foundation as such an approach produces an entirely artificial outcome.
50. With due respect to the FSP‟s argument the Panel disagrees. Whilst the
Panel accepts there has been a significant impact on the levels of the
Wivenhoe Dam by the rainfall that commenced falling on or about 9 January
2011 or earlier, the Panel is satisfied having regard to the information that
has been exchanged and the relevant legal principles, that the hea vy rain
that commenced falling on or about 4.00am on 11 January 2011 was a
proximate or effective cause of the adoption of the W4 strategy.
51. The Panel is also satisfied that whilst the level of the Brisbane River may
have been increasing under the W3 strategy, it was the heavy rainfall from
approximately 4.00am on 11 January 2011 that caused the need to adopt
the W4 strategy at 8.00am on the same day.
The Applicants’ Inundation
52. The hydrologist SC has provided a Key Conclusions summary which
indicates the effect of the W4 releases first reached the vicinity of the
Applicants‟ property at 2.29pm on 11 January 2011 (although where the
“vicinity” is in relation to the property is not defined). He estimated that the
property was first inundated at benchmark level by the Brisbane River at
5.32am on 12 January 2011 and hence, at 4.00am on 12 January 2011 the
property had not been inundated up above the relevant benchmark level.
53. The relevant benchmark level was SC‟s estimate of the lowest point of the
house on the land. This evidence has not been refuted by the Applicants in
any manner. With respect to these premises, SC estimated the benchmark
level at 7.2m AHD, being 0.2m higher than the lowest point on the property.
He does not specify whether the home was on stumps or a slab. Further to
this, the evaluation does not consider the Applicants‟ basement/wine cellar.
SC comments in his final statement regarding the benchmark level that the
property is “Elevated (possible storage areas)”.
54. SC did not inspect the Applican ts‟ property. No mention is made or
consideration given to the Applicants‟ basement/cellar and the alleged earlier
inundation on 10 January 2011.
55. Given the unresolved aspects of this matter the Panel Chair Ombudsman
(PCO) attended on site and met with the Applicants and a representative of
the FSP.
56. The Applicants confirm the cellar which is situated under the main residence
was first inundated on 10 January 2012. The cellar is a solid area of
concrete construction accessed by wooden stairs. The cellar is at a depth of
about 1.8 to 2m below the ground floor of the main residence.
57. According to the Applicants they removed most of the contents from the
cellar prior to damage being sustained although they did lose some
documents and records.
Case No: 262967 Determination Page 11 of 12
58. The actual main residence was inundated to a height of 650mm.
59. According to the Applicants, the veranda decking at the back of the house is
8.7m AHD, whilst the stormwater pit below the veranda is 7.2m AHD. The
male Applicant advised that he observed water bubbling from this pit at
around 4.00am and that ultimately the main residence was inundated by
water from the stormwater drains at approximately 5.30am on 12 January
2012.
60. The Panel notes according to the Brisbane City Council FloodWise property
report, the minimum ground level at the property was 7m AHD and maximum
ground level 7.7m AHD.
61. The Panel notes the Key Conclusion Statement of SC identifies the
approximate benchmark level at 7.2m AHD. This would appear to be the
level of a garden shed, towards the rear of the property.
62. There is some inconsistency between the Applicants‟ statements and the
report of SC. Assuming the benchmark is a shed and not the floor level of
the residence, the evidence is consistent that the property was not inundated
above benchmark level prior to approximately 5.30am on 11 January 2011.
63. The Applicants have argued that the relevant 24 hour period should run from
the timing of the heaviest of the rain that fell. The Applicants maintain the
heaviest rain fell at around 11.00am on 11 January 2011 and therefore their
property would be inundated within the relevant 24 hour period to attract the
flash flood cover. The Panel has considered these issues extensively in past
Determinations and have again considered these issues in the current
Determination.
64. The Panel is satisfied that the wording of the policy provide flash flood cover
providing the inundation occurs within 24 hours of the commencement of the
relevant heavy rain. The Panel has previously determined that the heavy rain
that commenced at approximately 4.00am on 11 January 2011 combined
with the heavy rain that fell over the Brisbane River from that time, and over
the Bremer River from approximately 6.00am on 11 January 2011 was the
relevant rainfall. As the commencement of the heavy rain is at 4.00am, then
the relevant 24 hour period for flash flood would continue until approximately
4.00am on 12 January 2011.
65. Based on the information available with respect to this matter, the Panel is
satisfied that the inundation of the Applicants‟ prop erty above the relevant
benchmark level did not occur until at least 5.30am on 12 January 2011 and
as such, was outside the relevant 24 hour period. Inundation outside the
relevant 24 hour period for flash flood cover would be considered “flood”
within the terms of the policy and therefore excluded from cover.
66. Based on the expert evidence and on the Applicants‟ own recount of events,
the Panel is satisfied that the inundation, being that water which inundated
inside the home on 12 January 2011, was not due to a flash flood (as
Case No: 262967 Determination Page 12 of 12
defined in the policy). As a result, the FSP is not obliged to cover the
Applicants for this loss.
67. Notwithstanding this, the Panel notes that the area surrounding the home
had been subject to strong rainfall over the preceding days and the
Applicants‟ reported inundation of the basement/cellar has been overlooked
by the FSP. In the absence of any contrary evidence, the Panel accepts that
the significant rainfall presents reasonable evidence of a prima facie
stormwater run-off event at this time, that is on or about 10 January 2011,
and therefore any loss incurred as a result of this inundation should be
covered subject to the relevant limitations under the policy. Further, it is likely
the basement/cellar was inundated as a result of the heavy rain that
commenced falling at 4.00am on 11 January 2011. The Panel accepts that
any damage to the cellar prior to 4.00am 12 January 2011 when the water
reached 7.2m AHD would be covered under the relevant “flash flood
provisions of the policy.”
68. No evidence of actual loss has been supplied by the Applicants and it
remains their onus to provide evidence of the damage to the basement/cellar
and any contents contained therein, prior to being indemnified under the
policy.
Determination
69. The FSP is to meet the cost of repairs and replacement of items damaged
as a result of stormwater inundation and subsequent flash flooding to the
cellar/basement of the Applicants‟ home subject to the limitations contained
within the policy.
70. In establishing quantum for any loss or damage in the cellar, the Applicants
are required to provide reasonable proof of their loss and the resultant cost
of rectification of any damage, and for any contents so damaged.
71. The FSP is not liable for the losses incurred as a result of any i nundation of
the home which occurred on 12 January 2011, as this event is properly
classed as a flood and duly excluded under the terms of the policy.
72. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from
10 March 2011 (being the date of rejection of the claim) to date of payment
of the claim, in accordance with Section 57 of the Act.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.