Home / Financial Firm (Unknown - Insurer) / Determination 262818

Determination 262818

Claim denied under flood exclusion; whether inundation was covered flash flood

FirmFinancial Firm (Unknown - Insurer)
Decided2012-12-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insured's home and contents were inundated in January 2011 and the FSP denied the claim as flood. AFCA found the loss was caused by flash flood within the policy, so the FSP must meet the building and contents loss subject to policy caps of $136,000 and $25,000, plus statutory interest.

The proximate cause of the inundation was heavy rain within 24 hours that triggered the W4 dam release strategy, which brings the loss within the flash flood cover rather than the excluded flood cover.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 262818 Determination Page 1 of 15 Case number: 262818 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Inundation - Policy Interpretation - Flood vs Flash Flood 19 November 2012 Background 1. The Applicant insured her home and contents in Goodna with the Financial Services Provider (FSP). The relevant period of insurance operated for twelve months beginning from 15 July 2010. During this period, the building was insured up to a sum of $272,200 and the contents for $48,800. 2. On 11 January 2011, the Applicant‟s home was damaged as a result of extensive water inundation following severe weather events in Queensland. 3. She lodged a claim which the FSP denied on the basis the damage was due to “flood” . The Applicant, through her solicitors, has disputed this. 4. For the sake of simplicity, reference to the Applicant will include her legal representatives. 5. Both the Applicant and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicant ’s position 6. The Applicant submits the following as alternative arguments in response to the FSP‟s decision:  The FSP misrepresented the cover available to her when speaking with her daughter at policy inception, by failing to advise that the policy provided no cover for “flood”. The FSP failed to ensure the policy was suitable to her needs.  The FSP‟s policy failed to clearly inform her that “flood” was excluded as required under Section 35 of the Insurance Contracts Act 1984 (the Act).  The damage was due to “Flash flood and stormwater run- off”, which is an insured event. In particular, the inundation was due to heavy rain that fell from 4.00am on 11 January 2011 which resulted in the Wivenhoe Dam engineers elevating their strategy to W4. This decision Determination Case No: 262818 Determination Page 2 of 15 resulted in massive discharges of water into the Brisbane River that ultimately inundated her property. Summary of FSP’s position 7. In response to the Applicant ‟ s arguments, the FSP submits the following:  The loss was due to flooding, which is excluded under the policy.  The FSP denies any of its telephone consultants misrepresented the cover to the Applicant or her daughter at the time of policy inception.  There is no dispute that the Applicant was provided with a copy of the PDS prior to the claim. The policy structure and layout of the document enables the FSP to rely on the exclusion clause of “flood” pursuant to Section 35(2) of the Act. 8. The FSP relies on a number of hydrology reports authored by SC and the following policy provisions to deny the Applicant‟s claim : Page 3 of the Certificate of Insurance (COI) “ What optional covers are included and not included Home Contents ... Flood and storm surge not included not included...” Pages 10-12 of the PDS “ Words / terms with special meanings Word / term Meaning ... Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off. ... Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightning, heavy rain, hail or snow, but not continuous bad weather by itself. ...” Pages 17-18 of the PDS Case No: 262818 Determination Page 3 of 15 “ Insured events you are covered for Damage caused by weather... What is covered What is not covered Storm Loss or damage:  caused by rain, hail or snow after it has reached the ground... ... Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood... ...” Page 27 of the PDS “ Your home The most we will pay you for home claims What is covered What is not covered Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. ... ...” Page 32 of the PDS “ Your contents The most we will pay you for contents claims What is covered What is not covered ... ... Flash flood and stormwater run-off We will pay up to 50% of your contents sum insured or $25,000, whichever is higher, but not exceeding your contents sum insured. ... ...” Case No: 262818 Determination Page 4 of 15 Issues 9. Whether the FSP misrepresented the level of cover provided under the policy to the Applicant‟s daughter (at the time of the policy‟s inception) and left the Applicant with the reasonable belief that she was covered for flood. 10. Whether the Applicant was “clearly informed” about what the policy did and did not cover and whether the FSP failed in its duty of utmost good faith. 11. Whether the cause of the Applicant‟s loss was covered under the policy. Reasons for decision 12. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to FOS‟s Terms of Reference. This dispute has not been the subject of a FOS Recommenda tion and has proceeded directly to Determination. 13. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 14. On 30 October 2012, the Panel Chair Ombudsman attended on site where he met with the Applicant, her daughter and a representative of the FSP. 15. It is appropriate to consider the issues under the various headings. Alleged Misrepresentation 16. The Applicant incepted the policy with the FSP in 2010 with the assistance of her daughter. The cover had previously been with another insurer and the daughter sought “exactly the same cover” as offered by the competitor. The consultant for the FSP allegedly failed to mention that the policy did not provide flood cover as a matter of course. 17. The FSP says that its underwriting procedures ensure that staff members are trained to inform prospective clients about the limits of flood cover when asked. Further to this, staff members are instructed to inform prospective customers about the flood option under the policy if a person asks about it. 18. The recollections from the Applicant‟s daughter are fairly vague, attesting only to asking for “exactly the same cover”. Policies offered by i nsurers generally vary in their terms and conditions and the Panel considers it unlikely that the FSP‟s representative would have agreed to provide identical cover in the knowledge that this could not be done. 19. The Panel also notes the cover provided was eq uivalent in that it provided general cover for the Applicant‟s home and contents; in this capacity, it served the purpose for which it was sought. Case No: 262818 Determination Page 5 of 15 20. Despite the limited available evidence regarding the inception of the policy, it is not in dispute that the Applicant subsequently received the PDS and the COI documents from the FSP. 21. Even if the FSP had made such misrepresentation (which the Panel does not accept) the Panel is satisfied that should the PDS (or COI) adequately demonstrate the limitations of cover provided, then a reading of the PDS would serve to clarify the FSP‟s alleged misrepresentation. 22. The Panel is further satisfied that the FSP‟s policy:  Is a standard home insurance policy that is available to the general public as opposed to being tailored to the Applicant‟s specific needs; and  Had a 21 day cooling off period which provided the Applicant ample opportunity to review the contract and obtain advice on it to ensure it was suitable for her needs. 23. Given this and assuming that the PDS was sufficient to inform the Applicant of the limitations of the cover provided, the Panel does not consider that the Applicant was unduly affected or prejudiced as a result of any failure to explain the absence of flood cover with her daughter at the time of the pol icy‟s inception . Consideration of "Flood" Definition in PDS 24. The Applicant contends that the definition of flood in the PDS is too broad, too difficult to comprehend and that the FSP has not met its obligations under Section 35 of the Act to “clearly inform” her of what is and is not covered under the policy. 25. The Panel has previously considered this issue for the FSP‟s policy. It is satisfied that the two events (“flood” and “flash flood and stormwater run - off”) can be distinguished. 26. The Applicant has raised an issue with the placing of definitions throughout the policy and the difficulty a “reasonable person” would have in evaluating it. The Panel is satisfied that the PDS should be read in its entirety and that (should this be done) the interpretation of sa me should not be difficult for a “reasonable person”. 27. The PDS has an index on the inside cover which highlights the areas of the policy in which the policyholder might find information. Included in this is “Words/terms with special meanings” on page 9, for which definitions of relevant terms in the policy are provided. Flood is included in this on page 10, together with the qualification that: “... This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. ” Case No: 262818 Determination Page 6 of 15 28. In addition to this, page 53 directs the reader to “Flood and storm surge”, which is explained under the broader definition of “Optional covers for extra peace of mind”. This section explains that: “... This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. ” 29. The COI shows that the Applicant did not elect to include the optional “Flood and storm surge” cover for her policy and this is clearly noted on the COI. 30. Accordingly, the Panel is satisfied that the FSP has satisfactorily defined the events in the policy as required under Section 35 of the Act and that it is entitled to rely upon those definitions in determining if the policy responds to the Applicant‟s loss. 31. Further, the Applicant contends that the FSP failed in its duty of utmost good faith by not ensuring that the policy was suitable for her needs; the FSP denies such responsibility. 32. The Panel agrees it is not appropriate for the FSP to provide specific advice regarding the Applicant‟s circumstances as it is not properly licensed with a relevant Australian Financial Services Licence; such advice is normally the domain of licensed insurance brokers or other appropriately authorised professionals. 33. Accordingly, in the Panel‟s view, the FSP has not breached it s duty of utmost good faith. Water Inundation The Evidence 34. The Panel accepts that the FSP‟s policy does not extend cover to circumstances where a loss is caused by a flood. The policy also distinguishes between flood, flash flood and stormwater run-off (the latter two of which are covered). It extends cover to damage from sudden flood events “caused by heavy rain that fell no more than 24 hours prior” to the flash flood. 35. The Applicant left her home on 10 January 2011 prior to her home being inundated. She is not aware of when the home was inundated. 36. After the lodgement of the claim, the FSP appointed a loss adjuster (MY) to investigate and report on the damage caused to the Applicant ‟ s property. The report estimated that there was about $150,000 worth of b uilding damage and up to $48,800 of contents damage (being the policy limit). MY suggested that water first entered the property on the morning of 11 January 2011. 37. MY considered that the cause of the loss was the “flood from the Brisbane River” and that this was caused by the “river bursting [its] banks”. Case No: 262818 Determination Page 7 of 15 38. The FSP subsequently engaged a hydrologist, SC, to provide a report as to the cause of the damage. 39. SC provided a statutory declaration dated 7 December 2011 to evaluate the cause of the loss in the region surrounding and specifically affecting the Applicant ‟ s home. He found that:  A substantial amount of rain fell in the greater Brisbane area from 9 January 2011 and over the subsequent two days, which caused significant inflows into the Wivenhoe Dam, which peaked on the evening of 11 January 2011.  Rain also fell in the area of the Bremer River from 6.00am on 11 January 2011. This rain travelled along the Bremer River to the junction of the Brisbane River and ultimately contributed about 15-25% of its peak flow.  A “small proportion” of the overall depth of the Brisbane River “may be partially attributable to the rain that fell in the Bremer River catchment on 11 January 2011”, although the “overwhelming influence” was the rain that had fallen in the previous days.  The terrain data for the Applicant‟s home shows that the property varies between 7.9m AHD (Australian Height Datum) and 8.8m AHD. The property slopes slightly from the rear to the front.  Woogaroo Creek is located about 80m from the Applicant‟s home.  The terrain data for the Applicant‟s home suggested that it was unlikely that she would have experienced significant stormwater or rain run-off problems during the period.  Inundation from stormwater run- off requires “intense levels of rain” which are sufficient to overcome the stormwater drainage system. Any such run-off generally occurs during or very shortly after such an intense period of rainfall.  A review of the rainwater gauge at the Opossum Alert, approximately 3.7km from the Applicant ‟ s property and representative of its rainfall in the expert‟s opinion, revealed that 61mm of rain fell over 9 and 10 January 2011, with a further 44mm falling on 11 January 2011. The most intense rainfall on 11 January 2011 fell between 10.00am and 11.00am when 17mm was recorded. No rainfall was recorded on 12 January 2011.  The overall intensity of the rainfall was “very low” and unlikely to result in run-off or stormwater inundation to the property.  The water levels of the Brisbane River rose to 7.9m AHD by about 1.00pm on 11 January 2011 and this was sufficient to inundate the minimum level of the Applicant‟s property. By 2.00pm, the water level would have been sufficient to inundate the house. The Applicant‟s property was inundated by the floodwater from the Brisbane River and not stormwater run-off or flash flooding (as defined in the policy). Case No: 262818 Determination Page 8 of 15 40. As a result of the report from SC, the FSP denied the claim on the basis that it considered the cause of the loss to be flooding from the Brisbane River. 41. Since the matter has been referred to the Service, the Applicant has suggested that the releases of water from the Wivenhoe Dam on 11 January 2011 were a significant factor in the increased water levels in the Brisbane River and that this was a major influ ence in the inundation of the Applicant‟s home. 42. The Applicant has not provided any expert evidence or eyewitness testimony in support of her contention that the home was first inundated by stormwater runoff. In the Panel‟s view the available evidence lead s to the conclusion that the inundation was caused by water which had escaped and/or back flowed from the Brisbane River. As such the flood exclusion would operate to defeat the claim. However, as outlined below, the policy provision of „flash flood‟ may have been enlivened. Releases from Wivenhoe Dam & Proximate Cause 43. While the Applicant‟s policy does not provide cover for flood, it does provide cover for a particular type of flood that is “Flash Flood”. In order for the Applicant to be entitled to this limited cover, the following elements must be established:  There was a sudden flood;  There was heavy rain that occurred within 24 hours prior to that flood;  The sudden flood was caused by that heavy rain. 44. Therefore, the central issue for Determination in this dispute is whether the inundation of the Applicant‟s home on 11 January 2011 was due to flash flood as defined within the terms of the policy; that is, whether rain that fell no more than 24 hours prior to the inundation of the Applicant‟s property was the proximate cause of the inundation. 45. The Panel suspended issuing Determinations relating to this question after the Queensland Flood Commission of Inquiry had been recalled to hear further evidence from the Wivenhoe Dam ‟s operating engineers. Once the final report was released, all relevant stakeholders were invited to put further submissions to the Panel relating to the impact of the heavy rainfall that commenced falling over the Wivenhoe Dam around 4.00am on 11 January 2011 and in particular the impact this had on the decision to adopt the W4 release strategy. 46. On 21 May 2012, FOS issued a memorandum to all relevant stakeholders advising that after considerable deliberation of all material available to it, the Panel formed a view that the heavy rain occurring from approximately 4.00am on 11 January 2011 and in particular the heavy rain between 4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4 strategy being invoked and therefore a proximate cause or trigger that led to the flooding of many of the properties along the Brisbane River. Case No: 262818 Determination Page 9 of 15 47. At that time, the Panel noted that the approach taken in each dispute would depend upon the individual and unique factors relevant to the dispute and in that regard the parties were invited to make further submissions in relation to disputes before FOS. 48. In view of this, the FSP provided detailed further submissions to FOS in relation to this dispute. Included with the submissions were the following documents:  A Reference document for disputes relating to Quee nsland Floods (this is a general reference document) relating to the various submissions the FSP makes in relation to a number of issues. Not all issues raised in the reference document appear in the current dispute. The Reference document has been updated ;  Letter from the FSP‟s hydrologist attaching a Key Conclusions Sheet for the Applicant‟s property;  Hydrologist report “Investigations of January 2011 inundation event – Brisbane” dated March 2011;  A further statement from SC regarding the timing and cause of the inundation. 49. The Panel has reviewed the reference documents. Insofar as the reference documents relate to the current issues in dispute, those matters have been considered. 50. In summary the FSP argues that the proximate cause of the inundation of the properties, that is the real or effective cause of the damage caused to the properties downstream of the dam, is not simply the rain that occurred from 4.00am on 11 January 2011. The FSP maintains that on any reasonable view, the damage sustained to the do wnstream properties was the combined effect of all of the rainfall and not just the rain that had fallen from 4.00am on 11 January 2011 leading to the implementation of the W4 strategy from 8.00am that day. 51. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment area and in fact parts of the Brisbane River from approximately 4.00am on 11 January 2011. It is not disputed that in addition to this there was heavy rain over the Bremer River which influenced the level of the Brisbane River and that rain commenced at approximately 6.00am on 11 January 2011. 52. The FSP‟s hydrologist has relied on data from SEQWater dated 2 March 2011 which confirms the rapid increase in releases from the Wivenhoe Dam from 8.00am on 11 January 2011. Examination of the SEQWater report identifies the rapid increase in the inflows to the Wivenhoe Dam commencing from about 4.00am, 11 January 2011. The report confirms the inflows into the dam had been decreasing from as early as 8.00am from 10 January 2011 with steady decreases from approximately 3.00pm on 10 January 2011 to 2.00am on 11 January 2011. Case No: 262818 Determination Page 10 of 15 53. The Queensland Flood Commission of Inquiry report confirms that prior to 4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011 the dam releases were being managed at the W3 strategy. Whilst it is accepted that the W3 strategy had led to an increase in the levels of the Brisbane River, the W3 strategy was designed to avoid where possible inundation of the properties below the Wivenhoe Dam by flooding from the Brisbane River. 54. There is no dispute that there were two significant rainfall spikes with rain that fell from 9 to 10 January 2011 being considered the first spike and rain that commenced falling from approximately 4.00am on 11 January 2011 being the second spike. 55. There is no dispute that following the second spike the W4 strategy was adopted. The FSP has argued that the switch to strategy W4 was not the natural and ordinary consequence of the rain that fell and in fact the move to W4 strategy was not taken in accordance with the Wivenhoe Dam manual. In the Panel‟s view, the Queensland Flood Commission of Inquiry final report does not find the adoption of W4 strategy at 8.00am on 11 January 2011 was inconsistent with the manual. Although there may be issues as to how the Wivenhoe Dam had been managed prior to this time, there is nothing in the material that has been provided to the Panel to suggest that the earlier management of the Wivenhoe Dam influenced to any significant degree, the adoption of the W4 release strategy at 8.00am on 11 January 2011. 56. The ICA hydrology and the information provided by the FSP‟s hydrologist confirms that the increased releases from the Wivenhoe Dam after the adoption of the W4 strategy led to the development of a flood wave that ultimately caused the flooding of many properties downstream of the Wivenhoe Dam. 57. The question arises as to what was the proximate cause of this inundation. In determining the proximate cause of the inundation it is necessary to look at the effective or dominant cause of the inundation. The Panel agrees with the FSP‟s general submission that the proximate cause is a cause determined by common sense evaluation of the relevant facts. In the event that there are two or more proximate causes, one within the policy and the other excluded, the policy does not respond. The proximate cause is not determined by identifying the last event or final trigger but by determining what is the dominant, effective, direct or efficient cause of the loss. 58. The FSP has maintained that the impact on the Wivenhoe Dam from the rainfall that fell in the early hours of 11 January 2011 was only 29% while 71% of the volume of the inflow came from the rain that fell on 9 and 10 January 2011 or earlier. The FSP maintains that to find the rainfall which had fallen from 4.00am on 11 January 2011 is the proximate cause is without foundation as such an approach produces an entirely artificial outcome. 59. With due respect to the FSP‟s argument the Panel disagrees. Whilst the Panel accepts there has been a significant impact on the levels of the Wivenhoe Dam by the rainfall that commenced falling on or about 9 January Case No: 262818 Determination Page 11 of 15 2011 or earlier, the Panel is satisfied having regard to the information that has been exchanged and the relevant legal principles, that the heavy rain that commenced falling on or about 4.00am on 11 January 2011 was the proximate or effective cause of the adoption of the W4 strategy. 60. The Panel is also satisfied that whilst the level of the Brisbane River may have been increasing under the W3 strategy, it was the heavy rainfall from approximately 4.00am on 11 January 2011 that caused the need to adopt the W4 strategy at 8.00am on the same day. The Applicant’s Inundation 61. Within the Key Conclusions Sheet dated 7 June 2012, SC indicates the effect of the W4 releases first reached the vicinity of the Applicant‟s property at 12.50pm on 11 January 2011. He also said that the property was ultimately inundated up to 8.4m above the relevant benchmark level by 4.56pm on 12 January 2011. 62. The relev ant benchmark level was SC‟s estimate of the lowest point of the two storey home on the land. SC identified that the benchmark level was at 8.2m AHD (the land varies between 7.9m AHD and 8.8m AHD). He commented that the home was “elevated” with possible st orage area underneath. The Panel notes that the FSP‟s assessor MY (based on an inspection of the property), referred to the type of foundations as “slab to ground level”. 63. On site inspection, the Panel Chair Ombudsman noted the two storey home is sited on a concrete slab. The downstairs area consists of a garage, a lounge and living area and a toilet and bathroom. 64. The Panel notes that SC appears to nominate the front left corner of the house (as the house is observed looking towards (M) Street), as the benchmark level, that is, the lowest point of the structure of the house on the land. 65. The Panel also notes that in his statement of 7 December 2011, SC concluded that by 2.00pm on 11 January 2011, the level of the Brisbane River would have been sufficient to inundate the house. 66. The Panel accepts the possibility that these assessments may not be entirely accurate. 67. However, of particular interest in this dispute is that while SC says that the “Approximate time (the) Brisbane River reached the approximate benchmar k level (being the lowest point of the structure of the house on the land) was 12.41pm on Tuesday 11 January 2011, he also says that the time the effect of the W4 releases first reached the vicinity of the property was 12.50pm on Tuesday 11 January 2011, that is, nine minutes after the approximate time he says the Brisbane River reached the approximate benchmark level. Case No: 262818 Determination Page 12 of 15 68. SC also says that “Assuming the releases from the Wivenhoe Dam had continued at the W3 rates of discharge which applied prior to 8.00AM on 11 January 2011, the river level would have first inundated the benchmark level at approximately 12.41pm on Tuesday 11 January 2011. On this assumption, the river level at 4.00am on 12 January 2011 would have been at approximately 12.9m AHD, which is 4.7m above the benchmark level. With the W4 releases, the river level at 4.00AM on 12 January 2011 would have been at approximately 14.5m AHD, which is 6.3m above the benchmark level. 69. The Panel has a number of concerns with the assumptions made by SC and the conclusions he has reached based upon those assumptions. 70. Firstly, the Panel notes that SC has not provided an explanation of what is meant by “the vicinity of the property”. 71. The Panel Chair Ombudsman has on previous occasions specifically asked SC and derivatively the FSP, to address this issue. But, the FSP as the entity bearing this ultimate responsibility, has not, to the Panel‟s satisfaction, been able to properly explain the meaning from a hydrological perspective of the site specific phrase „the vicinity of the property‟. 72. Secondly, the Panel is concerned that to reach the conclusions which SC reaches, it must be speculated that the releases from the Wivenhoe Dam would have continued at the same rate, at the W3 level, in the absence of any additional rainfall. 73. In this regard, the available information indicates the W3 strategy that was in place prior to 8.00am on 11 January 2011 had been successful in limiting the outflows and flooding below the Wivenhoe Dam. Whether the outflows would have continued at the same rate had the inflows continued to reduce is not known. 74. Thirdly, the Panel notes that within his statement of 7 December 2011, SC estimated that the Brisbane River in the vicinity of the subject property reached the level of 8.8m AHD at 2.00pm on 11 January 2011, which he said at that time would have been sufficient to inundate the house on the subject property. 75. Within the Key Conclusion Statement of 7 June 2012, SC, however, suggests that the house was inundated at 12.41pm on Tuesday 11 January 2011. 76. The Panel notes that SC has not included any statement within the comments component of his Key Conclusions Sheet and as such, the Panel is unclear as to why SC has altered the time of inundation of the house by some 79 minutes. 77. Further, in respect t o SC‟s estimate of the time the effect of the W4 releases first reached the vicinity of the property, that being 12.50pm on Tuesday 11 January 2011, within his statement of 24 October 2011, SC suggests that Case No: 262818 Determination Page 13 of 15 the travel time of the water released from the Wi venhoe Dam is only an estimate and likely to be accurate within plus or minus 10 to 20 percent (that is plus or minus approximately one to two hours from Moggill Alert onwards). 78. Finally, the Panel is satisfied, based on the material provided by the FSP, that SC did not conduct a site specific inspection of the risk address. In this regard the Panel notes SC‟s comments in his 7 June 2012 Key Conclusions Sheet “elevated (possible storage areas)” whereas on site, the Panel Chair Ombudsman, with the FSP‟s repre sentative, observed, not storage areas, but rather living quarters. 79. Considering all of these matters, the Panel is satisfied that in this case, on the balance of probabilities, it has sufficient information to permit it to diverge from SC‟s estimations in respect of timing and height of inundation of the waters from the Brisbane River in the area of the subject property on 11 and 12 January 2011. 80. As such and in accordance with what is fair in all the circumstances, the Panel is not satisfied that the estima ted time frames can be relied upon to definitively find that the house was inundated prior to the arrival of the W4 releases from the Wivenhoe Dam. 81. The Panel is satisfied that the variability in the potential times that the house was inundated (as variously outlined above) cannot be relied upon to exclude the Applicant from cover or to ignore the effect of the rainfall on the morning of 11 January 2011 and the releases under the W4 strategy from the Wivenhoe Dam. 82. In the circumstances, the Panel is satisfied on the facts that it was the heavy rainfall from approximately 4.00am on 11 January 2011 which caused the dam‟s operating engineers to engage the W4 strategy at 8.00am on the same day and that the subsequent dam releases led to the inundation of the Applicant ‟ s property. The Panel further determines, based upon the Panel Chair Ombudsman‟s site visit, on the balance of probabilities, that whether the appropriate height of inundation above the benchmark level is putatively suggested as either 4.7m AHD or 6.3 m AHD (as variously approximated by the FSP pursuant to SC‟s calculations), the net effect is the same, namely the whole house was inundated pursuant to the FSP‟s policy event of „flash flood‟. 83. To this extent, the Panel is satisfied that the total inundation of the Applicant ‟ s property was caused by flood that occurred within 24 hours of the heavy rainfall. Quantum 84. The Renewal Certificate of Insurance for the relevant period provides a sum insured of $272,200 for the home with contents of $48,800. Pursuant to the policy cap for the insured event of “Flash flood and stormwater runoff”, the FSP is liable up to an amount of $136,000 for the damage to the building and $25,000 for the contents. Case No: 262818 Determination Page 14 of 15 85. Given the time since the loss was sustained, the Panel accepts that the parties may be unable to provide an exact estimate of the total loss sustained, or a breakdown of that loss. 86. The Applicant and the FSP are asked to work cooperatively together to establish the extent of the loss sustained to the property and to reach an agreement as to cost of repairs of same and on replacement of the various contents lost. Insofar as the FSP may have made payment of a compassionate sum to the Applicant, FOS does not have jurisdiction to deal with this payment but acknowledges that the FSP, given the terms on which the compassionate payment was made, may be entitled to deduct this payment from any settlement sum. 87. The Panel has also considered the issue of interest. 88. The FSP has argued that interest is only payable from the date from which it was unreasonable to withhold payment. The FSP maintains that it is entitled to a reasonable period to investigate and determine its position, and given the complex nature of the flood disputes, the delays are not unreasonable. Further complex situations require substantial periods of time for independent bodies such as the Queensland Flood Commission of Inquiry and FOS, to make conclusions on the issues in dispute. 89. The FSP maintains that it did not act unreasonably in this dispute and therefore interest is not payable. Alternatively if some period of interest is to be awarded it should be reduced to account for the substantial delays through the course of the process which were not the FSP‟s fault. 90. Section 57 of the Insurance Contracts Act requires interest be paid when it becomes “unreasonable for the insurer to have withheld payment”. An examination of relevant case law indicates that most probably, interest will be awarded from either when an insurer first emphatically denied liability or disputed a matter, or from when in the normal course of events the claim should have been paid if liability had not been disputed. 91. In this dispute the Panel accepts that the FSP was entitled to withhold payment of the settlement monies until such time as it had properly investigated the dispute and made its decision as to liability. 92. The FSP made its original decision to deny the claim after receiving relevant assessment reports, hydrology reports and other information. The FSP was aware of the terms of its policy and aware of the relevant provisions under which liability might arise and chose to deny the claim having reviewed those relevant provisions and the evidence available to it. 93. In the Panel‟s view, at that point the FSP has made its decision on the claim and it is appropriate that from that time interest be paid unless it can be established that the Applicant had withheld information from the FSP that would have led to an alteration of its decision. Case No: 262818 Determination Page 15 of 15 94. Accordingly, the Panel determines that it is appropriate that the FSP in this dispute pay interest from the day upon which the FSP determined to deny liability of the Applicant‟s claim, until payment of the claim. Determination 95. The FSP is to meet the cost of repairs incurred by the Applicant and the cost of the replacement of items damaged as a result of the inundation of the property. Any payment is subject to the limitations expressed in paragraph 84 of this Determination. 96. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from 12 April 2011 (being the date of rejection of the claim) to date of payment of the claim, in accordance with Section 57 of the Act.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.