Text of the determination
Case No: 261609 Determination Page 1 of 25
Case number: 261609
General Insurance - Domestic Insurance - Home Building - Service - Delay in
Claim Handling/Inadequate Settlement
17 January 2013
Background
1. The Applicant held a home buildings insurance policy with the Financial
Services Provider (FSP) which was current at the time of loss. The insurance
policy provided a sum insured for buildings of $332,800 and had an
applicable policy excess of $300.
2. On 7 February 2011 the Applicant contacted the FSP to report extensive
damage to her property caused by cyclone, which occurred on or about 2
February 2011.
3. The FSP accepted the claim and provided an emergency payment to the
Applicant in accordance with the terms and conditions of the insurance
policy of $2,500. The FSP then arranged assessments of the damage to the
Applicant’s property and the Applicant arranged temporary accommodation
which was paid for by the FSP.
4. Upon receipt of the advice from its experts, the FSP attempted to authorise
repairs to the Applicant’s property, howe ver the Applicant had numerous
concerns regarding the extent of repairs and whether the scope of works
(SOW) she had been provided encompassed all cyclone damage repairs.
5. Over the ensuing months, a number of discussions and reinspections of the
property were undertaken however the “SOW” was not accepted by the
Applicant. The Applicant reluctantly accepted a cash settlement offer on 14
June 2012, which was sent to the Applicant on 3 July 2012, to enable her to
begin repairs on her property. The settlement was accepted on the basis that
it was not a full and final settlement, dependant on the outcome of the
dispute she lodged with FOS.
Summary of Applicant’s position
6. The Applicant says the FSP attempted to authorise repairs to her property in
April 2011 based on a “SOW” prepared by its builder/assessor, despite the
fact that she had not met on site with any builder to ensure the “SOW”
Determination
Case No: 261609 Determination Page 2 of 25
suggested encompassed all necessary repairs to the cyclone damaged
property.
7. Her attempts to have the FSP attend to outstanding issues has resulted in
unnecessary delays, countless reinspections of her property by various
people, with and without her presence, changes to the “SOW” resulting in
cyclone damaged items being excluded then reintroduced at her request,
herself and her children being displaced from their residence for
approximately 21 months and an inadequate settlement figure being offered
to her by the FSP.
8. The current outstanding issues relate to inadequate settlement offers for the
removal of rubbish and debris (associated bin hire costs), external painting
of her property and costs associated with obtaining relevant council approval
for the structural repairs required to the property. In addition, the Applicant
seeks additional settlement amounts for the replacement of windows to
current code specifications and for temporary accommodation of two weeks
for a delay in being able to start repairs due to termites.
9. One item authorised for repair by the FSP is a timber beam and it is as yet
unknown if this beam can be successfully repaired until repairs are
attempted. Should the beam require replacement, the Applicant also seeks
to have the additional costs paid to her by the FSP.
10. As a result of the cyclone and other personal issues, the unreasonable
delays in rebuilding caused by the FSP and endless reinspections of her
property by the FSP has caused the Applicant additional stress and anxiety
which she says could have been avoided. This has resulted in her taking
extended sick leave and having to leave her previous employment.
11. The Applicant seeks to have the FSP provide to her a settlement which is
fair and reasonable and which takes into account all damage caused by the
cyclone.
Summary of FSP’s position
12. The FSP says there has been no undue delay in processing or finalising the
Applicant’s claim especially considering the magnitude of the cyclone event
and the extensive damage to the Applicant’s home. It notes that the
Applicant was unwilling to allow any of its representatives onto her property
without her presence and therefore, delays caused by this were out of its
control.
13. The Applicant has failed to provide any supporting documentation or
evidence to support her suggestion of the inadequacy of the settlement
offered by the FSP in relation to building permits and rubbish removal (bin
hire).
14. The windows/glass sliding doors at the property were not installed to the
required building code requirements and as such, the FSP is not responsible
Case No: 261609 Determination Page 3 of 25
for any additional costs in ensuring the windows/glass sliding doors are
replaced to meet those requirements.
15. The FSP regrets the level of service provided by it to the Applicant did not
meet the Applicant’s expectations. However, there is no cover for any
consequential loss under the terms and conditions of the insurance policy
and as such, it cannot provide any compensation in this regard.
16. The FSP relies on the following policy provisions of its Product Disclosure
Statement (PDS):
“ We do not cover
...
Extra costs following an insured incident
Consequential losses or extra costs following an insured incident ... ”
(Page 126)
“ How we settle your claim
We choose how your claim is settled
If we agree to pay a claim for loss, theft or damage to your home, contents or
landlord’s fixtures and fittings, we will decide if we will:
- repair damage new for old or
- replace home or contents new for old or
- pay you what it would costs us to repair or replace home or contents new
for old.
The meaning of new for old is defined on the next page.
We will not:
- pay extra to replace your home, contents or landlord’s fixtures and fittings
to a better standard, specification or quality that it was before the loss or
damage occurred except as stated in ‘new for old’ on the next page
- fix a fault that existed before the loss or damage occurred.
New for old means:
- new materials, new items
We replace or repair with new items or new materials that are available at
the time of replacement or repair from Australian suppliers.
- new for old, regardless of age
We replace or repair new for old regardless of age, with no allowance for
depreciation.
...
- same type, standard and specification as when new
We replace or repair to the same type, standard and specification as when
new. If the same is not available, it means of a similar type, standard and
specification when new. It can be a different brand.
New for old does not:
Case No: 261609 Determination Page 4 of 25
- include paying the extra cost of replacing or purchasing an extended
warranty on any home or contents item or
- mean of a better standard, specification or quality than when new.”
(Pages 134 and 135)
“ How we settle your claim (continued)
...
Home Claims
How we settle home claims
If we agree to pay a claim for loss, theft or damage to your home, we will
decide if we will:
- repair new for old or
- rebuild your home new for old or
- pay you what it would cost us to repair or rebuild your home new for old.
When we repair or rebuild your home
We will do our best to obtain new materials that are the same type, standard
and specification as when new. If the same is not available, we will use new
materials of a similar type, standard and specification that are commercially
available and compliant with the latest building regulations.”
(Page 138)
Issues
17. Whether the FSP caused any undue delays in the claims handling process.
18. Whether the FSP’s level of service to the Applicant was acceptable.
19. Whether the Applicant has received adequate settlement for a variety of
items.
20. Whether the Applicant is entitled to any additional loss of rent payment.
21. Whether the Applicant is entitled to compensation.
Reasons for decision
22. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
23. I am satisfied there has been a full exchange of material between the parties
and that each party has had the opportunity of clarifying the issues that arise
from the material.
Case No: 261609 Determination Page 5 of 25
24. This dispute essentially relates to the claims handling process conducted by
the FSP which the Applicant says, resulted in unnecessary delays and an
inadequate claims settlement.
Time Line
25. To assist in reviewing the issues of this dispute, I have confirmed the
following time line of events, based on file notes provided by the FSP:
Date of Loss – 3 February 2011
Loss reported to FSP by Applicant – 7 February 2011
Emergency payment made to Applicant of $2,500 – 7 February 2011
Temporary accommodation arranged by Applicant – 16 February 2011
Temporary accommodation arrangements approved by FSP – 26
February 2011
Assessor attended to inspect property – 26 February 2011
Applicant advised FSP temporary accommodation arranged is not
suitable for her family and looking for alternative based on assessor’s
advice that she will be out of her home for 12 months – 5 March 2011
Assessor’s report noted as being on file and awaiting review – 5 March
2011
Approval given for alternative temporary accommodation by FSP – 14
March 2011 (to start from April 2011)
Make safe to make property watertight arranged on Applicant’s advice
that water is still entering property – 23 March 2011
First rental payment made by FSP for period 15 April 2011 to 15 May
2011 – 26 April 2011
Email sent by Applicant to FSP requesting temporary accommodation
payment as overdue – 25 May 2011
Payment for temporary accommodation from 15 May 2011 to 15 June
2011 made – 30 May 2011
Payment for temporary accommodation from 15 June 2011 to 15 July
2011 made on email request from Applicant – 9 June 2011
Applicant requested “SOW” /quote, advised she wanted her own builder
to complete work and requested FSP to note her file with the following:
“The builder from [LL] had contacted me and asked for permission to
look at the home when I wasn’t at home. He said he would contact me
after that to discuss the quote and “SOW” in person with me before
lodgement. This was never done. Because of this can you please
notate my file to say that I do not give permission ever under any
circumstances for anyone to enter my property unless I am present.
Can you please ensure this information is passed onto [LL] and any
other relevant representatives who are acting on [the FSP]’s behalf.” –
6 July 2011
Case No: 261609 Determination Page 6 of 25
“SOW” without costings emailed to Applicant by FSP – 6 July 2011
Payment for temporary accommodation from 15 July 2011 to 15 August
2011 made on email request from Applicant – 9 July 2011
Quotation for works received from FSP’s builder for $71,811 – 18 July
2011
FSP’s file notes indicate an email was received from Applicant advising
items appear to be missing from “SOW” . FSP requested builder to
review – 18 July 2011
Payment for temporary accommodation from 15 August 2011 to 15
September 2011 made on telephone request from Applicant – 8 August
2011
Payment for temporary accommodation from 15 September 2011 to 15
October 2011 made on telephone request from Applicant – 19
September 2011
Applicant called FSP requesting rent payment and requesting that this
be set up automatically each month so she did not have to call – also
complained as having never spoken to the Case Manager (CM)
handling her claim and requested to speak to “CM” or a Team Leader –
these requests were denied by FSP’s call operator as no -one was
available, however Applicant was advised that “CM” would call her back
within two working days. Call operator advised Applicant that automatic
payments could not be guaranteed due to the volume of claims as a
result of this event – 19 September 2011
Complaint from Applicant reviewed by FSP – Applicant was called and
a message left. “CM” was emailed “appointment” to make temporary
accommodation payments on the 1 st of every month – 23 September
2011
FSP’s file note indicates a request to the builder to provide the “SOW”
which had been provided by builder to Applicant to sign (appears not to
have been received by FSP at this time) and a quotation had been
received from the Applicant – 26 September 2011
FSP calls Applicant as a courtesy – no other details of call – 28
September 2011
Payment for temporary accommodation from 15 October 2011 to 15
November 2011 made on telephone request from Applicant – 10
October 2011
Telephone discussion between FSP and Applicant – Applicant advised
that she was concerned with “SOW”, had been told an engineer was
required and as one had not been appointed by FSP, she had
appointed her own – FSP advised Applicant her concerns would be
raised with its builder – 19 October 2011
Complaint lodged by Applicant – FSP responded – advised FSP will
pay for Applicant’s engineer’s costs. Applicant advised people still
Case No: 261609 Determination Page 7 of 25
entering her property whilst she is not there and make safe of property
still needs to be done – 31 October 2011
“CM” spoke with Applicant who became agitated after being advised by
CM that temporary accommodation payment would be made for two
weeks only to bring Applicant a month in advance on payments which
senior staff of FSP agreed was all the FSP could pay. Applicant
cancelled appointments with assessor and FSP’s engineer. FSP’s
builder disagreed with Applicant’s engineer’s report – 1 November 2011
FSP’s builder provided advic e to FSP that the Applicant was not co-
operating – 9 November 2011
FSP responds to Applicant’s complaint – reinspection with Assessor
and FSP’s engineer arranged , apology made for inconvenience,
temporary accommodation checked and up to date to 15 November
2011 – 11 November 2011
Payment for temporary accommodation from 15 November 2011 to 15
December 2011 made – 11 November 2011
Applicant contacts FSP – requests no contact from FSP while the
matter is being reviewed by FOS, assessor’s appointment to be
cancelled and make safe requested by FSP – 14 November 2011
FSP calls Applicant noting that, “... -insd has specifically requested we
only email her – due to restrictions of conversation i called insd mobile,
no answer, LMTCB – insd called back whilst drafting note .. .”. FSP
advised Applicant payment to be made for fence and engineer’s report,
that the appointed assessor was not appointed to hurt her case or void
her claim, rather to clarify areas in dispute between her and the builder
– Applicant advised FSP no further assessments until FOS have
reviewed – 15 November 2011
Payment made to Applicant for fence and engineer’s report – 16
November 2011
Applicant discusses site visit with assessor before his attendance to
clarify some issues – 17 November 2011
FSP file note detailing a diary entry received to review file for next
temporary accommodation payment – file reviewed and re-filed for
payment to be made on 12 December 2011 – 1 December 2011
Applicant contacts FSP as temporary accommodation payment not
received and now due – call was made as outside of work hours –
email sent to claims handler to follow up – 16 December 2011
Payment for temporary accommodation from 15 December 2011 to 15
January 2012 made on review of file and note by FSP that payment
had been overlooked – 20 December 2011
Payment for temporary accommodation for balance of limit of this cover
made, due to works not yet started and Applicant requiring to provide
lessor with six weeks notice if not continuing rental agreement – 21
December 2011
Case No: 261609 Determination Page 8 of 25
Letter sent to Applicant requesting urgent response regarding whether
or not she accepts the new “SOW” – 5 January 2012
Quotation from FSP’s suppliers requested for replacement stove – 10
January 2012
FSP’s builder advises quote for stove is $4,224 and FSP’s suppliers
suggest $6,676 – review required. Final “SOW” quote from FSP’s
builder on items agreed by Applicant at previous review is $196,931
including stove – 11 January 2012
FSP requested revised quote from suppliers for stove as specifications
of original stove have now been received and original quote provided
by supplier does not match specifications – 13 January 2012
Email sent to Applicant advising her concerns regarding the “SOW” are
being addressed, including if there is any asbestos in walls – 13
January 2012
Follow up call made by FSP to supplier regarding quote for oven – 13
January 2012
Email received from Applicant regarding her concerns with new “SOW”
issued – sent to FSP’s builder for a response – 16 January 2012
Complaint from Applicant addressed by FSP by appointing another
assessor to assist in resolving current issues with “SOW” etc – 17
January 2012
Telephone call received by FSP from co- insured (Applicant’s ex -
partner) requesting an update on file – FSP advised that all payments
regarding claim would be made into a joint account or via cheque in
both parties names as at the time of the loss, both parties were listed
on the policy (at renewal, ex-partner had been removed from policy) –
19 January 2011
Email received by FSP from Applicant advising she does not wish to
discuss claim on telephone and date of appointment for second
assessor to attend is not convenient for her – better time would be 6pm
however this does not suit assessor due to others also having to be
onsite. FSP requested via email a suitable time for FSP to call
Applicant to discuss – 24 January 2012
SMS sent to Applicant for her to call FSP – 24 January 2012
FSP called Applicant and left message on voice mail to call FSP – 24
January 2012
Co-insured called FSP for update on claim – advised close to a
settlement and currently awaiting another assessment to confirm final
“SOW”. FSP notes that both co -insured and Applicant are to be
provided with update on claim – 25 January 2012
Payment for temporary accommodation made to cover period to 22
March 2012 made on an ex-gratia basis as this is over policy limit – 2
February 2012
Case No: 261609 Determination Page 9 of 25
Make safe repairs organised for 7 February 2012 – 3 February 2012
FSP confirms with suppliers that quotation sent by Applicant for
replacement stove is the closest match to what she had as original
manufacturer no longer exists. Applicant’s quotation is $7,149 which is
accepted by FSP – 15 February 2012
FSP follow up email to builder for amended “SOW” and email sent to
Applicant with copies of asbestos report and glazing report – 15
February 2012
FSP advised Applicant via email that FSP required evidence that
windows installed at property were installed to code at the time property
was built. FSP also called Applicant’s solicitor regarding co -insured and
how any settlement may be affected by any agreements between
Applicant and co-insured regarding their separation – 16 February 2012
Applicant advised FSP that property was built to code and disputed
codes quoted by FSP’s glazing expert – Applicant requested details to
discuss with other experts – 21 February 2012
FSP followed up builder for amended “SOW” – 21 February 2012
Co- insured contacted FSP for update, advised that the Applicant’s
name is incorrect on policy and asked how he could change it – Co-
insured was advised could only be changed at policy level and was
provided with update on claim – 24 February 2012
Co- insured contacted FSP and requested “SOW” and cash settlement
details to also be emailed to him at a different email address to what he
had provided previously. FSP advised co- insured that the final “SOW”
was not yet ready – 27 February 2012
Applicant contacts FSP disputing windows report advising when house
was built, it was built to code, including windows and that she has
documentation to support th is. FSP file note indicates FSP has “asked
insd on numerous occasions for these reports with no docs received.”
(Only one previous file note mentions a request for this information by
FSP). Applicant also raises that windows previously repaired under a
previous cyclone claim lodged with FSP. FSP reviews previous claim
and finds Applicant was cash settled, and therefore, FSP did not
authorise any previous window repairs. FSP notes that Applicant has
also raised further concerns with “SOW” and that these conc erns were
not previously raised with FSP – 27 February 2012
FSP reviewed file and notes that issues with “SOW” raised by Applicant
are correct as items were removed from “SOW” by builder with no
apparent reasoning for same – FSP requested builder add these items
back into “SOW”. FSP agrees to cover windows to be repaired/replaced
to the condition they were in prior to loss due to them not being
installed to code at time of property being built and Applicant failing to
provide any documentation or evidence to the contrary – 28 February
2012
Case No: 261609 Determination Page 10 of 25
FSP follows up builder for amended “SOW” and sends email to
Applicant advising what it is waiting on from her, namely,
documentation relating to windows being installed to code,
documentation relating to pool and legal doc uments from Applicant’s
solicitor regarding settlement with co-insured regarding property etc – 2
March 2012
FSP contacts builder to follow up amended “SOW” – 7 March 2012
Ex-gratia payment made for temporary accommodation from 23 March
2012 to 19 April 2012 – 7 March 2012
“SOW” received from builder by FSP – FSP contacted builder to
discuss its concerns as quote was significantly less than previous and
items had in fact been added to previous – there was no reason why
from builder. Update sent to Applicant advising additional temporary
accommodation payment made and awaiting correct “SOW” from
builder – 7 March 2012
Email received from Applicant with concerns and reply sent by FSP
addressing those concerns (no information regarding what concerns
were are detailed in file notes) – 8 March 2012
Co-insured contacted FSP requesting copies of all documents on file as
he had received nothing – FSP advised co-insured a privacy request
would need to be made by him and that a timeframe to supply
documents could not be provided – 12 March 2012
Applicant’s solicitor calls FSP at FSP’s request and confirms that all
property was signed over to the Applicant as part of the property
settlement and as such, all interests in property and claim need to be
signed over to Applicant – FSP agrees if a letter is obtained from the
co- insured’s solicitor confirming this agreement, then this would suffice
for the FSP’s needs – 13 March 2012
Email received by FSP from Applicant advising that the make safe
completed by FSP’s builde rs has failed. Requested floors be reviewed
as they have now suffered possible water damage and Applicant also
requested FSP’s builder re -attend to rectify. FSP contacts builder to
arrange – 14 March 2012
Applicant’s solicitor called FSP to confirm letter has been drafted and
will be sent to FSP – 15 March 2012
Co-insured called FSP seeking an update – matter referred to claims
team – 15 March 2012
Email sent by Applicant to FSP outlining concerns with new “SOW” –
FSP advised Applicant the matter is under review – 19 March 2012
Co-insured called FSP seeking an update – matter referred to claims
team as call received out of hours – 20 March 2012
Co-insured called FSP seeking an update – FSP advised it was
currently arranging the relevant information to send him and no
timeframe could be given. FSP notes that information regarding
Case No: 261609 Determination Page 11 of 25
Applicant’s accommodation was not to be provided to co -insured – 21
March 2012
FSP reviewed Applicant’s concerns and referred concerns to builder for
comment – Applicant advised of th is. Call made to Applicant’s solicitor
seeking letter previously requested and message left for him to return
FSP’s call – 21 March 2012
Co-insured called FSP for an update – advised documentation still
being compiled and someone would call him when it was ready – 27
March 2012
Co-insured called FSP for an update – advised matter would be
followed up with him early the following week – 30 March 2012
Review of claim – email received from builder addressing Applicant’s
concerns over “SOW” and email sent to FSP’s legal advisers regarding
an email it received on 2 April 2012 (details of which are not provided in
file notes) – 2 April 2012
Co-insured called FSP for update and advised FSP he will call every
day until the information is received – FSP advised “SOW” is still under
review – 4 April 2012
Applicant contacted FSP requesting further temporary accommodation
payment – payment approved and made – 4 April 2012
Applicant contacted FSP and asked if her builder could be paid direct –
denied by FSP as no guarantee applies to her builder – 5 April 2012
Co-insured called FSP wanting update – advised that matter is
currently under review. Co-insured advised matter has be going on for
too long and requested to speak to someone “legal” at FSP. FSP
advised no- one “legal” he could speak to however process is under
review – 11 April 2012
FSP sent email to builder following up concerns/queries with “SOW” –
11 April 2012
Response received by FSP from builder – FSP agreed that a floor
specialist report was required and this was authorised – 12 April 2012
Email sent to Applicant by FSP outlining builder’s response to her
concerns and email sent to builder requesting floor report by the
following week – 13 April 2012
Email sent to Applicant by FSP regarding her concerns – 16 April 2012
FSP notes builder is to provide it with details of floor specialist so this
information can be provided to the Applicant – 17 April 2012
Emails sent to builder and Applicant by FSP to arrange floor specialist
attendance – 19 April 2012
Co-insured called FSP for update and complained that repairs need to
be authorised to FSP’s builder as the property affects his children’s
inheritance – 20 April 2012
Case No: 261609 Determination Page 12 of 25
Email received by FSP from builder advising floor report has been
completed and will be sent through to FSP – 27 April 2012
Applicant called FSP seeking further temporary accommodation
payment – 30 April 2012
Payment for temporary accommodation from 19 May 2012 to 16 June
2012 made – 30 April 2012
Emails sent by FSP to builder (requesting floor report) and Applicant to
see if paperwork from her lawyer has been received – 14 May 2012
FSP received floor report from builder – emailed builder to confirm no
further changes required to “SOW” . Email received by FSP from
Applicant advising paperwork from lawyer has not yet been received –
16 May 2012
Co-insured requested update and at least a copy of the assessment
report be sent to him – FSP advised this is still being reviewed – 23
May 2012
FSP received email from builder on 24 May 2012 with a revised “SOW”
and quotation for $196,080. FSP received email from Applicant on 25
May 2012 advising she will review offer being made and seek to have
FOS mediate the issues which the parties cannot agree on. She also
says that she has been classed unfit for work for a further three months
due to the stresses associated with the cyclone – 29 May 2012
Email sent by FSP to Applicant confirming cash settlement to be made
of $203,229 which is $196,080 for repairs and $7,149 for replacement
stove/oven – 6 June 2012
Email received by FSP from Applicant requesting a further one month
of temporary accommodation – ex-gratia payment approved by FSP –
8 June 2012
Applicant telephoned FSP following up temporary accommodation
payment – 12 June 2012
Payment for temporary accommodation from 17 June 2012 to 15 July
2012 made – 13 June 2012
Payment for claim made to Applicant via cheque and to be sent
registered mail – 14 June 2012
Claims team still awaiting cheque to be received so it can be posted via
registered mail – 25 June 2012
Cheque received by claims team to send as registered post. Email sent
to Applicant to advise and Applicant requested a copy of most recent
“SOW” as she has so many on file – 3 July 2012
Email sent to Applicant with latest “SOW” and floor report – 4 July 2012
Email received by FSP for temporary accommodation – agreed to pay
120 days from date of settlement. Review of claim saw that payments
had already been paid to 16 July 2012 (date of settlement was 3 July
Case No: 261609 Determination Page 13 of 25
2012). Temporary accommodation agreed to paid until 30 October
2011 and settled at $11,754.14 – 16 July 2012
Payment for final temporary accommodation made – 16 July 2012
Additional temporary accommodation payment made for period from 30
October 2012 to 15 November 2012 – 23 July 2012
Applicant contacted FSP and advised payment was cleared in her
account and then transferred – FSP to look into – 23 July 2012
Additional temporary accommodation payment made on 23 July 2012
was recalculated and reissued ($1,648.40) – 24 July 2012
Applicant’s complaint regarding payment of $11,754.14 being paid into
the joint account belonging to her and the co-insured was reviewed.
Applicant had previously advised this money was to be paid to her
account only and as a result of FSP’s actions, co - insured has “stolen”
money. FSP originally advised that they could not reissue and had not
done anything wrong. IDR review resulted in this decision being
overturned and FSP agreeing to re-pay the money to Applicant – 13
August 2012
Email to FSP from Applicant requesting payment of temporary
accommodation – email from IDR received with letter to Applicant – 21
August 2012
Email from Applicant to FSP confirming bank account details for
payment – 22 August 2012
Reissuing of payment made by FSP to Applicant’s bank account – 22
August 2012
26. Whilst the timeline above details the FSP’s file notes, many of these notes
reiterate the email documentation provided by the Applicant. On reviewing
the FSP’s file notes, I found that there was some communication
documented by the Applicant which did not appear in t he FSP’s file notes
and that the file notes are scant, at best, in some respects. Nonetheless, the
file notes provide a relatively accurate picture of the issues in dispute.
Delays
27. The Applicant says she was subjected to unnecessary and long delays in the
processing of her claim and the eventual settlement of her claim due to the
FSP’s continuous request to reinspect her property and its failure to properly
amend the “SOW” , as required.
28. On 16 October 2012 the FSP provided additional comments to its original
NOR. In these comments, the FSP says:
“[The FSP] submits that the nature and extent of the damage to the
applicant’s home required investigation over a period of time and that
specialist opinion was required to ensure that an objectively correct claim
outcome was provided to the applicant in accordance with the terms and
conditions of the policy.
Case No: 261609 Determination Page 14 of 25
The applicant eventually obtained engineering opinion in October 2011, upon
which it was appropriate that [the FSP] sought further qualified opinion. Upon
receipt of such further expert opinion, [the FSP] was able to come to a fully
informed decision as to the quantum of the building damage claim. [The FSP]
promptly sought to cash settle the applicant accordingly.”
29. The Applicant sought an engineer’s opinion and rep ort on her home
approximately seven months after the event and after several months of
attempting to have the FSP address her concerns, which it had failed to do
to this point. The FSP after investigating the issues raised by the Applicant’s
engineer then set tled the Applicant’s claim on 3 July 2012, some eight
months after the Applicant had submitted her engineer’s report.
30. The FSP’s comments that the Applicant “eventually” obtained an engineer’s
report and that it “promptly sought to cash settle” are somewhat surprising
giving the facts detailed above.
31. Having reviewed all of the material provided by both parties I can find no
instances where any delays were caused by the Applicant, other than her
request to be present when inspections/site attendances were made and co-
ordinating these times with the relevant parties.
32. However I note numerous instances of delays caused or created by the FSP
throughout the entire claims handling process, essentially relating to the
FSP’s requirement to have the Applicant’s home repeatedly re-inspected.
33. The FSP suggests that the magnitude of the cyclone event and the
extensive damage caused to the Applicant’s property contributed to the
delays and I am satisfied this is the case.
34. However the FSP also suggests that the Applicant’s “ongoing submissions
as to damage to the home building” and the FSP’s need to quantify this
damage were the prime contributors to the unusual delays experienced.
35. I am not satisfied that the issues raised by the Applicant throughout the
claims process were unusual or new. In fact, the only additional items
queried by the Applicant throughout the course of the claim were relevant to
the FSP’s failure to conduct proper “make safe” repairs and resultant
damage from that failure, or the fact that the property had been left
unprotected for such a lengthy period of time. The issues were ongoing,
however this was largely contributed to by the FSP’s lack of care or attention
in amending the “SOW” in accordance with the Applicant’s concerns (see
“ Handling of claim ”, below).
Handling of claim
36. The Applicant has raised many issues in respect to the way in which her
claim was handled by the FSP. These issues include:
A loss of rent payment made into a joint bank account in the name of
her former partner and herself. This amount was subsequently
withdrawn by her former partner before she was aware of it and
Case No: 261609 Determination Page 15 of 25
effectively “stolen” by him. This payment was made by the FSP despite
the fact it was aware of the Applicant’s situation with her former partner
(ie: separated, intervention orders in place due to his violence etc). The
FSP initially advised it could not do anything about this and it was the
Applicant’s responsibility, despite the fact it was aware that the
Applicant had been paying the rent and had organised the rental
agreement in her name and her name only for the duration of the
claims handling process. The money was eventually repaid by the FSP
to the Applicant by cheque.
Rent payments by the Applicant to her real estate agent were due on
the 15 th of each month and a month’s ren t was due on each occasion to
be one month in advance each time. Loss of rent payments from the
FSP were frequently late, had to be followed up by the Applicant or, on
one occasion, were made as a fortnightly payment only.
The original “SOW” issued to her by the builder was done without any
previous contact with her by the builder and she did not have the
opportunity to walk through her home with a builder to ensure all
aspects of cyclone damage were included initially.
Despite repeated requests that no-one to attend her property without
her being present, this continued to occur.
On more than one occasion, revised scope of work documents were
provided to the Applicant where items that had been previously agreed
to by the FSP and Applicant were deleted without explanation. It was
only upon the Applicant bringing these matters to the FSP’s attention
that these items were again included on the “SOW” .
The Applicant advised the FSP that a timber beam had been damaged
by SES workers when they attended her property shortly after the
cyclone event in an attempt to provide some level of protection to her
property and prevent further damage. The FSP advised the Applicant
that this was not covered as it had been deliberately damaged. Only
when the Applicant queried this and the broader consequences of such
a denial, did the FSP agree to accept this item as being part of the
Applicant’s claim.
37. I am of the opinion that the FSP, whilst entitled to seek opinion from its
experts in relation to the Applicant’s concerns, was so mewhat careless when
reviewing and relaying the information it received from its experts, especially
in the early stages of the claims handling process. This appears to have
created an air of distrust on the part of the Applicant who was frequently
confronted with conflicting and differing information.
38. I have many concerns over the issues raised by the Applicant as her
concerns as detailed above have been confirmed through file notes provided
in the material from the FSP.
39. I am therefore satisfied that the Applicant has been subjected to a sub-
standard level of service from the FSP in relation to the manner in which it
has handled her claim.
Case No: 261609 Determination Page 16 of 25
Timber Beam
40. It has been confirmed by both the FSP and the Applicant that the costs
settled by the FSP in relation to the timber beam repairs, is subject to the
timber beam actually being able to be repaired. This item remains as an
“unknown” until the repairs are attempted.
41. Until repairs are attempted, the FSP would be unable to consider any
additional settlement amount towards this item.
42. Should the timber beam be irreparable, a detailed report from the Applicant’s
builder providing what repairs were attempted, why the repairs were
unsuccessful and any costs associated with the repair attempt, will need to
be supplied to the FSP, in addition to an invoice or receipt for the
replacement of the timber beam.
43. As the FSP has had ample opportunity to have these costs
quoted/substantiated by its own builders, the Applicant should only be
required to produce her invoices or receipts for these costs without the FSP
requiring any additional investigation or information to substantiate same.
Windows
44. The Applicant says that the windows at her home were installed
professionally when the house was originally built and some of those
windows were replaced after a previous cyclone in 2006, a claim for which
was lodged with the FSP.
45. The FSP says it did not pay for the replacement of any windows as a result
of the 2006 claim and cash settled the Applicant for the necessary building
repairs. It also says, based on its expert’s advice, that the windows at the
Applicant’s property were not installed in accordance with current building
codes, nor would they have complied with the relevant building codes at the
time the house was constructed.
46. The Applicant says she was provided with a Certificate of Occupancy when
took possession of the property after it was built and believes this Certificate
would not have been issued by her local council if there were any breaches
of the building code, including the installation of windows. Unfortunately, the
Applicant is unable to produce a copy of this Certificate as it, along with a lot
of other personal paperwork, was destroyed or lost during the cyclone in
February 2011.
47. The FSP says it has settled the Appli cant’s claim for windows based on the
replacement cost of the same type of materials and construction which was
present at the time of loss. It initially said it was not responsible for the costs
associated with bringing these items up to current building codes as they did
not meet the appropriate building codes at the time the house was
constructed. In this regard, it relied on its PDS wording, which says:
Case No: 261609 Determination Page 17 of 25
“ 4. Extra costs to comply with the latest home building regulations
...
Complete details for this feature
We cover
When rebuilding or repairing damaged parts of your home we will pay for the
extra cost of making these parts comply with the latest home building
regulations and laws.
The extent of the upgrade needed will depend on how old your home is and
what building regulations have changed since your home was built. The cover
in this feature is not paid in addition to your home sum insured, so always
keep your sum insured up to date with the latest new rebuilding cost.
We do not cover
- costs to upgrade undamaged parts of your home to comply with the latest
building regulations
- costs to make your home comply with building regulations that existed
when the home was originally built or altered.”
(Page 84)
48. I have reviewed the FSP’s glazier ’s report and note h is comments which
read:
“ Upon inspection of the above property, windows were fabricated
inadequate materials & assembled insufficiently and fail all AS1288
requirements.
The windows appear to have failed because of the following reasons:
Selection & installation AS1288-2006: Does not meet requirements
The design of the structure for strength and serviceability. As/NZS 1170.0
does not meet the wind loads for housing requirements
Standard specification of structural silicone sealants complying with
ASTMC1184, does not meet the minimum requirements
...
The house appears to be situated in a C3 area, and windows &
doors should meet the Australian standards that were in effect when
the house was built in 1996.” (sic)
49. On receiving queries from the Applicant and FOS, the FSP appointed an
Engineer to provide a report on the Applicant’s windows. The FSP has
confirmed the engineer did not attend the Applicant’s property or inspect the
windows. This engineer provided the following comments:
“ The windows that have been installed are not standard glazed window
frames. The question has been asked what is the insurer to do with respect to
returning the dwelling to pre event condition and how does this relate to the
requirements of the Building Code of Australia.
The original construction must comply with the Building Code of Australia –
not necessarily the Australian Standards. The Building Code provides for
installations that are what are called “deemed to comply” installations (often
Case No: 261609 Determination Page 18 of 25
these reference the Australian Standards to advise that if you construct in
accordance with the Australia Standards then you are in compliance with the
Building Code) and alternate solutions.
An alternate solution is allowed under the Building Code which may not
comply with any Australian Standard. This alternate solution is only required
to meet the performance requirements of the Building Code. The Building
Code is designed to promote innovation in building design and construction.
For windows for example the performance requirements of the Building Code
of Australia are contained in section P2.2 Weatherproofing;
“P2.2 Weatherproofing
A roof and external wall (including openings around windows and doors) must
prevent the penetration of water that could cause-
(a) Unhealthy or dangerous conditions, or loss of amenity for occupants; and
(b) Undue dampness or deterioration of building elements.”
As the windows are not glazed an alternate solution would have been part of
their application to Council. There is no requirement under the Building Code
that requires all windows to be glazed.
...
I would confirm that the contents of this quote [from FSP’s builder] in section
B are commercially realistic prices to return the windows to pre event
condition and that the installation is compliant with the requirements of the
Building Code of Australia.”
50. Based on this report, the FSP in its further submission to FOS advised that:
“[The FSP] submits that the applicant installed “ an alternative solution ” on
construction, compliant with the Building Code of Australia. Consequent upon
event-related damage to the windows, the applicant was cash settled for the
reasonable cost of repairs and reinstatement of windows of the same type,
standard, and specification as when new.
[The FSP] submits that the allowance in t he [FSP’s builder] quotation provides
for windows which will comply with the requirements of the Building Code of
Australia, as advised by [FSP’s engineer].”
51. I am of the opinion that the FSP has met its obligation with respect to the
replacement cost of windows, however, had it not been for its original advice
to the Applicant that the windows did not meet the Australian Standards
(based on the information the FSP received from its original glazier) the
Applicant would not have sought an alternative installation method or
materials for the damaged windows.
52. I note that should the Applicant be required by any code or standard to install
a different type of window, the FSP will be required to meet any additional
costs associated with the installation of same, given the FSP has now
accepted that the original windows installed at the Applicant’s property met
the required building codes/standards.
Case No: 261609 Determination Page 19 of 25
Repainting of property exterior
53. The Applicant says the costs settled by the FSP in relation to repainting the
exterior of her home are inadequate. She bases this on the quoted amount
of $30m 2 and suggests the FSP’s advice that scaffolding used for roof and
other exterior repairs could be utilised at the same time to repaint the
exterior is not feasible.
54. Until building works are completed, she is unable to confirm the exact costs
involved.
55. The FSP says the amount it has offered in settlement of this aspect is
adequate based on the quotation provided to it by its builders. It says the
scaffolding required to repaint the exterior would already be in place for other
exterior repairs and thus, could be utilised to effect the exterior painting
activities.
56. The Applicant suggests that painting of the exterior could not be completed
simultaneously as the other repairs, as suggested by the FSP, due to dust
and other debris which would fall onto the painted surface, causing an
unacceptable finish.
57. I am of the opinion the FSP could only consider the Applicant’s suggestion
on receipt of documented evidence to confirm the exact costs associated
with the repainting of the exterior of her home with the same materials used
as the exterior paint . The Applicant’s invoices and/or receipts should provide
full details of equipment and materials required, in addition to any equipment
which may already be in place for other external repairs, or any additional
time this equipment was required to effect the painting.
58. As the FSP has had ample opportunity to have these costs
quoted/substantiated by its own builders, the Applicant should only be
required to produce her invoices or receipts for these costs without the FSP
requiring any additional investigation or information to substantiate same.
Permit costs
59. The Applicant says the costs settled by the FSP in relation to bin hire to
remove the rubbish and debris associated with the repairs are not adequate.
However, until building works are completed, she is unable to confirm the
exact costs involved.
60. The FSP says the amount it has offered in settlement of this aspect is
adequate based on the quotation provided to it by its builders.
61. I am of the opinion the FSP could only consider the Applicant’s suggestion
on receipt of documented evidence to confirm the exact costs associated
with the removal of rubbish and debris (bin hire). The Applicant’s invoices
and/or receipts should provide full details of the services provided by her
local council, ie: plan application etc.
Case No: 261609 Determination Page 20 of 25
62. As the FSP has had ample opportunity to have these costs
quoted/substantiated by its own builders, the Applicant should only be
required to produce her invoices or receipts for these costs without the FSP
requiring any additional investigation or information to substantiate same.
Removal of rubbish and debris costs
63. The Applicant says the costs settled by the FSP in relation to obtaining
relevant building permits from her local council are not adequate. However,
until she is in a position to be able to submit the relevant plans to her council,
she is unable to confirm the exact costs involved.
64. The FSP says the amount it has offered in settlement of this aspect is
adequate based on the quotation provided to it by its builders.
65. I am of the opinion the FSP could only consider the Applicant’s suggestion
on receipt of documented evidence to confirm the exact costs associated
with obtaining the relevant pe rmits etc. The Applicant’s invoices and/or
receipts should provide full details of what was hired, ie: bin(s), size of bin(s),
time on site etc.
66. As the FSP has had ample opportunity to have these costs
quoted/substantiated by its own builders, the Applicant should only be
required to produce her invoices or receipts for these costs without the FSP
requiring any additional investigation or information to substantiate same.
Loss of rent
67. The Applicant has suggested that the loss of rent already paid by the FSP
may not be adequate to effect repairs. She has, since 15 November 2012,
been living back at her residence after she arranged for kitchen and
bathroom repairs to be completed out of the settlement sum provided by the
FSP. The Applicant says despite her and her children moving back to the
property, the property still has no power or water facilities, however as the
loss of rent payments ceased as of 15 November 2012, she could no longer
afford to remain in the temporary accommodation and pay her mortgage as
well.
68. The FSP says the loss of rent payments already paid to the Applicant are
adequate and the final payment made was to cover 120 days which it says,
its experts have suggested is the time it would take to repair the Applicant’s
home. It also suggests that the Applicant has failed to mitigate her loss by
not applying for relevant building permits through her council to start the
repair process.
69. After reviewing the material and comments made by both parties on this
issue, I am of the opinion that due to the normal financial constraints of the
Applicant, she would not have been in a position to make application for any
permits until she had received settlement from the FSP. Upon receiving this
settlement, she immediately set about arranging for a termite condition
Case No: 261609 Determination Page 21 of 25
report and to have the kitchen and bathroom repairs started by her own
builder.
70. Upon receipt of the termite report, she was advised that termite activity had
increased and required treatment due to the length of time the property had
been unoccupied and subjected to usual weather conditions. This put the
commencement date of repairs back by approximately two weeks. The
Applicant has provided a copy of the termite report which confirms this
information.
71. The FSP has not disputed this termite report and says only that it is not
responsible for the costs associated with the termite treatment.
72. The Applicant says she is not seeking the costs for the termite treatment as
she understands this is an expense she would have had to have incurred if
the property had not been damaged by cyclone, however, she is seeking an
additional two weeks loss of rent.
73. I am somewhat perplexed at the FSP’s opinion that the Applicant has not
attempted to mitigate her loss when she has been proactively attempting to
use the funds she has received from the FSP to effect repairs to the home
as quickly as possible to make the property habitable so she could move out
of the temporary accommodation and so as to not incur any additional costs.
The fact remains that the FSP failed to adequately settle the Applicant for
any part of her claim, other than loss of rent, until July 2012.
74. I am therefore of the opinion that the Applicant is entitled to an additional two
weeks loss of rent.
Conclusion
75. FOS acknowledges and accepts that during times of catastrophic weather
events the resources of any FSP are stretched to cope with the unusually
high influx of new claims and the additional demands of policyholders who
have been displaced from their usual residences. The cyclone event the
subject of t he Applicant’s claim certainly falls into this category. It is therefore
reasonable to accept that some delays would occur during the claims
handling process.
76. However, in this particular claim, I find the circumstances surrounding the
delays and countless inspections/reinspections conducted by the FSP to
address the Applicant’s concerns to be unreasonable.
77. The FSP in its NOR has suggested that these additional inspections of the
property were due to:
“various items [were] reported by the applicant on many occasions.”
(Page 2, “ The Claim ”, paragraph 3)
78. After reviewing the material provided by both parties, I am not satisfied that
the Applicant raised “various” items on “many” occasions, rather, the
Case No: 261609 Determination Page 22 of 25
Applicant was not invited to attend the property when the initial builder’s
assessment was conducted to ensure all items, or at least the majority of
items, were addressed. In addition, other items were raised by the Applicant
with the FSP during the cours e of the claim due to inadequate “make safe”
repairs which resulted in additional damage being caused, and additional
damage being caused generally due to the property being subjected to
normal weather conditions for the area, in its cyclone damaged state.
79. I would suggest that many delays have been caused by the FSP and this in
turn has caused a degree of stress and anxiety for the Applicant. Other
factors to consider in the Applicant’s stress levels are the quality of “make
safe” repairs and the lack of ca re taken by the FSP to safeguard the
Applicant’s property from further damage, allowing third parties to enter the
Applicant’s property in her absence and without her express permission to
do so, the removal of repairs from the “SOW” which were later returned to
the “SOW” and the Applicant’s belief that the FSP has provided an
inadequate settlement.
Compensation
80. I have given consideration to another aspect of the matter which concerns
me.
FOS Terms of Reference
“ 9.3 Other compensation
a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that
the Financial Services Provider compensate the Applicant for
consequential financial loss or damage up to a maximum amount of
$3,000 per claim made in the Dispute.
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that
the Financial Services Provider compensate the Applicant for non-
financial loss but only where:
(i) an unusual degree or extent of physical inconvenience, time taken
to resolve the situation or interference with the Applicant’s
expectation of enjoyment or peace of mind has occurred; or
(ii) in the case of a Dispute pertaining to an individual’s privacy r ights
- injury has occurred to the Applicant’s feelings or humiliation has
been suffered by the Applicant.
The maximum amount of compensation for non-financial loss will be
$3,000 per claim made in the Dispute. ”
81. I raised the relevance of paragraph 9.3(b) with the FSP. In a detailed
submission the FSP argued that no award should be made to the Applicant
as the Applicant has not satisfied the requirement of paragraph 9.3(b)(i).
82. I do not accept the FSP’s submmission , given the facts as detailed above,
regarding its handling of this claim. In its final settlement offer to the
Applicant, the majority of items listed by the Applicant in the initial stages of
the claim as having been excluded from the “SOW” , had been subsequently
Case No: 261609 Determination Page 23 of 25
included by the FSP, indicating t he Applicant’s concerns were not only valid,
but correct.
83. Additionally, the FSP agreed to settle the Applicant for 120 days
(approximately 4 months) of temporary accommodation being the time its
builder had estimated it would take to effect repairs to the property.
However, the FSP did not settle the Applicant’s claim until Ju ly 2012, some
16 months after the event and the Applicant remained in temporary
accommodation until 15 November 2012 approximately 21 months after the
event.
84. I am therefore of the view that the FSP’s conduct of the matter has been
such as to cause a good deal of physical inconvenience and time taken to
resolve the matter, thus having an impact upon the Applicant’s expectation
of enjoyment and peace of mind.
85. I need not set out the facts again. In my opinion the FSP has contributed to
the Applicant’s stress due to its actions, after a catastrophic weather event
which displaced her and her children from their home.
86. The FSP also relies upon its PDS in relation to consequential loss, which
reads:
“ We do not cover
...
Extra costs following an insured incident
Consequential losses or extra costs following an insured incident ...”
87. The Terms of Reference 9.3(c) says:
“c) Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation
for:
(i) consequential financial loss; or
(ii) non-financial loss,
in a Dispute arising as a result of a claim on a General Insurance Policy that
expressly excludes such liabili ty.”
88. As the FSP’s PDS does not “expressly” exclude non -financial loss, I consider
the Applicant is entitled to receive compensation for the stress and anxiety
caused by the FSP’s actions.
89. I therefore consider that the FSP should further compensate the Applicant by
payment of the sum of $3,000 under this heading.
Determination
90. On the basis of the available information I determine that the Applicant must
produce documentation in the form of invoices and/or receipts to support her
actual costs associated with:
Case No: 261609 Determination Page 24 of 25
permit application etc with her local council
removal of rubbish and debris (bin hire)
91. On receipt of the invoices and/or receipts, the FSP will settle the Applicant
any and all amounts above what it has already settled the Applicant for these
costs (including GST) for the removal of rubbish and debris (bin hire) costs.
92. In relation to the timber beam, I also determine that if the timber beam is
unable to be repaired, a detailed report from the Applicant’s builder providing
what repairs were attempted, why the repairs were unsuccessful and any
costs associated with the repair attempt, will need to be supplied to the FSP,
in addition to an invoice or receipt for the replacement of the timber beam.
On receipt of this information, the FSP is to pay to the Applicant any and all
amounts over the amount already settled for the timber beam repairs,
including GST, for the attempted repairs and replacement cost of the timber
beam.
93. In relation to painting the exterior of the house, I also determine that if
additional equipment and/or materials are required to effect the painting of
the exterior, over and above what has already been settled by the FSP, then
the Applicant is to provide her detailed invoices and/or receipts for these
costs, including a detailed report from her builder explaining why the
additional costs were incurred. On receipt of this information, the FSP is to
pay to the Applicant any and all amounts over the amount already settled for
the painting of the exterior, including GST.
94. I further determine that the FSP is to pay to the Applicant an additional two
weeks loss of rent for the setback in having to have the property treated for
termites before building works could begin.
95. The FSP is to make payment to the Applicant within 14 days of receipt of the
invoices and/or receipts in relation to each item detailed in points 90 to 94,
submitted by the Applicant, as they are received. That is, the FSP is not to
withhold payment for any aspect detailed in points 90 to 94, pending receipt
of all documentation for all aspects detailed in these points.
96. In addition, the FSP is to pay interest on all of these amounts from the date
of its original settlement to the Applicant, being 3 July 2012, until the date of
settlement of each aspect detailed in points 90 to 94. The applicable interest
rate is calculated pursuant to Section 57 of the Insurance Contracts Act 1984
(Cth) in the sum of 6.75% given the Applicant would have had access to
these settlement amounts at the time of the original settlement.
97. I further determine that the FSP has met its obligations with respect to the
replacement of damaged windows, in that it has settled this aspect of the
claim based on repairing/replacing the damaged items using similar
materials to what was in place when new and prior to the loss. As such, no
further payment will be required to the Applicant for this aspect, unless she is
required to meet any new or additional building code or standard. Additional
Case No: 261609 Determination Page 25 of 25
costs in this regard will need to be forwarded to the FSP for further
consideration.
98. Pursuant to paragraph 9.3(b)(i) of the Terms of Reference, I also determine
that the FSP should pay to the Applicant the sum of $3,000.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.