Home / Financial Firm (Unknown - Insurer) / Determination 261915
Determination 261915
Flood exclusion applied to denial of investment property water damage
Summary
Investment property at Charlton, Victoria was inundated in January 2011 and the FSP denied the claim as flood. AFCA found the Avoca River floodwater was excluded, but initial stormwater inundation to 100mm was covered, so the FSP must pay for flooring damage and assess the rest of the damage.
Water from the Avoca River is flood under the policy, but the initial inundation was surface runoff, which is covered up to about 100mm above floor level.
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Case No: 261915 Determination Page 1 of 10
Case number: 261915
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
29 November 2012
Background
1. The Applicant’s investment property at 18 Armstrong Street was insured
under a Home Insurance Essentials (defined events) policy issued by the
Financial Services Provider (FSP) for $107,000. An excess of $500 applied
to claims.
2. On 14 January 2011 the building in Charlton Victoria was inundated by water
following intense rainfall in the area over several days.
3. A claim under the policy was denied by the FSP on the ground that flooding
from the Avoca River caused the damage and as such was excluded from
cover provided by the policy.
4. The Applicant maintains the initial inundation of her property was from
surface runoff rainwater which is covered by her policy.
5. The property also sustained damage during the floods in September 2011.
The property was insured by another FSP at that time. A claim under the
policy was also denied on the ground the water which inundated the property
was flood water and excluded from the policy.
6. The Applicant disputed the FSP’s decision to deny that claim and the matter
was referred to the Service (case number 238492)
Summary of Applicant’s position
7. The Applicant is represented by her lawyer. Reference to the Applicant in
this determination will include her representative.
8. The damage to the building is extensive.
9. The Applicant submits that stormwater runoff associated with heavy rainfall
between 10 and 14 January 2011 inundated her house causing extensive
damage to the building, the building foundations and to the contents.
10. The Applicant relies substantially on a hydrological report provided by “M”
which she contends supports her position.
Determination
Case No: 261915 Determination Page 2 of 10
11. The M report concluded:
that as a result of high intensity short bursts of rainfall overflow from
the local drainage system and culverts was highly likely.
It was likely that rain which fell in paddocks to the south and south-east
of Charlton accumulated and ran off along natural drainage lines into
the town.
It was likely that inundation of homes in Charlton by clear water
supports the suggestion that prior to inundation via overflow from the
Avoca River some floodwater was sourced locally from stormwater.
12. The Applicant does not dispute the Avoca River burst its banks and that the
flood water inundating homes sometime after this would ha ve been dirty.
The Applicant submits that the initial inundation of the home was clear and
caused by rainwater runoff.
13. It was the initial inundation that caused damage for which the dispute was
brought.
Summary of FSP’s position
14. The FSP relies on reports provided by an assessor and a hydrologist who
carried out site inspections and made enquires within the local area.
15. Following investigation of the circumstances surrounding the loss, it
determined the damage was caused by flood as defined by the policy.
16. The relevant policy terms provide as follows:
“ Words with special meanings
...
‘flood’ means the inundation of normally dry land by water that has escaped
or has been released from the normal confines of any natural watercourse,
lake or lagoon, whether or not altered or modified or from any reservoir, canal
or dam.
...
Other benefits we will provide
...
9. Storm, rainwater or run-off
...
We will not pay for loss or damage;
a caused by
flood, ...:
Case No: 261915 Determination Page 3 of 10
Issues
17. Whether water which inundated the building was flood water as defined by
the policy.
Reasons for decision
18. Due to the complex nature of this dispute, FOS has considered it appropriate
to expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. The dispute has not been the subject of a FOS
Recommendation and has proceeded direct to Determination.
19. The decision had been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
20. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to respond.
21. Prior to arriving at a determination, the Panel has read and considered all
the material submitted by the parties to FOS. A site visit has also been
carried out by the FOS representatives.
22. The Panel has been provided with copies of hydrological reports obtained by
the FSP and the Applicant. As these documents have been exchanged it is
not intended to recite the details in full in this determination. The Panel will
however summarise the reports in relation to the information relevant to the
issues disputed in this matter.
Loss adjuster’s report dated 28 January 2011
The property was i nundated to a level of 70cm above floor level.
Flood waters damaged the timber floorboards throughout the house
and wall claddings up to 70cm. Kitchen units, bathroom cabinets and
electric wiring were also damaged.
Hydrologist WT - report dated 18 March 2011 commissioned by the FSP
Local flooding
Historically the town has been flooded from two directions in a north
south plane with an area remaining free though the town centre along
the St Arnaud-Charlton Road.
Heavy rain fell in the area between 10 and 14 January 2011. The
largest total fall was recorded at 9am on Friday 14 th
The most intense rainfall fell on the morning of 11 th and early morning
on 13 th January as shown on charts (figure 7.3).
Case No: 261915 Determination Page 4 of 10
The peak flood level of 8.05m was reached early morning on 15 th
January being at least 2 days after the most intense rainfall.
The volume of water suggests either the Yeungroon Creek transferred
flows across the flood plain upstream of Charlton or the Avoca River
pushed more water into the floodplain upstream of town.
Given the timing of flooding on the eastern edge of town was similar to
the gauged readings, suggests the Yeungroon Creek and Avoca River
flows merged to become one system.
Township summary
The general method of flooding for properties in Charlton was via
overflows of the Avoca River and Yeungroon Creek systems.
The Avoca River peaked at 8.05m resulting in widespread flooding of
the town and inundation of multiple properties. A large portion of the
town flooded about 12 hours after the last significant rainfall.
Any flooding after lunchtime can be directly attributable to the Avoca
River/Yeungroon Creek flooding
Floor inundation that occurred east of Armstrong Street early morning
on 14 January can be attributed to storm water.
Site flooding
The site is located about 500m from the Avoca River.
Site observations included:
i. Signs of water around the property,
ii. Distinct flood lines.
iii. Discussions with neighbouring properties revealing timing of
inundation around the area of town.
Site summary
Following i nvestigation of this property flood damage at this site occurred as a
result of flood flows from the Avoca River.
Hydrologist “M" report dated 3 November 2011 commissioned by the Applicant
Rainfall
The highest rainfall was 15mm per hour from 1700 to 0800 o n 13
January 2011. Rainfall rates were persistently high from 2300 hours on
13 January to 0600 on 14 January. No rain fell after 0800 on 14
January.
Case No: 261915 Determination Page 5 of 10
The radar data for Charlton indicates the rainfall was highly
concentrated in short duration bursts. The rainfall which produced the
15mm/hour actually occurred over a period of about 12 minutes.
This situation is similar for the rainfall over night on 13-14 January.
The rainfall intensities in these bursts are much bigger than the
recorded hourly rates.
Overflow from local drainage systems
Given the intensity of rainfall which was much more than hourly rainfall
rates overflow from local drainage systems and culverts was highly
likely. Especially given that the drainage system was already close to
capacity from earlier rainfall bursts.
The timing of overflow would correspond closely to the timing of the
rainfall.
The first possible incident of stormwater drainage overflow would have
occurred around 0700 on 13 January. Any of the intense rainfall
periods recorded between 13 and 14 January could have been
responsible for overflow of stormwater drainage systems. The greater
probability being from midnight to 0400 on 14 January.
Direct overflow is less likely after this time.
Without augmentation from other sources stormwater drainage
overflow would be short lived.
Runoff from surrounding areas
There were two possible sources of runoff. Runoff was possible from
Charlton which does not enter the drainage systems and runoff from
surrounding rural areas.
During periods of heavy rainfall bursts, water would have overflowed
and contributed to surface runoff. Without augmentation from other
sources stormwater drainage overflow would have been short-lived.
It is highly likely that rainfall which fell on 13 and 14 (January) was
saturation overland flow and would have led to inundation of Charlton
on 13 and 14 before floodwater from Avoca (River) entered the town.
Water falling south and east of Armstrong and High Streets will tend to
move east with water to the west and north tending to move to the river.
Water runoff as overland flow would concentrate water in the eastern
part of Charlton.
The combination of surface runoff from the surrounding area being
directed toward east Charlton combined with periodic overflow from
drainage systems in other parts of the town would lead to inundation by
stormwater and locally derived surface water on the morning of 14
January.
Case No: 261915 Determination Page 6 of 10
That inundation from locally derived rather than Avoca River water is
further supported by the changing sediment loads of water seen in
Charlton.
Clear water
When the Avoca River overtopped its banks and Charlton was
inundated by floodwater the source of that water can be clearly seen
because of its high sediment load.
Flooding from Avoca River
Minor flood level was reached at 0400 on 13 January. Moderate flood
levels were reached at 2045 on 13 January. Major flood level was
reached at 1715 on 14 January.
Significant inundation of Charlton from the Avoca River did not begin
until late afternoon on 14 January and became more severe through
the evening and night. Some outlying parts of Charlton would have
been inundated mid-afternoon.
Summary
Depending on the exact location of properties, they will have begun to
have been inundated from the Avoca River overflow some time in the
afternoon and early evening of 14 January.
Any inundation from runoff before this time particularly corresponding to
those time when periods of heavy rainfall occurred on 13 and early
morning on 14 January could not have been caused by inundation from
the Avoca River.
It is possible that flooding could have been caused by
stormwater/intense rainfall runoff on 13 and early on 14 January.
23. Inundation from stormwater accumulating in eastern and southern Charlton
is probable on the night of 13/14 and early morning/early afternoon of 14 th
(January).
Summary
24. The Panel Chair Ombudsman and Panel members have visited a number of
sites in Charlton on several occasion and observed first-hand many
properties (including the property subject of this dispute) and discussed the
event with policy holders, as well as FSP representatives, experts and a
range of local residents.
25. The peak level of inundation of the properties in Charlton was generally
accepted to be water from the Avoca River and/or a combination of water
from the Avoca River with surface runoff rainwater which could not drain
away and surface run off from surrounding flood plains. This water is flood
water as defined by the policy.
Case No: 261915 Determination Page 7 of 10
26. Having considered all of the evidence, and based on its own discussions and
observations, the Panel is satisfied that ultimately the Applicant’s property
was flooded by water from the Avoca River. Given the terms of the policy the
Panel accepts that water from the Avoca River is properly categorised as
flood water and damage arising from this water is excluded from cover
provided by the policy.
27. However in the Panel’s experience the initial inundation of many homes was
caused by surface run off rainwater which could not drain away through the
town’s stormwater drainage syste ms and water which entered the town from
the surrounding landscape.
28. In these cases timing of the initial inundation, colour of the water and flow
path are matters which have some bearing on the source of the water.
29. According to the assessor the Applicant ’s premises were leased and the
tenant occupying the premises at the time of the inundation was unavailable.
The Panel therefore has no eye witness information relating to the time of
the initial inundation of the premises.
30. The hydrologist WT says discussions with neighbouring properties revealed
the timing of inundation around this area of the town. However other than
stating a large portion of the town flooded about 12 hours after the last
significant rainfall, WT has not reported a specific time when water first
entered the Applicant’s premises or from what direction the flow came.
31. It is unclear from the rainfall data contained within WT’s report whether
reference to the last significant rainfall was the last intense rain fall on
Thursday with 66cm collected at 9am on14 January 2011 or was the most
intense rainfall on the morning of 11 January and early morning on 13
January.
32. Further, although the WT report notes the river peaked at 8.05m in the early
morning of 15 January, the report is silent in relation to exactly where or at
what time the river overtopped its banks in or around Charlton.
33. According to the M report the Avoca River reached major flood level at 5.15
pm on 14 January. It is reasonable to conclude that some delay would be
experienced from the time that water overtopped the river banks at 5.15 pm
before it reached the township to mix with water from other sources.
34. It is therefore reasonable to conclude the Applicant’s premises were not
inundated by flood water until sometime after 5.15pm, but before, and
inundation before that time would not have been water from the Avoca River
in Charlton.
35. The WT report suggested that due to the increased volume of water than
that experienced in the September 2010 flood, either the Yeungroon Creek
transferred flows across the flood plain upstream of Charlton or the Avoca
River pushed more water into the flood plain upstream of the town. However
the report has provided no data relating to breakouts of the river upstream
Case No: 261915 Determination Page 8 of 10
such as gauge readings to determine the river level, time and location of the
breakout and any delay which may be expected before that water mixed with
surface runoff from the Yeungroon Creek flood plains.
36. In the Panel’s opinion without these specific details it is open to conjecture
when or if the Avoca River upstream of Charlton influenced the flow of water
across the flood plains south and east of the town.
37. Following a visit to the area by FOS Panel members, and based on
discussion with a number of parties, the Panel is of the opinion the
landscape over which the water flowed from the south and east of the town
cannot be regarded as a natural watercourse. Although the area from which
the water flowed is designated as “Yeungroon Creek”, that appellation alone
cannot be taken as evidence of a watercourse.
38. The following ruling was made by the High Court in Gartner v Kidman [1962]
HCA 27: 108 CLR 12 (30 May 1962):
“This distinction between watercourse and depression follows the language of
Hood J in Lyons v Winter (1899) 25 VLR 464, who in that case held that a
depression which took rainwater for about three months of a year fell short of
the legal definition of a natural watercourse. To constitute such a watercourse
as a matter of law, there must be a stream of water flowing in a defined
channel or between something in the nature of banks. The stream may be
very small and need not run, nor need the banks be clearly or sharply defined.
But there must be a course, marked on earth by visible signs, along which
water usually flows in order to constitute a watercourse such as creates
riparian rights (1899VLR at p485 (at p16)
39. The landscape to the south and south east of the town does not have
evidence of visible banks between which water flows and further, water does
not usually flow along this stretch of land, which is only vaguely described by
a range of indentations and vegetation. The landscape may best be
described as a flood plain over which water flows in a direction determined
by the rise and fall of the land.
40. This view is further supported by the description given by M who observed
Yeungroon Creek has been infilled with flood deposits over many years. The
course of the creek to the south of the town is marked by linear depressions
and vegetation.
41. Accordingly the Panel accepts that water which came from the Yeungroon
Creek area to the south and south east of the town may not be regarded as
water which was from a natural watercourse.
42. The M report also addressed the issue of surface run off rainwater in the
town, the ability of the town stormwater systems to cope with the runoff and
the influence of surface run off from Yeungroon Creek area.
43. Further, the M report discussed the flow of surface runoff from the
surrounding area south of Charlton being directed to east Charlton and
overloading the stormwater drainage system.
Case No: 261915 Determination Page 9 of 10
44. The Panel is aware that the Avoca River rose rapidly on 14 January 2011,
which in turn prevented water in the town stormwater drain system from
escaping thus adding to the flow of water through the to wn.
45. The M report also discussed the presence of clear water in Charlton which
suggested that prior to inundation by overflow from the river some of the
flood water was sourced locally from stormwater which either fell in town or
collected to the east of town and followed natural drainage lines to low points
to partially inundate low lying parts of Charlton.
46. M stated:
“Depending on the exact location of properties they will have begun to have
been inundated from the overbank flooding of the Avoca River sometime in
the afternoon or early evening of the 14 January. Any inundation or damage
from runoff before that time, particularly corresponding to those times when
periods of heavy rainfall were occurring (on 13 and early morning on the 14
January) could not h ave been caused by inundation from the Avoca River.”
47. The FOS representatives also observed the Applicant’s property was about
200m above ground level with the floor of the property almost at the same
height as the crest of the road; the ground level was below the crest of the
road; local drainage in front of the premises is covered in leaves and debris.
Given these observations, the FOS representatives formed a view that
stormwater could have entered the property during the afternoon of 14
January 2011.
Conclusion
48. The Panel has carefully considered all the evidence and arguments
submitted by the parties, information obtained from local residents and
observations of the Panel representatives who attended the site.
49. While the expert evidence is inconsistent in respect of the source of water
which inundated the premises, the following are generally accepted:
Rainfall was heavy for several days between 10-14 January 2011 but
effectively ceased by 8am on 14 January.
Clear water was seen running overland from the south and south east
of the town during the day of 14 January.
Floodwater from the Avoca River in Charlton would have inundated
parts of the town sometime later in the day possibly after about 5.30pm
50. Given the intense rainfall which fell early on 14 January 2011 and the rapid
rise in river levels during the day it seems likely that the stormwater systems
in town were at capacity and unable to disperse the surface water. This
water would have been augmented by the build up from the south in the area
of the Charlton-St Arnaud Road. At this point any runoff would be impeded
by the ineffective culvert flows at the road. Accumulating water would then
back up along the flood plain and push back along the east of town but also
to the west of Armstrong Street.
Case No: 261915 Determination Page 10 of 10
51. After analysis of the material the Panel concludes on the balance of
probabilities that the Applicant’s premises were initially inundated by surface
runoff rainwater or a combination of surface run off and water backing up
from the surrounding areas to the south and east.
52. Given the absence of any actual observation as to the height of stormwater
runoff, the Panel is inclined to rely on its remit to do what is reasonable in all
the circumstances; having regard to the timing and the height of the property
and the house thereon, the Panel concludes that stormwater to a height of
100mm would have first inundated the home prior to inundation by
floodwater.
53. The Panel has not been provided with any material to establish the extent of
the damage caused by water to that height. It is unclear whether damage
sustained to the property in the September floods had been repaired. If it
had not been repaired given the earlier inundation was above floor height the
FSP will need to assess whether any additional damage has been sustained
in the January 2011 flood and if so the extent of that damage.
54. Any damage above the level of 100mm above floor is in the Panels view,
most likely either floodwater or a combination of floodwater and stormwater
runoff. In either case such inundation is classified as flood and would be
excluded under the policy.
Determination
55. On the basis of the available information the Panel determines;
a. The FSP is not liable for the total cost of rectifying the water damage to
the building,
b. The FSP is liable for the cost of rectifying any damage to flooring
caused by water inundation,
c. The FSP is entitled to assess the extent of this damage and the cost of
its rectification.
d. In the event the FSP settles the claim by cash payment to the
Applicant, the FSP is to include interest in accordance with Section 57
of the Act from 7 April 2011 to the date of payment.