Text of the determination
Case No: 262777 Determination Page 1 of 11
Case number: 262777
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim-Exclusion/ condition
31 August 2012
Background
1. The Applicant holds a Home and Contents Insurance policy with the
Financial Services Provider (FSP). The policy covers a residential home up
to $190,000 and contents up to $156,000. The policy was further subject to a
$50 excess.
2. On 31 January 2011 the Applicant contacted the FSP to advise the insured
residence had been affected by flood water. In particular, contents stored in
garden sheds had been damaged and the stumps under the home had
moved. The water did not inundate the residence above floor level.
3. The FSP accepted the claim for contents but denied the claim for the stumps
on the basis the damage was not caused by flood/inundation. The FSP also
originally applied a $1,000 excess (based on an old alteration) but later
reduced this to $50 in accordance with the policy documentation.
4. The Applicant disputes the declinature of the claim on the basis the stumps
were damaged by the flood. The Applicant was also dissatisfied that the FSP
failed to respond to correspondence and attempted to apply a large excess.
Summary of Applicant’s position
5. The Applicant submits the flood caused movement to the stumps. The
Applicant disputes that the soil has subsided as the soil was “hard as a
rock”. He further queries how flat land can subside.
6. The Applicant notes the engineer did not go under the house and properly
examine the stumps, not even the stumps rolled over by the sheer force of
water. The Applicant further notes he had no reason to suspect the stumps
were rotting or previously damaged as they have stayed “completely still”.
Further, the Applicant believes the stumps which rolled over or which have
been damaged by dampness should be covered.
7. The Applicant holds concerns that the inspection was not thorough as it was
non-invasive which means items under wall linings were not inspected.
Further, the Applicant notes that he has two stormwater drains and a slight
Determination
Case No: 262777 Determination Page 2 of 11
slope so any water drains away quickly. In fact during the inundation the
water ran away quickly.
8. The Applicant refers to works to the weatherboard which is older but quite
solid and trimmings as well as new guttering. The Applicant notes the home
has been maintained and just requires a repaint as well as putty in the
windows. The Applicant also enclosed a letter from his painter stating that
the home would be repainted on 17 April 2012 as evidence of maintenance.
9. The Applicant contends the FSP delayed in acknowledging the correct
excess was $50.
10. The Applicant submits that the FSP sought a list of damaged items which he
had already provided to the assessor. The FSP did not progress the matter
in the belief that the Applicant had not provided the list. Consequently the
Applicant only received payment for contents items on 2 September 2011.
11. The Applicant was dissatisfied with the communication from the FSP. The
Applicant states he sent 3 letters on 18 April 2011, 16 May 2011 and 21
June 2011 which were not replied. The Applicant notes that whilst away from
April to August of 2011 that he provided the FSP with his address but did not
receive correspondence. Further, there was no response from the IDR
department to his letter dated 4 January 2012.
12. The Applicant submits that if his claim is not allowed that he considers
compensation is warranted due to the delays caused by the FSP.
Summary of FSP’s position
13. The FSP has enclosed its claims notations. I note the following from these
records:
On 15 February 2011 the Applicant confirmed the assessor had not yet
contacted him. The Applicant noted concerns with telephone reception
and provided alternative contact details.
On 3 March 2011 the Applicant confirmed he would be away from April
to August 2011. It was confirmed that as he would be away from the
home for over 60 days a $1,000 excess would apply during this time.
On 9 August 2011 the Applicant indicates that he had just returned
from England. The list of items provided to the assessor and excess
issues are discussed in some detail. The excess is confirmed as $50.
The Applicant verbally informs the FSP that he is dissatisfied with the
service he has received. The Applicant had advised of his
dissatisfaction as early as 1 April 2011, particularly after the assessor
attended the premises without forewarning.
The FSP has sought clarification regarding a number of statements
made by the engineer in order to determine whether the flood was in
Case No: 262777 Determination Page 3 of 11
fact responsible for some damage. In p articular, the engineer‟s
statement that the framing was “largely unaffected by the flood”.
14. The FSP has enclosed emails supporting difficulties encountered by its
experts in contacting the Applicant.
15. The FSP has enclosed assessor reports from which I note the following:
The actual inspection date is unclear although the first assessment
report is dated 14 March 2011 and the second is dated 18 April 2011.
Both state the case file was received on 22 February 2011 and
contacted the insured on 23 February 2011. The appointment date in
the first and second assessor reports is listed as 8 March 2011
The water inundation at the property occurred up to a depth of 600mm
above ground under the main building on the property and 250mm
through shed and laundry outbuildi ngs. There was no inundation of the
actual building.
There are 56 stumps in total ranging in height from 300-600mm above
ground. One third of the stumps show visual signs of movement and
not all of the movement is consistent with the movement of water. 5
stumps have completely dislodged. The ground beneath the dwelling is
extremely wet and the inspection was restricted to the perimeter
stumps which showed signs of rotting at or below ground level. The
assessor stated “...the condition of the stumps has been a contributing
factor to the claimed loss”
The property is situated on reactive black soil and the Applicant
confirmed regular movement within the dwelling is present. It is
therefore likely that the movement and rotation of the stumps has been
happening on an ongoing basis.
There is cosmetic damage inside the dwelling which will not be rectified
with re-stumping.
The assessor notes that an engineer should be engaged but the
insured wishes to be present at the time of the engineer‟s attendance.
The Applicant was absent for 4 months.
16. The FSP has enclosed its engineer‟s report from which I note the following:
During the flood, water was approximately 100mm deep under the
residence.
The weatherboard exterior appeared aged and no longer level in
places.
The internal floor was uneven and generally high in the centre of the
room. There was evidence of movement between the „Double D‟
boards that lined the walls. Several boards had buckled slightly.
Several doors had jammed and could not be opened. Access was
restricted due to the number of items stored in the residence.
Many of the stumps showed signs of rot, particularly around the bases
and one stump had been replaced by a steel post. There was a
Case No: 262777 Determination Page 4 of 11
noticeable level difference between a number of stumps. Shims had
been placed between the stumps and bearers in a number of locations,
indicating the residence had previously been re-levelled.
There was erosion noted under the residence and the subfloor area
appeared poorly drained.
The timber floor framing was in relati vely good condition.
The materials that form the framing and supporting stumps appear to
be largely unaffected by the flood event. The issues of uneven floor,
difference in level, jamming of doors and damage to the wall linings is
consistent with the increased moisture content under the residence
causing swelling of the soil and lifting of the internal stumps.
The stumps have suffered rot and appear to be in poor condition. The
process of rot occurs over a period of many years and would not be
affected by a brief one-off flood event.
While there were no obvious signs of structural damage to the timber
framing of the residence, the engineer could not make a definitive
comment regarding structural integrity due to restricted access.
17. The FSP has provided an email from the engineer dated 21 October 2011
from which I note the following:
Poor site drainage refers to the depressions in the soil noted under the
residence that allow water to pond under the residence and thus
prevent the soil from drying in a time ly and even manner.
The materials (timber) that form the framing and linings have not
suffered any degradation as a result of the flood as the majority of
these elements did not become wet during the flood.
The swelling of the soil that resulted from the flood event has caused
movement of these elements which is evident through the level of the
floor, jamming doors and cracks between sections of the „Double D‟
linings.
18. The FSP has produced a report from a builder from which I note the
following:
The builder was of the opinion that an attempt had been made to re-
level the residence prior to the flood. This was based on the existence
of shims and timbers placed between the stumps and the bearers in a
number of locations with up to 70mm in difference.
The weatherboard cladding is in extremely poor condition and has had
no maintenance done over the years.
The issues with the cladding or the movement of the stumps have been
a result of pre-existing conditions and not the result of the January
floods.
19. The FSP relies on the expert evidence to assert the damage to the stumps
under the home was not caused by flood. The FSP states the damage was
Case No: 262777 Determination Page 5 of 11
caused by wear, tear, gradual deterioration and rot which are causes of loss
specifically excluded under the terms and conditions of the policy.
20. The FSP notes the Applicant made admission regarding ongoing issues of
movement at the home building. Further, re-levelling and replacement of a
stump with a steel post occurred prior to the flood and supports the FSP‟s
contention the ongoing damage pre-existed the flood event.
21. In response to the Applicant‟s complaint on the delay, the FSP states that
multiple parties had difficulty contacting the Applicant in Australia. The
Applicant has acknowledged such difficulties at various times d uring the
claims process. Further, the Applicant‟s absence from Australia made it
difficult to proceed with the claim as he indicated that settlement should be
finalised on his return to Australia. In addition to this, the Applicant wished to
be present for the attendance of the engineer which required the FSP to
delay in order to accord with the Applicant‟s request. The FSP notes multiple
issues were settled on the Applicant‟s return to Australia.
22. The FSP notes that as its policy excludes payment of loss of wages and the
Applicant‟s time that the Service‟s Terms of Reference preclude an order for
compensation for this type of amount. The FSP further submits its actions
have not caused any actual loss.
Issues
23. Whether the FSP is liable under the policy for the damage to the stumps,
timber framing and internal damage.
24. Whether the FSP has acted in a manner which delayed the resolution of this
matter.
25. Whether the Applicant is entitled to compensation.
Reasons for Decision
26. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with clause 8.6 of the FOS Terms of Reference. This
is due to the circumstances and quantum of the dispute. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
27. Due to the nature of the dispute, the FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. Thus, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination. The
parties have been previously advised that a Determination will be issued in
this case.
Case No: 262777 Determination Page 6 of 11
28. There has been an exchange of material between each party and the
Ombudsman is satisfied each party has had an opportunity to reply to the
issues raised.
29. The Ombudsman has read each party‟s submissions and materials and will
only refer to the relevant submissions and materials raised.
30. The Ombudsman considers that there are three discrete issues (listed
above) which will be dealt with separately below.
Whether the FSP is liable under the policy for the damage to the stumps,
timber framing and internal damage
31. I consider the relevant policy terms and conditions are:
“Insured events 1 to 12
...
We cover
Damage caused by rain, wind, hail, storm (eg. your roof is torn off during a
storm) and damage caused by flood from rivers, streets and canals.
...
What is not covered under any part of your policy
...
Erosion or subsidence
Caused by or as a result of erosion, vibration, subsidence, landslip, landslide,
mudslide, collapse, shrinkage or any other earth movement
But we will cover
Subsidence damage to your home if it is caused by:
...
i. These insured events if the damage occurs within 72 hours of the event
happening:
- insured event 1 (storm and flood)
We do not cover
Wear, tear, rust or mould
Loss or damage caused by wear, tear, rust, fading, gradual deterioration,
mould, rising damp, mildew, action of light, atmospheric or climatic conditions,
corrosion or rot
Unless this is covered under
ii. Insured event 1 (storm and flood)”
32. The engineer, assessor and builder have noted prior attempt(s) to re-level
the floor were in evidence. The Applicant does not address or refute these
observations. Accordingly, I accept that there have been attempts previously
to maintain a level floor within the home. It should be noted though that the
Applicant believed the stumps were „completely still‟ prior to the flood. This
Case No: 262777 Determination Page 7 of 11
may be possible if the re-levelling works were in fact successful – although
unfortunately the experts have not commented on this.
33. The builder‟s report was surprisingly short in comparison with the assessor
and engineer reports. Accordingly in some respects it is unclear whether the
builder considered the effect of the soil issues on stump movement and
discounted it. The builder also suggests areas of the property have not been
maintained which are not listed by the assessor or engineer.
34. The assessor stated “...the condition of the stumps has been a contributing
factor to the claimed l oss” but concluded the stump movement had been
ongoing for quite some time. The assessor did recommend an engineer be
engaged.
35. In view of the brevity of the builder‟s report and the assessor‟s comments of
the need to obtain an engineer‟s report, I accept that it‟s appropriate to place
more weight on the expert engineer‟s report when determining this matter.
The Applicant has not provided evidence to contest the engineer‟s position.
The engineer whilst concluding that the materials have formed the framing
and supporting stumps appeared to be largely unaffected by the flood event,
consider the unevenness of the floor, the difference in the level, the jamming
of the doors and damage in the wall aligning to be consistent with the
increased moisture contents under the residence causing swelling of the soil
and lifting of the internal stumps. This view is reinforced in the email from the
engineer dated 21 October 2011 where the engineer has stated specifically:
“...however the swelling of the soil that has resulte d from the flood event has
caused (my emphasis) some movement of these elements which is evident
through the level of the floor, jamming doors and cracks between sections of
the Double D linings”.
36. Although I accept the evidence of the engineer to the effect that the stumps
suffered rot and appeared to be in poor condition and this was a pre-existing
condition, it is apparent from the engineer‟s report that the flood event has
caused movement of the stumps which has led to issues with the evenness
of the floor, jamming doors and cracks. I note the engineer considered the
uplift of the stumps had been caused by the swelling of the soil due to the
flood. Insofar as the uplift of the stumps has caused some damage then as
flood would be seen to be the proximate cause that is the effective cause of
the stumps uplifting and therefore causing the movement of the floor, doors
and cracks, then the policy would respond.
37. I have also considered whether any of the damage could be said to be
caused by subsidence within 72 hours of the flood which again is damage
which would be covered under the terms of the policy.
38. I sought further information from the engineer on the question of subsidence
to clarify the engineers report and also researched the relevant case law on
this issue. The plain English meaning of subsidence is the downward
movement of the earth, “ to sink down or a fall in the level ” .
Case No: 262777 Determination Page 8 of 11
39. The engineer in a supplementary report of 16 August 2012 confirmed that
there was no subsidence of the stumps due to the flood event of January
2012. There is no evidence that the Applicant‟s property subsided as a result
of the flood or that the damage sustained internally to the building was due
to subsidence. There is no evidence that the uplift in the stumps was caused
by subsidence.
40. Based on the information as exchanged, whilst I accept that the FSP is not
liable to meet the costs of loss or damage caused by wear, tear, rust, fading,
gradual deterioration or rot of the stumps and I am satisfied that the actual
condition of the stumps was not affected by the flood, I am satisfied the
evidence establishes that the flood event is the proximate cause of the
unevenness of the floor, difference in level, jamming of the doors and
damage to the wall aligning as found in the engineering report. The report
has clearly identified that the increased moisture content under the
residence cause the swelling of the soil and the lifting of the internal stump.
41. In circumstances, I am satisfied that the FSP is liable to meet the cost of the
damage sustained as a result of the movement of the stumps as identified by
the engineer. I am satisfied that that liability does not extend to replacement
of the stumps.
42. Whilst I have been provided with a loss adjustor‟s report, I am unable to
determine based on the report the extent of damage sustained as a result of
the uplifting of the stumps.
43. The parties are asked to work cooperatively together to determine the cost of
repair associated with the re-levelling of the property and repair of the
damage to the walls sustained as a result of the movement of the property.
44. If the parties are unable to agree as to the amount, then the matter can be
returned to FOS and I will determine the amount for the parties subject to
further submissions.
Whether the FSP has acted in a manner which delayed the resolution of this
matter
45. The Applicant lodged the claim on 31 January 2011 and contacted the FSP
on 15 February 2011 to advise the assessor had not contacted him. The
assessor notes receipt of the case on 22 February 2011 and contact
occurred on 23 February 2011. There were two assessments of the property
on 8 March 2011 and 11 April 2011 according to the FSP. The Applicant
does not dispute this but notes his dissatisfaction with the attendance of the
assessor without forewarning.
46. Based on the limited evidence before me, there were two assessments
carried out within 2.5 months. An engineer was required to ascertain the
cause of loss prior to determining the claim and the Applicant indicated he
wished to attend an inspection. The FSP then received notice the Applicant
was going overseas. The letter also contained a suggestion that the
settlement of the matter be finalised on his return to Australia.
Case No: 262777 Determination Page 9 of 11
47. In practical terms the FSP could not arrange an inspection by an engineer
without the consent/attendance of the Applicant to allow access. A delay of
four months then occurred prior to the return of the Applicant. The engineer
indicates he attended the insured property on 5 September 2011 and the
report is dated 9 September 2011. I therefore conclude the report was
provided in an expeditious manner.
48. I consider that in terms of the building claim, the Applicant‟s extended
overseas visit has assisted the delay. This is particularly in light of the FSP
being required to hold the matter so the engineer would attend after the
Applicant‟s return. There were also difficulties recorded in contacting the
Applicant by telephone and there was only a UK postal address for written
communications.
49. I have noted that there was a delay in determining the applicable excess and
the FSP‟s receipt of the list of contents items.
50. It is unclear to me why it took the FSP until 9 August 2011 to determine the
correct excess when he had first complained about same in April 2011. This
should have been reviewed and responded to prior to this date. There is no
suggestion in the material that the Applicant was away from the home for
over 60 days during the January 2011 flood event. Accordingly I am at a loss
to understand the basis of the initial $1,000 excess application.
51. It is unclear to me why the FSP did not consider the contents list contained
within the assessor report dated 18 April 2011. The assessor provided a list
of items and values to allow for settlement of the contents items. There
should have been no reason for the FSP to await a list already in its
possession.
Whether the FSP is liable to pay compensation to the Applicant
52. Under the FOS Terms of Reference, FOS is able to award compensation for
consequential and/or non-financial loss in certain circumstances as provided
under section 9.3 of the Terms of Reference as follows:
“ 9.3 Other compensation
Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial Services Provider compensate the Applicant for consequential
financial loss or damage up to a maximum amount of $3,000 per claim made
in the Dispute
...
Subject to paragraph 9.3c) and paragraph 9.7, FOS may decide that the
Financial Services Provider Compensate the Applicant for non-financial loss
but only where:
an unusual degree or extent of physical inconvenience, time taken to resolve
the situation or interference with the Applicant‟s expectation of enjoyment or
peace of mind has occurred; or
Case No: 262777 Determination Page 10 of 11
in the case of a Dispute pertaining to an individual‟s privacy rights – injury has
occur red to the Applicant‟s feelings or humiliation has been suffered by the
Applicant.
The maximum amount of compensation for non-financial loss will be $3,000
per claim made in the Dispute.
Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation
for:
consequential financial loss; or
non-financial loss,
in a Dispute arising as a result of a claim on a General Insurance Policy that
expressly excludes such liability ”
53. The FSP‟s policy terms and conditions exclude compensation for
consequ ential losses arising from the loss of the Applicant‟s time.
Accordingly, under Terms of Reference 9.3(c) I am precluded from making
any order for consequential losses of this kind. This does not prevent
compensation being awarded for non-financial losses not covered by this
exclusion.
54. Under 9.3(b) of the Terms of Reference (TOR) there must be an unusual
degree or extent of physical inconvenience, time taken to resolve the
situation or interference with the Applicant‟s expectation of enjoyment or
peace of mind has occurred before compensation for non-financial loss may
be determined.
55. The evidence before me indicates that the building issue was dealt with over
a period of time. The progress of the claim however was essentially halted
for four months to allow the Applicant to be present during the engineer‟s
inspection. This impacted the overall progress of the building claim.
56. In relation to the list of contents items, the list was provided to the assessor
and there is no explanation as to why the FSP did not recognise this.
Unfortunately the excess dispute was similarly unresolved despite there
being no evidence to suggest the Applicant was absent at the time of the
flood.
57. Whilst I understand the inherent difficulties presented to the FSP in dealing
with a large volume of claims, the FSP had sufficient evidence to deal with
the excess dispute immediately. Further, the FSP had the relevant evidence
from its experts on 18 April 2011 regarding the contents but failed to
recognise and make payment of same until 23 August 2011. The absence of
the Applicant should not have materially affected settlement of these issues.
58. Although I do not accept the delays by the FSP with respect to the settling of
the contents claim or the excess claim has been reasonable, I am not
satisfied that these delays have in fact caused an unusual degree or physical
inconvenience or time taken to resolve the situation or interference with the
Applicant‟s expectation or enjoyment of peace of mind such as to attract
compensation.
Case No: 262777 Determination Page 11 of 11
59. In determining this I am satisfied the Applicant has not suffered the loss of
enjoyment of the contents given his extended absence overseas. In fact the
Applicant had left for overseas one day after the assessor finalised his report
and the claim was settled shortly after his return from overseas. This
situation may well have been different if the Applicant had been left without
these contents while still residing at the home.
Determination
60. Accordingly, I determine the FSP meet its liability in accordance with the
terms of the policy to cover the cost sustained as a result of the uplifting of
the stumps caused by the insured event “flood”. The damage is limited to the
costs of re-levelling the premises and repairing internal damage to the walls,
floors and doors caused as a result of the uplifting of the stumps due to the
flood event.
61. The FSP is not liable to pay damage to the stumps identified as due to wear
and tear or gradual deterioration or rot.
62. If the parties are unable to agree as to the amount of the damage, then the
parties are invited to make further submissions and the matter will be
determined accordingly.
63. Insofar as the FSP determines to cash settle the Applicant‟s claim, the FSP
is to pay interest in accordance with Section 57 of the Act on the settlement
amount from 23 December 2011 being the date of the decision to deny the
claim to date of payment of the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.