Summary

The applicants claimed ongoing wall cracking and a shower leak after a 2010 arson fire was repaired. The FSP denied liability after two expert reports attributed the cracking to normal movement and wet weather, and AFCA found the applicants had not shown the damage was fire-related.

The applicants bore the onus of proving on the balance of probabilities that the ongoing damage was caused by the insured fire, and the expert evidence did not support that.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 261554 Determination Page 1 of 6 Case Number: 261554 General Insurance – Domestic Insurance – Home Building – Repair rectification – Policy exclusions – Settling, shrinkage 16 July 2012 Background 1. The Applicants insured their two storey home building under a Home Building Policy against loss or damage caused by insured events for $231,500 with a $250 policy excess. The policy had been extended to cover accidental damage. The property is situated in a suburb of the Brisbane LGA. 2. In October 2010, the Applicants’ hom e was damaged during a random arson attack on the ground floor area of their home. The Financial Services Provider (FSP) accepted liability for the fire damage to the home and repairs were completed in early 2011. 3. However, soon after the fire, the Applicants noticed cracks developing in some walls and ceilings of the home. The Applicants state that cracking of the building is still occurring. 4. The Applicants also reported that water is leaking from the shower during its operation which they consider is a consequence of the fire. 5. The FSP appointed a building consultant (builder) to inspect and report on the cause of the cracking. In a report dated 7 July 2011 the builder stated that in his opinion the cracking to the home was only minor and has been caused by normal building movement. 6. In view of the Applicants ’ continued opinion that the damage to their home was the result of the fire, the FSP appointed a consulting structural engineer (engineer) to inspect the Applicants’ home to determine causation of the reported damage. 7. The engineer submitted a report dated 3 December 2011which stated that the cracking and movement to the internal linings and patio members was primarily due to wet weather experienced over the period from October 2010 to March 2011. 8. In respect to the leaking shower the engineer suggested that the only way to determine whether the leak was caused by fire damage in the wall space behind the shower or whether the shower mixer is leaking is to remove the mixer cover and inspect the wall behind. If there is no fire damage it is likely that the leakage is from normal wear and tear. Determination Case No: 261554 Determination Page 2 of 6 Summary of Applicants ’ Position 9. Following the random arson attack of their home repairs were completed. However, they consider that there are continuing problems with the house due to the fire. 10. There is cracking to the plasterboard and movement of the house which was not evident before the fire. Since the fire this has become increasingly worse. 11. Due to the fire they consider the steel and timber of the building have structurally been compromised and weakened by the fire. They are of the opinion that a forensic engineer should be appointed to determine why the house is moving. 12. They also require their shower to be repaired as it is leaking which they feel was as a consequence of the fire. 13. The Applicants have submitted a statutory declaration in which they depose that the house had no cracking or leaking before the fire. The cracking and leaking only became evident after the fire. 14. The FSP appointed a building consultant to report on the cause of the cracking. The builder suggested it was caused by incompetent workmanship. However, the previous owners of the house provided the Applicants with documents prepared by the engineering company who structurally engineered the house. 15. The FSP arranged for a second report to be prepared by a structural engineer. The engineer suggested that atmospheric conditions are the reasons for the damage. 16. However, only days after the fire, three rooms developed major cracking. These rooms were directly above the fire and the timeline shows the deterioration of the house is in line with fire deterioration. 17. Fire damage cannot be determined immediately as it takes time to manifest but the fact the three bedrooms showed immediate cracking, creates cause for concern. 18. The cracking was not present before the fire. They moved into the house in April 2005 and there had been a large quantity of rainfall since that time. 19. They have consulted with a neighbour who does not have cracking in their house due to unusual atmospheric conditions. They also consulted another property owner close by with a similar age and constructed house who also has not experienced cracking. Summary of FSP’s Posi tion 20. The FSP maintains that it has repaired the Applicants’ property in a full and complete manner. Case No: 261554 Determination Page 3 of 6 21. The FSP commissioned two reports to investigate concerns raised by the Applicants. The first report dated 7 July 2011 was submitted by a building consultant who was of the opinion any damage to the Applicants’ house was not the result of the fire. 22. The second report dated 3 December 2011 was submitted by a consulting engineer who was of the opinion that the cracking and movement is primarily due to wet weather and is not related to movement in the structure. The report identified that the issues identified by the Applicants were not a result of the fire. 23. In respect to the leaking shower, on the recommendation of the engineer, it appointed a leak check service, ‘OPS’, to inspect the shower. OPS reported that the shower screen was leaking and water was tracking under the house. OPS did not consider that this was due to the fire and no resultant damage was found. 24. The FSP’s policy does not respond to the cost of rep airing the item that caused the escape of the water or liquid. It is up to the Applicants to re-seal the shower. 25. The FSP considers that it has fully and completely discharged its obligations and by providing the reports to the Applicants it believes it has been able to demonstrate that it has reinstated the damage and put the Applicants back into the same position as if the fire had not occurred. 26. The FSP relies on the following policy/contract provisions: ‘Accidental Damage Cover If you have chosen Accidental Damage Home Insurance, we will cover your buildings or contents for any accidental loss or damage. ... Water or liquid damage Under Accidental damage, we will cover your buildings or contents for loss or damage caused by water or liquid. We will also cover the cost of finding where the water or liquid escaped from, including the cost of repairing any damage that occurs while looking for the cause. ... We will not cover the cost of repairing the item that caused the escape of water or liquid. ... Exclusions to your cover Any cover we provide is subject to the following exclusions. We will NOT cover any loss or damage as a result of, or caused by  settling, shrinkage or any movement of earth  ...  a defect in an item, structural defects, or faulty workmanship or design  ...’ Case No: 261554 Determination Page 4 of 6 Issues 27. Whether the damage to the Applicants home building is a consequence of the October 2010 fire event. 28. Whether the damage has been caused by normal movement in the building. Reasons for Decision 29. The onus of proof is on the Applicants to establish, on the balance of probabilities, that they have suffered a loss caused by a risk insured against. Once the Applicants have established that the loss was prima facie caused by a risk insured against, the onus shifts to the FSP to show, on the balance of probabilities, that the loss falls within an exclusion in the contract of insurance. 30. There has been an exchange of material which the parties rely on. Each party has had access to the material on which the other party bases its case. As a consequence it is not necessary to go into all of this material other than when relevant. 31. The Applicants contend that the ongoing cracking to the interior of their house is as a consequence of the October 2010 fire. In view of the FSP’s opinion that the fire has not caused the damage, the Applicants consider that a forensic engineer should be appointed to report on the cause of the damage. 32. The shower of the home also leaks when being used which they state is also the result of the fire. 33. The FSP initially appointed a building consultant to inspect and report on the damage to the building. The builder carried out a comprehensive inspection of all rooms, the patio and vinyl clad external wall of the building. 34. In his report dated 7 July 2011 the builder reported that the cracking in the building, which the exception of the family room, has been caused by normal building movement. 35. The Applicants reported they could notice the joins in the plasterboard ceiling sheets. The joins were more obvious during the night when the light was on. 36. The builder inspected the ceiling space and noted that the plasterboard had been installed over the original asbestos ceiling sheets. However, ‘Back - blocking’ had not been installed to the back of the plasterboard sheet joints because the sheets are installed directly onto the original asbestos cement sheets. 37. “Back - blocking’ assists in preventing ‘peaking’ which appears as a continuous ridge, bead or crack along the length of the joint. Back-blocking is a manufacturer’s recommendatio n since March 1965. The plasterboard ceiling was installed around 2004. Case No: 261554 Determination Page 5 of 6 38. The builder is of the opinion that the peaking to the plasterboard is the result of the omission of the ‘ Back- blocking’ which he considered to be defective building work. 39. The Applicants directed the builder to the timber handrail of the patio which they stated they noticed had developed cracking to the timber handrail. 40. The vinyl cladding to the gable end of the building had been painted. The builder noted that two of three vinyl cladding joints had not been correctly joined. There were also hairline paint cracks to the joins of the vinyl weatherboards. 41. The builder was of the opinion that normal building movement has caused the cracking to the paintwork to the handrail and gable end and was not the result of the fire under the building. 42. The builder is of the opinion that there was minor building movement to the entire building which is evident by cracking to all areas of the building. He also stated that, in his opinion, the fire had not structurally damaged the building. 43. In November 2011, the FSP engaged a consulting engineer to inspect the building structure to determine the cause of the reported damage, subsequent to the fire and completed repairs. 44. In his report dated 3 December 2011, the engineer stated that he inspected the interior and exterior of the house and gained access to the roof space. He also used an electronic builder’s bubble level to determine if the structure was out of level. 45. The engineer was of the opinion that cracking to linings over the dwelling is attributable to moisture variation due to above average rainfall for the period October 2010 and March 2011 at the time of the fire and after completion of repairs. 46. He also stated that he was unable to find any evidence of major structural movement. 47. In respect to the leaking shower, the engineer recommended further investigation is carried out to determine if the fire damage was sustained in the shower wall space. 48. The FSP engaged a leak check firm, OPS, to investigate water dripping under the house below the bathroom area when the shower is in use. 49. OPS reported that the shower screen was found to be leaking and water was tracking through to under the house. OPS did not consider the leaking shower screen was related to the fire. 50. The Applicants initially reported cracks in the walls of their house to the FSP’s loss assessor in late October 2010 and over the ensuring months. Case No: 261554 Determination Page 6 of 6 51. The loss assessor arranged for the builder who was repairing the house following the fire to investigate the cause of the cracking. 52. The builder reported that it was determined that the cracking was due to the general movement of the house and was not related to the fire that occurred in October 2010. 53. Although the Applicants have requested a forensic engineer be appointed to inspect and report on the damage to their home, the onus is on them to establish that, on the balance of probabilities, the movement cracks in the home building are the result of the October 2010 fire. 54. The builder who was involved in repairing the fire damage had the damage inspected and the report was that the cracking was due to the normal movement of the house. 55. The FSP engaged a consulting builder and consulting structural engineer to inspect and report on the damage. Both experts reported that the damage is not related to the fire. It is hard to imagine that a forensic engineer could add anything to the opinion of the consulting structural engineer. 56. I sympathise with the Applicants particularly as the damage had been observed so soon after the fire. However, as stated above, I can only determine the matter on the basis of the material available to me. Determination 57. Therefore, based on the evidence submitted to me I find that the Applicants have failed to establish that, on the balance of probabilities, the ongoing damage to their home is related to the October 2010 fire. 58. Accordingly, I determine that the FSP is entitled to deny liability for the damage to the Applicants ’ home.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.