Home / Financial Firm (Unknown - Insurer) / Determination 261585

Determination 261585

Denial of building claim for flash flood damage

FirmFinancial Firm (Unknown - Insurer)
Decided2012-05-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer paid the contents portion of a flash flood claim but declined the building portion under the workmanship and erosion exclusions. AFCA found the exclusions applied and the insurer was entitled to decline the building claim.

Section 46 of the Insurance Contracts Act 1984 applies only to exclusions with a temporal aspect, and the relied-on exclusions apply generally regardless of when the contract was entered into.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 261585 Determination Page 1 of 6 Case number: 261585 General Insurance - Domestic Insurance - Home Building and Contents - Flash flood - FSP Decision - Denial of claim - Obligation to clearly inform - Sections 35 and 46 of the Insurance Contracts Act 1984 10 May 2012 Background 1. The Applicant held a home building and contents insurance policy with the Financial Services Provider (FSP), which was in force at the time of the loss. 2. The Applicant lodged a claim for damage to her home and contents after the severe weather events occurred in Queensland in January 2011. 3. The FSP paid the portion of the claim for contents, but denied the claim for the repair of the lower level doors and floor tiles on the basis the damage was due to defective or faulty workmanship and erosion or landslide, which are excluded under the policy. 4. The Applicant disagrees with this decision and argues the damage was caused by a flash flood event which is covered by the policy. She wants the building portion of her claim paid in full. Summary o f Applicant’s position 5. In disputing the declinature of her claim, the Applicant has sought the assistance of a legal representative. For the sake of clarity and brevity, both the Applicant and her legal representative will be referred to as “the Applicant” for the purpose of this Determination. 6. The FSP agrees the property was affected by a flash flood as defined in the policy; however, it says the damage to doors and floor tiles was due to poor workmanship and long term slab and soil movement occurring before the flash flood. 7. The Applicant was not aware of damage to the property prior to the claim. Further, there is no evidence there was soil or slab movement prior to the flash flood. Even if there had been such damage, it could not have been apparent to a reasonable person. 8. Section 46 of the Insurance Contracts Act 1984 (the Act) protects consumers who were unaware of a fault or defect when the insurance contract was Determination Case No: 261585 Determination Page 2 of 6 entered into. As this is the case for the Applicant, this provision of the Act prevents the FSP from denying the claim. Summary of FSP’s position 9. Upon receipt of the report regarding the investigations of inundation of various areas in Queensland, it determined the cause of inundation to the Applicant’s property was flash flood or stormwater run-off as defined in the policy. 10. After settling the claim for contents, it informed the Applicant that the building claim was declined on the grounds the damage was caused by a combination of poor workmanship and faulty construction, long term soil and slab movement prior to the flash flood event and inadequate drainage, which are all excluded from cover under the policy. 11. It disputes the suggestion that the defects were not apparent. The expert reports show most of the defects were readily apparent from a visual inspection. 12. The relevant policy exclusions are not subject to the operation of section 46 of the Act. 13. According to Asteron Life Limited v Zeiderman [2004] NSWCA 47 and Greg Nelson v The Hollard Insurance Company Pty Ltd [2010] NSWSC 199, an insurer is entitled to exclude cover for particular events, irrespective of when they occur. An exclusion of this character does not fall within the provision of section 46 of the Act when the time of entry into the contract is irrelevant to the exclusion. 14. Its policy exclusions do not consider the time of entry into the contract; therefore, it is entitled to partially decline the claim based on the policy exclusions for defective or faulty workmanship and erosion or landslide. 15. The FSP relies on the following policy provisions: “ Words / terms with special meanings Word / term Meaning Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off. ... Insured events you are covered for Damage caused by weather... What is covered What is not covered Case No: 261585 Determination Page 3 of 6 Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood;  ... ... Your home The most we will pay you for home claims What is covered What is not covered Flash flood and stormwater run - off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. ... When you are not covered - general exclusions Exclusions When you are not covered defective or faulty workmanship  The inherent defect or defective or faulty workmanship, design or manufacture. erosion, landslide  erosion, landslide, subsidence, earth movement (except earthquake), earth shrinkage or expansion no matter how caused.” Issues 16. Whether the FSP is entitled to decline indemnity for the building portion of the Applicant’s claim under the terms and conditions of the policy. Reasons for decision 17. As advised to the parties, due to the nature of the dispute, the Financial Ombudsman Service (FOS) has considered it appropriate to expedite the dispute to Determination in accordance with the Operational Guidelines to the FOS Terms of Reference. 18. I am satisfied a full exchange of information has taken place between the parties and each party has had the opportunity to address the issues raised. Case No: 261585 Determination Page 4 of 6 19. I have reviewed the submissions of the parties and observe there is no dispute that the insured property was damaged by inundation caused by flash flood and the FSP has accepted partial liability for the claim. 20. The central issue in this dispute is whether the building portion of the claim is covered under the policy. 21. There are other issues raised by the Applicant which I shall address briefly. Obligation to clearly inform 22. The Applicant alleges the FSP did not clearly inform her of the monetary cap to the cover for flash flooding or stormwater run-off prior to entering into the contract of insurance and as such did not comply with section 35 of the Act. The FSP argues its policy’s table of contents clearly indicates where to find the section referring to limits to the payments of claims. 23. The highest quoted amount (which also includes non claim-related works) available in the parties’ materials is $18,500. This amount is below the monetary cap for flash flood claims. As such, I am of the view that an argument about the application of the cap is immaterial to the dispute. Hydrology report 24. The Applicant disputes the reliability of the hydrology report because she says its definition of flash flood may be different to the one used in the policy. The FSP says the hydrology report takes into account the policy definition. 25. Since there is no dispute between the parties that the property was damaged by flash flood and this is covered under the policy, I find a discussion of the role of the hydrology report immaterial to the dispute. Whether the FSP is entitled to decline indemnity for the building portion of the Applicant’s claim under the terms and conditions of the policy 26. In this circumstance, the insured has the onus to establish on the balance of probabilities that the claim falls within the definition of an insured event; this is known as a prima facie claim. The onus then shifts to the FSP to establish the application of any exclusion on which it relies to deny the claim. 27. As previously stated, there is no dispute between the parties that the property was damaged due to a flash flood which is covered under the policy. Therefore, I accept there is a prima facie claim. 28. As to potentially applicable exclusions, the FSP says the damage to doors and floor tiles was caused by faulty workmanship and soil or slab movement which are excluded under the policy. The Applicant says she was not aware of this damage prior to entering into the contract of insurance and as such, section 46 of the Act applies to prevent the FSP from denying the claim. Case No: 261585 Determination Page 5 of 6 29. Section 46 of the Act provides that if a claim is made in respect of a loss that occurred in whole or in part as a result of a defect or imperfection in a thing and the insured was not aware of the defect or a reasonable person in the circumstances could not be expected to have been aware of the defect or imperfection the insurer may not rely on an exclusion clause that refers to the condition of the thing before the contract was entered into. 30. As noted in Greg Nelson v The Hollard Insurance Company Pty Ltd [2010] NSWSC 199, this section only applies to exclusions that have a temporal aspect. That is, it only applies to a clause that makes reference to a defect or imperfection that existed before an insurance contract was entered into. It does not apply to exclusion clauses that seek to exclude liability for defects generally. 31. In this case the relevant exclusion relied on by the FSP is not simply directed to pre-existing defects but applies generally. As such, the Applicant ’ s lack of knowledge of any defect cannot assist her in this instance. 32. Further, the FSP has presented reports by its loss adjustor M, its building expert S and an engineer R. I have reviewed these reports and the photographic evidence available. I note the reports say in summary that:  The lower level where the building damage occurred was not designed for its current use and needs extensive rectification.  The area around the building is considered to be poorly drained in a manner which encourages water to flow into the building.  During storm activity, water frequently pools near the building and has collected in the tiled patio area in the past.  The building is situated on a site of highly reactive clay soils. This type of soil is expected to be the subject of shrink-swell effects as the result of moisture changes.  The floor system to the lower area comprises a thin unstiffened concrete slab which is not capable of resisting soil movements. This slab has moved significantly out of level over a long period of time.  The storm activity of January 2011 would not have had a significant contributory effect by comparison to the long term soil movement due to changes in soil moisture.  The internal doors are all second hand items which have not been installed or maintained in a manner which will seal out moisture.  These doors were installed too close to the floor and have moved from their intended location due to ground subsidence . The co-insured has trimmed the bottom of some of these doors in the past.  The floor tiles are not levelled and are poorly laid. Their damage is due to soil erosion, landslide, earth movement and earth shrinkage which has caused the external paving slabs to move and crack, in turn causing the tiles to lift and crack. Case No: 261585 Determination Page 6 of 6  The patio tiles have further issues related to the original installation such as glue failure, method of laying and preparation of the original substrate.  The line of orange tiles has been laid over a construction joint in the slab, which is a faulty construction practice and has contributed to the damage.  Some of the other tiles have lost adhesion to the underlying concrete but have not cracked. This is most likely due to failure to install appropriate expansion control measures in the surface and due to poor workmanship in regard to the gluing.  The flash flood may have contributed to the loss of adhesion to some tiles, but numerous other factors are likely to have had a more significant effect. 33. I note the Applicant has argued it is unreasonable for the FSP to base its denial of this portion of the claim on inadequate drainage, as no draining system could have prevented the significant damage caused by the flash flood of January 2011. 34. I note the FSP, based on R’s report , has only alleged that insufficient drainage may have caused or contributed to the soil moisture causing soil movement and tile expansion over a long period of time. 35. Having said this, I have not found any evidence to the contrary or to suggest that the damage was not caused or at least contributed by defective or faulty workmanship and soil movement. 36. Based on the available material, I am satisfied the FSP has established on the balance of probabilities that the policy exclusions of “defective or faulty workmanship” and “erosion, landslide” apply to this claim. Determination 37. Accordingly, I determine that the FSP is entitled to decline indemnity for the building portion of the Applicant’s claim under the terms and conditions of the policy.