Home / Financial Firm (Unknown - Insurer) / Determination 262102

Determination 262102

Claim denial for water damage to strata basement car park (flood exclusion)

FirmFinancial Firm (Unknown - Insurer)
Decided2012-05-31
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A body corporate claimed for water ingress into basement car parks after the January 2011 Brisbane floods, and the FSP denied it as flood damage. AFCA accepted that Brisbane River floodwater backflowed into the basements and found the FSP entitled to deny the claim.

Water entering through the stormwater system from the Brisbane River is floodwater, which the policy excludes, and the FSP's hydrology evidence on timing outweighed the engineer's alternative cause.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 262102 Determination Page 1 of 5 Case number: 262102 General Insurance - Domestic Insurance - Residential Strata Title - FSP Decision - Denial of claim (Flood) 31 May 2012 Background 1. The Applicant is representing a body corporate and the insured property is a multi-storey residential unit tower in Brisbane Queensland, owned by various owners. For the sake of expedience, reference to the Applicant will include the body corporate. 2. The Applicant entered into an insurance contract with the Financial Services Provider (FSP) for a 12 month period beginning on 30 June 2010. This policy covered property damage to the building. 3. On 25 January 2011, a claim was lodged on the policy for water damage sustained following severe weather events in Queensland. The following description was provided in the claim form: “Water ingress into basements 3 & 4.” 4. The FSP denied the claim on the basis it was due to “flood”. The Applicant has disputed this decision. Summary of Applicant ’s position 5. The Applicant submits the damage was due to rainwater entering the basement following on from the heavy rains leading up to 12 January 2011. This was corroborated by a consulting engineer’s report dated 15 February 2011. 6. Based on this and the discrepancie s in the FSP’s hydrologist’s report, the Applicant maintains the claim should be paid. Summary of FSP’s position 7. The FSP relied upon a hydrology report and the following policy provisions to deny the claim: “ SECTION 1: PROPERTY DAMAGE Cover Determination Case No: 262102 Determination Page 2 of 5 The Company will pay for Damage occurring during the Policy Period to Property Insured shown in the Schedule caused by or resulting from a cause not otherwise excluded. … Excluded Causes Policy 1 of this Package does not cover Damage directly or indirectly caused or occasioned by or arising from: … 3.13 physical loss, destruction or damage occasioned by or happening through:-  flood, which shall mean the inundation of normally dry land by water escaping or released from the normal confines of any natural watercourse or lake (whether or not altered or modified), or of any reservoir, canal or dam.” Issue 8. Whether the FSP is entitled to deny the claim based on “flood”. Reasons for decision 9. Due to the nature of the dispute, the matter has been referred to the Pane l for Determination in line with the Operational Guidelines to the Service’s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 10. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 11. The Panel is satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 12. The FSP’s insurance contract is structured in a way that any claim is covered unless it is caused by or resulting from an excluded cause. Pursuant to established legal principles, as the FSP is seeking to rely on an exclusion clause to deny the claim, it therefore has the burden of establishing this applies on the balance of probabilities. 13. The FSP engaged a hydrologist who provided a report dated 21 April 2011 that contained the following releva nt remarks regarding the water inundation:  There are four levels of basement car-parking at the property that were inundated. The fourth (upper most) level was inundated to about a third of its height. The main sections of the complex were not inundated above floor level. Case No: 262102 Determination Page 3 of 5  At about 0900 hours on Wednesday 12 January 2011, water started to flow into the basement car-park. The sump pumps were initially coping with this. However, at around 1430 hours that day, water came in a deluge and completely overwhelmed the sump pumps. Water appeared to be coming through the walls.  Total rainfall of 180mm was recorded for the period 9 to 13 January at the Brisbane City Alert Station, located approximately 350m east of the property. Peak 1-hour rainfall intensity of 28mm/hr occurred at 1600 hours on Sunday 9 January 2011. Peak stormwater runoff from the surrounding catchment would have occurred within 10 to 30 minutes of peak rainfall.  There was no rain of significance recorded after 1500 hours on Tuesday 11 January 2011 and no rain was recorded after 0000 hours on 12 January 2011. Given the property was not inundated until Wednesday 12 January 2011, local stormwater runoff would not have inundated the basement above floor level.  The Brisbane River drains around the western, southern and eastern sides of Brisbane. The Brisbane River overflowed and inundated the southern areas of Brisbane City, including the southern end of A Street, on 12 and 13 January 2011.  Floodwaters did not enter the basement via the access ramp from C S treet. It would have entered the neighbours’ adjoining basement car park to the south.  It is likely the initial inundation of the basement was the Brisbane River back-flowing through the stormwater pipes as the floor level of the basement car-parks are well below river level.  Water would also have seeped through cracks and holes in the walls of the car-park from the surrounding ground. It is possible some of these holes are connected to subsurface drainage through which Brisbane River floodwater surcharged.  The recorded water levels at the Brisbane City Alert gauge peaked at a level of 4.46m AHD at 0400 hours on 13 January 2011. 14. Based on this, the hydrologist concluded as follows: “ The basement car-park at the subject property was inundated above floor level by floodwater from the Brisbane River backflowing through the piped stormwater drainage system. Stormwater runoff would not have inundated the basement above floor level. ” 15. The consulting engineer’s report provided by the Applicant was dated 15 February 2011 and contained the following relevant remarks:  No water entered the property from across the footpath or driveway access.  A system of drains around the perimeter of each basement floor are located to catch any seepage that comes through the wall and direct it Case No: 262102 Determination Page 4 of 5 to a sump pumping system. The walls are performing adequately with only minor seepage evident.  The volume of water in the basement was not from a seepage source. The source is likely from the incoming electricity mains to the building on the C St reet frontage. A “waterfall” from this location was observed by staff. The water staining on the vermiculite encasing of the incoming conduits and failed fire proofing of the entry location boxing soffit confirm the likelihood of this location being the main source of water entry into the basement.  Other service entries into the basement show signs of seepage but are not considered to have contributed to the water inundation. All them are long term seepage sources and catered for by the building’s drainage and sump pumping system.  The pump outflow would not have been able to cope with the rate of water inflow from the Energex cable entry source.  The stormwater pipe along the southern boundary of the site showed no signs of water escape or seepage. 16. The Applicant has substantively based her submissions on various anomalies in the FSP’s hydrologist’s report, particularly its omission to properly consider the location of the cable entry points that the engineer highlighted was the likely source of water entry. 17. However, in the same vein, the Applicant does not dispute that the water which entered this point was from the Brisbane River breaking its banks. Instead, she submits this is irrelevant as the cause of the loss was the lack of water tight sealing of the cable entry points in the service pits outside the building. 18. The Applicant’s submissions in this regard are incorrect. The exclusion being relied upon by the FSP is based on identifying the source of the water inundation that caused the damage. Although the Panel acknowledges the Applicant’s submission that this lack of sealing could have resulted in water damage from a broken mains, this does not assist her position as the policy clearly states the FSP is able to deny the claim if it can establish the damage was directly or indirectly caused by flood. 19. Despite the anomalies identified by the Applicant in the hydrologist’s report, such as the likely point of entry, there are a number of substantive points from the report that lead the Panel to accept that the likely source of the water inundation was “flood”:  Water first entered the building at 9am on 12 January 2011, being 9 hours after the last recorded rainfall and 18 hours after the last significant rainfall. Normally, stormwater inundation occurs contemporaneous to intense rainfall in the area.  At 2.30pm on 12 January 2011, 14 hours after the last rainfall was recorded and 23 hours after the last significant rainfall was recorded, Case No: 262102 Determination Page 5 of 5 water came in such intense volume that it was described as a deluge and overwhelmed the sump pumps.  Around the time of this deluge, the level of the Brisbane River was reaching its peak and it is well accepted that this water inundated various areas of the Brisbane City proximate to the Applicant’s property. 20. Given this, the Panel accepts, on the balance of probabilities, it was water from the Brisbane River escaping its normal confines which inundated the Applicant’s property. As this falls within the policy definition of “flood”, the Panel accepts the FSP is entitled to deny the claim. Determination 21. On the basis of the available information the Panel determines the FSP is entitled to deny the Applicant’s claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.