Summary

The FSP denied a home inundation claim from the January 2011 Queensland floods as excluded flood. AFCA found the damage was caused by flash flood within the policy and ordered the FSP to meet repair and contents costs, with interest from the denial date, quantum to be agreed.

Proximate cause is the dominant, effective cause, and the Brisbane River inundation was held to be flash flood within 24 hours of the heavy rainfall, which the policy covers.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 261100 Determination Page 1 of 12 Case number: 261100 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Inundation - Policy Interpretation - Flood vs Flash Flood 11 October 2012 Background 1. The Applicants insured their home and contents with the Financial Services Provider (FSP). The relevant period of insurance operated for twelve months beginning from 23 March 2010. During this period, the building was insured up to a sum of $622,000 and the contents for $110,975. 2. On 11 January 2011, the Applicants‟ home in Vernor was subject to extensive water inundation following severe weather events in Queensland. 3. The FSP denied the claim on the basis the damage was due to “flood”. The Applicants, have disputed this. 4. The Applicants and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will only briefly summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicants ’ position 5. The Applicants are assisted in this matter by legal representatives. For the sake of simplicity, reference to the Applicants will include their legal representatives. 6. The Applicants submit the following as alternative arguments in response to the FSP‟s decision:  The FSP‟s policy failed to clearly inform them that “flood” was excluded or the limitations of “flash flood” cover as required under Section 35 of the Insurance Contracts Act 1984 (the Act).  The damage was due to “Flash flood and stormwater run - off”, which is an insured event. In particular, the inundation was due to heavy rain that fell from 4.00am on 11 January 2011 which resulted in the Wivenhoe Dam operators elevating their strategy to W4. This decision resulted in massive discharges of water into the Brisbane River that ultimately inundated their property. Determination Case No: 261100 Determination Page 2 of 12 Summary of FSP’s position 7. In response to the Applicants‟ arguments, the FSP submits that:  It is not in dispute that the Applicants were supplied with a copy of the Product Disclosure Statement (PDS) prior to the claim. This document served to “clearly inform” them about the limitations of the policy. The policy structure and layout of the PDS enables the FSP to rely on the exclusion clause of “flood” pursuant to Section 35(2) of the Act.  The cause of the loss was the flooding of the Brisbane River and this is an excluded event. 8. The FSP relies on a number hydrology reports authored by SC and the following policy provision s to deny the Applicants‟ claim : Page 4 of the Certificate of Insurance (COI) “ What optional covers are included and not included Home Contents ... Flood and storm surge not included not included...” Pages 10-12 of the PDS “ Words / terms with special meanings Word / term Meaning ... Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off. ... Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightning, heavy rain, hail or snow, but not continuous bad weather by itself. ...” Pages 17-18 of the PDS “ Insured events you are covered for Damage caused by weather... Case No: 261100 Determination Page 3 of 12 What is covered What is not covered Storm Loss or damage:  caused by rain, hail or snow after it has reached the ground... ... Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood... ...” Page 27 of the PDS “ Your home The most we will pay you for home claims What is covered What is not covered Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. ... ...” Page 32 of the PDS “ Your contents The most we will pay you for contents claims What is covered What is not covered ... ... Flash flood and stormwater run-off We will pay up to 50% of your contents sum insured or $25,000, whichever is higher, but not exceeding your contents sum insured. ... ...” Issues 9. Whether the Applicants were “clearly informed” about what the policy did and did not cover. 10. Whether the cause of the Applicants‟ loss was covered under the policy. Case No: 261100 Determination Page 4 of 12 Reasons for decision 11. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to FOS‟s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 12. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 13. It is appropriate to consider the issues under the various headings. Consideration of "Flood" Definition in PDS 14. It is not in dispute that the Applicants received a PDS, and an annual COI from the FSP. 15. The Applicants contend that the definition of flood is too broad, too difficult to comprehend and that the FSP has not met its obligations under Section 35 of the Act to “clearly inform” them of what is and is not covered under the policy. 16. The Panel has previou sly considered this issue for the FSP‟s policy. It is satisfied that the two events (“flood” and “flash flood and stormwater run - off”) can be distinguished. 17. The Applicants have raised issue with the placing of definitions throughout the policy and the diff iculty a “reasonable person” would have in evaluating it. The Panel is satisfied that the PDS should be read in its entirety and that (should this be done) the interpretation of same should not be difficult for a “reasonable person”. 18. The PDS has an index on the inside cover which highlights the areas of the policy to which the policyholder might find information. Included in this is “Words/terms with special meanings” on page 9, for which definitions of relevant terms in the policy are provided. Flood is included in this on page 10, together with the qualification that: “... This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. ” 19. In addition to this, page 53 directs the reader to “Flood and storm surge”, whic h is explained under the broader definition of “Optional covers for extra peace of mind”. This section explains that: “... This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. ” Case No: 261100 Determination Page 5 of 12 20. No cover was optioned by th e Applicants for “Flood and storm surge” protection which is reflected in the COI. Therefore they did not have the general “flood” cover available under the policy. 21. Accordingly, the Panel is satisfied that the FSP has satisfactorily defined the events in the policy as required under Section 35 of the Act and that it is entitled to rely upon same in determining if the policy responds to the Applicants‟ loss. Water Inundation The Evidence 22. The Panel accepts that the FSP‟s policy does not extend cover to circumstances where a loss is caused by a flood. The policy also distinguishes between flood, flash flood and stormwater run-off (the latter two of which are covered). It extends cover to damage from sudden flood events “caused by heavy rain that fell no more than 24 hours prior” to the flash flood. 23. The Applicants were not at the property when it was inundated. They evacuated sometime after 3.00pm on 11 January 2011 and note that a neighbour recorded 19½ inches of rain that morning. The home was situated in fairly close proximity to the Brisbane River (albeit at a higher level) and the Applicants did not return until around 5.30am on 12 January 2011. In addition lightning strikes in the area had knocked down power lines. 24. After the lodgement of the claim, the FSP appointed a loss adjuster (MY) to investigate and report on the damage caused to the Applicants ‟ property. The report estimated that there was about $150,000 worth of building damage and $106,000 of contents damage. 25. MY considered that the cause of the loss was “storm” and that this related to an inundation by “rainwater” as a result of “flood and lightening strike”. 26. The FSP subsequently engaged a hydrologist, SC, to provide a report as to the damage. SC provided a statutory declaration dated 25 November 2011 to evaluate the cause of the loss in the region surrounding and specifically affecting the Applicants ‟ home. He found that:  The subject property was a rural dwelling located approximately 3km from Lowood. Rainfall recorded in this area could be considered generally representative of that which fell at the property.  Heavy rainfall fell between 4.00am and 1.00pm on 11 January 2011. The intensity of this rainfall was “sufficient to cause localised flash flooding or stormwater damage to some properti es”. However, he did not believe that the Applicants‟ property was affected by this. Case No: 261100 Determination Page 6 of 12  The Brisbane River at Lowood peaked shortly after midnight on 12 January 2011. This was just after the peak release from the Wivenhoe Dam and implies that the two were linked.  The terrain data for the Applicants‟ home shows that the property varies between 24m AHD (Australian Height Datum) and 46m AHD. The home building is situated at about 44m AHD, with the northern patio level elevated by about 0.1m.  There is a gully to the southwest of the property, which is situated at the base of a series of hills. Drainage channels are present on both sides of the main road through the area. A local water catchment is located southeast of the home and any run-off from this area is diverted away from the property and ultimately into the Brisbane River.  It is unlikely that the Applicants would have experienced significant stormwater or run-off problems during the period.  Inundation from stormwater run- off requires “intense levels of rain” which is sufficient to overcome the stormwater drainage system. Any such run- off generally occurs during or very shortly after such an intense period of rainfall.  A review of the rainwater gauge at Lowood, approximately 1.3km from the Applicants‟ property and representative of its rainfall in the expert‟s opinion, revealed that 113mm of rain fell over 9 and 10 January 2011, with a further 342mm falling on 11 January 2011, the majority of which was between 6.00am and 3.00pm. The most intense rainfall on 11 January 2011 fell between 8.00am and 9.00am when 54mm was recorded. A further 53mm was recorded between 1.00pm and 2.00pm.  The overall intensity of the rainfall was high throughout 11 January 2011, particularly between the aforementioned times. Notwithstanding this, the high rainfall intensity was not responsible for the inundation of the home due to the terrain allowing for run-off to drain into the Brisbane River and the fact that the home had not been inundated at or around the time of the most intense rainfall.  The rising water levels of the Brisbane River and backflow from the river through the gully near the property would have been sufficient to inundate the home from about 6.30pm on 11 January 2011.  The Applicants‟ property was inundated by backflow and overflow from the Brisbane River and not stormwater run-off or flash flooding (as defined in the policy). 27. As a result of the report from SC, the FSP denied the claim on the basis that it considered the cause of the loss to be flooding from the Brisbane River. 28. The extremely high rainfall figures and admission from SC that “localised flash flooding” occurred, invites the prospect that the Applicants may have Case No: 261100 Determination Page 7 of 12 suffered some stormwater inundation prior to any flooding from the Brisbane River. This is despite the consideration from SC that it did not happen. However, for reasons outlined below, the Panel does not intend to pursue this line of reasoning. 29. The Applicants have further suggested that the releases of water from the Wivenhoe Dam on 11 January 2011 were a significant factor in the increased water levels in the Brisbane River and that this was a major influence in the inundation of the Applicants‟ home. Releases from Wivenhoe Dam & Proximate Cause 30. The central issue for Determination in this dispute is whether the inundation of the Applicants‟ home on 11 January 2011 was due to flash flood as defined within the terms of the policy, that is whether rain that fell no more than 24 hours prior to the inu ndation of the Applicants‟ property was the proximate cause of the inundation. 31. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders advising that after considerable deliberation of all material available to it, the Panel formed a view that the heavy rain occurring from approximately 4.00am on 11 January 2011 and in particular the heavy rain between 4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4 strategy being invoked and therefore a proximate cause or trigger that led to the flooding of many of the properties along the Brisbane River. 32. At that time, the Panel noted that in relation to the approach that each dispute would depend upon the individual and unique factors relevant to the dispute and in that regard the parties were invited to make further submissions in relation to disputes before FOS. 33. In view of this, the FSP provided detailed further submissions to FOS in relation to this dispute. Included with the submissions were the following documents:  Reference documents for disputes relating to Queensland Floods (this is a general reference document) relating to the various submissions the FSP makes in relation to a number of issues. Not all issues raised in the reference document appear in the current dispute;  Letter fro m the FSP‟s hydrologist attaching a key information sheet for the Applicants‟ property;  Hydrologist report “Investigations of January 2011 inundation event – Brisbane”;  Further statement from SC. 34. In summary the FSP argues that the proximate cause of the inundation of the properties, that is the real or effective cause of the damage caused to the properties downstream of the dam, was the cumulative effect of the heavy rainfall that commenced on 9 January 2011 (or earlier) and not simply the rain that occurred from 4.00am on 11 January 2011. Case No: 261100 Determination Page 8 of 12 35. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment area and in fact parts of the Brisbane River from approximately 4.00am on 11 January 2011. 36. The FSP‟s hydrologist has relied on data from SEQWater d ated 2 March 2011 which confirms the rapid increase in releases from the Wivenhoe Dam from 8.00am on 11 January 2011. Examination of the SEQWater report identifies the rapid increase in the inflows to the Wivenhoe Dam commencing from about 4.00am, 11 Janua ry 2011. The report confirms the inflows into the dam had been decreasing from as early as 8.00am from 10 January 2011 with steady decreases from approximately 3.00pm on 10 January 2011 to 2.00am on 11 January 2011. 37. The Queensland Flood Commission of Inquiry report confirms that prior to 4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011 the dam releases were being managed at the W3 strategy. Whilst it is accepted that the W3 strategy had led to an increase in the levels of the Brisbane River, the W3 strategy was designed to avoid where possible inundation of the properties below the Wivenhoe Dam by flooding from the Brisbane River. 38. There is no dispute that there were two significant rainfall spikes with rain that fell from 9 to 10 January 2011 being considered the first spike and rain that commenced falling from approximately 4.00am on 11 January 2011 being the second spike. 39. There is no dispute that following the second spike that the W4 strategy was adopted. The FSP has argued that the switch to strategy W4 was not the natural and ordinary consequence of the rain that fell and in fact the move to W4 strategy was not taken in accordance with the Wivenhoe Dam manual. In the Panel‟s view, the Queensland Flood Commission of Inquiry‟s final report does not find the adoption of W4 strategy at 8.00am on 11 January 2011 was inconsistent with the manual. Although there may be issues as to how the Wivenhoe Dam had been managed prior to this time, there is nothing in the material that has bee n provided to the Panel to suggest that the earlier management of the Wivenhoe Dam influenced to any significant degree, the adoption of the W4 release strategy at 8.00am on 11 January 2011. 40. The ICA hydrology and the information provided by the FSP‟s hydro logist confirms that the increased releases from the Wivenhoe Dam after the adoption of the W4 strategy led to the development of a flood wave that ultimately caused the flooding of many properties downstream of the Wivenhoe Dam. 41. In determining the proximate cause of the inundation it is necessary to look at the effective or dominant cause of the inundation. The Panel agrees with the FSP‟s general submission that the proximate cause is a cause determined by common sense evaluation of the relevant facts. In the event that there are two or more proximate causes, one within the policy and the other excluded, the policy does not respond. The proximate cause is not Case No: 261100 Determination Page 9 of 12 determined by identifying the last event or final trigger but by determining what is the dominant, effective, direct or efficient cause of the loss. 42. The FSP has maintained that the impact on the Wivenhoe Dam from the rainfall that fell in the early hours of 11 January 2011 was only 29% while 71% of the volume of the inflow came from the rain that fell o n 9 and 10 January 2011 or earlier. The FSP maintains that to find the rainfall which had fallen from 4.00am on 11 January 2011 is the proximate cause is without foundation as such an approach produces an entirely artificial outcome. 43. With due respect to th e FSP‟s argument the Panel disagrees. Whilst the Panel accepts there has been a significant impact on the levels of the Wivenhoe Dam by the rainfall that commenced falling on or about 9 January 2011 or earlier, the Panel is satisfied having regard to the i nformation that has been exchanged and the relevant legal principles, that the heavy rain that commenced falling on or about 4.00am on 11 January 2011 was a proximate or effective cause of the adoption of the W4 strategy. 44. The Panel is also satisfied that whilst the level of the Brisbane River may have been increasing under the W3 strategy, it was the heavy rainfall from approximately 4.00am on 11 January 2011 that caused the need to adopt the W4 strategy at 8.00am on the same day. The Applicants’ Inundati on 45. To assist in determining the extent and timing of the inundation the Panel Chair Ombudsman conducted a site inspection of the property with the Applicants and the FSP‟s representative on 4 October 2011. 46. The Applicants did not dispute the assessor ‟ s comments that the house was subject to inundation for a period of nine to 10 hours. The Applicants identified the level of inundation at 1.2m above floor. It did not go above the height of the kitchen bench. The inundation caused damage to the concrete slab veranda floor and cracking of the walls of the main residence. 47. The property included a granny flat, numerous sheds and fences. All were significantly damaged in the floods. She could not say at what time the water reached this peak level as she left the property around 3.00pm 11 January 2012. 48. At the time there were also lightning strikes that caused electrical damage. This damage has been covered by the FSP. 49. SC‟s statement of 7 June 2012 indicates the effect of the W4 releases first reached the vicinity of th e Applicants‟ property at 8.17am on 11 January 2011. He estimated that the actual property was first inundated by the Brisbane River at 4.40pm on 11 January 2011. The river, swollen by the W4 releases, peaked at approximately 45.9m AHD and given the releva nt benchmark level was RL 44.1 AHD (represented by a slab on ground for a bungalow style residence), the peak inundation of the property was 1.8 metres above benchmark. In reaching this conclusion, SC abandons an Case No: 261100 Determination Page 10 of 12 earlier site report carried out by his company on the grounds this report: „(contains) further analysis (which) is a more accurate representation of Brisbane River levels in the vicinity of the subject property‟. 50. The relevant benchmark level was SC‟s estimate of the lowest point of the bungalow/granny flat. This evidence has not been refuted by the Applicants in any manner and was supported by the site inspection. The Panel accepts the relevant benchmark level is the floor of the bungalow/granny flat. The Panel notes that the ultimate inundation of the property was 1.8m above the benchmark level and this peak inundation occurred before 4.00am on 12 January 2011. 51. Although the Panel accepts the possibility that these assessments may not be entirely accurate, the assessments are consistent with the Applicants comments. In the circumstances the Panel is satisfied that the assessment represent an accurate view as to the timing and cause of inundation of the Applicants property. 52. The FSP ‟ s hydrologist has speculated that if the W3 strategy had been maintained, then, according to the key conclusion statement, the property would not have been inundated. 53. The Panel is of the view that this evidence strengthens the argument that the cause of the inundation of the home was the W4 release, which occurred as a direct result of the heavy rainfall that occurred on 11 January 2011. 54. To this extent, the Panel is satisfied that the inundation of the Applicants‟ property to the level of 1.8m above benchmark level was caused by flood that occurred within 24 hours of the heavy rainfall. Quantum 55. The Renewal Certificate of Insurance for the relevant period provides a sum insured of $622,000 for the home with contents of $110,975. Pursuant to the policy cap for the insured event of “Flash flood and stormwater runoff”, the FSP is liable up to an amount of $311,000 for the damage to the building and $55,487.50 for the contents. 56. Based on the information that is currently available the Panel is unable to determine the likely cost of repairs to the building or replacement of the contents lost. 57. Given this the Panel asks that the parties agree to a scope of work being conducted by the FSP to determine the extent of damage to the building and an assessment performed as to the damage to contents. 58. The Applicants and the FSP are asked to work cooperatively together to establish the extent of the loss sustained and to reach an agreement as to cost of repairs and replacement of the various contents lost. In the event that the parties are unable to reach agreement as to the cost of repair and Case No: 261100 Determination Page 11 of 12 replacement of the items lost the parties may make further submissions to the Panel and the Panel will determine the quantum in dispute. 59. The Panel has also considered the issue of interest. 60. The FSP has argued that interest is only payable from the date from which it was unreasonable to withhold payment. The FSP maintains that it is entitled to a reasonable period to investigate and determine its position, and given the complex nature of the flood disputes, the delays are not unreasonable. Further complex situations require substantial periods of time for independent bodies such as the Queensland Flood Commission of Inquiry and FOS, to make conclusions on the issues in dispute. 61. The FSP maintains that it did not act unreasonably in this dispute and therefore interest is not payable. Alternatively if some period of interest is to be awarded it should be reduced to account for the substantial delays through the course of the process which were not the FSP‟s fault. 62. Section 57 of the Insurance Contracts Act requires interest be paid when it becomes “unreasonable for the insurer to have withheld payment”. An examination of relevant case law indicates that most probably, interest will be awarded from either when an insurer first emphatically denied liability or disputed a matter, or from when in the normal course of events the claim should have been paid if liability had not been disputed. 63. In this dispute the Panel accepts that the FSP was entitled to withhold payment of the settlement monies until such time as it had properly investigated the dispute and made its decision as to liability. 64. The FSP made its original decision to deny the claim after receiving relevant assessment reports, hydrology reports and other information. The FSP was aware of the terms of its policy and aware of the relevant provisions under which liability might arise and chose to deny the claim having reviewed those relevant provisions and the evidence available to it. 65. In the Panel‟s view, at that point the FSP has made its decision on the claim and it is appropriate that from that time interest be paid unless it can be established that the Applicants had withheld information from the FSP that would have led to an alteration of its decision. 66. Accordingly, the Panel determines that it is appropriate that the FSP in this dispute pay interest from the day upon which the FSP determined to deny liability of the Applicants‟ claim, until payment of the claim. 67. Insofar as the FSP may have made payment of a compassionate sum to the Applicants, FOS does not have jurisdiction to deal with this payment but acknowledges that the FSP, given the terms on which the compassionate payment was made, may be entitled to deduct this payment from any settlement sum. Case No: 261100 Determination Page 12 of 12 Determination 68. The FSP is to meet the cost of repairs incurred by the Applicants and the cost of the replacement of items damaged as a result of the inundation of the property to a height of 1.8 metres above benchmark level subject to the limitations within the terms of the policy. 69. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from 3 June 2011 (being the date of rejection of the claim) to date of payment of the claim, in accordance with Section 57 of the Act.