Home / Financial Firm (Unknown - Insurer) / Determination 261554
Determination 261554
Wall cracking and shower leak claim denied as unrelated to fire
Summary
The applicants claimed ongoing wall cracking and a shower leak after a 2010 arson fire was repaired. The FSP denied liability after two expert reports attributed the cracking to normal movement and wet weather, and AFCA found the applicants had not shown the damage was fire-related.
The applicants bore the onus of proving on the balance of probabilities that the ongoing damage was caused by the insured fire, and the expert evidence did not support that.
Issues
- Claim denial primary · not upheld
“The Applicants have failed to establish that, on the balance of probabilities, the ongoing damage to their home is related to the October 2010 fire.”
- Inadequate claim investigation secondary · not upheld
“Both experts reported that the damage is not related to the fire. It is hard to imagine that a forensic engineer could add anything.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 261554 Determination Page 1 of 6
Case Number: 261554
General Insurance – Domestic Insurance – Home Building – Repair
rectification – Policy exclusions – Settling, shrinkage
16 July 2012
Background
1. The Applicants insured their two storey home building under a Home Building
Policy against loss or damage caused by insured events for $231,500 with a
$250 policy excess. The policy had been extended to cover accidental damage.
The property is situated in a suburb of the Brisbane LGA.
2. In October 2010, the Applicants’ hom e was damaged during a random arson
attack on the ground floor area of their home. The Financial Services Provider
(FSP) accepted liability for the fire damage to the home and repairs were
completed in early 2011.
3. However, soon after the fire, the Applicants noticed cracks developing in some
walls and ceilings of the home. The Applicants state that cracking of the
building is still occurring.
4. The Applicants also reported that water is leaking from the shower during its
operation which they consider is a consequence of the fire.
5. The FSP appointed a building consultant (builder) to inspect and report on the
cause of the cracking. In a report dated 7 July 2011 the builder stated that in his
opinion the cracking to the home was only minor and has been caused by
normal building movement.
6. In view of the Applicants ’ continued opinion that the damage to their home was
the result of the fire, the FSP appointed a consulting structural engineer
(engineer) to inspect the Applicants’ home to determine causation of the
reported damage.
7. The engineer submitted a report dated 3 December 2011which stated that the
cracking and movement to the internal linings and patio members was primarily
due to wet weather experienced over the period from October 2010 to March
2011.
8. In respect to the leaking shower the engineer suggested that the only way to
determine whether the leak was caused by fire damage in the wall space
behind the shower or whether the shower mixer is leaking is to remove the
mixer cover and inspect the wall behind. If there is no fire damage it is likely
that the leakage is from normal wear and tear.
Determination
Case No: 261554 Determination Page 2 of 6
Summary of Applicants ’ Position
9. Following the random arson attack of their home repairs were completed.
However, they consider that there are continuing problems with the house due
to the fire.
10. There is cracking to the plasterboard and movement of the house which was
not evident before the fire. Since the fire this has become increasingly worse.
11. Due to the fire they consider the steel and timber of the building have
structurally been compromised and weakened by the fire. They are of the
opinion that a forensic engineer should be appointed to determine why the
house is moving.
12. They also require their shower to be repaired as it is leaking which they feel
was as a consequence of the fire.
13. The Applicants have submitted a statutory declaration in which they depose
that the house had no cracking or leaking before the fire. The cracking and
leaking only became evident after the fire.
14. The FSP appointed a building consultant to report on the cause of the cracking.
The builder suggested it was caused by incompetent workmanship. However,
the previous owners of the house provided the Applicants with documents
prepared by the engineering company who structurally engineered the house.
15. The FSP arranged for a second report to be prepared by a structural engineer.
The engineer suggested that atmospheric conditions are the reasons for the
damage.
16. However, only days after the fire, three rooms developed major cracking. These
rooms were directly above the fire and the timeline shows the deterioration of
the house is in line with fire deterioration.
17. Fire damage cannot be determined immediately as it takes time to manifest but
the fact the three bedrooms showed immediate cracking, creates cause for
concern.
18. The cracking was not present before the fire. They moved into the house in
April 2005 and there had been a large quantity of rainfall since that time.
19. They have consulted with a neighbour who does not have cracking in their
house due to unusual atmospheric conditions. They also consulted another
property owner close by with a similar age and constructed house who also has
not experienced cracking.
Summary of FSP’s Posi tion
20. The FSP maintains that it has repaired the Applicants’ property in a full and
complete manner.
Case No: 261554 Determination Page 3 of 6
21. The FSP commissioned two reports to investigate concerns raised by the
Applicants. The first report dated 7 July 2011 was submitted by a building
consultant who was of the opinion any damage to the Applicants’ house was
not the result of the fire.
22. The second report dated 3 December 2011 was submitted by a consulting
engineer who was of the opinion that the cracking and movement is primarily
due to wet weather and is not related to movement in the structure. The report
identified that the issues identified by the Applicants were not a result of the
fire.
23. In respect to the leaking shower, on the recommendation of the engineer, it
appointed a leak check service, ‘OPS’, to inspect the shower. OPS reported
that the shower screen was leaking and water was tracking under the house.
OPS did not consider that this was due to the fire and no resultant damage was
found.
24. The FSP’s policy does not respond to the cost of rep airing the item that caused
the escape of the water or liquid. It is up to the Applicants to re-seal the shower.
25. The FSP considers that it has fully and completely discharged its obligations
and by providing the reports to the Applicants it believes it has been able to
demonstrate that it has reinstated the damage and put the Applicants back into
the same position as if the fire had not occurred.
26. The FSP relies on the following policy/contract provisions:
‘Accidental Damage Cover
If you have chosen Accidental Damage Home Insurance, we will cover your buildings
or contents for any accidental loss or damage.
...
Water or liquid damage
Under Accidental damage, we will cover your buildings or contents for loss or
damage caused by water or liquid. We will also cover the cost of finding where the
water or liquid escaped from, including the cost of repairing any damage that occurs
while looking for the cause.
...
We will not cover the cost of repairing the item that caused the escape of water or
liquid.
...
Exclusions to your cover
Any cover we provide is subject to the following exclusions.
We will NOT cover any loss or damage as a result of, or caused by
settling, shrinkage or any movement of earth
...
a defect in an item, structural defects, or faulty workmanship or design
...’
Case No: 261554 Determination Page 4 of 6
Issues
27. Whether the damage to the Applicants home building is a consequence of the
October 2010 fire event.
28. Whether the damage has been caused by normal movement in the building.
Reasons for Decision
29. The onus of proof is on the Applicants to establish, on the balance of
probabilities, that they have suffered a loss caused by a risk insured against.
Once the Applicants have established that the loss was prima facie caused by
a risk insured against, the onus shifts to the FSP to show, on the balance of
probabilities, that the loss falls within an exclusion in the contract of insurance.
30. There has been an exchange of material which the parties rely on. Each party
has had access to the material on which the other party bases its case. As a
consequence it is not necessary to go into all of this material other than when
relevant.
31. The Applicants contend that the ongoing cracking to the interior of their house
is as a consequence of the October 2010 fire. In view of the FSP’s opinion that
the fire has not caused the damage, the Applicants consider that a forensic
engineer should be appointed to report on the cause of the damage.
32. The shower of the home also leaks when being used which they state is also
the result of the fire.
33. The FSP initially appointed a building consultant to inspect and report on the
damage to the building. The builder carried out a comprehensive inspection of
all rooms, the patio and vinyl clad external wall of the building.
34. In his report dated 7 July 2011 the builder reported that the cracking in the
building, which the exception of the family room, has been caused by normal
building movement.
35. The Applicants reported they could notice the joins in the plasterboard ceiling
sheets. The joins were more obvious during the night when the light was on.
36. The builder inspected the ceiling space and noted that the plasterboard had
been installed over the original asbestos ceiling sheets. However, ‘Back -
blocking’ had not been installed to the back of the plasterboard sheet joints
because the sheets are installed directly onto the original asbestos cement
sheets.
37. “Back - blocking’ assists in preventing ‘peaking’ which appears as a continuous
ridge, bead or crack along the length of the joint. Back-blocking is a
manufacturer’s recommendatio n since March 1965. The plasterboard ceiling
was installed around 2004.
Case No: 261554 Determination Page 5 of 6
38. The builder is of the opinion that the peaking to the plasterboard is the result of
the omission of the ‘ Back- blocking’ which he considered to be defective building
work.
39. The Applicants directed the builder to the timber handrail of the patio which
they stated they noticed had developed cracking to the timber handrail.
40. The vinyl cladding to the gable end of the building had been painted. The
builder noted that two of three vinyl cladding joints had not been correctly
joined. There were also hairline paint cracks to the joins of the vinyl
weatherboards.
41. The builder was of the opinion that normal building movement has caused the
cracking to the paintwork to the handrail and gable end and was not the result
of the fire under the building.
42. The builder is of the opinion that there was minor building movement to the
entire building which is evident by cracking to all areas of the building. He also
stated that, in his opinion, the fire had not structurally damaged the building.
43. In November 2011, the FSP engaged a consulting engineer to inspect the
building structure to determine the cause of the reported damage, subsequent
to the fire and completed repairs.
44. In his report dated 3 December 2011, the engineer stated that he inspected the
interior and exterior of the house and gained access to the roof space. He also
used an electronic builder’s bubble level to determine if the structure was out of
level.
45. The engineer was of the opinion that cracking to linings over the dwelling is
attributable to moisture variation due to above average rainfall for the period
October 2010 and March 2011 at the time of the fire and after completion of
repairs.
46. He also stated that he was unable to find any evidence of major structural
movement.
47. In respect to the leaking shower, the engineer recommended further
investigation is carried out to determine if the fire damage was sustained in the
shower wall space.
48. The FSP engaged a leak check firm, OPS, to investigate water dripping under
the house below the bathroom area when the shower is in use.
49. OPS reported that the shower screen was found to be leaking and water was
tracking through to under the house. OPS did not consider the leaking shower
screen was related to the fire.
50. The Applicants initially reported cracks in the walls of their house to the FSP’s
loss assessor in late October 2010 and over the ensuring months.
Case No: 261554 Determination Page 6 of 6
51. The loss assessor arranged for the builder who was repairing the house
following the fire to investigate the cause of the cracking.
52. The builder reported that it was determined that the cracking was due to the
general movement of the house and was not related to the fire that occurred in
October 2010.
53. Although the Applicants have requested a forensic engineer be appointed to
inspect and report on the damage to their home, the onus is on them to
establish that, on the balance of probabilities, the movement cracks in the
home building are the result of the October 2010 fire.
54. The builder who was involved in repairing the fire damage had the damage
inspected and the report was that the cracking was due to the normal
movement of the house.
55. The FSP engaged a consulting builder and consulting structural engineer to
inspect and report on the damage. Both experts reported that the damage is
not related to the fire. It is hard to imagine that a forensic engineer could add
anything to the opinion of the consulting structural engineer.
56. I sympathise with the Applicants particularly as the damage had been observed
so soon after the fire. However, as stated above, I can only determine the
matter on the basis of the material available to me.
Determination
57. Therefore, based on the evidence submitted to me I find that the Applicants
have failed to establish that, on the balance of probabilities, the ongoing
damage to their home is related to the October 2010 fire.
58. Accordingly, I determine that the FSP is entitled to deny liability for the damage
to the Applicants ’ home.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.