Home / Financial Firm (Unknown - Insurer) / Determination 261568

Determination 261568

claim_denial

FirmFinancial Firm (Unknown - Insurer)
Decided2012-07-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A farm property was inundated during heavy rain in January 2011 and the FSP declined the claim under the flood exclusion. AFCA found the water was stormwater run-off from a gully rather than flood, so the decline was not justified, and ordered the parties to agree the loss up to 300mm of inundation, with interest if cash settled.

Water from a naturally occurring gully that is not a watercourse, lake, reservoir or dam is not flood as defined in the policy, so the flood exclusion did not apply.

Issues

Subjects and remedies

home or building damagenatural disasterpay interestreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 261568 Determination Page 1 of 9 Case number: 261568 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 29June 2012 Background 1. The Applicant holds a Farm Insurance Policy with the Financial Services Provider (FSP) covering a farming property. 2. On or about 10 January 2011 the insured premise in Gatton Queensland was inundated by water. The Applicant subsequently made a claim on his policy. 3. The FSP declined the claim on the basis that the inundation was caused by flood which is an excluded event under the policy. 4. The Applicant disputes the declinature on the basis that the inundation arose from stormwater run-off and/or flash flood. Further, the FSP failed to inform him of the flood exclusion. Summary of Applicant’s p osition 5. The Applicant relies on his Statutory Declaration dated 28 March 2012 from which the Panel notes the following:  On Monday 10 January 2011 the Applicant was at the property until 12.00pm. His son stayed the whole day.  His son is unable to provide a statutory declaration as he lives on the property and it is difficult to obtain an appropriately qualified person to witness the document.  The property has hills right up the back, about 40 or 50 „chain‟ away from the house going north west.  There was a large storm around 3.00pm and water came from the north west and travelled south east.  Blackfellow Creek is about 20 chains away to the south-east of the property. The water flowed from the hills to the Creek. 6. The Applicant‟s son “Q” has provided a letter dated 17 February 2012 stating the following:  Q was present on 10 January 2011 at the insured premise which is his place of residence. Determin ation Case No: 261568 Determination Page 2 of 9  On 10 January 2011 there was an extremely heavy storm resulting in a “...massive amount of water never ever seen before . ”  At 3.00pm the water ran through the house for approximately 20-30 minutes.  The water did not come from Blackfellow Creek as the residence is approximately 20 chains away from the creek. 7. The Applicant has enclosed daily weather observations from Gatton Queensland. The rainfall indicates 87.2mm fell on 10 January 2011. 8. The Applicant has enclosed photographs of the insured premise which indicates that the area is hilly. The hills appear to be relatively high and steep with some vegetation. 9. The Applicant has enclosed a verbal report of loss dated 22 February 2011 regarding the incident. The report indicates a telephone call was made straight after the incident. 10. When the Applicant first contacted the FSP it did not accept the claim and discouraged him from making the claim. The Applicant submits this is against the General Insurance Code of Practice. Further, the FSP has failed to properly investigate the claim and its IDR letter stated the property was damaged by the flood in Gatton from the Lockyer Creek which occurred between 4.30pm Monday 10 January 2011 and 4.30am Tuesday 11 January 2011. The Applicant lives 30kms away from Gatton and does not live near the Lockyer Creek. In addition the water that caused damage in Grantham on 10 January 2011 did not affect the insured premise. 11. The Product Disclosure Statement (PDS) is misleading and deceptive as it fails to draw the readers notice to the flood exclusion in the policy construction. Accordingly the FSP failed to fully inform the Applicant under Section 35 of the Insurance Contracts Act 1984. 12. The Applicant states that flood is a prescribed event for the purposes of section 35 of the Insurance Contracts Act 1984, as defined b y section 14 of the Insurance Contracts Regulations 1985. The Corporations Act 2001 further requires clear, concise and effective disclosure. 13. Alternatively, the Applicant notes that storm is a covered event under the policy and the damage arose from storm. 14. The Applicant submits the water that fell at Gatton was extremely heavy and intense. The ICA Locker Valley LGA event acknowledges the extreme rainfall event in the 24 hours to 9.00am on Tuesday 11 January 2011. In particular, that the rain fell predomina ntly on the afternoon of 10 January 2011. In addition to this, the nearest rain gauge (Mt Castle Alert) indicates the rain did not ease until 5.00pm. 15. There is a gully in the area that runs off the back of the hills and runs down but there is usually never water in it. The water came from the north-west and flowed south east. It came off the hill and flowed straight through. The hill is about 40-50 chains away from the house going north-west. Case No: 261568 Determination Page 3 of 9 16. The property is not normally affected by heavy rainfall and is set back from the creek. The creek has created some issues for others in the past but not the Applicant due to the drains set around the property. However, the heavy rainfall on 10 January 2011 was sufficient to inundate the property. 17. The hydrologist acknowledged the nearby Blackfellow Creek did not cause the inundation of the property. The hydrologist did not consider the possibility of any flash flood or significant stormwater event. The hydrologist has claimed a „channel‟ would be considered a watercourse. However, the hydrologist is basing this on works to a channel which has been worked on since the January 2011 event. The hydrologist claimed the local catchment runs east in a natural watercourse to a series of three dams. The hydrologist indicated that the water holding capacity was likely the reason the channel was so small prior to excavation work. The dams were in fact built in an effort to combat a 10 year drought. 18. The Applicant disputes the FSP‟s position that the damage was caused by an unnamed ephemeral natural channel and the Lockyer Creek. First, the insured premise is not near the Lockyer Creek. Second the unnamed ephemeral natural channel should not be considered a watercourse as it does not have defined banks or a bed that regularly conveys wate r from one place to another ( Gartner v Kidman (1962) 108 CLR 12) . Further, the Applicant believes the area described as a channel by the hydrologist is merely a „depression in the ground‟. Summary of FSP’ s position 19. The FSP relies on the policy definition o f flood: “Flood means the inundation of normally dry land by water escaping, or being released from, the normal confines of a reservoir, natural watercourse or lake (whether or not they have been altered or modified). Flood also includes water discharged from any sewerage or waste water systems due to pressure induced by Flood water” 20. The FSP has enclosed the renewal schedule for the period covering 16 September 2010 to 16 September 2011. The document contains a section entitled „Important Information‟ which indicates there is no flood cover in the policy. This information is at page 7. 21. The FSP relies on an assessor‟s report from which the Panel notes the following:  The water entered the property on 10 January 2011 at 4.00pm  The water rose quickly and was surface water only.  The nearest waterway is Blackfellow Creek which is 500m away.  The property is on a foundation and the floor is 300mm from ground level.  The water peaked at 600mm in the property. 22. The FSP has enclosed a copy of the site specific hydrolog y report from which the Panel notes the following: Case No: 261568 Determination Page 4 of 9  The insured premise is situated on “S” Road which is approximately 25kms from Gatton in the Lockyer Valley. The site is on the western side of S Road and the Blackfellow Creek runs north approximately 50 metres to the east of S Road.  There are a series of three dams on the property. When these dams are breached the water flows along a small channel which is approximately 0.15m deep.  During the storm, water flowed from the south east through the dams and exceeded the capacity of the channel.  Water flowed through the shed and the house to a depth of 0.38m.  Water from Blackfellow Creek inundated the paddock but did not affect the insured residence.  The area of Blackfellow Creek catchment down to the site is estimated to be in the order of 28,000 hectares. The majority of the catchment consists of a steep sloped mountain range which remains heavily forested.  The local catchment that feeds into dams on the site extends to the top of the mountain range to the west of the property and is estimated to be approximately 200 hectares. It runs east in a natural watercourse to the series of three dams. Downstream of this location and prior to the January event, the insured described the channel as being narrow and approximately 0.15m deep.  The hydrologist‟s report provides cumulative rainfall totals over the period of 3 January 2011 to 14 January 2011. It appears that in Gatton a 12 hour duration was beyond a 100 year ARI.  The hydrologist accepts that Blackfellow Creek did not cause the inundation of the house and sheds.  The hydrologist claims the insured informed him the local catchment exceeded capacity of the dams and a small drainage channel that flowed through the shed and house. Accordingly, he undertook works to excavate and widen the channel as well as construct a levee to alleviate future overflows from the channel. The channel is well defined in the upper catchment and flows through into three dams upstream of the sheds and house.  The channel is classified as an unnamed minor ephemeral natural channel. The hydrologist considers this would be deemed a watercourse. That being a drainage channel, stream, creek, river, estuary, lake or dam, or any associated water holding structure. Accordingly, the inundation at the property was the result of flood. 23. The FSP notes the Applicant has not provided the date or the name of the claims staff he spoke with regarding the claim. 24. The FSP disputes that its PDS failed to clearly inform in accordance with Section 35 of the Insurance Contracts Act. The FSP notes the PDS is indexed and is set out in a clear and orderly manner. The renewal schedule also confirms that flood is not covered. Case No: 261568 Determination Page 5 of 9 25. The FSP relies on the ICA Lockyer Valley LGA and the site specific hydrology report which concludes the inundation arose from flood. The FSP notes the 24 hours to 9.00am on 11 January 2011 recorded a rainfall between 160-180mm with the highest falls in the eastern and southern areas of the catchment. 26. The FSP refers to a Hydrology Report regarding the flood in Gatton which indicates the flood onset was 4.30pm on 10 January 2011 and peaked at 4.30am on 11 January 2011. The FSP then suggests the property is located in close proximity of Ma Ma Creek. The Panel is puzzled by this as Ma Ma Creek does not appear to be in close proximity to the insured premise and the property was inundated prior to 4.30pm. 27. The FSP notes that whilst the site specific report gives a 100 year ARI for 12 hour durations, that for a 3hour or less it would be a 5 year ARI. The hydrology report concluded the rainfall was insufficient to cause the damage alleged. 28. The FSP maintains the body of water described in the site specific hydrology report would constitute a watercourse under the policy. 29. The ICA and site specific hydrology reports support a finding of flood but no evidence for flash flood. Issues 30. Whether the FSP has breached the General Insurance Code of Practice. 31. Whether the FSP is entitled to rely on the policy terms and conditions. 32. Whether the FSP was entitled to decline the Applicant‟s claim. Reasons for Decision 33. There has been an exchange of material between each party and the Panel is satisfied each party has had an opportunity to reply to the issues raised. 34. The Panel has read each party‟s submissions and materials and wil l only refer to the relevant submissions and materials raised. 35. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 36. The Panel considers that there are three discrete issues (listed above) which will be dealt with separately below. Whether the FSP has breached the General Insurance Code of Practice 37. The Applicant has alleged that his original verbal claim was not acted upon and that he was discouraged from taking the matter further. Case No: 261568 Determination Page 6 of 9 38. The information provided on this point, however, is unclear. There is no information regarding the date, time or individual spoken to at the FSP or more particularly, details regarding the content of the conversation. 39. The Panel further notes that the FSP did not provide claim file records and/or has not indicated whether such a telephone call would be recorded on the system. It is disappointing the FSP has not provided such records which should be readily available. 40. There is insufficient evidence on which to base a finding the FSP has conducted its initial claims handling in a manner which breached the General Insurance Code of Practice. 41. The Panel is, however, concerned by the references made by the FSP in relation to watercourses which are not in geographical proximity to the property. Further, the site specific hydrology report clearly indicates there was no inundation from the nearest waterway, being Blackfellow Creek. The Panel considers such references are not appropriate in relation to this claim. 42. The Panel further notes that the assessor‟s report dated 14 March 2011 indicated in answer to its question: „Where did the water come from: Surface water only‟; later in the same report in answer to: „Next report: Obtain expert consultants reports‟. Accordingly the original denial without a site specific hydrology report does not represent industry best practice in terms of claims‟ investigation. Whether the FSP was entitled to rely on the policy terms and conditions 43. The Applicant does not dispute receiving the PDS, only that the wording does not satisfy the requirement to clearly inform under section 35 of the Insurance Contracts Act (1984). 44. The case law supports that in most cases the provision of the policy document is sufficient to discharge an insurer‟s onus under section 35 of the Act. The document, however, must readily answer whether an event such as flood is covered, from the perspective of a person of average intelligence and education. 45. The Panel considers that the policy does provide information in the definition of flood, as to what flood is and what flood is not. The policy is indexed and is written in plain English. The flood exclusion is mentioned multiple times across the PDS and the renewal notice, which also forms part of the policy documentation. 46. The Panel concludes that the wording and structure of the policy is not such that it would fail the requirements under section 35 of the Act or the clear, concise and effecti ve disclosure regime mandated by the Corporations Act 2001. Whether the FSP was entitled to decline the Applicant’s claim 47. First, the parties do not appear to dispute that there was heavy rainfall leading up to the inundation of the insured premise. The Panel notes the Case No: 261568 Determination Page 7 of 9 FSP‟s assertion that the hydrologist stated there was insufficient rainfall to inundate the property; however no such conclusion is reached by that report. 48. Second, there is no dispute that the water inundation was not from the nearby Blackfellow Creek. 49. The Panel notes there is some suggestion by the FSP the water inundating the risk address coincided with the „normal flooding‟ experienced in the township of Gatton, some 30kms in distance from the risk address, from the Lockyer Creek; however, the Panel is unable to discern by what methodology the FSP may have formed this view. The FSP then goes on to assert the risk address „is located is (sic) close proximity to Ma Ma Creek‟; however, the Panel is again unable to discern by what analysis of the local topography the FSP established this geographical fact, given the risk address is in a different valley, with hills between the risk address and Ma Ma Creek. 50. The evidence from the Applicant and the site specific hydrologist is that the upper catchment flows towards the property. The hydrologist describes a channel that flows through into three dams and then describes a minor channel which directs overflow from the dams. The Applicant describes the upper catchment „channel‟ as a gully. 51. The hydrologist described the upper catchment channel as a watercourse on the basis it is an „unnamed minor ephemeral natural channel‟. The hydrology report is not particularly specific regarding this channel. However, the Panel understands this „channel‟ is located in th e upper catchment and receiving local stormwater run-off which then diverts through this unnamed minor ephemeral natural channel. The nature of something which is deemed ephemeral is normally something that is transient in its state of being. This may sugg est that the „channel‟ as described by the hydrologist is normally dry. This may in fact be why the Applicant describes it as a gully. A gully would normally be dry but as the gully is usually constituted of a depression in the ground, it would naturally be a place to which stormwater flowed. Accordingly, based on the limited information before it, the Panel is prepared to accept this land feature was a gully. 52. The Panel must have reference to flood as defined by the policy. This being: “Flood means the inun dation of normally dry land by water escaping, or being released from, the normal confines of a reservoir, natural watercourse or lake (whether or not they have been altered or modified). Flood also includes water discharged from any sewerage or waste water systems due to pressure induced by Flood water” 53. The Panel has reviewed the case of Gartner v Kidman [1962] HCA 27 and notes the following:  The case held there was a difference between natural and artificial watercourses as well as the natural flow of surface water.  The Court relied on the case of Lyons v Winter (1899) 25 VLR which held that to constitute a watercourse, there must be a stream of water flowing in a defined channel or between something in the nature of banks. Case No: 261568 Determination Page 8 of 9  The Court further noted the case of Cooper v The Corporation of Sydney (1853) 1 Legge 756 which distinguished between a regular stream between banks and the occasional overflow of a swamp.  The Court further considered with some approval the American case of Barkley v Wilcox (1881) 86 NY 140 which stated “Depressions in the soil to which the surface water from adjacent lands naturally finds it way and is discharged into some natural outlet are not thereby made watercourses” . 54. The Panel considers that the case of Provincial Insurance Australia v Consolidated Wood Products (1991) 25 NSWLR 541 has assisted in defining stormwater channels. Kirby J gave preference to the Australian rather than English or North American meaning of canal. Kirby preferred the Macquarie Dictionary definition for canal and stormwater channel which were: “Canal An artificial waterway for navigation draining, irrigation, etc A channel or watercourse Stormwater Channel An artificial passage from stormwater and floodwater; floodway. Also, stormwater canal, stormwater drai n.” 55. The gully is clearly not a lake, reservoir, dam or river given that it neither stores water or has an ongoing flow of water. 56. The Panel further notes that depressions in the soil to which surface water from adjacent lands naturally finds its way and is charged into some natural outlet are not automatically deemed watercourses. Further, there is no evidence that the gully is artificial or constructed for the purpose of drainage at the time of the loss. 57. The evidence provided indicates the gully is a naturally occurring topographical feature arising from the mountainous/hilly ranges surrounding the property. It does not necessarily follow that such a feature is automatically a watercourse, channel or canal. 58. The Panel notes that the hydrologist refers to this topographical feature as a feature through which stormwater run-off would have flowed. The evidence indicates the water normally is channelled to the dams and flows to Blackfellow Creek. However, the photographs provided by the hydrologist appear to show water flow outside of the channel and as having a more westerly than north-west flow as stated by the Applicant. 59. The Panel has difficulty accepting that the flow purely went through the dams and its outlet channel, given the northerly aspect of the catchment site and the eye witness evidence of Q. 60. The Panel therefore accepts that there is no evidence before it to indicate water from the gully should be deemed a flood for the purpose of the policy exclusion. Further, that the water purely entered the dams and then overflowed rather than some independent overland flow having occurred. It Case No: 261568 Determination Page 9 of 9 is a corollary of these findings that any damage caused by stormwater run- off coming from the gully(s) to the insured items would be covered. 61. The Panel notes the assessor claimed there was 600mm peak flow at the property. The Panel notes that the assessor confirms that the distance from floor level to ground is 300mm. The Panel trusts the assessor was able to accurately record the level of damage as an appropriately qualified building loss adjuster. 62. The Panel notes that the hydrologist has referred to “water flowed through shed 1... and through the house, to a depth of approximately 15 inches [ ˜ 0.38m]. ” 63. Having considered the evidence in its totality, the Panel prefers the calculations of the loss assessor, to the effect that inundation of the house is to the level of 300mm. Determination 64. On the basis of the available information the Panel determines the FSP has not breached the General Insurance Code of Practice. However, it has noted some concerns with the manner in which the claims decision was reached. 65. The Panel determines the FSP was entitled to rely on policy terms and conditions. 66. The Panel determines the FSP was not entitled to decline the Applicant‟s claim. The parties are asked to work cooperatively to determine the extent of the loss caused by inundation up to 300mm. Should the parties not be able to agree on a monetary settlement, the matter can be remitted to the Panel for a Supplementary Determination. 67. The Panel determines that if the claim is to be cash settled, then the FSP is to pay interest at the rates specified by the Insurance Contracts Act 1984 from the date of denial of the claim to the date of settlement.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.