Home / Financial Firm (Unknown - Insurer) / Determination 262289
Determination 262289
Denial of flood damage to shop as predating policy inception
Summary
The applicant's shop was flooded in December 2010, and the policy incepted at 4pm on 30 December 2010 after the flood had begun. The FSP denied the claim as predating the policy. AFCA found the FSP must indemnify damage above 500mm, with quantum left to the parties and interest at 7.75%.
The policy covers damage occurring after inception, and the panel found the premises were inundated to 500mm at inception, so only damage above that level falls within cover.
Subjects and remedies
natural disastersmall businesspay claimpay interestreassess claim
Text of the determination
Case No: 262289 Determination Page 1 of 5
Case number: 262289
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of Claim - Loss Prior to Inception of Policy - Flood
09 May 2012
Background
1. The Applicant held a business insurance policy for her business premises
with the Financial Services Provider (FSP), incepted at 4pm on 30
December 2010. The policy provided accidental damage cover.
2. On or about 29 December 2010, the local area suffered a flood, which
continued over the course of several days, peaking on 31 December 2010.
The Applicant‟s premises, located within a shopping mall, sustained damage
during this period and she lodged a claim.
3. The FSP denied the claim on the basis that it was of the opinion that the loss
pre-dated the inception of the policy.
4. The Applicant disagrees and believes that her shop was not inundated until
after the policy came into force. In the alternative, she considers that some
minor water damage occurred prior to the commencement of the policy but
the stock damage did not occur until the time of the peak flood on 31
December 2010.
Summary of Applicant’s position
5. The Applicant says that the FSP‟s policy provides cover for “accidental
physical damage, destruction or loss”. In this context, regardless of the
damage caused prior to the inception of the policy, she should be covered
for any damage occurring after this time.
Summary of FSP’s position
6. The FSP says that the flooding event and the flow of water into the
Applicant‟s business premises pre -dated the inception of the policy.
7. The FSP relies on the following policy provisions:
Page 11 of the Product Disclosure Statement (PDS)
“ Cover
Determination
Case No: 262289 Determination Page 2 of 5
We will pay up to the limit of liability in accordance with the Basis of
Settlement for property that is damaged at the premises during the period of
insurance. ”
Issue
8. Whether the Applicant‟s loss is covered by the FSP‟s policy.
Reasons for decision
9. This decision has been made by a Panel consisting of an Ombudsman, an
insurance industry representative and a consumer representative.
10. The Terms of Reference for the Service do not allow for consideration of
business interruption claims and the Panel will therefore limit its
consideration of this claim to the issue of indemnity for property damage.
11. The Panel is satisfied that a full exchange of information has taken place
between the respective parties and that each party has had the opportunity
of addressing any issues raised.
12. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the potential amount of the claim and the
issues to be considered. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
13. There is an onus on an insured to establish on the balance of probabilities
that a claim fits the definition of an insured event. Should this onus be
discharged, it is then the responsibility of the insurer to establish the
application of any exclusion on which it relies to deny the claim.
14. To be entitled to cover from the FSP, the onus therefore rests with the
Applicant to establish that her loss fits within the scope of what is covered by
the FSP‟s policy.
15. It is common ground between the parties that the business policy did not
come into effect until 4pm on 30 December 2010.
16. The policy provided cover for accidental damage, including flood damage.
The Applicant‟s business premise was located within a shopping mall. It is
not in dispute that the property was damaged by the flood or that the initial
inundation of floodwater itself pre-dated the inception of the policy.
17. The Applicant considers that her shop was not inundated at the time the
policy came into effect, or in the alternative (if the property was inundated),
her business stock was not affected until later on, probably when the peak of
the flood was reached on 31 December 2010.
Case No: 262289 Determination Page 3 of 5
18. The Applicant states that her staff moved the business stock up off the floor
prior to the arrival of the flood to minimise the potential damage. The FSP
has not disputed this.
19. A hydrologist, WR, was retained to inspect the premises and to comment on
the timing of inundation. WR noted:
shops within the mall were inundated to a depth of between 0.6m-1m;
the source of the flooding was the Nogoa River;
whilst the floodwaters at the Nogoa River peaked at 4am on 31
December 2010, the levels were within 0.2m of this at the time the
policy came into force;
stormwater run-off was not a factor in the loss;
the peak level of inundation at the shop was unknown. It was
suspected to be between 0.7 and 1m above floor level; and
it was likely that the shop was initially inundated about 4am on 30
December 2010.
20. Photographs of the water observed at the site were provided. These photos
pre-date the inception of the policy and were allegedly taken around midday
on 30 December 2010, prior to the inception of the policy. The photos do not
show the Applicant‟s business premises but they confirm that the mall had
been inundated at that time.
21. The Applicant claims that the photos and the hydrology report are misleading
as her business premise was at the highest point of the mall and therefore
would have been the last to be inundated.
22. The Panel is satisfied that the mall had been inundated by the flood prior to
the policy coming into force. The Applicant concedes that some water may
have entered the premises but remains adamant that the damaged items
were moved above floor level and would not have been affected until well
after the initial inundation.
23. As the peak period of inundation of the Nogoa River was not until 31
December 2010, whatever the level of inundation present at the business
property at the time the policy came into force, it continued to increase after
4pm on 30 December 2010.
24. To this end, t he Panel must consider the policy‟s construction and the level
of cover offered. There is no question that whatever damage incurred after
the policy came into force was accidental (and therefore within the ambit of
the policy). The policy addresses the issue of damaged items thus:
“When property shown in the schedule is damaged during the period of
insurance the following Basis of Settlement will apply...”
Case No: 262289 Determination Page 4 of 5
25. Whilst the event that gave rise to this loss pre-dated the inception of the
cover, the policy does not create any barrier to the Applicant claiming for
damage that occurred after its inception.
26. On this basis, the fact that the event may have preceded the cause of some
or all of the damage is not an impediment to the Applicant‟s entitlement to
claim. She is entitled to cover for any loss incurred after 4pm on 30
December 2010.
27. In consideration of the evidence provided, the Panel notes that the Disaster
Coordinator „MP‟ reported the flood peak with the centre to be between
700mm and 800mm. He also notes that floor levels can vary by between
50mm and 100mm. Given the Applicant contends that her shop was at the
high point of the centre, her premises were likely inundated to a height of
700mm.
28. The Panel also notes that the hydrology report from WR notes:
At about 1600 on 30 December 2010 floodwaters were within 0.2m of the
peak flood
At about 1200 on 30 December 2010 floodwaters were within 0.3m of the
peak flood.
29. Therefore at the time cover came into effect at 1600 on 30 December 2010,
the Applicant‟s premises w ould have been inundated to a level of 0.5m
(500mm).
30. This data also indicates that at 1200 on 30 December 2010 the flood level at
the centre would have been at about 400mm which appears consistent with
the photographs provided by the FSP showing inundatio n at 12 noon.
31. This corroboration gives the Panel some comfort that the WR‟s data is
reliable.
32. In consideration of all of the above, the Panel finds that at the time the policy
came into force the Applicant‟s premises would, on the balance of
probabilities, have already been inundated to a height of 500mm.
Conversely, any damage above the height of 500mm falls within the cover
provided by the policy.
33. The Panel therefore determines that the FSP is required to indemnify the
Applicant for any damage above 500mm.
34. Whilst the Panel is unable to make any findings as to quantum, the parties
are required to work cooperatively to undertake a fair assessment of the loss
so sustained.
35. As already noted the Panel is unable to make a determination on the issue
of business interruption, but encourages the parties to work cooperatively to
reach an appropriate settlement.
Case No: 262289 Determination Page 5 of 5
Determination
36. On the basis of the available information, the Panel determines that the FSP
should indemnify the Applicant for damage caused above 500mm, including
any stock/contents items kept above this level.
37. The parties should work together cooperatively to determine the full extent of
the damage.
38. Insofar as any payment is to be made on the claim, the FSP must pay
interest at the statutory rate of 7.75% per annum from 7 February 2011 until
the date of payment.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.