Denial of commercial property claim for backflow inundation under flood exclusion
Text of the determination
Case No: 261390 Determination Page 1 of 10
Case number: 261390
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of claim - Flood
28 March 2012
Background
1. The Applicants “P” and “B” held a Business Insurance Policy (the policy) with
the Financial Services Provider (FSP).
2. A claim was lodged under the policy seeking indemnity for extensive
damage to the insured property in Bundaberg Queensland and associated
loss arising from the significant weather conditions experienced in the area
in December 2010.
3. The FSP declined the Applicants‟ claim on the basis that the loss/damage
was due to the event “Flood”, with such loss specifically excluded under the
policy.
4. The Applicants remain dissatisfied with the FSP‟s decision to decline the
claim and are seeking full indemnity for the property loss under the policy.
Summary of Applicants’ position
5. The Applicants in disputing the FSP‟s decision to decline the claim have
sought the representation of their broker “AH”. In the interest of brevity a nd
the easy understanding of the parties both the Applicants and AH will be
referred to as “the Applicants” for the purpose of this Determination.
6. The Applicants are aware of and have accepted that the Service‟s
jurisdiction does not extend to consideratio n of the “Business Interruption”
component of their claim and that this determination is limited to
consideration of the property damage component only.
7. The Applicants maintain that if the FSP‟s position is that it is not required to
cover loss arising from inundation of insured properties due to the
overflowing of drains (when water is unable to drain) because of the level of
a watercourse (in this case Burnett River), this would mean that the FSP
would never have to provide indemnity for any water inundation claims
where a watercourse is at full tide (which occurs twice a day) and prevents
stormwater from draining away.
Determination
Case No: 261390 Determination Page 2 of 10
8. The Applicants do not believe the flood exclusion provisions were intended
to exclude water damage arising from the backflow of stormwater drains
because it could not drain into the river system due to high tides.
9. The stormwater drains were blocked due to debris from an adjoining old
timber mill whilst Bundaberg was experiencing substantial rainfall that could
not get away and back flowed up through the drains adjacent to the insured
property.
10. Prior to, during and after the event, rainwater was unable to disperse down
the stormwater drains and backed up into the Applicants‟ premises. The
water entering the property was rainwater and the power pad was turned off
by Ergon Energy due to rising stormwater from the drains in the street and
not water from Burnett River (the River).
11. The inundation of the property occurred 12 to 14 hours prior to the River
breaking its banks and therefore does not fall within the definition of flood
provided in the policy.
12. The Department of Meteorology reports rainfall in the area over the three
days prior, during and after the date of loss.
13. The Applicant P provided a statutory declaration whereby he claims that:
On the morning of 28 December 2010, their electrician contacted Ergon
Energy regarding the possible need to disconnect the power supply
due to the possible inundation of the transformer by water from the
stormwater pit.
The stormwater pit is located 9m from the electricity transformer which
is 2m outside the boundary of the insured property.
Water continued to back up from the stormwater drain all day until
Ergon Energy disconnected the power supply to the insured property at
7.43pm on 28 December 2010.
The insured property was not inundated till 8.00am on 29 December
2010. Once the water receded it was found that the stormwater pit was
blocked by a large piece of ply approximately 3m below ground level.
14. The Applicants are seeking complete indemnity for their loss by the FSP
under the claim.
Summary of FSP’s position
15. The Applicants‟ policy provides cover for loss arising from “Accidental
Damage” to “Contents and Stock” caused by storm, rainwater and liquid
escaping from a fixed pipe and drains but specifically excludes damage
caused by “Flood”.
16. In deciding the Applicants‟ claim the FSP has relied upon information
obtained from the Applicants, hydrology consultants “M” and “W”, loss
Case No: 261390 Determination Page 3 of 10
adjusters “C”, legal precedents and other information contained on its files. It
is clear that the damage to the Applicants‟ property is solely from the actions
of a flood.
17. The FSP acknowledges the Applicants position and basis for their decision
to dispute the FSP‟s declinature of their claim. However, the FSP maintains
that the Applicants have not made available any evidence to substantiate
their claim, that rainwater had inundated the property as opposed to
floodwater.
18. The statutory declaration from P confirms that on the morning of 28
December 2010, the Applicants‟ electrician conta cted Ergon to request that
the power supply be disconnected due to inundation from the storm pit.
Further, that the insured property was not inundated till 8.00am on 29
December 2010.
19. The FSP maintains that this information, only further confirms that water
back flowed after the rain in the area had ceased and a significant time after
the rising River commenced back flow through the drainage system into the
insured property.
20. The Bureau of Meteorology readings show that in the vicinity of the insured
property rainfall up to 9.00am on 28 December 2010 was 165.2mm and as
at 9.00am on 29 December 2012 the rainfall over previous 24 hours was
only 24.2mm.
21. When stormwater is the sole source of inundation, the damage occurs
around the same time as the peak rainfall occurs. The water rises quickly
and drains away quickly once the rainfall slows or stops. However, on this
occasion there was clearly a delay from the time the rainfall occurred to the
time water inundated the insured property.
22. The insured property is located in an area that was severely affected by the
flooding of the River channel. Any failure of the drains would be attributable
to the water being unable to drain into the River system, either because it
was already in flood or the River system had risen above the exit point of the
stormwater drains.
23. Floodwater that mixes with stormwater run-off which then subsequently
inundated a property is considered as damage by floodwater for the purpose
of insurance cover. The legal principle behind this is known as the “Wayne
Tank” principle.
24. It is only when stormwater run-off occurs, independent of any floodwater,
that loss or damage is covered under the policy.
25. The FSP relies on the following policy provisions:
“ Flood
the inundation of normally dry land by water escaping or released from the
normal confines of any natural watercourse or lake (whether or not they have
been altered or modified) or from any dam, reservoir or canal.
Case No: 261390 Determination Page 4 of 10
…
Defined events cover
We cover You for loss or damage at the Business Premises caused by the
following defined events:
7. Storm, tempest, rainwater, snow, sleet, wind, hail but not:
(a) by water from or action of the sea, tidal wave, storm surge, high water or
Flood.
…
Accidental Damage
We will cover You for accidental loss or damage to Your Business Property at
the Business Premises other than the events or items listed in „What You are
not covered for under Accidental damage cover‟.
…
What you are not covered for under Accidental damage cover
We will not pay for claims under „Accidental damage cover‟ for:
1. loss or damage caused by any defined events cover in this section.
2. loss or damage caused by events or to the items listed under general
exclusions
3. loss or damage insurable under any other section or sections of the policy.
4. …
…
What your are not covered for under this section
1. We will not pay for loss or damage under the Business Property cover
section caused by:
(h) Flood”
Issues
26. Whether water overflowing/back flowing from drains is considered to be
storm or flood water.
27. Whether the FSP is entitled to decline indemnity to the Applicants for the
loss (property damage) claimed under the policy.
Reasons for decision
28. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
Case No: 261390 Determination Page 5 of 10
29. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
30. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this Determination except where considered
relevant.
31. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
32. The Panel notes the parties do not dispute the following:
The Applicants utilised the services of broker AH to manage their
insurance cover.
AH in the capacity of his role was well versed/aware of the relevant
terms, conditions and limitations of the policy subject to this dispute.
The insured property is in very close proximity to the Burnett River.
The most likely source/cause for the inundation of the property was
back flow flooding from the stormwater drains in the vicinity of the
property.
The property was initially inundated on 29 December 2010.
33. Accordingly, it is not in dispute that the terms of the policy were available to
both parties prior to the loss and as such each party is entitled to rely upon
the wording of the policy in their efforts to establish their respective positions.
34. The Panel has reviewed the available hydrological evidence and notes that
the evidence has been exchanged between the parties and according ly it will
only reiterate information it finds relative to this dispute. The Panel notes that
the reports confirm:
C’s Report dated 20 January 2011
C undertook an assessment of the insured property on 5 January 2011.
The insured property is a cold storage facility for local Bundaberg
seafood.
Due to the effects of a tropical storm front, substantial rainfall was
experienced in the headwaters of a number of major river systems and
watercourses in Central and South East Queensland.
Rain fell within the catchment area of the River, which passes through
the town of Bundaberg, commencing on 26 December 2010 through to
29 December 2010.
Due to the heavy rain prior to Christmas 2010, the water level of the
River was already charged with a water flow and additional rainfall
Case No: 261390 Determination Page 6 of 10
caused the system to surge into the Paradise Dam upstream of
Bundaberg.
The dam reached its full level and overflowed the spillway resulting in a
cascade of water along the River towards Bundaberg.
The River broke its banks on 29 December 2010 spilling across the
CBD and residential areas in Bundaberg.
The insured property is located directly on the River and it appears the
River rose and inundated the property causing extensive damage.
M’s Report dated 20 January 2011
The River passes through Bundaberg with most of the city being south
of the River.
The River has a catchment area of about 33,000 km 2 discharging to the
ocean at Burnett Heads.
The catchment receives an average annual rainfall of 763mm of which
only 5% becomes flow in the River.
Rainfalls over the catchment were 300-400% of the long term
December average.
For the entire period of 28 December – 31 December 2010 rainfall
exceeded 300mm over most of eastern Queensland. Some locations in
Bundaberg- Wide Bay regions had a total of 600-800mm of rainfall over
this period. This was the wettest December period on record for much
of South East Queensland.
Within the River catchment the rain fall data recorded for Bundaberg
was 573mm.
The extensive and heavy rainfalls resulted in major flooding i n
Bundaberg from 28 December 2010 – 1 January 2011. The recent
flood peak of 7.9m gauge height (7.9m AHD) is the highest since about
1870. It would be approximately a 20 to 50 year ARI.
Local and stormwater run-off drainage issues could also have impacted
the inundation of individual properties.
W’s Report dated 11 July 2011
The property is a commercial building located in the suburb of
Bundaberg East located about 100m from the south bank of the River.
The River‟s catchment area is approximately 33,000km 2 making it a
large watercourse requiring large weather systems to generate rainfall
over a significant portion of its catchment.
Flood mapping shows the property residing wholly within the River‟s
flooding extent.
The ground level of the property is approximately 6.2m AHD with the
elevation of the north side at 6.5m AHD. The local run-off catchment
Case No: 261390 Determination Page 7 of 10
draining to the Applicants‟ property covers an area of approximately 15 -
20 Ha.
The Applicant was in the property on 26 December 2010.
Evidence of inundation of the property was visible through water marks
on a rear wall, with depth of inundation being approximately 900mm
over ground level or approximately 7.1m AHD.
Stormwater run-off is handled through sub-surface kerb and gutter
drainage. Infrastructure mapping shows the field drain connected to a
stormwater main pipe that discharges to the River about 100m north
west of the property.
A comparison of the rainfall records to intensity frequency data for
Bundaberg suggests the rainfall recorded during the 24hr period to
midday 28 December 2010 had an ARI of 2-5 years. However, it is
likely that individual high intensity, short duration rainfall bursts had an
ARI of higher than 2-5 years.
Run-off from local catchment, which covers an area of approximately
15-20 ha, would have contributed only a small proportion to the total
flow in the River, and would have been insufficient to generate the
volume of floodwater necessary to inundate the property to depths
experienced.
The River gauge indicates that higher levels on the River would have
begun to inundate the property at approximately 1800hrs on 28
December 2010. It is likely that increasingly high River levels would
have reversed flow in the stormwater main and inundated the property
from the field drain.
During the peak rainfall intensities (early morning) on 28 December, the
level of the River would have likely allowed run-off to freely discharge to
the River before flow conditions reversed in the stormwater main later
that evening.
W concludes with the opinion that the inundation of the insured
property was caused by water escaping the confines of the River
channel by backing up the local drainage system towards the property.
Cause for flooding of the insured property
35. The Applicants maintain the water damage to the ins ured property occurred
due to storm water overflowing from drains at the insured property and
accordingly the damage is not due to the event flood as defined within the
policy.
36. The Panel notes that the Applicants were not present at the time of the loss
with 26 December 2010 being the last day (as per evidence available) that
the Applicants were present at the property prior to the loss.
37. The FSP has referred to the consultants‟ reports and maintains that it is not
in dispute that the inundation of the property occurred on 29 December
2010.
Case No: 261390 Determination Page 8 of 10
38. The Panel notes the heaviest rain occurred in the Bundaberg area in the
early part of 28 December 2010. Further, that the Applicants within their
statutory declaration also confirms that the inundation of the property did not
commence until the morning of 29 December 2010.
39. Had stormwater been the single contributing factor, the Panel would have
expected the inundation to have occurred in the immediate hours after the
most significant period of rain. The Case Manager unde rtook further
research and notes the BoM records show significant rain fell on 28
December (165.2mm) whilst only 24.2mm of rain fell on 29 December, with
the heaviest rain falling during the early part of 28 December 2010.
40. In these circumstances, the Panel would have expected the inundation, if
due solely to stormwater, to have occurred in the early to mid afternoon of 28
December 2010. This was not the case; in this instance as the available
evidence reveals, Ergon Energy turned off the transformer outside the
property at about 7.30pm on 28 December 2010, at which point neither the
transformer nor the property had been inundated by stormwater run-off
and/or floodwaters.
41. Accordingly, on the basis of the available evidence submitted by the parties
to this dispute, it is likely the water from the River as it continued to rise,
back flowed through the drainage system; this also prevented the
stormwater runoff from draining away.
42. This is further supported by the available evidence which illustrates the
increasing height of the River over the relevant period of time i.e. 25
December – 30 December 2010. This information from BoM provides that
the level of the River rose above the property‟s elevation of 6.2 -6.5m AHD at
some stage during the early hours of 29 December 2010.
43. It appears any backflow water either came from the River via the drainage
system, or water build up that could not drain into the River because it was
already flooding. In either situation, the water would be considered
floodwater. It is established law that water that cannot enter or drain into a
watercourse because that watercourse is in flood, is considered floodwater.
44. Based on the information available, it would seem likely that inundation of
the property that occurred early on 29 December 2010 was due to back flow
from the River.
45. On that basis, the Panel is satisfied on the balance of probabilities that the
loss was caused by floodwater.
46. The Panel has considered the Applicants‟ reference to the variations in the
level of the watercourse arising from tidal changes. However, the Panel is
not satisfied that this is a matter relevant to this dispute and/or is a factor
relevant in determining whether the loss subject to this claim is due to
stormwater or floodwater as defined within the policy.
Case No: 261390 Determination Page 9 of 10
Cover under the policy
47. Having established that the inundation of the insured property, on the
balance of probabilities, did occur as a result of flood water, the question
before the Panel is whether the policy provides cover for loss or damage
arising from the event flood.
48. The Panel notes the Applicants‟ policy provides cover for loss or damage
arising from the specifically listed events and also includes Accidental
Damage Cover, with such cover subject to the limitations imposed by the
exclusion provisions provided within the policy.
49. The loss claimed by the Applicants and subject to this determination
(excluding Business Interruption) falls under the “Business Property cover”
section of the policy. The Panel notes within this section the policy provides
the scope of cover and applicable limitations under the sub-headings
“ Defined Events Cover ”, “ Accidental Damage Cover ” and “ What you are not
covered for under this Section ”.
50. The Panel has considered the specified insured events for which the FSP is
liable to provide indemnity with the event “ Storm, tempest, rainwater, snow,
sleet, wind, hail ”, being the most relevant to the circumstances giving rise to
th e Applicants‟ loss. Further, it is also noted that this provision of the policy
clearly excludes from cover loss arising from:
“(a) by water from or action of the sea, tidal wave, storm surge, high water or
Flood”
51. Accordingly, the Panel is satisfied that the policy in respect to the relevant
defined event, excludes from cover loss arising due to flood, which on this
occasion has been established to be the proximate cause for the Applicants‟
loss. Therefore indemnity under the “Defined Events Section” of the policy is
not available to the Applicants.
52. The Panel has also considered the “ Accidental Damage Section ” of the
policy and notes that this section provides cover to the policyholders for
accidental damage to the business property at the business premises other
than the events or items listed in the “ What you are not covered for under
Accidental Damage Cover ” section of the policy.
53. The “ What you are not covered for under Accidental Damage Cover ” section
provides:
“We will not pay for claims under „Accidental damage cover‟ for:
1. loss or damage caused by any defined events cover in this section.
2. loss or damage caused by events or to the items listed under general
exclusions
3. loss or damage insurable under any other section or sections of the policy.
4. ….
…”
Case No: 261390 Determination Page 10 of 10
54. The Panel notes that the above noted cover (Accidental Damage) is subject
to specific exclusions applicable to the “Business Property cover section” as
a whole and are listed on page 21 of the policy. The section “What you are
not covere d for under this section” provides:
“1. We will not pay for loss or damage under the Business Property cover section
caused by”
(h) Flood”
55. The Applicants have alleged that at the time of establishing the policy, the
FSP failed to offer him the option to i nclude cover for loss or damage arising
from flood upon the policy.
56. The Panel is satisfied that although establishing that the Applicants have
established a prima facie claim under the accidental damage section of the
policy, such indemnity if due to the event flood, is clearly excluded from
cover.
57. Having considered the evidence made available by the parties, the Panel is
satisfied that, on the balance of probabilities, the inundation of the
Applicants‟ property was due to backwater flooding due to the ris ing level of
the river and as such is excluded under the terms of the policy.
58. The Panel has considered possible indemnity under the “Accidental Damage
Cover” section however this does not come to the assistance of the
Applicants on this occasion due to the flood exclusion.
Determination
59. On the basis of the available information the Panel determines that the FSP
is entitled to refuse the claim in line with the relevant provisions of the policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.