Home / Financial Firm (Unknown - Insurer) / Determination 261258
Determination 261258
Denial of flood-damaged home building claim
Summary
The applicants claimed for damage to their Queensland home from January 2011 inundation, which the FSP denied under the flood exclusion. AFCA found the initial inundation was floodwater and upheld the denial.
Water overflowing from a watercourse, or water that cannot enter a full watercourse, is flood under the policy definition and is excluded.
Issues
- Claim denial primary · not upheld“the Panel finds that the water which initially inundated the Applicants' property is properly designated as floodwater, as therefore the resultant damage is excluded from cover”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 261258 Determination Page 1 of 7
Case number: 261258
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim - Flood
13 June 2012
Background
1. The Applicants hold an Accident Damage Policy (the Policy) underwritten by
the Financial Service Provider (FSP) to cover the insured building (the
property) for a sum insured of $500,000 and contents for a sum insured of
$96,230.
2. The Applicants lodged a claim for damage to their property resulting from the
severe weather events experienced in Queensland in January 2011.
3. Just prior to midnight on 11 January 2011 or in the early hours of 12 January
2011 the property was inundated by water, which reached a height of
approximately 1.9m above floor level at the front of the house and 3.2m at
the rear of the house.
4. The FSP obtained a Site Specific Hydrology Report (Site Report) dated 14
July 2011 which concluded that the inundation was caused by flood.
5. The FSP denied the Applicants‟ claim on the basis that the Policy specifically
excludes cover for damage caused by flood.
6. The Applicants also obtained a hydrology report which, they, submit shows
that the property was inundated by storm water prior to being inundated by
flood and a part of the damage should be covered under the Policy.
Summary of Applicants ’ position
7. The Applicants submit that the entirety of the damage was not caused by the
Brisbane River flooding.
8. The Applicants submit that the storm water runoff which could not enter the
waterway entered their premises before the property was flooded by water
from the Brisbane River.
9. The Applicants commissioned their own hydrology report (O Report), which
indicates that there were 2 separate events, one being the initial inundation
Determination
Case No: 261258 Determination Page 2 of 7
(the height where the stormwaters reached) and the ultimate inundation (the
final height of the water).
10. The Applicants submit that the initial inundation was caused by the storm
water run-off being water that could not enter the storm drainage network.
Subsequently and separately, the property was further inundated by
floodwater which contributed further to the damage suffered by the
Applicants.
11. The Applicants submit that the storm water inundation reached a certain
height (position A) and should be covered by the Policy. They accept that
damage from Position A to the final height is excluded by the Policy.
12. The Applicants estimate that the damage from ground level to Position A
amounts to 75% of the total damage sustained. It is estimated that the cost
of the total damage is $500,000. The Applicants therefore estimate the
insured loss to be approximately $375,000.
13. However, the Applicants accept that the Financial Ombudsman Service‟s
(FOS) jurisdictional limit, pursuant to the Terms of Reference, is $280,000.
Summary of FSP’s position
14. The FSP relies on the Site Report as well as the findings contained in the
hydrology report commissioned by the Insurance Council of Australia (ICA
Report).
15. The FSP states that the following factors prove on the balance of
probabilities that the inundation was caused by flood:
a. Timing of the rainfall:
The Site Report states at page 6-7:
“Inundation of the subject property did not commence until the early hours of
Wednesday 12 January, more than 12 hours after the peak rainfall intensity
and about 5 hours after rainfall in the area had ceased.”
b. Insufficient rainfall:
The Site Report states on page 2:
“Rainfall intensities recorded at Jindalee Alert for durations up to 24 hours
were not particularly intense, with an Average Recurrence Interval (ARI) of
less than 1 year.”
It is submitted that heavier rainfall occurred between 48 and 72 hours
prior to the recorded time of inundation on 12 January 2011 and that it
is unlikely, if not impossible, that rainfall would cause a flash flood or
directly inundate property 72 hours after it fell.
c. The Site Report c oncludes that “ the subject property was inundated
above floor level by floodwaters from the Brisbane River which flowed
back up Mount Ommaney Creek .” According to the report, the local
Case No: 261258 Determination Page 3 of 7
topography combined with the intensity of the January rainfall meant
that the property could not have been inundated by stormwater.
d. The ICA report suggests that water was back flowing through the storm
water drains from the Brisbane River and its tributaries, leading to
inundation in the low lying areas. The FSP submits that water that is
unable to enter a watercourse because it is full has been deemed by
the Courts to be flood water: Hams v CGU Insurance (2002) 12 ANZ
Ins Cas 61-525.
16. The FSP relies on Wayne Tank & Pump Co Ltd v Employers Liability
Insurance Corp Ltd [1974] QB 57 and submits that in circumstances where
flood water mixes with rain or stormwater, it is not necessary to identify the
precise origin of water for a flood exclusion to apply.
17. The FSP relies on the following policy provisions:
“ What we will not pay for
We will not cover your buildings and your contents for any accidental loss or
accidental damage caused by:
...
Flood
Flood is the covering of normally dry land by water escaping or
released from the normal confines of a watercourse or lake, whether
or not it is altered or modified. Flood also includes water escaping from
the confines of any reservoir, channel, canal or dam.
... ”
Issues
18. Whether the damage caused by the initial inundation to the Applicants‟
property is covered under the Policy.
Reasons for decision
19. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
20. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
21. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS. The Applicants rely on the O
Report. The FSP relies on the Site Report and the ICA Report.
Case No: 261258 Determination Page 4 of 7
22. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. As
each party has been provided with a copy of the material, it is not intended to
recite the hydrological reports submitted by the parties in detail except where
relevant.
Cover under the Policy
23. It is an accepted principle of general insurance law that an insured bears the
onus to establish, on the balance of probabilities, that they have suffered a
loss caused by an event or incident to which the policy responds. Once so
established, the onus shifts to the insurer to prove that a policy exclusion
applies.
24. The Applicants do not dispute that they had been provided with a Policy
Disclosure Statement (PDS) which informed them of the applicable policy
terms.
25. The Panel has reviewed the PDS and notes that the policy provides cover
for accidental damage. According to its ordinary meaning, „accidental‟ means
„happening by chance or accident, or unexpectedly” (Macquarie Dictionary).
It is also noted that the policy excludes damage caused by flood, which is
clearly defined in the policy.
26. The Panel accepts that the inundation of the property was unexpected and
can be deemed accidental. Accordingly, the Panel accepts on the balance of
probabilities that that the Applicants have a prima facie claim under the
Policy. The onus then shifts to the FSP to establish that a policy exclusion
applies to defeat the claim.
27. The parties do not dispute that damage caused by flood water is not covered
by the Policy. It is also accepted that the water which ultimately inundated
the property was flood water. What is in dispute is:
a. Whether the water that first inundated the property was flood water or
storm water runoff alone.
b. Whether overflow from Mount Ommaney Creek should be regarded as
stormwater runoff or floodwater.
Cause of the Initial Inundation
28. The O Report states that:
”the initial inundation of the property most likely occurred from stormwater
overflow and local stormwater/overland runoff from the hillside to the west of
the property, which concentrated at the low point in Westlake Drive,
immediately adjacent to the property, which exceeded the discharge capacity
of the stormwater drainage system and inundated the property from Westlake
Drive.”
29. The O Report relies on a contour map from BCC Online and states that
significant runoff “ probably in excess of the capacity of the local storm water
Case No: 261258 Determination Page 5 of 7
system, would be expected to have occurred from this area ” moving
downslope through the property.
30. The Site Report addresses the possibility of stormwater overflow and states:
“...Westlake Drive has a moderate gradient in front of the property and
stormwater would quickly flow northwest to the sag point without affecting the
property...”
31. According to the Site Report, the estimated stormwater discharge from the
local hill slope catchment at Hannah Street would be approximately 1.3 m³/s.
It is calculated that a stormwater discharge of 25m³/s could flow across
Westlake Drive without inundating the property above floor level. According
to the Site Report it is “ not possible that storm water runoff from the local
catchment draining to Hannah Street inundated the property above floor
level . ”
32. The site report notes:
a. The peak rainfall intensity in the area had occurred at 1100 on Tuesday
11 January, more than 12 hours prior to the initial inundation. Further,
no rainfall was recorded at Jindalee Alert after 2000 on Tuesday 11
January, 5 hours prior to the initial inundation;
b. The timing of the initial inundation matches the time at which the
Brisbane River water levels reached the floor level of the property;
c. The recorded Brisbane River water levels were higher than the floor
levels of the property;
d. According to the Applicants, the water which initially inundated the
property had a low turbidity level.
33. The O Report notes:
a. On Tuesday 11 [January 2011] a storm occurred in the morning and
rain continued as it had done the previous day and the owners noticed
the tributary in the golf course had overflowed and was gradually
enlarging, approaching those properties adjoining the golf course;
b. Between 9pm and 11pm on Tuesday night [11 January 2011] the
insureds observed the inundation enter the outskirts of their property;
c. There was a minimum of mud, and no smell in the house after the
water receded (an indication of low turbidity).
34. The Panel has considered the Applicants‟ submission that rainfall recorded
at Jindalee Alert should only be used as an estimate for how much rain fell
and when it stopped. The Panel notes that Jindalee Alert rainfall s tation is
located about 1.8km north of the property. In the absence of any evidence to
indicate that the data obtained from Jindalee Alert varies from the rainfall
that affected the property, the Panel accepts that the data is relevant.
35. Having considered the conflicting conclusions reached by the hydrologists,
the Panel finds the Site Report more persuasive than the O report, noting
that the O report refers to the likelihood of inundation by storm water runoff,
Case No: 261258 Determination Page 6 of 7
with little data in support, while the Site Report provides detailed data to
support its conclusions.
36. The Panel has considered the possibility of overland flow inundation as
described by the ICA Report. The ICA Report states “ it is possible that
overland flow may have caused initial inundation in some low lying areas
subsequently inundated by waterflo w .”
37. To assist in determining this dispute the Panel Chair Ombudsman conducted
a site inspection of the property on 5 June 2012 in the presence of the
Applicants and their Broker. The property backs onto the golf course. Mt
Ommaney Creek runs through the golf course. According to the Applicants it
was water from the golf course that could not enter the creek that inundated
the property. This water was stormwater runoff from the surrounding area
that drained to the creek. As the ground was saturated and the creek rising
the stormwater could not drain away, with the inundation resulting.
38. Both parties agree that overflow from Mount Ommaney Creek inundated the
property. Both hydrologists also accept that the Mount Ommaney Creek is a
tributary of the Brisbane River.
39. O report suggests that overflow from Mount Ommaney Creek should be
regarded as stormwater runoff due to its small catchment size, short
response time, high degree of urbanization and the low turbidity levels in the
overflowing water compared to that in the Brisbane River.
40. The Panel notes that Mount Ommaney Creek is a watercourse. Using the
definition of flood contained in the policy, the Panel accepts that any
inundation by water overflowing from a wate rcourse would be considered
flood water. This means, overflow from the Mount Ommaney Creek is
therefore considered flood water.
41. The Panel also recognises the accepted legal principle that water that is
unable to enter a watercourse because it is full, will be deemed flood water.
On this basis, water that could not enter Mount Ommaney Creek because it
was full and inundated the property will be deemed flood water.
42. There evidence also indicates that the overflow from Mount Ommaney Creek
would have been further influenced by backflow from the Brisbane River
which was the cause of the ultimate and peak inundation.
43. Having carefully considered all of the evidence the Panel is of the view that
the water which initially inundated the Applicants‟ property is properl y
designated as floodwater, as therefore the resultant damage is excluded
from cover.
Case No: 261258 Determination Page 7 of 7
Determination
44. On the basis of the available information the Panel determines that the water
that initially inundated the property is flood water, which is excluded by the
Policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.