Home / Financial Firm (Unknown - Insurer) / Determination 262955

Determination 262955

Denial of flood inundation claim for Bundamba home

FirmFinancial Firm (Unknown - Insurer)
Decided2012-08-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home was inundated during the January 2011 Queensland floods and the FSP denied the claim as flood damage. AFCA found the flood exclusion was clearly disclosed and the water was floodwater, so nothing was ordered.

Under Section 35 of the Insurance Contracts Act the PDS clearly informed the insured of the flood exclusion, and hydrological evidence showed the damage was caused by flood rather than stormwater.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 262955 Determination Page 1 of 8 Case number: 262955 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Inundation - Flood 23 August 2012 Background 1. The Applicant held a home and contents policy with the Financial Services Provider (FSP) from 11 July 1999. The policy provided for complete building replacement and contents cover of $79,864. 2. On or about 12 January 2011, the Applicant‟s home in Bundamba was damaged as a result of water inundation at the time of the flood events that affected significant parts of Queensland. 3. The FSP declined the claim on the basis that it considered the cause of the loss was flooding of the nearby Bundamba Creek and the Bremer River. 4. The Applicant disagrees with the decision and considers that his home was subject to a flash flood, storm or rainwater run-off and/or water from nearby stormwater pipes. He further states that he was not properly informed of the flood exclusion by the FSP. Summary of Applicant’s position 5. The Applicant says that the FSP did not provide a Product Disclosure Statement (PDS) each year at renewal or sufficiently inform him of the flood exclusion in the policy. 6. His property was inundated by water from a flash flood or as a result of the heavy rain which occurred on and before 11 January 2011. Alternatively, the water emanated from nearby drains, for which the policy provides cover. Summary of FSP’s position 7. The FSP says that the inundation of the home was due to flooding. The policy excludes cover where this is the cause. 8. Copies of the Home Building Product Disclosure Statement (Home PDS) and the Home Contents Product Disclosure Statement (Contents PDS) were provided to the Applicant at relevant intervals when new documents were produced by the FSP, with the last copies of these documents supplied in Determination Case No: 262955 Determination Page 2 of 8 2007 (Home PDS) and 2008 (Contents PDS). These PDS documents served to inform the Applicant about what was covered under the policy. 9. The FSP is satisfied that it met its obligations to “clearly inform” the Applicant about the flood exclusion in the policy, as required under Section 35 of the Insurance Contracts Act 1984 (the Act). 10. Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. 11. The FSP also relies upon the following policy provisions: Pages 8-13 of the Home PDS and pages 16-21 of the Contents PDS “ What we cover – insured events This section describes under the heading: Yes – the insured events you are covered for, No – the conditions and exclusions that specifically apply to particular insured events. ... Yes Storm and rainwater including stormwater runoff from areas surrounding the site or water escaping from any water main, drain, pipe, street gutter, guttering or surface. Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy fall of rain, snow or hail. ... No Damage or loss caused by flood . Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter, because it is full or has overflowed, or is prevented from entering because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. Flood does not mean stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface.” Page 14 of the Home PDS and page 22 of the Contents PDS Case No: 262955 Determination Page 3 of 8 “ What we do not cover – general exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: ... flood...” Issues 12. Whether the FSP provided individual copies of the Home PDS and Contents PDS to the Applicant in 2007 (Home PDS) and 2008 (Contents PDS). 13. Whether the Applicant was “clearly informed” that the policy did not provide cover for flooding, as required under Section 35 of the Act. 14. Whether the damage to the Applicant‟s property was caused by flash flood, stormwater run-off, water from the local drains and/or floodwater. Reasons for decision 15. The Panel is satisfied that a full exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. 16. As advised to the parties, FOS has considered it appropriate to elevate the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the potential amount of the claim and the issues to be considered. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 17. This decision has been made by a Panel consisting of an Ombudsman, an insurance industry representative and a consumer representative. 18. For ease of reference throughout this document, the submissions from the Applicant‟s solicitor will be represented as submissions from the Applicant. 19. The Panel Chair Ombudsman attended on site where he met with the Applicant‟s daughter and a representative of the FSP. The Ombudsman later spoke on the telephone with the Applicant. Provision of the PDS documents 20. The Applicant has not alleged that he never received a co py of the FSP‟s PDS documents, merely that he did not receive them prior to incepting the policy in 1999 and that the FSP did not send him copies of these documents annually. 21. The Panel is satisfied that an insurer is not required to supply a copy of a PDS prior to policy inception. In accordance with Section 69 of the Act, a copy of a PDS need only be supplied within 14 days of the policy being Case No: 262955 Determination Page 4 of 8 incepted. Where the insurer does not comply within 14 days, the terms of the conditions of the policy will not supersede the conditions of a prescribed insurance contract until such time as the documents are provided. 22. To this end, where the FSP is able to establish that a copy of the Home PDS and the Contents PDS were provided to the FSP prior to the insured event, the Panel is satisfied that it may rely upon same (assuming that the documents fulfilled the FSP‟s other requirements to be “clear, concise and effective” and to “clearly inform” the Applicant). 23. Detailed proof of dispatch information has been supplied by the FSP to attest to the provision of the Home PDS on 31 May 2007 and the Contents PDS on 29 May 2008. Without labouring the information supplied by the FSP, the Panel is satisfied that both documents were dispatched to the Applicant on or about the dates stated and that there was no returned mail from the Applicant in relation to these documents. 24. No contrary information has been supplied to suggest that the Applicant did not receive the respective PDS documents (only that he did not recall receiving them). 25. In the circumstances, the Panel accepts that the Applicant was supplied with copies of the Home PDS and Contents PDS on or about the dates stated. Whether the Applicant was “clearly informed” about the flood exclusion 26. The Applicant considers that the PDS documents relied upon by the FSP did not serve to “clearly inform” him of the limitations of the policy, particularly in relation to the flood exclusion. 27. Section 35 of the Act allows for an insurer to define and limit the level of cover offered for insuranc e on the basis that it “clearly informs” the policyholder. This requirement is in writing and no obligation is on the insurer to inform a policyholder of the limitations verbally. 28. The question of what it means to “clearly inform” was considered by the Northern Territory Court of Appeal in the matter of Marsh v CGU Insurance Ltd t/as Commercial Union Insurance [2004] NTCA 1 (the Marsh case). Mildren J wrote in relation to an insurer‟s obligations under section 35(2) of the Act that: “... a fair reading of se c 35(2) [does] not warrant the conclusion that the result needed to go further than providing for the relevant exclusion in the policy wording in clear and unambiguous language and in a manner which a person of average intelligence and education was likely to have little difficulty in finding and understanding if that person read the policy in question.” 29. Therefore, on the basis that a PDS is written in plain English and can be understood by a person of “average intelligence and education”, the Panel is sati sfied that the provision of it discharges the FSP‟s obligations under Section 35(2) of the Act. Case No: 262955 Determination Page 5 of 8 30. With respect to this claim, the clarity of what is written in the PDS documents determines whether the FSP may limit its cover to exclude losses which are attri butable to a “flood”. 31. The PDS documents provide a single page index on page 3 of the Home PDS and page 2 of the Contents PDS. Under the title, “Where to find”, these highlight relevant sections, including “What we cover – insured events” (page 8 of Home PD S and page 16 of Contents PDS) and “What we do not cover – general exclusions” (page 14 Home PDS and page 22 of the Contents PDS). The “insured events” section describes the circumstances under which cover is provided. In this section, under the “Storm and rainwater” event, the policy specifically identifies that cover does not extend to “loss caused by flood”. It further provides a detailed analysis of the definition of flood. The area for “general exclusions” confirms that the policy as a whole does not c over flood events. 32. The Panel considers that the definition of “flood” adequately conveys that the policy does not cover events where water “escapes or overflows... [or] cannot enter... or is prevented from entering” the normal confines of a water body. It further specifies that flood does not mean stormwater run-off or water escaping from certain areas, including drains or pipes. The definition, in the Panel‟s view, is straightforward. 33. Accordingly, the Panel is satisfied that the FSP made the Applicant aware through the provision of the respective PDS documents, that the policy did not provide flood cover. In the circumstances, the Panel is satisfied the FSP has complied with its obligation to clearly inform the Applicant of the flood exclusion, pursuant to Section 35 of the Act. Cause of the damage 34. The Panel accepts that the FSP‟s policy does not extend cover to circumstances where a loss is caused by a flood. The policy does extend cover in circumstances where damage is caused by stormwater run-off or where water escapes from a drain or a pipe and inundates the home. 35. The Applicant reports that he was evacuated from his home on 11 January 2011 and that the property was subsequently inundated sometime the next day. The home was nearly completely submerged and the Applicant suggests that the water inundation was caused by a flash flood, stormwater run-off and/or water escaping from local pipes or drains. 36. It is the FSP‟s position that the home was inundated by floodwater from the nearby Bundamba Creek, which in turn was flooded by the overflowing Bremer River. 37. After the report of the incident, the FSP appointed a loss adjuster to investigate and report on the damage caused to the Applicant‟s property. 38. The assessor, CL, noted in his report of 30 January 2011 that: Case No: 262955 Determination Page 6 of 8  the home was a single storey building on a concrete slab. A swimming pool and shed were also present on the property;  the Applicant was “forced to evacuate” on 11 January 2011 and the property was inundated the next day;  inundation of the property was to a depth of about 3m;  the estimate of policy related damage was in the vicinity of $200,000;  the home was situated about 300m from the Bundamba Creek, which flows into the Bremer River. During the course of the flooding events between 10-13 January 2011, the Bremer River rose to a peak of 19.4m;  the policy “does not respond” to the cause of the loss. 39. The FSP denied the Applicant‟s claim and further relied upon the general reports for the flood event commissioned by the Insurance Council of Australia (ICA). 40. The ICA noted that rainfall in the Ipswich area (where the Applicant‟s property was located) was heaviest through the 6.00am to 4.00pm period on 11 January 2011. Page 41 of Volume 2 of the report notes: “Rain ceased over the Brisbane City area around 1800 hours on Tuesday 11 January, some 24-30 hours before flood levels in the Brisbane River peaked. Thus, when the Brisbane River peaked, there is no evidence that there was any „normal‟ flow of significance from the catchment areas of tributary creeks draining the Brisbane LGA [Local Government Area]. As the floodwave passed downstream along the Brisbane River, backwater flooding occurred up the tributary creeks. The peak flood level and time of peak along the tributary peaks are expected to be the same as those in the Brisbane River at the mouth of the creeks. Flooding along the mainstream of the Brisbane River and along the lower tributaries was principally caused by releases from Wivenhoe Dam (dam release flooding).” 41. Therefore, as a result of releases from the Wivenhoe Dam, widespread flooding occurred through many areas in and around Brisbane (including the Applicant‟s area) on or after 12 January 2012. 42. The FSP suggests that Bundamba Creek flooded as a result of overflow from the Bremer River. This in turn would have been subject to flooding as a result of the overflow of the Brisbane River when water was released from the Wivenhoe Dam. 43. Volume 2 of the ICA report notes that: “Given that rainfall across the Brisbane City [local area] had ceased by 1800 hours on Tuesday 11 January, any flooding after this time will have been caused by waterflow inundation from the Brisbane River and its tributary creeks, it being noted that inundation along the tributaries was associated with backwater flooding from the Brisbane River (which in turn was principally caused by the dam release flood from Wivenhoe Dam).” Case No: 262955 Determination Page 7 of 8 44. The FSP argues that the inundation of most homes after the completion of the heaviest rainfall on 11 January 2011 was almost certainly due to flooding and not stormwater run-off. 45. After the Applicant challenged the denial of his claim, the FSP retained a hydrologist (WR) to consider the cause of the loss. WR‟s subsequent desktop report of 14 December 2011 revealed:  the property is located about 170m from Bundamba Creek and about 2.9km upstream of the Bremer River;  the Bundamba (Hanlon Street) Alert rainfall station, which was about 770m north of the subject property, was relied upon for rainfall information. A total of 123mm of rainfall was recorded between 12am on 9 January 2011 and 6.00pm on 11 January 2011;  the peak rainfall intensity of 16.3mm per hour was recorded at the alert rainfall station at 2.00pm on 11 January 2011. The peak period of stormwater run- off at the Applicant‟s property would have occurred within 15 minutes of this time;  the ground level of the Applicant‟s property ranged from 8.7mAHD (Australian Height Datum) at the boundary, to 16.8mAHD at the south eastern corner. The peak water level would have been up to 18.7mAHD. For the home to be inundated to a depth of 3m, the floor level must have been situated at approximately 15.7mAHD;  initial inundation of the lower portion of the Applicant‟s property would have occurred at about 5.00am on 11 January 2011;  any water that entered the property after 5.00pm on 11 January 2011 “could not have been stormwater runoff because rainfall ceased about this time”;  the inundation above floor level of the home would have occurred about 11.00pm on 11 January 2011, about six hours after rain ceased and nine hours after the period of peak rainfall; and  given the low intensity rainfall recorded and the fact that the subject property was not inundated for about six hours after rainfall effectively ceased, the source of water inundation was floodwater from Bundamba Creek. 46. W R‟s conclusion was unequivocal in concluding that the source of inundation at the Applicant‟s property was floodwater. 47. Noting that inundation of the Applicant‟s property (which has variable heights due to the topography of the land) was early on 11 January 2011, the Panel accepts that some of this initial inundation may have been due to stormwater run-off. As it is estimated that the home itself was not inundated until some 18 hours after the initial inundation of the property (and six hours after rainfall had ceased), it is reasonable to conclude that stormwater alone did not cause inundation of the home. 48. It is accepted insurance law in Australia that where stormwater run-off mixes with floodwater prior to inundation of a property, the ensuing result is Case No: 262955 Determination Page 8 of 8 properly attributed to flood. This means that the possible presence of run-off mixed in with the floodwater is of no benefit to the Applicant‟s claim. The proximate cause of the loss is still due to the excluded event of flood. 49. The report from WR does not address the possibility of inundation to the property from local drains or stormwater pipes. This is a covered event under the policy. 50. There is, however, no persuasive or contemporaneous evidence from the Applicant on this issue. In the circumstances, the Panel is not persuaded that there was inundation above floor level to the home, attributable to such a policy defined event. 51. The Applicant‟s submission suggests that “flash flooding” may have been the cause also, although based on the reports provided, it is the Panel‟s view that the only reasonable explanation for the inundation was the floodwater from the Bundamba Creek. 52. It is well established that floodwater inundated the area and the flood maps provided by the FSP confirm that the Applicant‟s home was well within the boundaries of the affected area. 53. When the Panel Chair Ombudsman spoke with him, the Applicant confirmed the salient findings of the FSP‟s hydrologist; particularly that the house itself was inundated at approximately 12 midnight on 11 January 2011 (11.00pm as estimated by the FSP‟s hydrologist). 54. Having observed the topography of the area; in particular the setting of the home well above the lower area of the lower portion of the property and noting the approximate time that rain ceased in the area (5.00pm or 6.00pm), the Panel is satisfied that the water required to inundate the home would not have been stormwater runoff or discharge from local drains or stormwater pipes or flash flood. 55. The Panel is therefore satisfied, on the balance of probabilities, that the water which inundated the home was floodwater and therefore that the FSP is not obliged to provide cover for the Applicant‟s loss. Determination 56. On the basis of the available information, the Panel determines that the FSP is not obliged to indemnify the Applicant for his loss.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.