Home / Financial Firm (Unknown - Insurer) / Determination 261568
Determination 261568
claim_denial
Summary
A farm property was inundated during heavy rain in January 2011 and the FSP declined the claim under the flood exclusion. AFCA found the water was stormwater run-off from a gully rather than flood, so the decline was not justified, and ordered the parties to agree the loss up to 300mm of inundation, with interest if cash settled.
Water from a naturally occurring gully that is not a watercourse, lake, reservoir or dam is not flood as defined in the policy, so the flood exclusion did not apply.
Issues
- Claim denial primary · upheld
“The Panel determines the FSP was not entitled to decline the Applicant's claim.”
- Inadequate claim investigation secondary · upheld
“the original denial without a site specific hydrology report does not represent industry best practice in terms of claims investigation”
- Failure to disclose secondary · not upheld
“The Panel concludes that the wording and structure of the policy is not such that it would fail the requirements under section 35”
Subjects and remedies
home or building damagenatural disasterpay interestreassess claim
Text of the determination
Case No: 261568 Determination Page 1 of 9
Case number: 261568
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
29June 2012
Background
1. The Applicant holds a Farm Insurance Policy with the Financial Services
Provider (FSP) covering a farming property.
2. On or about 10 January 2011 the insured premise in Gatton Queensland
was inundated by water. The Applicant subsequently made a claim on his
policy.
3. The FSP declined the claim on the basis that the inundation was caused by
flood which is an excluded event under the policy.
4. The Applicant disputes the declinature on the basis that the inundation arose
from stormwater run-off and/or flash flood. Further, the FSP failed to inform
him of the flood exclusion.
Summary of Applicant’s p osition
5. The Applicant relies on his Statutory Declaration dated 28 March 2012 from
which the Panel notes the following:
On Monday 10 January 2011 the Applicant was at the property until
12.00pm. His son stayed the whole day.
His son is unable to provide a statutory declaration as he lives on the
property and it is difficult to obtain an appropriately qualified person to
witness the document.
The property has hills right up the back, about 40 or 50 „chain‟ away
from the house going north west.
There was a large storm around 3.00pm and water came from the north
west and travelled south east.
Blackfellow Creek is about 20 chains away to the south-east of the
property. The water flowed from the hills to the Creek.
6. The Applicant‟s son “Q” has provided a letter dated 17 February 2012 stating
the following:
Q was present on 10 January 2011 at the insured premise which is his
place of residence.
Determin ation
Case No: 261568 Determination Page 2 of 9
On 10 January 2011 there was an extremely heavy storm resulting in a
“...massive amount of water never ever seen before . ”
At 3.00pm the water ran through the house for approximately 20-30
minutes.
The water did not come from Blackfellow Creek as the residence is
approximately 20 chains away from the creek.
7. The Applicant has enclosed daily weather observations from Gatton
Queensland. The rainfall indicates 87.2mm fell on 10 January 2011.
8. The Applicant has enclosed photographs of the insured premise which
indicates that the area is hilly. The hills appear to be relatively high and
steep with some vegetation.
9. The Applicant has enclosed a verbal report of loss dated 22 February 2011
regarding the incident. The report indicates a telephone call was made
straight after the incident.
10. When the Applicant first contacted the FSP it did not accept the claim and
discouraged him from making the claim. The Applicant submits this is
against the General Insurance Code of Practice. Further, the FSP has failed
to properly investigate the claim and its IDR letter stated the property was
damaged by the flood in Gatton from the Lockyer Creek which occurred
between 4.30pm Monday 10 January 2011 and 4.30am Tuesday 11 January
2011. The Applicant lives 30kms away from Gatton and does not live near
the Lockyer Creek. In addition the water that caused damage in Grantham
on 10 January 2011 did not affect the insured premise.
11. The Product Disclosure Statement (PDS) is misleading and deceptive as it
fails to draw the readers notice to the flood exclusion in the policy
construction. Accordingly the FSP failed to fully inform the Applicant under
Section 35 of the Insurance Contracts Act 1984.
12. The Applicant states that flood is a prescribed event for the purposes of
section 35 of the Insurance Contracts Act 1984, as defined b y section 14 of
the Insurance Contracts Regulations 1985. The Corporations Act 2001
further requires clear, concise and effective disclosure.
13. Alternatively, the Applicant notes that storm is a covered event under the
policy and the damage arose from storm.
14. The Applicant submits the water that fell at Gatton was extremely heavy and
intense. The ICA Locker Valley LGA event acknowledges the extreme
rainfall event in the 24 hours to 9.00am on Tuesday 11 January 2011. In
particular, that the rain fell predomina ntly on the afternoon of 10 January
2011. In addition to this, the nearest rain gauge (Mt Castle Alert) indicates
the rain did not ease until 5.00pm.
15. There is a gully in the area that runs off the back of the hills and runs down
but there is usually never water in it. The water came from the north-west
and flowed south east. It came off the hill and flowed straight through. The
hill is about 40-50 chains away from the house going north-west.
Case No: 261568 Determination Page 3 of 9
16. The property is not normally affected by heavy rainfall and is set back from
the creek. The creek has created some issues for others in the past but not
the Applicant due to the drains set around the property. However, the heavy
rainfall on 10 January 2011 was sufficient to inundate the property.
17. The hydrologist acknowledged the nearby Blackfellow Creek did not cause
the inundation of the property. The hydrologist did not consider the possibility
of any flash flood or significant stormwater event. The hydrologist has
claimed a „channel‟ would be considered a watercourse. However, the
hydrologist is basing this on works to a channel which has been worked on
since the January 2011 event. The hydrologist claimed the local catchment
runs east in a natural watercourse to a series of three dams. The hydrologist
indicated that the water holding capacity was likely the reason the channel
was so small prior to excavation work. The dams were in fact built in an
effort to combat a 10 year drought.
18. The Applicant disputes the FSP‟s position that the damage was caused by
an unnamed ephemeral natural channel and the Lockyer Creek. First, the
insured premise is not near the Lockyer Creek. Second the unnamed
ephemeral natural channel should not be considered a watercourse as it
does not have defined banks or a bed that regularly conveys wate r from one
place to another ( Gartner v Kidman (1962) 108 CLR 12) . Further, the
Applicant believes the area described as a channel by the hydrologist is
merely a „depression in the ground‟.
Summary of FSP’ s position
19. The FSP relies on the policy definition o f flood:
“Flood means the inundation of normally dry land by water escaping, or being
released from, the normal confines of a reservoir, natural watercourse or lake
(whether or not they have been altered or modified). Flood also includes water
discharged from any sewerage or waste water systems due to pressure
induced by Flood water”
20. The FSP has enclosed the renewal schedule for the period covering 16
September 2010 to 16 September 2011. The document contains a section
entitled „Important Information‟ which indicates there is no flood cover in the
policy. This information is at page 7.
21. The FSP relies on an assessor‟s report from which the Panel notes the
following:
The water entered the property on 10 January 2011 at 4.00pm
The water rose quickly and was surface water only.
The nearest waterway is Blackfellow Creek which is 500m away.
The property is on a foundation and the floor is 300mm from ground
level.
The water peaked at 600mm in the property.
22. The FSP has enclosed a copy of the site specific hydrolog y report from
which the Panel notes the following:
Case No: 261568 Determination Page 4 of 9
The insured premise is situated on “S” Road which is approximately
25kms from Gatton in the Lockyer Valley. The site is on the western
side of S Road and the Blackfellow Creek runs north approximately 50
metres to the east of S Road.
There are a series of three dams on the property. When these dams
are breached the water flows along a small channel which is
approximately 0.15m deep.
During the storm, water flowed from the south east through the dams
and exceeded the capacity of the channel.
Water flowed through the shed and the house to a depth of 0.38m.
Water from Blackfellow Creek inundated the paddock but did not affect
the insured residence.
The area of Blackfellow Creek catchment down to the site is estimated
to be in the order of 28,000 hectares. The majority of the catchment
consists of a steep sloped mountain range which remains heavily
forested.
The local catchment that feeds into dams on the site extends to the top
of the mountain range to the west of the property and is estimated to be
approximately 200 hectares. It runs east in a natural watercourse to the
series of three dams. Downstream of this location and prior to the
January event, the insured described the channel as being narrow and
approximately 0.15m deep.
The hydrologist‟s report provides cumulative rainfall totals over the
period of 3 January 2011 to 14 January 2011. It appears that in Gatton
a 12 hour duration was beyond a 100 year ARI.
The hydrologist accepts that Blackfellow Creek did not cause the
inundation of the house and sheds.
The hydrologist claims the insured informed him the local catchment
exceeded capacity of the dams and a small drainage channel that
flowed through the shed and house. Accordingly, he undertook works
to excavate and widen the channel as well as construct a levee to
alleviate future overflows from the channel. The channel is well defined
in the upper catchment and flows through into three dams upstream of
the sheds and house.
The channel is classified as an unnamed minor ephemeral natural
channel. The hydrologist considers this would be deemed a
watercourse. That being a drainage channel, stream, creek, river,
estuary, lake or dam, or any associated water holding structure.
Accordingly, the inundation at the property was the result of flood.
23. The FSP notes the Applicant has not provided the date or the name of the
claims staff he spoke with regarding the claim.
24. The FSP disputes that its PDS failed to clearly inform in accordance with
Section 35 of the Insurance Contracts Act. The FSP notes the PDS is
indexed and is set out in a clear and orderly manner. The renewal schedule
also confirms that flood is not covered.
Case No: 261568 Determination Page 5 of 9
25. The FSP relies on the ICA Lockyer Valley LGA and the site specific
hydrology report which concludes the inundation arose from flood. The FSP
notes the 24 hours to 9.00am on 11 January 2011 recorded a rainfall
between 160-180mm with the highest falls in the eastern and southern areas
of the catchment.
26. The FSP refers to a Hydrology Report regarding the flood in Gatton which
indicates the flood onset was 4.30pm on 10 January 2011 and peaked at
4.30am on 11 January 2011. The FSP then suggests the property is located
in close proximity of Ma Ma Creek. The Panel is puzzled by this as Ma Ma
Creek does not appear to be in close proximity to the insured premise and
the property was inundated prior to 4.30pm.
27. The FSP notes that whilst the site specific report gives a 100 year ARI for 12
hour durations, that for a 3hour or less it would be a 5 year ARI. The
hydrology report concluded the rainfall was insufficient to cause the damage
alleged.
28. The FSP maintains the body of water described in the site specific hydrology
report would constitute a watercourse under the policy.
29. The ICA and site specific hydrology reports support a finding of flood but no
evidence for flash flood.
Issues
30. Whether the FSP has breached the General Insurance Code of Practice.
31. Whether the FSP is entitled to rely on the policy terms and conditions.
32. Whether the FSP was entitled to decline the Applicant‟s claim.
Reasons for Decision
33. There has been an exchange of material between each party and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
34. The Panel has read each party‟s submissions and materials and wil l only
refer to the relevant submissions and materials raised.
35. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
36. The Panel considers that there are three discrete issues (listed above) which
will be dealt with separately below.
Whether the FSP has breached the General Insurance Code of Practice
37. The Applicant has alleged that his original verbal claim was not acted upon
and that he was discouraged from taking the matter further.
Case No: 261568 Determination Page 6 of 9
38. The information provided on this point, however, is unclear. There is no
information regarding the date, time or individual spoken to at the FSP or
more particularly, details regarding the content of the conversation.
39. The Panel further notes that the FSP did not provide claim file records and/or
has not indicated whether such a telephone call would be recorded on the
system. It is disappointing the FSP has not provided such records which
should be readily available.
40. There is insufficient evidence on which to base a finding the FSP has
conducted its initial claims handling in a manner which breached the General
Insurance Code of Practice.
41. The Panel is, however, concerned by the references made by the FSP in
relation to watercourses which are not in geographical proximity to the
property. Further, the site specific hydrology report clearly indicates there
was no inundation from the nearest waterway, being Blackfellow Creek. The
Panel considers such references are not appropriate in relation to this claim.
42. The Panel further notes that the assessor‟s report dated 14 March 2011
indicated in answer to its question: „Where did the water come from: Surface
water only‟; later in the same report in answer to: „Next report: Obtain expert
consultants reports‟. Accordingly the original denial without a site specific
hydrology report does not represent industry best practice in terms of claims‟
investigation.
Whether the FSP was entitled to rely on the policy terms and conditions
43. The Applicant does not dispute receiving the PDS, only that the wording
does not satisfy the requirement to clearly inform under section 35 of the
Insurance Contracts Act (1984).
44. The case law supports that in most cases the provision of the policy
document is sufficient to discharge an insurer‟s onus under section 35 of the
Act. The document, however, must readily answer whether an event such as
flood is covered, from the perspective of a person of average intelligence
and education.
45. The Panel considers that the policy does provide information in the definition
of flood, as to what flood is and what flood is not. The policy is indexed and
is written in plain English. The flood exclusion is mentioned multiple times
across the PDS and the renewal notice, which also forms part of the policy
documentation.
46. The Panel concludes that the wording and structure of the policy is not such
that it would fail the requirements under section 35 of the Act or the clear,
concise and effecti ve disclosure regime mandated by the Corporations Act
2001.
Whether the FSP was entitled to decline the Applicant’s claim
47. First, the parties do not appear to dispute that there was heavy rainfall
leading up to the inundation of the insured premise. The Panel notes the
Case No: 261568 Determination Page 7 of 9
FSP‟s assertion that the hydrologist stated there was insufficient rainfall to
inundate the property; however no such conclusion is reached by that report.
48. Second, there is no dispute that the water inundation was not from the
nearby Blackfellow Creek.
49. The Panel notes there is some suggestion by the FSP the water inundating
the risk address coincided with the „normal flooding‟ experienced in the
township of Gatton, some 30kms in distance from the risk address, from the
Lockyer Creek; however, the Panel is unable to discern by what
methodology the FSP may have formed this view. The FSP then goes on to
assert the risk address „is located is (sic) close proximity to Ma Ma Creek‟;
however, the Panel is again unable to discern by what analysis of the local
topography the FSP established this geographical fact, given the risk
address is in a different valley, with hills between the risk address and Ma
Ma Creek.
50. The evidence from the Applicant and the site specific hydrologist is that the
upper catchment flows towards the property. The hydrologist describes a
channel that flows through into three dams and then describes a minor
channel which directs overflow from the dams. The Applicant describes the
upper catchment „channel‟ as a gully.
51. The hydrologist described the upper catchment channel as a watercourse on
the basis it is an „unnamed minor ephemeral natural channel‟. The hydrology
report is not particularly specific regarding this channel. However, the Panel
understands this „channel‟ is located in th e upper catchment and receiving
local stormwater run-off which then diverts through this unnamed minor
ephemeral natural channel. The nature of something which is deemed
ephemeral is normally something that is transient in its state of being. This
may sugg est that the „channel‟ as described by the hydrologist is normally
dry. This may in fact be why the Applicant describes it as a gully. A gully
would normally be dry but as the gully is usually constituted of a depression
in the ground, it would naturally be a place to which stormwater flowed.
Accordingly, based on the limited information before it, the Panel is prepared
to accept this land feature was a gully.
52. The Panel must have reference to flood as defined by the policy. This being:
“Flood means the inun dation of normally dry land by water escaping, or being
released from, the normal confines of a reservoir, natural watercourse or lake
(whether or not they have been altered or modified). Flood also includes water
discharged from any sewerage or waste water systems due to pressure
induced by Flood water”
53. The Panel has reviewed the case of Gartner v Kidman [1962] HCA 27 and
notes the following:
The case held there was a difference between natural and artificial
watercourses as well as the natural flow of surface water.
The Court relied on the case of Lyons v Winter (1899) 25 VLR which
held that to constitute a watercourse, there must be a stream of water
flowing in a defined channel or between something in the nature of
banks.
Case No: 261568 Determination Page 8 of 9
The Court further noted the case of Cooper v The Corporation of
Sydney (1853) 1 Legge 756 which distinguished between a regular
stream between banks and the occasional overflow of a swamp.
The Court further considered with some approval the American case of
Barkley v Wilcox (1881) 86 NY 140 which stated “Depressions in the
soil to which the surface water from adjacent lands naturally finds it way
and is discharged into some natural outlet are not thereby made
watercourses” .
54. The Panel considers that the case of Provincial Insurance Australia v
Consolidated Wood Products (1991) 25 NSWLR 541 has assisted in defining
stormwater channels. Kirby J gave preference to the Australian rather than
English or North American meaning of canal. Kirby preferred the Macquarie
Dictionary definition for canal and stormwater channel which were:
“Canal
An artificial waterway for navigation draining, irrigation, etc
A channel or watercourse
Stormwater Channel
An artificial passage from stormwater and floodwater; floodway.
Also, stormwater canal, stormwater drai n.”
55. The gully is clearly not a lake, reservoir, dam or river given that it neither
stores water or has an ongoing flow of water.
56. The Panel further notes that depressions in the soil to which surface water
from adjacent lands naturally finds its way and is charged into some natural
outlet are not automatically deemed watercourses. Further, there is no
evidence that the gully is artificial or constructed for the purpose of drainage
at the time of the loss.
57. The evidence provided indicates the gully is a naturally occurring
topographical feature arising from the mountainous/hilly ranges surrounding
the property. It does not necessarily follow that such a feature is
automatically a watercourse, channel or canal.
58. The Panel notes that the hydrologist refers to this topographical feature as a
feature through which stormwater run-off would have flowed. The evidence
indicates the water normally is channelled to the dams and flows to
Blackfellow Creek. However, the photographs provided by the hydrologist
appear to show water flow outside of the channel and as having a more
westerly than north-west flow as stated by the Applicant.
59. The Panel has difficulty accepting that the flow purely went through the dams
and its outlet channel, given the northerly aspect of the catchment site and
the eye witness evidence of Q.
60. The Panel therefore accepts that there is no evidence before it to indicate
water from the gully should be deemed a flood for the purpose of the policy
exclusion. Further, that the water purely entered the dams and then
overflowed rather than some independent overland flow having occurred. It
Case No: 261568 Determination Page 9 of 9
is a corollary of these findings that any damage caused by stormwater run-
off coming from the gully(s) to the insured items would be covered.
61. The Panel notes the assessor claimed there was 600mm peak flow at the
property. The Panel notes that the assessor confirms that the distance from
floor level to ground is 300mm. The Panel trusts the assessor was able to
accurately record the level of damage as an appropriately qualified building
loss adjuster.
62. The Panel notes that the hydrologist has referred to “water flowed through
shed 1... and through the house, to a depth of approximately 15 inches
[ ˜ 0.38m]. ”
63. Having considered the evidence in its totality, the Panel prefers the
calculations of the loss assessor, to the effect that inundation of the house is
to the level of 300mm.
Determination
64. On the basis of the available information the Panel determines the FSP has
not breached the General Insurance Code of Practice. However, it has noted
some concerns with the manner in which the claims decision was reached.
65. The Panel determines the FSP was entitled to rely on policy terms and
conditions.
66. The Panel determines the FSP was not entitled to decline the Applicant‟s
claim. The parties are asked to work cooperatively to determine the extent of
the loss caused by inundation up to 300mm. Should the parties not be able
to agree on a monetary settlement, the matter can be remitted to the Panel
for a Supplementary Determination.
67. The Panel determines that if the claim is to be cash settled, then the FSP is
to pay interest at the rates specified by the Insurance Contracts Act 1984
from the date of denial of the claim to the date of settlement.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.