Determination 261577
Claim amount - cash settlement for flood-damaged home below sum insured and further loss of rent
Summary
The insured disputed the FSP's cash settlement of $139,472.15 for flood damage to his investment home and sought the sum insured plus further rent. The panel found the settlement met the FSP's indemnity obligations and no further rent or other costs were payable.
The panel preferred the FSP's expert evidence that most stump movement pre-dated the flood, so the cash settlement covered the flood-caused damage under the policy.
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 261577 Determination Page 1 of 8
Case number: 261577
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
27 September 2012
Background
1. The Applicant and his brother incepted a home building insurance policy on
5 December 2010, to cover an investment property. The building was
insured for the sum of $184,000 subject to a standard excess of $200.
2. On 13 January 2011, the Applicant contacted the Financial Services
Provider (FSP) to advise the insured property had been extensively
inundated by floodwater.
3. The FSP appointed a loss assessor to attend the property and report on
damage. A scope of works was obtained following an inspection by a
consulting engineer in respect of flood damage to foundation movement and
framing.
4. The Applicant indicated he may wish to have the claim cash settled. The
Applicant also claimed for loss of rent.
5. On 23 May 2011, the FSP advised the Applicant it was prepared to settle the
claim for damage on the figure of $116,698.
6. The Applicant voiced his concern with the offer believing the FSP had not
appropriately considered the restumping requirements for the house. The
Applicant also indicated other repairs had not been considered including
flood damage to the driveway.
7. The FSP obtained an updated scope of wor ks in light of the Applicant‟s
concerns. The FSP amended its cash settlement offer to $136,710.
8. The Applicant arranged for his own engineer‟s report. It was indicated all
stumps under the house required replacement. However the FSP was of the
view that not all the stumps were flood damage or affected. It offered to
settle the claim for the amount of $139,472.15. The FSP does not accept
this.
9. Quotes obtained by Applicant indicated repairs were in excess of
$227,569.89 and accordingly he believed the FSP‟s mi nimum liability
towards him was the building sum insured of $184,000.
Determination
Case No: 261577 Determination Page 2 of 8
10. The FSP has paid the Applicant for 12 months rent but he believes he
should be paid a further six months of rent from the commencement of
rebuilding.
Summary of Applicant’s position
11. He does not accept that the FSP‟s offer is sufficient to repair the building to
Australian standards and pre-damaged condition. In any case, his quotes to
repair the building exceed its sum insured.
12. When the FSP‟s loss assessor first attended the property he believed it was
likely to be a write off.
13. The FSP is relying on an unreliable engineer‟s report which had a
predetermined outcome.
14. He has two independent builder‟s reports which have the same outcome as
his engineer‟s report. All of whom recommend replace ment of all stumps and
the roof to be removed to enable alignment of the walls.
15. The process has taken far too long and the FSP has been pushing him to
accept a cash settlement which it knew was insufficient to repair the building.
16. He is seeking settlement on at least the sum insured of $184,000 plus
demolition costs and a further loss of rent for six months.
Summary of FSP’s position
17. The insured property has been carefully assessed and the scope of works
and cash settlement offer was based on the findings and recommendations
contained within its consulting engineer‟s reports.
18. There is no engineering evidence to support that all stumps were flood
damaged or required removal or replacement because of flood inundation.
19. There is no engineering evidence advising the roof required to be removed
or detached to achieve levelling of the floor or realignment of walls.
20. None of the engineers opine there is a need to repair or replace joists or
bearers.
21. The available evidence does not demonstrate the driveway sustained
damage as a result of a flood event. Any concerns with the driveway are due
to normal wear and tear.
22. There is no evidence to support that fencing or the letterbox was damaged
from the flood event.
Case No: 261577 Determination Page 3 of 8
23. The scope of works allowed for cleaning and there is no evidence to show
that the allowance made is insufficient.
24. The policy provides for payment of rent for a maximum 52 weeks or 10% of
the sum insured. It has paid the Applicant 52 weeks loss of rent and is not
obliged to extend the benefit beyond this.
25. It does not accept it has caused any undue delay with settlement of the
claim. It says it was not possible to deal with the claim as expeditiously
under normal circumstances due to the magnitude of the flood event. It was
prepared to cash settle the claim on 23 May 2011 and it promptly paid the
Applicant for loss of rent.
26. The FSP relies on the following policy provisions:
“ We cover
1 (a) Loss of rent caused by an insured incident
When you have home cover if an insured incident damages your home to
the extent it cannot be lived in, we will pay the rent you lose for the
reasonable time it should take to repair or replace the home so it can be lived
in again.
...
The most we will pay for this feature is
52 weeks loss of rent or
10% of the sum insured for a home claim
...
We do NOT cover
Loss of rent:
beyond the period it should reasonably take to replace or repair the home or
unit so it can be lived in again or 52 weeks (whichever is shorter).
...
What is not covered under any part of your policy
...
We do NOT cover the cost of repairing, replacing of fixing
...
wear, tear, rust, mould
loss or damage caused by wear, tear, rust, fading, gradual deterioration,
mould, rising damp, mildew, action of light atmospheric or climatic conditions,
corrosion or rot
unless this is covered under
storm and flood (insured event 6)
...
How claims are paid
Home and contents claims
Case No: 261577 Determination Page 4 of 8
We choose how a claim is settled. If we agree to pay a claim for loss, theft or
damage to your home and contents, we will decide if we will:
repair damage new for old or
replace home or contents new for old
pay you what it would cost us to repair or replace home or contents new for
old.
We will not:
pay extra to repair or replace an item to a better standard, specification or
quality than it was before the loss or damage, except as outlined in the
meaning of new for old (see page 11)
fix a fault that existed before the loss or damage occurred
pay to replace undamaged parts of the home or contents to create a
uniform appearance ”
Issues
27. Whether the FSP‟s offer of settlement of $139,472.15 fulfils its obligations
under the terms and conditions of the policy for damage caused.
28. Whether the FSP is liable for any additional loss of rent.
Reasons for decision
29. Due to the nature of the dispute, this matter has been referred to the Panel
for a Determination in line with the Operational Guidelines to the Financial
Ombudsman Service‟s Terms of Reference.
30. The Panel consists of an Ombudsman, a representative with extensive
experience in insurance industry matters and a representative with extensive
experience in consumer claims.
31. There has been an exchange of material upon which the parties rely. Each
party has had access to the material on which the other party bases its case.
It is not necessary to recite any of the information in this determination
unless deemed necessary.
Safety net
32. The Applicant accepts that the safety net home protection does not apply to
the circumstances of the claim as the policy was not endorsed to include this
as optional cover.
Rent
33. The FSP has settled the Applicant‟s claim for loss of rent with a payment for
52 weeks which is the maximum entitlement under the policy.
Case No: 261577 Determination Page 5 of 8
34. Consideration may be given by the Panel if it is deemed the FSP has
unnecessarily prolonged the claims p rocess. There is no evidence to support
this.
35. The Panel accepts the Applicant is not entitled to any further loss of rent
payment.
Driveway
36. The Applicant sought repair/replacement of the driveway. However he has
not included any evidence that establishes the driveway was flood damaged.
The FSP says based on its evidence cracking caused to the driveway was
pre-existing.
37. The Panel has sighted photographs of the driveway which appears to have
suffered long term cracking.
38. The Panel is satisfied the FSP was entitled to exclude the repair of the
driveway from the claim.
Building damage
39. The Panel notes the Applicant withheld information from the FSP until such
time he had received its initial submission. The withheld material has been
exchanged with the FSP.
40. The Applicant has advised the building has been demolished.
41. The crux of this dispute as asserted by the Applicant is the FSP‟s cash
settlement proposal which he says is based on an inadequate scope of
works.
42. According to the Applicant the building cannot be reinstated to its original,
square and aligned condition without his greater scope of works being
carried out which included a full restumping. The Applicant relies on the
opinion of his appointed consulting engineer and builders to support his
position.
43. It is not disputed the stumps to the north-west wall have rotated outwards.
According to the Applicant‟s consulting engineer (B) a number of internal
stumps have rotated by varying degrees.
44. B reported timber bearers running back to front have sagged at mid-span
with evidence of rotation.
45. B also commented that the ground on which the house is built is susceptible
to changes in moisture levels. Nevertheless he opined the flood event
caused differential movement and in turn stump rotation.
46. No expert opinion on the site soil has been tendered.
Case No: 261577 Determination Page 6 of 8
47. B commented that to realign the house all stumps would be required to be
replaced. This would include removal of the roof to enable realignment of
walls and floor.
48. The FSP‟s consulting engineer (M) reported stumps along the northern side
had undergone “some minor settlement and rotation”. It stated it was not
possible to determine if this was due to the flood event. In a later report,
dated 22 September 2011, it maintained its position that the majority of the
measured settlement [other than the northern wall] pre -existed the flood
event.
49. It confirmed the stumps along the northern wall required repair and
confirmed that using shims to re-level the floor was an appropriate repair
method.
50. B has indicated this method of repair to be a „bandaid‟ approach.
51. The Applicant‟s policy covers him for damage caused by events covered by
the policy including flood.
52. Further, the policy provides that the FSP determines how the claim is settled.
It can either the repair the damage or pay the cost to it to repair the damage
or pay the sum insured.
53. The FSP offered the Applicant a cash settlement for the repairs based on
quotes it obtained.
54. Although the Applicant says the FSP was pushing him towards a cash
settlement the Panel notes it was he who raised this option with the FSP.
55. The FSP accepted the claim and scope of works based upon the inspection
of the property. However, t he Applicant does not accept that the FSP‟s
scope of works is complete as it does not include the replacement of all
stumps and realignment of the building as allowed for by his builders .
56. The expert opinion is conflicting. M has indicated there is pre - existing
movement damage to the building. Whereas B has indicated in his
professional opinion the integrity, straightness, plumb and general alignment
of the building structure has suffered as a direct result of the flood
inundation.
57. The Panel notes M visited the site on 23 February 2011shortly a fter the
flood. It again visited the site, on 25 September 2012, some eight months
after the flood. It reported “the condition of the stumps was generally
unchanged compared to our original inspection, however the stumps on the
northern side of the residen ce appear to have re - straightened slightly.”
58. In commenting on the variation in the internal stump and floor levels it
reported “more recently constructed elements” in the dwelling had been built
to match the slope [existing] in the floor.
Case No: 261577 Determination Page 7 of 8
59. B inspected the property on 27 September 2012. This inspection was
subsequent to M‟s second inspection. B reported “The concrete stumps to
the north - west wall have rotated outwards, as well as a number of internal
stumps rotating to various degrees.” B includes the rotati ons amongst a
number of “common defects linked to flood inundation in this type of
property”.
60. B also refers to “raised highpoints” in the timber floor, the result of rotated
stumps and midspan sag of bearers which it states are “all likely to be
caused by flood inundation of the property, and saturation of the ground in
which the house is founded.”
61. The Panel acknowledges the evidence the house has suffered some
movement arising from the flood event.
62. It notes the FSP has conceded stumps to the north - west wall are flood
affected and that it has made an allowance for this in its settlement offer.
63. However, it further notes, that whilst B also identified stumps to the north -
west wall as having been affected, it also reported some internal stumps as
having rot ated . B has failed however to indicate the number of such stumps
or to specifically identify them. B has indicated in his opinion all stumps are
to be replaced .
64. B further reported that the internal stumps rotation with the consequent effect
on the upper le vel floor was “likely” due to flood. M however has argued that
this damage was pre existing as is evidenced by the “more recently
constructed elements” such as the built in wardrobe having been built to
accommodate the existing movement.
65. The Panel notes th e uncertain nature of B‟s report and also the comments of
M supported by the evidence of the built in wardrobe which evidence is not
disputed.
66. In addition to the expert evidence the Panel has examined all other evidence
available to it, inclusive of the relevant levels and the available photographs,
and it concludes that the internal stumps were subject to pre existing
damage rather than flood damage. Moreover, it finds it does not have
evidence before it to establish that all of the stumps require replac ement .
67. Accordingly, the Panel is not satisfied the FSP is responsible to pay for the
replacement of all the stumps or indeed any stumps additional to those
identified on the north side as being flood damaged .
68. Further, there is no evidence before the Panel to show that the FSP‟s
preferred method of leveling the house is unacceptable building industry
practice.
69. However, as the Applicant has already demolished the house the FSP‟s
preferred method of repairs cannot be tested.
70. The FSP‟s settlement offer is in clusive of its preferred repair method.
Case No: 261577 Determination Page 8 of 8
71. Taking into account the FSP willingness to repair the dwelling for the amount
of $ 139,472.15 the Panel is satisfied that by its payment of that amount as a
cash settlement it has met its obligations in terms of its l iability to indemnify
the Applicant for the damage caused to the dwelling by the flood.
Other costs
72. The Applicant also sought consideration of demolition, architect/surveyor
fees and planning costs with the intention of rebuilding.
73. The policy provides cov er for removal of damaged parts of the home from
the address when the FSP authorizes the repairs or rebuilding. The Panel
notes this cost was provided in the quoted amount.
74. The policy also covers quantity surveyors, land surveyors, architect and
engineers fees but only if the FSP authorizes the repair or rebuilding of the
home. The FSP has not done so in this circumstance.
75. There was no evidence before the Panel to suggest it was necessary to
demolish the home.
76. The Panel is satisfied the FSP is not obliged to cover these other costs
sought by the Applicant.
Determination
77. For the reasons addressed above the Panel determines the FSP has fully
discharged its liability to the Applicant under the terms and conditions of the
policy and is therefore not obliged to make any further payments to the
Applicant in respect to the claim.