Text of the determination
Case No: 262818 Determination Page 1 of 15
Case number: 262818
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Inundation - Policy Interpretation - Flood vs Flash Flood
19 November 2012
Background
1. The Applicant insured her home and contents in Goodna with the Financial
Services Provider (FSP). The relevant period of insurance operated for
twelve months beginning from 15 July 2010. During this period, the building
was insured up to a sum of $272,200 and the contents for $48,800.
2. On 11 January 2011, the Applicant‟s home was damaged as a result of
extensive water inundation following severe weather events in Queensland.
3. She lodged a claim which the FSP denied on the basis the damage was due
to “flood” . The Applicant, through her solicitors, has disputed this.
4. For the sake of simplicity, reference to the Applicant will include her legal
representatives.
5. Both the Applicant and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will summarise these
submissions given all of the material made available has been exchanged
with the other party.
Summary of Applicant ’s position
6. The Applicant submits the following as alternative arguments in response to
the FSP‟s decision:
The FSP misrepresented the cover available to her when speaking with
her daughter at policy inception, by failing to advise that the policy
provided no cover for “flood”. The FSP failed to ensure the policy was
suitable to her needs.
The FSP‟s policy failed to clearly inform her that “flood” was excluded
as required under Section 35 of the Insurance Contracts Act 1984 (the
Act).
The damage was due to “Flash flood and stormwater run- off”, which is
an insured event. In particular, the inundation was due to heavy rain
that fell from 4.00am on 11 January 2011 which resulted in the
Wivenhoe Dam engineers elevating their strategy to W4. This decision
Determination
Case No: 262818 Determination Page 2 of 15
resulted in massive discharges of water into the Brisbane River that
ultimately inundated her property.
Summary of FSP’s position
7. In response to the Applicant ‟ s arguments, the FSP submits the following:
The loss was due to flooding, which is excluded under the policy.
The FSP denies any of its telephone consultants misrepresented the
cover to the Applicant or her daughter at the time of policy inception.
There is no dispute that the Applicant was provided with a copy of the
PDS prior to the claim. The policy structure and layout of the document
enables the FSP to rely on the exclusion clause of “flood” pursuant to
Section 35(2) of the Act.
8. The FSP relies on a number of hydrology reports authored by SC and the
following policy provisions to deny the Applicant‟s claim :
Page 3 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
Pages 10-12 of the PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off.
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightning, heavy
rain, hail or snow, but not continuous bad weather by
itself.
...”
Pages 17-18 of the PDS
Case No: 262818 Determination Page 3 of 15
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...”
Page 32 of the PDS
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater run-off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher, but not exceeding your contents
sum insured.
...
...”
Case No: 262818 Determination Page 4 of 15
Issues
9. Whether the FSP misrepresented the level of cover provided under the
policy to the Applicant‟s daughter (at the time of the policy‟s inception) and
left the Applicant with the reasonable belief that she was covered for flood.
10. Whether the Applicant was “clearly informed” about what the policy did and
did not cover and whether the FSP failed in its duty of utmost good faith.
11. Whether the cause of the Applicant‟s loss was covered under the policy.
Reasons for decision
12. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‟s Terms of Reference. This dispute has not
been the subject of a FOS Recommenda tion and has proceeded directly to
Determination.
13. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
14. On 30 October 2012, the Panel Chair Ombudsman attended on site where
he met with the Applicant, her daughter and a representative of the FSP.
15. It is appropriate to consider the issues under the various headings.
Alleged Misrepresentation
16. The Applicant incepted the policy with the FSP in 2010 with the assistance of
her daughter. The cover had previously been with another insurer and the
daughter sought “exactly the same cover” as offered by the competitor. The
consultant for the FSP allegedly failed to mention that the policy did not
provide flood cover as a matter of course.
17. The FSP says that its underwriting procedures ensure that staff members
are trained to inform prospective clients about the limits of flood cover when
asked. Further to this, staff members are instructed to inform prospective
customers about the flood option under the policy if a person asks about it.
18. The recollections from the Applicant‟s daughter are fairly vague, attesting
only to asking for “exactly the same cover”. Policies offered by i nsurers
generally vary in their terms and conditions and the Panel considers it
unlikely that the FSP‟s representative would have agreed to provide identical
cover in the knowledge that this could not be done.
19. The Panel also notes the cover provided was eq uivalent in that it provided
general cover for the Applicant‟s home and contents; in this capacity, it
served the purpose for which it was sought.
Case No: 262818 Determination Page 5 of 15
20. Despite the limited available evidence regarding the inception of the policy, it
is not in dispute that the Applicant subsequently received the PDS and the
COI documents from the FSP.
21. Even if the FSP had made such misrepresentation (which the Panel does
not accept) the Panel is satisfied that should the PDS (or COI) adequately
demonstrate the limitations of cover provided, then a reading of the PDS
would serve to clarify the FSP‟s alleged misrepresentation.
22. The Panel is further satisfied that the FSP‟s policy:
Is a standard home insurance policy that is available to the general
public as opposed to being tailored to the Applicant‟s specific needs;
and
Had a 21 day cooling off period which provided the Applicant ample
opportunity to review the contract and obtain advice on it to ensure it
was suitable for her needs.
23. Given this and assuming that the PDS was sufficient to inform the Applicant
of the limitations of the cover provided, the Panel does not consider that the
Applicant was unduly affected or prejudiced as a result of any failure to
explain the absence of flood cover with her daughter at the time of the
pol icy‟s inception .
Consideration of "Flood" Definition in PDS
24. The Applicant contends that the definition of flood in the PDS is too broad,
too difficult to comprehend and that the FSP has not met its obligations
under Section 35 of the Act to “clearly inform” her of what is and is not
covered under the policy.
25. The Panel has previously considered this issue for the FSP‟s policy. It is
satisfied that the two events (“flood” and “flash flood and stormwater run - off”)
can be distinguished.
26. The Applicant has raised an issue with the placing of definitions throughout
the policy and the difficulty a “reasonable person” would have in evaluating
it. The Panel is satisfied that the PDS should be read in its entirety and that
(should this be done) the interpretation of sa me should not be difficult for a
“reasonable person”.
27. The PDS has an index on the inside cover which highlights the areas of the
policy in which the policyholder might find information. Included in this is
“Words/terms with special meanings” on page 9, for which definitions of
relevant terms in the policy are provided. Flood is included in this on page
10, together with the qualification that:
“... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance. ”
Case No: 262818 Determination Page 6 of 15
28. In addition to this, page 53 directs the reader to “Flood and storm surge”,
which is explained under the broader definition of “Optional covers for extra
peace of mind”. This section explains that:
“... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance. ”
29. The COI shows that the Applicant did not elect to include the optional “Flood
and storm surge” cover for her policy and this is clearly noted on the COI.
30. Accordingly, the Panel is satisfied that the FSP has satisfactorily defined the
events in the policy as required under Section 35 of the Act and that it is
entitled to rely upon those definitions in determining if the policy responds to
the Applicant‟s loss.
31. Further, the Applicant contends that the FSP failed in its duty of utmost good
faith by not ensuring that the policy was suitable for her needs; the FSP
denies such responsibility.
32. The Panel agrees it is not appropriate for the FSP to provide specific advice
regarding the Applicant‟s circumstances as it is not properly licensed with a
relevant Australian Financial Services Licence; such advice is normally the
domain of licensed insurance brokers or other appropriately authorised
professionals.
33. Accordingly, in the Panel‟s view, the FSP has not breached it s duty of utmost
good faith.
Water Inundation
The Evidence
34. The Panel accepts that the FSP‟s policy does not extend cover to
circumstances where a loss is caused by a flood. The policy also
distinguishes between flood, flash flood and stormwater run-off (the latter
two of which are covered). It extends cover to damage from sudden flood
events “caused by heavy rain that fell no more than 24 hours prior” to the
flash flood.
35. The Applicant left her home on 10 January 2011 prior to her home being
inundated. She is not aware of when the home was inundated.
36. After the lodgement of the claim, the FSP appointed a loss adjuster (MY) to
investigate and report on the damage caused to the Applicant ‟ s property.
The report estimated that there was about $150,000 worth of b uilding
damage and up to $48,800 of contents damage (being the policy limit). MY
suggested that water first entered the property on the morning of 11 January
2011.
37. MY considered that the cause of the loss was the “flood from the Brisbane
River” and that this was caused by the “river bursting [its] banks”.
Case No: 262818 Determination Page 7 of 15
38. The FSP subsequently engaged a hydrologist, SC, to provide a report as to
the cause of the damage.
39. SC provided a statutory declaration dated 7 December 2011 to evaluate the
cause of the loss in the region surrounding and specifically affecting the
Applicant ‟ s home. He found that:
A substantial amount of rain fell in the greater Brisbane area from 9
January 2011 and over the subsequent two days, which caused
significant inflows into the Wivenhoe Dam, which peaked on the
evening of 11 January 2011.
Rain also fell in the area of the Bremer River from 6.00am on 11
January 2011. This rain travelled along the Bremer River to the junction
of the Brisbane River and ultimately contributed about 15-25% of its
peak flow.
A “small proportion” of the overall depth of the Brisbane River “may be
partially attributable to the rain that fell in the Bremer River catchment
on 11 January 2011”, although the “overwhelming influence” was the
rain that had fallen in the previous days.
The terrain data for the Applicant‟s home shows that the property varies
between 7.9m AHD (Australian Height Datum) and 8.8m AHD. The
property slopes slightly from the rear to the front.
Woogaroo Creek is located about 80m from the Applicant‟s home.
The terrain data for the Applicant‟s home suggested that it was unlikely
that she would have experienced significant stormwater or rain run-off
problems during the period.
Inundation from stormwater run- off requires “intense levels of rain”
which are sufficient to overcome the stormwater drainage system. Any
such run-off generally occurs during or very shortly after such an
intense period of rainfall.
A review of the rainwater gauge at the Opossum Alert, approximately
3.7km from the Applicant ‟ s property and representative of its rainfall in
the expert‟s opinion, revealed that 61mm of rain fell over 9 and 10
January 2011, with a further 44mm falling on 11 January 2011. The
most intense rainfall on 11 January 2011 fell between 10.00am and
11.00am when 17mm was recorded. No rainfall was recorded on 12
January 2011.
The overall intensity of the rainfall was “very low” and unlikely to result
in run-off or stormwater inundation to the property.
The water levels of the Brisbane River rose to 7.9m AHD by about
1.00pm on 11 January 2011 and this was sufficient to inundate the
minimum level of the Applicant‟s property. By 2.00pm, the water level
would have been sufficient to inundate the house. The Applicant‟s
property was inundated by the floodwater from the Brisbane River and
not stormwater run-off or flash flooding (as defined in the policy).
Case No: 262818 Determination Page 8 of 15
40. As a result of the report from SC, the FSP denied the claim on the basis that
it considered the cause of the loss to be flooding from the Brisbane River.
41. Since the matter has been referred to the Service, the Applicant has
suggested that the releases of water from the Wivenhoe Dam on 11 January
2011 were a significant factor in the increased water levels in the Brisbane
River and that this was a major influ ence in the inundation of the Applicant‟s
home.
42. The Applicant has not provided any expert evidence or eyewitness testimony
in support of her contention that the home was first inundated by stormwater
runoff. In the Panel‟s view the available evidence lead s to the conclusion that
the inundation was caused by water which had escaped and/or back flowed
from the Brisbane River. As such the flood exclusion would operate to defeat
the claim. However, as outlined below, the policy provision of „flash flood‟
may have been enlivened.
Releases from Wivenhoe Dam & Proximate Cause
43. While the Applicant‟s policy does not provide cover for flood, it does provide
cover for a particular type of flood that is “Flash Flood”. In order for the
Applicant to be entitled to this limited cover, the following elements must be
established:
There was a sudden flood;
There was heavy rain that occurred within 24 hours prior to that flood;
The sudden flood was caused by that heavy rain.
44. Therefore, the central issue for Determination in this dispute is whether the
inundation of the Applicant‟s home on 11 January 2011 was due to flash
flood as defined within the terms of the policy; that is, whether rain that fell
no more than 24 hours prior to the inundation of the Applicant‟s property was
the proximate cause of the inundation.
45. The Panel suspended issuing Determinations relating to this question after
the Queensland Flood Commission of Inquiry had been recalled to hear
further evidence from the Wivenhoe Dam ‟s operating engineers. Once the
final report was released, all relevant stakeholders were invited to put further
submissions to the Panel relating to the impact of the heavy rainfall that
commenced falling over the Wivenhoe Dam around 4.00am on 11 January
2011 and in particular the impact this had on the decision to adopt the W4
release strategy.
46. On 21 May 2012, FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
Case No: 262818 Determination Page 9 of 15
47. At that time, the Panel noted that the approach taken in each dispute would
depend upon the individual and unique factors relevant to the dispute and in
that regard the parties were invited to make further submissions in relation to
disputes before FOS.
48. In view of this, the FSP provided detailed further submissions to FOS in
relation to this dispute. Included with the submissions were the following
documents:
A Reference document for disputes relating to Quee nsland Floods (this
is a general reference document) relating to the various submissions
the FSP makes in relation to a number of issues. Not all issues raised
in the reference document appear in the current dispute. The
Reference document has been updated ;
Letter from the FSP‟s hydrologist attaching a Key Conclusions Sheet
for the Applicant‟s property;
Hydrologist report “Investigations of January 2011 inundation event –
Brisbane” dated March 2011;
A further statement from SC regarding the timing and cause of the
inundation.
49. The Panel has reviewed the reference documents. Insofar as the reference
documents relate to the current issues in dispute, those matters have been
considered.
50. In summary the FSP argues that the proximate cause of the inundation of
the properties, that is the real or effective cause of the damage caused to the
properties downstream of the dam, is not simply the rain that occurred from
4.00am on 11 January 2011. The FSP maintains that on any reasonable
view, the damage sustained to the do wnstream properties was the combined
effect of all of the rainfall and not just the rain that had fallen from 4.00am on
11 January 2011 leading to the implementation of the W4 strategy from
8.00am that day.
51. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment
area and in fact parts of the Brisbane River from approximately 4.00am on
11 January 2011. It is not disputed that in addition to this there was heavy
rain over the Bremer River which influenced the level of the Brisbane River
and that rain commenced at approximately 6.00am on 11 January 2011.
52. The FSP‟s hydrologist has relied on data from SEQWater dated 2 March
2011 which confirms the rapid increase in releases from the Wivenhoe Dam
from 8.00am on 11 January 2011. Examination of the SEQWater report
identifies the rapid increase in the inflows to the Wivenhoe Dam
commencing from about 4.00am, 11 January 2011. The report confirms the
inflows into the dam had been decreasing from as early as 8.00am from 10
January 2011 with steady decreases from approximately 3.00pm on 10
January 2011 to 2.00am on 11 January 2011.
Case No: 262818 Determination Page 10 of 15
53. The Queensland Flood Commission of Inquiry report confirms that prior to
4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011
the dam releases were being managed at the W3 strategy. Whilst it is
accepted that the W3 strategy had led to an increase in the levels of the
Brisbane River, the W3 strategy was designed to avoid where possible
inundation of the properties below the Wivenhoe Dam by flooding from the
Brisbane River.
54. There is no dispute that there were two significant rainfall spikes with rain
that fell from 9 to 10 January 2011 being considered the first spike and rain
that commenced falling from approximately 4.00am on 11 January 2011
being the second spike.
55. There is no dispute that following the second spike the W4 strategy was
adopted. The FSP has argued that the switch to strategy W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
W4 strategy was not taken in accordance with the Wivenhoe Dam manual.
In the Panel‟s view, the Queensland Flood Commission of Inquiry final report
does not find the adoption of W4 strategy at 8.00am on 11 January 2011
was inconsistent with the manual. Although there may be issues as to how
the Wivenhoe Dam had been managed prior to this time, there is nothing in
the material that has been provided to the Panel to suggest that the earlier
management of the Wivenhoe Dam influenced to any significant degree, the
adoption of the W4 release strategy at 8.00am on 11 January 2011.
56. The ICA hydrology and the information provided by the FSP‟s hydrologist
confirms that the increased releases from the Wivenhoe Dam after the
adoption of the W4 strategy led to the development of a flood wave that
ultimately caused the flooding of many properties downstream of the
Wivenhoe Dam.
57. The question arises as to what was the proximate cause of this inundation.
In determining the proximate cause of the inundation it is necessary to look
at the effective or dominant cause of the inundation. The Panel agrees with
the FSP‟s general submission that the proximate cause is a cause
determined by common sense evaluation of the relevant facts. In the event
that there are two or more proximate causes, one within the policy and the
other excluded, the policy does not respond. The proximate cause is not
determined by identifying the last event or final trigger but by determining
what is the dominant, effective, direct or efficient cause of the loss.
58. The FSP has maintained that the impact on the Wivenhoe Dam from the
rainfall that fell in the early hours of 11 January 2011 was only 29% while
71% of the volume of the inflow came from the rain that fell on 9 and 10
January 2011 or earlier. The FSP maintains that to find the rainfall which had
fallen from 4.00am on 11 January 2011 is the proximate cause is without
foundation as such an approach produces an entirely artificial outcome.
59. With due respect to the FSP‟s argument the Panel disagrees. Whilst the
Panel accepts there has been a significant impact on the levels of the
Wivenhoe Dam by the rainfall that commenced falling on or about 9 January
Case No: 262818 Determination Page 11 of 15
2011 or earlier, the Panel is satisfied having regard to the information that
has been exchanged and the relevant legal principles, that the heavy rain
that commenced falling on or about 4.00am on 11 January 2011 was the
proximate or effective cause of the adoption of the W4 strategy.
60. The Panel is also satisfied that whilst the level of the Brisbane River may
have been increasing under the W3 strategy, it was the heavy rainfall from
approximately 4.00am on 11 January 2011 that caused the need to adopt
the W4 strategy at 8.00am on the same day.
The Applicant’s Inundation
61. Within the Key Conclusions Sheet dated 7 June 2012, SC indicates the
effect of the W4 releases first reached the vicinity of the Applicant‟s property
at 12.50pm on 11 January 2011. He also said that the property was
ultimately inundated up to 8.4m above the relevant benchmark level by
4.56pm on 12 January 2011.
62. The relev ant benchmark level was SC‟s estimate of the lowest point of the
two storey home on the land. SC identified that the benchmark level was at
8.2m AHD (the land varies between 7.9m AHD and 8.8m AHD). He
commented that the home was “elevated” with possible st orage area
underneath. The Panel notes that the FSP‟s assessor MY (based on an
inspection of the property), referred to the type of foundations as “slab to
ground level”.
63. On site inspection, the Panel Chair Ombudsman noted the two storey home
is sited on a concrete slab. The downstairs area consists of a garage, a
lounge and living area and a toilet and bathroom.
64. The Panel notes that SC appears to nominate the front left corner of the
house (as the house is observed looking towards (M) Street), as the
benchmark level, that is, the lowest point of the structure of the house on the
land.
65. The Panel also notes that in his statement of 7 December 2011, SC
concluded that by 2.00pm on 11 January 2011, the level of the Brisbane
River would have been sufficient to inundate the house.
66. The Panel accepts the possibility that these assessments may not be
entirely accurate.
67. However, of particular interest in this dispute is that while SC says that the
“Approximate time (the) Brisbane River reached the approximate benchmar k
level (being the lowest point of the structure of the house on the land) was
12.41pm on Tuesday 11 January 2011, he also says that the time the effect
of the W4 releases first reached the vicinity of the property was 12.50pm on
Tuesday 11 January 2011, that is, nine minutes after the approximate time
he says the Brisbane River reached the approximate benchmark level.
Case No: 262818 Determination Page 12 of 15
68. SC also says that “Assuming the releases from the Wivenhoe Dam had
continued at the W3 rates of discharge which applied prior to 8.00AM on 11
January 2011, the river level would have first inundated the benchmark level
at approximately 12.41pm on Tuesday 11 January 2011. On this
assumption, the river level at 4.00am on 12 January 2011 would have been
at approximately 12.9m AHD, which is 4.7m above the benchmark level.
With the W4 releases, the river level at 4.00AM on 12 January 2011 would
have been at approximately 14.5m AHD, which is 6.3m above the
benchmark level.
69. The Panel has a number of concerns with the assumptions made by SC and
the conclusions he has reached based upon those assumptions.
70. Firstly, the Panel notes that SC has not provided an explanation of what is
meant by “the vicinity of the property”.
71. The Panel Chair Ombudsman has on previous occasions specifically asked
SC and derivatively the FSP, to address this issue. But, the FSP as the
entity bearing this ultimate responsibility, has not, to the Panel‟s satisfaction,
been able to properly explain the meaning from a hydrological perspective of
the site specific phrase „the vicinity of the property‟.
72. Secondly, the Panel is concerned that to reach the conclusions which SC
reaches, it must be speculated that the releases from the Wivenhoe Dam
would have continued at the same rate, at the W3 level, in the absence of
any additional rainfall.
73. In this regard, the available information indicates the W3 strategy that was in
place prior to 8.00am on 11 January 2011 had been successful in limiting the
outflows and flooding below the Wivenhoe Dam. Whether the outflows would
have continued at the same rate had the inflows continued to reduce is not
known.
74. Thirdly, the Panel notes that within his statement of 7 December 2011, SC
estimated that the Brisbane River in the vicinity of the subject property
reached the level of 8.8m AHD at 2.00pm on 11 January 2011, which he
said at that time would have been sufficient to inundate the house on the
subject property.
75. Within the Key Conclusion Statement of 7 June 2012, SC, however,
suggests that the house was inundated at 12.41pm on Tuesday 11 January
2011.
76. The Panel notes that SC has not included any statement within the
comments component of his Key Conclusions Sheet and as such, the Panel
is unclear as to why SC has altered the time of inundation of the house by
some 79 minutes.
77. Further, in respect t o SC‟s estimate of the time the effect of the W4 releases
first reached the vicinity of the property, that being 12.50pm on Tuesday 11
January 2011, within his statement of 24 October 2011, SC suggests that
Case No: 262818 Determination Page 13 of 15
the travel time of the water released from the Wi venhoe Dam is only an
estimate and likely to be accurate within plus or minus 10 to 20 percent (that
is plus or minus approximately one to two hours from Moggill Alert onwards).
78. Finally, the Panel is satisfied, based on the material provided by the FSP,
that SC did not conduct a site specific inspection of the risk address. In this
regard the Panel notes SC‟s comments in his 7 June 2012 Key Conclusions
Sheet “elevated (possible storage areas)” whereas on site, the Panel Chair
Ombudsman, with the FSP‟s repre sentative, observed, not storage areas,
but rather living quarters.
79. Considering all of these matters, the Panel is satisfied that in this case, on
the balance of probabilities, it has sufficient information to permit it to diverge
from SC‟s estimations in respect of timing and height of inundation of the
waters from the Brisbane River in the area of the subject property on 11 and
12 January 2011.
80. As such and in accordance with what is fair in all the circumstances, the
Panel is not satisfied that the estima ted time frames can be relied upon to
definitively find that the house was inundated prior to the arrival of the W4
releases from the Wivenhoe Dam.
81. The Panel is satisfied that the variability in the potential times that the house
was inundated (as variously outlined above) cannot be relied upon to
exclude the Applicant from cover or to ignore the effect of the rainfall on the
morning of 11 January 2011 and the releases under the W4 strategy from
the Wivenhoe Dam.
82. In the circumstances, the Panel is satisfied on the facts that it was the heavy
rainfall from approximately 4.00am on 11 January 2011 which caused the
dam‟s operating engineers to engage the W4 strategy at 8.00am on the
same day and that the subsequent dam releases led to the inundation of the
Applicant ‟ s property. The Panel further determines, based upon the Panel
Chair Ombudsman‟s site visit, on the balance of probabilities, that whether
the appropriate height of inundation above the benchmark level is putatively
suggested as either 4.7m AHD or 6.3 m AHD (as variously approximated by
the FSP pursuant to SC‟s calculations), the net effect is the same, namely
the whole house was inundated pursuant to the FSP‟s policy event of „flash
flood‟.
83. To this extent, the Panel is satisfied that the total inundation of the
Applicant ‟ s property was caused by flood that occurred within 24 hours of the
heavy rainfall.
Quantum
84. The Renewal Certificate of Insurance for the relevant period provides a sum
insured of $272,200 for the home with contents of $48,800. Pursuant to the
policy cap for the insured event of “Flash flood and stormwater runoff”, the
FSP is liable up to an amount of $136,000 for the damage to the building
and $25,000 for the contents.
Case No: 262818 Determination Page 14 of 15
85. Given the time since the loss was sustained, the Panel accepts that the
parties may be unable to provide an exact estimate of the total loss
sustained, or a breakdown of that loss.
86. The Applicant and the FSP are asked to work cooperatively together to
establish the extent of the loss sustained to the property and to reach an
agreement as to cost of repairs of same and on replacement of the various
contents lost. Insofar as the FSP may have made payment of a
compassionate sum to the Applicant, FOS does not have jurisdiction to deal
with this payment but acknowledges that the FSP, given the terms on which
the compassionate payment was made, may be entitled to deduct this
payment from any settlement sum.
87. The Panel has also considered the issue of interest.
88. The FSP has argued that interest is only payable from the date from which it
was unreasonable to withhold payment. The FSP maintains that it is entitled
to a reasonable period to investigate and determine its position, and given
the complex nature of the flood disputes, the delays are not unreasonable.
Further complex situations require substantial periods of time for
independent bodies such as the Queensland Flood Commission of Inquiry
and FOS, to make conclusions on the issues in dispute.
89. The FSP maintains that it did not act unreasonably in this dispute and
therefore interest is not payable. Alternatively if some period of interest is to
be awarded it should be reduced to account for the substantial delays
through the course of the process which were not the FSP‟s fault.
90. Section 57 of the Insurance Contracts Act requires interest be paid when it
becomes “unreasonable for the insurer to have withheld payment”. An
examination of relevant case law indicates that most probably, interest will
be awarded from either when an insurer first emphatically denied liability or
disputed a matter, or from when in the normal course of events the claim
should have been paid if liability had not been disputed.
91. In this dispute the Panel accepts that the FSP was entitled to withhold
payment of the settlement monies until such time as it had properly
investigated the dispute and made its decision as to liability.
92. The FSP made its original decision to deny the claim after receiving relevant
assessment reports, hydrology reports and other information. The FSP was
aware of the terms of its policy and aware of the relevant provisions under
which liability might arise and chose to deny the claim having reviewed those
relevant provisions and the evidence available to it.
93. In the Panel‟s view, at that point the FSP has made its decision on the claim
and it is appropriate that from that time interest be paid unless it can be
established that the Applicant had withheld information from the FSP that
would have led to an alteration of its decision.
Case No: 262818 Determination Page 15 of 15
94. Accordingly, the Panel determines that it is appropriate that the FSP in this
dispute pay interest from the day upon which the FSP determined to deny
liability of the Applicant‟s claim, until payment of the claim.
Determination
95. The FSP is to meet the cost of repairs incurred by the Applicant and the cost
of the replacement of items damaged as a result of the inundation of the
property. Any payment is subject to the limitations expressed in paragraph
84 of this Determination.
96. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from
12 April 2011 (being the date of rejection of the claim) to date of payment of
the claim, in accordance with Section 57 of the Act.