Home / Financial Firm (Unknown - Insurer) / Determination 262318

Determination 262318

Structural damage claim: repair quality and exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2013-03-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$9,946
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Applicants claimed for foundation damage after a leaking-pipe claim, and sought a full rebuild after faulty repairs. AFCA ordered the FSP to fund drainage rectification ($9,946.20 or arrange the works), complete remaining claim repairs, pay accommodation and expert report costs, but refused a rebuild.

The insured must prove an insured event caused the loss; inherent site drainage problems were not covered, although faulty contractor repairs warranted compensation.

Issues

Subjects and remedies

home or building damagepay compensationrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 262318 Determination Page 1 of 10 Case number: 262318 General Insurance - Domestic Insurance - Home Building - Service - Service quality - Policy Exclusion 8 February 2013 Background 1. The Applicants hold a Home Building and Contents Insurance Policy (the Policy) with the Financial Service Provider (FSP) to cover the insured property for a sum insured of $242,050 subject to a standard excess of $500. 2. On 13 June 2008, the Applicants lodged a claim under the Policy for structural damage to the property believed to be caused by leaking pipes. The Applicants noticed the home was starting to sink into the ground. 3. The FSP appointed a builder (JP) and a structural engineer (SC) to assess the damage. SC determined that the damage to the property resulted from significant founding soil moisture variations caused by a combination of leaking pipes and tree root drying. 4. In October 2008 the FSP accepted the claim on the condition that all rectification work to the sewerage and stormwater system was completed by the Applicants after which a 6 month drying out period was to be allowed prior to the FSP completing the outstanding repairs. 5. The Applicants completed the repairs to the sewerage and storm water system in November 2008, after which the property was assessed by CS and a 2 stage repair process was recommended. 6. JP commenced Stage 1 of the repairs in September 2009, which took 4 weeks longer to complete than was originally anticipated. The repairs were assessed by SC and several deficiencies were identified, which were leading to additional damage. 7. As Stage 1 repairs were still ongoing by March 2010, the Applicants no longer wanted JP involved in the repair works. New builders ‘ BB ’ were engaged to complete the remainder of the work. 8. Due to ongoing concerns with the repairs, SC attended the site and prepared further reports. In April 2010, SC noted that the levels were not acceptable and that demolition and rebuilding should be undertaken of the external Determination Case No: 262318 Determination Page 2 of 10 veneer brick walls, for aesthetic reasons. He maintained that the building was structurally sound. 9. Stage 2 of the repairs commenced in June 2010 and was substantially completed by November 2010. In March 2011, a further assessment indicated the property continued to have differential settlement. 10. In August 2011 SC believed the moisture was coming from another source, such as poor drainage around the property, and instructed a Geotechnical Engineer (CA) to conduct a soil test and provide a report. 11. CA’s report dated 1 September 2011 concluded that : a. The Applicants’ neighbours on the western side had leaking gutters which were causing excess amounts of water to pool on that side of the house. b. The veranda (both before and after the rebuild) had no fascia spouting or downpipes, causing water to pool and run under the house. c. The septic tank had been poorly backfilled and would need to be excavated and removed with more suitable backfilling of the excavation. d. The property required further time to dry out (approximately 8 months) to allow the differential settlement to re-stabilise before any alteration to the sub-floor should occur. 12. Both CS and CA identified serious drainage issues with the property and recommended rectification of these issues to prevent future problems with differential settlement. 13. The FSP recommended that the Applicants undertake the following, to address the drainage issues and avoid similar problems in the future: a. Arrange for the western side neighbours to repair or replace their leaking gutters; b. Arrange for the excavation and removal of the old septic tank; c. Arrange for the installation of fascia spouting and a downpipe across the edge of the rear veranda roof construction and for the downpipe to discharge into below-ground stormwater system to ensure all collected roof rainwater is discharged correctly away from the site; d. Arrange for re-landscaping and levelling of the rear yard to minimise surface rainwater flowing towards the house; e. Arrange for appropriate sealed surface treatment across the edge of the rear veranda to prevent future rainwater from seeping down into the gravel-filled trench. 14. The FSP also recommended that the Applicants improve the entire external site drainage conditions, remove trees close by and install new and improved surface and sub-surface drainage collection provisions. Case No: 262318 Determination Page 3 of 10 15. The FSP agreed to: a. Arrange for a re-stumping contractor to re-attend and adjust packing shims beneath the central area of the property to allow the floor framework to re-settle back to its original levels in due course; b. Allow for any final adjustments to the stumps and floor framework in late autumn 2012 to restore a final improved floor level. 16. The Applicants have obtained their own engineers report by TC, which also concludes that the site has inherent drainage problems. TC recommends the following to address the problems and prevent further movement: a. Long span floor joists to be used in preference to re-stumping; b. All the brickwork to be removed and replaced; c. Tree root barriers be installed to protect the building from the influence of trees; d. A 1.5m wide path be constructed around the home, with a fall away from the building. South side of the home between the wall and the fence to be paved. 17. Although repairs to rectify inherent site drainage issues are not covered by the Policy, the FSP offers to pay $9,946.20 for the cost of the works recommended by SC based on a quotation by BB on an ex gratia basis, or alternatively, to arrange BB to complete the rectification work. 18. The Applicants require repairs be undertaken as recommended by TC, or alternatively that the FSP rebuild the Applic ants’ home and pay compensation for the faulty repairs, time delays and other expenses. Summary of Applicants ’ position 19. The repair works to the property commenced in 2009 and to date have not been completed to building regulation standards. 20. JP were incompetent and breached the scope of works, did not complete repairs within the required time frame, failed to complete brickwork to professional standards and failed to reconnect plumbing correctly, which resulted in further damage. 21. Upon moving back to the house following the rectification work, the Applicants discovered the following major issues: a. Floor levels not meeting Australian Standards; b. Plumbing not connected correctly leading to further water damage; c. Leaking roof. 22. The FSP has acted negligently with respect to the claim, which has impacted their personal lives and caused them to engage their own engineer at their own cost. Case No: 262318 Determination Page 4 of 10 23. The Applicants are now left with a building that does not meet Australian Building Standards and has lost value, which will affect the Applicants financially should they chose to sell the property. 24. The Applicants are not confident that the cost offered by the FSP as an ex gratia payment will be sufficient to complete the repairs recommended. 25. The foundation movement is being caused by the poor repair work which has continued over 3 years and is the FSP’s liability. 26. The condition of the property has continued to deteriorate over the last few years since repairs commenced, with additional cracking and brick movement being identified in newly rebuilt areas, caused by faulty repair and foundation works. 27. The Applicants rely on reports by TC, who disagrees with SC ’s recommendations in relation to the work required to rectify the drainage problems at the property. They also rely upon a geo-technical report of TT which they commissioned because of concerns about SC’s and CA’s reports. 28. The Applicants seek: a. The FSP to pay for all repair works required to prevent future damage; b. An abandonment of the repair method recommended by SC, with works to be undertaken as recommended by TC; c. Alternatively, the FSP to pay for a complete rebuild of the house, as it has not been repaired to an acceptable standard; d. Compensation; e. Payment of accommodation if the Applicants are required to vacate the premises for future repairs. Summary of FSP’s position 29. The FSP relies on several expert reports, including multiple reports by SC. 30. The external drainage problems are causing ongoing differential foundation movement problems throughout the Applicants’ property. 31. The additional cracking, brick movement and dropping of the floor levels has been caused by the Applicants’ failure to un dertake the rectification repairs recommended by SC. The ongoing damage at the property is a natural consequence of the un-remedied drainage problem and is excluded from cover. 32. The FSP is willing to cash settle the Applicants on an ex gratia basis for the rectification works in the sum of $9,946.20; or arrange for BB to undertake repairs and pay them directly. Case No: 262318 Determination Page 5 of 10 33. It is unreasonable for the Applicants to reject the ex gratia offer to rectify the drainage problems, which are not covered by the policy, and expect the FSP to rebuild the Applicants’ house instead. 34. Any damage resulting from subsidence is excluded from cover under the policy. 35. The FSP denies liability for further costs associated with the Applicants’ expert reports, or repairs recommended by TC, as these are unnecessary. The Applicants will be duly compensated by way of the ex gratia offer. Issues 36. Whether the Applicants are entitled to: a. Full payment for the additional repair works required to prevent future damage; b. An abandonment of the repair method recommended by SC, with repairs to be undertaken as recommended by TC; c. A requirement that the FSP pay for a complete rebuild of the house; d. Payment of accommodation if the Applicants are required to vacate the premises for future repairs; e. Compensation. Reasons for decision 37. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination by an Ombudsman. 38. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. In these circumstances the details contained in the relevant expert reports will not be recited in this determination except where considered relevant. 39. It is an accepted principle of general insurance law that an insured bears the onus to establish, on the balance of probabilities, that they have suffered a loss caused by an event or incident to which the policy responds. Once so established, the onus shifts to the insurer to prove that a policy exclusion applies to defeat a claim. 40. This dispute contains a long and unfortunate history and has involved several attempts at repairs and rectifications, involving numerous builders, engineers and other experts. I note that the repairs are still incomplete and damage at the property is continuing. Case No: 262318 Determination Page 6 of 10 41. An almost impossible task confronts the parties (and decision makers) in determining which of the problems now presenting may be due to the water leaks, or inadequate work by JP (in which case the FSP is liable for rectification of the problem) and other factors, quite unrelated to the water leaks or JP’s work. 42. The material exchanged indicates that the following issues are not contested: a. The Applicants have a valid claim under the Policy for damage caused by leaking pipes. b. Some of the repairs undertaken by JP during phase 1 were faulty and incomplete, requiring rectification. JP plainly breached the scope of works in many respects including leaving the Applicant’ s furniture in the property when the scope of works required that it be removed. c. Upon commencement of repairs and rectification works, excessive moisture in the soil and drainage issues were identified as a dominant cause of the foundation movement occurring at the property. d. The FSP has agreed to pay for rectification repairs as recommended by SC, to be performed by BB. e. Critically, once the rectification works are complete and the required settling period has expired, the FSP will undertake to complete the levelling work at the property, including any final adjustments and repairs. f. The FSP has agreed to reimburse the Applicants for the costs incurred in obtaining reports from TC. Rectification works recommended by SC 43. The FSP maintains that the Applicants’ failure to complete the r epairs recommended by SC has led to additional damage at the property. The FSP has accepted to settle the Applicants’ claim relating to the pipe leaks, subject to the Applicants undertaking repairs to rectify the drainage issues, as recommended in SC’s report dated 27 September 2011. 44. The FSP and its experts maintain that the rectification works need to be completed urgently prior to any further repairs being considered. 45. The Applicants attribute the ongoing damage to faulty construction work by JP and say it is the FSP’s liability to complete the additional repairs. The Applicants require the FSP to abandon the repair methods suggested by SC and seek cash settlement for repairs recommended by TC in his report dated 24 March 2011. 46. Having considered the evidence, I think it is clear that the following issues, independent of claim related repairs, are affecting the property and causing or contributing to the ongoing damage:  Excessive moisture and site drainage problems; Case No: 262318 Determination Page 7 of 10  poorly back-filled septic tank;  drainage problems off the Western side neighbour’s garage roof guttering;  tree root drying of the reactive clay soils from a number of large trees which are planted close to and surrounding the dwelling structure. 47. There is also evidence to suggest that the faulty repairs by JP and the additional repair works have contributed to the continuing damage and foundation movement at the site. 48. The onus is on the Applicants to establish a claim under the policy. While I accept that the faulty repair works by JP may have contributed to the continued foundation movement and resultant damage, there is no evidence to establish that the ongoing damage at the property is solely caused by an insured event. 49. Instead, on the balance of probabilities, the evidence suggests that a combination of inherent problems at the site and additional faulty repair works have led to the current condition of the property. 50. Given the history of the claim and the issues that have arisen, I consider that the FSP’s ex gratia offer to undertake, or cash settle the Applicant for the site rectification work is fair in the circumstances. 51. I am describing the FSP’s offer as ‘ex gratia’ because I am satisfied that the items referred to in paragraph 13 are not matters for which the FSP is liable. Appropriate method of repair 52. The FSP proposes to conduct the repairs recommended by SC, or cash settle the Applicant for the repairs, on the basis of a quotation from BB. 53. While BB’s estimate is not complete and was prepared in the absence of an on-site inspection of the property, the FSP’s offer to have BB complete the recommended repairs eliminates the issue of whether the cash settlement offered is adequate to cover all the required repairs. 54. Instead, the Applicant seeks settlem ent on the basis of TC’s report, the most significant difference being TC’s recommendation for long span floor joists to be used instead of re-stumping. 55. According to SC, long span floor joists are likely to cost significantly greater than the re-stumping and will not necessarily fix the problems at the site, as the only long term solution is to address the underlying drainage issue. 56. Based on the evidence, I am not satisfied that SC’s recommendations are for an unsuitable method of repair. TC notes that the extent of the re stumping and re blocking has been minor, and the Applicant suggests that any stump work is unlikely to resolve the situation, therefore preferring the long span joist method of repair. Case No: 262318 Determination Page 8 of 10 57. SC’s response is that the movements in the internal timber floorings are not the result of inferior or problematic support system, but rather due to problems predominantly with on-site drainage problems and tree drying issues, as identified by all the experts. 58. I am satisfied that there is sufficient evidence to support the FSP’s decision to approve the repair method proposed by SC, who is suitably qualified and experienced. 59. While I understand the Applicants’ concerns regarding the FSP’s proposed methods of repair, particularly given the history of the claim and the issues that have arisen, I am satisfied that the FSP is entitled to authorise SC’s recommendations, which comply with industry standards and may be more economical in the circumstances. 60. Once the rectification works are completed by BB and the required waiting period has expired, the FSP has agreed to undertake any further repairs, including re stumping, as required. 61. Based on the evidence, I am not satisfied that the Applicants are entitled to a complete rebuild of their house, considering that some of the factors contributing to the condition of the property are inherent to the site. Instead, I am satisfied that the FSP, by rectifying the drainage issues as recommended by SC and completing the required repair works to the home thereafter, will address the Applicants’ claim. 62. I note that the parties are unable to determine the extent of the further repairs that will be required in order to finalise the claim, until the immediate rectification works are completed and the settling time has expired. I am therefore not in a position to make a determination in relation to this aspect of the claim. Compensation 63. There is no doubt that the matter has been considerably aggravated by the very poor work of JP. This has led to suspicion on the part of the Applicants as to the work of SC. I have therefore read carefully all which the Applicants have said about SC’s recommenda tions as indeed about his qualifications. Ultimately, I am not satisfied that SC has been in error or that his recommendations should not be followed. 64. However the entire history of the matter has understandably given rise to concern on the part of the Applicants and has led to them obtaining further reports. In the circumstances, it is reasonable that the FSP reimburse the Applicants for the costs of these reports. Case No: 262318 Determination Page 9 of 10 65. The Terms of Reference of this Service provide for compensation as follows: “ 9.3 Other compensation ... b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for non-financial loss but only where: (i) an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant’s expectation of enjoyment or peace of mind has occurred; ...” 66. The Applicants claim for compensation and legal costs, including devaluation costs for the property decreasing in value due to the faulty repair works and continuing damage. 67. It is accepted that the repairs by JP were not up to standard and caused significant time delays, inconvenience and additional damage to the property. This would normally justify a payment pursuant to Paragraph 9.3. 68. However, the fact that the FSP has agreed to pay for the rectification works to address the drainage issues, not all of which are claim related, in my view, compensates for the faulty works that have contributed to at least some of the damage. 69. I note also the FSP’s agreement to pay the fees for the TC report. I consider the Applicants should also be reimbursed for TT’s fees. 70. Based on the evidence I do not consider the Applicants are entitled to either legal costs or devaluation costs, noting that the property has inherent issues which have contributed to the current condition of the property and the FSP has continued to assess and offer methods of resolving the dispute. 71. If the Applicants require alternative accommodation during periods when repairs are being conducted, it is reasonable that the FSP pays for these expenses, including any additional costs associated with contents storage. Determination 72. On the basis of the available information I determine: a. The FSP to arrange BB to complete the rectification works recommended by SC ’s report dated 27 September 2011 and pay BB directly for these repairs or, alternatively, pay to the Applicants the sum of $9,946.20 in order that the Applicants may have the work described in paragraph 13 carried out. Case No: 262318 Determination Page 10 of 10 b. Once the drainage issues are rectified and the required time for soil settling has expired, the FSP is to complete any remaining claim related repairs as proposed by SC. c. The FSP to undertake the costs of alternate accommodation and contents storage during periods of repair, if the home is considered unliveable during this time. d. The FSP shall reimburse the Applicants for the costs of the reports from TC and TT.