Home / Financial Firm (Unknown - Insurer) / Determination 261100
Determination 261100
claim_denial
Summary
The FSP denied a home inundation claim from the January 2011 Queensland floods as excluded flood. AFCA found the damage was caused by flash flood within the policy and ordered the FSP to meet repair and contents costs, with interest from the denial date, quantum to be agreed.
Proximate cause is the dominant, effective cause, and the Brisbane River inundation was held to be flash flood within 24 hours of the heavy rainfall, which the policy covers.
Issues
- Claim denial primary · upheld“the inundation of the Applicants' property ... was caused by flood that occurred within 24 hours of the heavy rainfall”
- Failure to disclose secondary · not upheld“the Panel is satisfied that the FSP has satisfactorily defined the events in the policy as required under Section 35”
- Product terms interpretation secondary · not upheld“the two events ('flood' and 'flash flood and stormwater run-off') can be distinguished”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 261100 Determination Page 1 of 12
Case number: 261100
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Inundation - Policy Interpretation - Flood vs Flash Flood
11 October 2012
Background
1. The Applicants insured their home and contents with the Financial Services
Provider (FSP). The relevant period of insurance operated for twelve months
beginning from 23 March 2010. During this period, the building was insured
up to a sum of $622,000 and the contents for $110,975.
2. On 11 January 2011, the Applicants‟ home in Vernor was subject to
extensive water inundation following severe weather events in Queensland.
3. The FSP denied the claim on the basis the damage was due to “flood”. The
Applicants, have disputed this.
4. The Applicants and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will only briefly summarise
these submissions given all of the material made available has been
exchanged with the other party.
Summary of Applicants ’ position
5. The Applicants are assisted in this matter by legal representatives. For the
sake of simplicity, reference to the Applicants will include their legal
representatives.
6. The Applicants submit the following as alternative arguments in response to
the FSP‟s decision:
The FSP‟s policy failed to clearly inform them that “flood” was excluded
or the limitations of “flash flood” cover as required under Section 35 of
the Insurance Contracts Act 1984 (the Act).
The damage was due to “Flash flood and stormwater run - off”, which is
an insured event. In particular, the inundation was due to heavy rain
that fell from 4.00am on 11 January 2011 which resulted in the
Wivenhoe Dam operators elevating their strategy to W4. This decision
resulted in massive discharges of water into the Brisbane River that
ultimately inundated their property.
Determination
Case No: 261100 Determination Page 2 of 12
Summary of FSP’s position
7. In response to the Applicants‟ arguments, the FSP submits that:
It is not in dispute that the Applicants were supplied with a copy of the
Product Disclosure Statement (PDS) prior to the claim. This document
served to “clearly inform” them about the limitations of the policy. The
policy structure and layout of the PDS enables the FSP to rely on the
exclusion clause of “flood” pursuant to Section 35(2) of the Act.
The cause of the loss was the flooding of the Brisbane River and this is
an excluded event.
8. The FSP relies on a number hydrology reports authored by SC and the
following policy provision s to deny the Applicants‟ claim :
Page 4 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
Pages 10-12 of the PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off.
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightning, heavy
rain, hail or snow, but not continuous bad weather by
itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
Case No: 261100 Determination Page 3 of 12
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run - off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...”
Page 32 of the PDS
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater run-off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher, but not exceeding your contents
sum insured.
...
...”
Issues
9. Whether the Applicants were “clearly informed” about what the policy did and
did not cover.
10. Whether the cause of the Applicants‟ loss was covered under the policy.
Case No: 261100 Determination Page 4 of 12
Reasons for decision
11. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‟s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
12. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
13. It is appropriate to consider the issues under the various headings.
Consideration of "Flood" Definition in PDS
14. It is not in dispute that the Applicants received a PDS, and an annual COI
from the FSP.
15. The Applicants contend that the definition of flood is too broad, too difficult to
comprehend and that the FSP has not met its obligations under Section 35
of the Act to “clearly inform” them of what is and is not covered under the
policy.
16. The Panel has previou sly considered this issue for the FSP‟s policy. It is
satisfied that the two events (“flood” and “flash flood and stormwater run - off”)
can be distinguished.
17. The Applicants have raised issue with the placing of definitions throughout
the policy and the diff iculty a “reasonable person” would have in evaluating
it. The Panel is satisfied that the PDS should be read in its entirety and that
(should this be done) the interpretation of same should not be difficult for a
“reasonable person”.
18. The PDS has an index on the inside cover which highlights the areas of the
policy to which the policyholder might find information. Included in this is
“Words/terms with special meanings” on page 9, for which definitions of
relevant terms in the policy are provided. Flood is included in this on page
10, together with the qualification that:
“... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance. ”
19. In addition to this, page 53 directs the reader to “Flood and storm surge”,
whic h is explained under the broader definition of “Optional covers for extra
peace of mind”. This section explains that:
“... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance. ”
Case No: 261100 Determination Page 5 of 12
20. No cover was optioned by th e Applicants for “Flood and storm surge”
protection which is reflected in the COI. Therefore they did not have the
general “flood” cover available under the policy.
21. Accordingly, the Panel is satisfied that the FSP has satisfactorily defined the
events in the policy as required under Section 35 of the Act and that it is
entitled to rely upon same in determining if the policy responds to the
Applicants‟ loss.
Water Inundation
The Evidence
22. The Panel accepts that the FSP‟s policy does not extend cover to
circumstances where a loss is caused by a flood. The policy also
distinguishes between flood, flash flood and stormwater run-off (the latter
two of which are covered). It extends cover to damage from sudden flood
events “caused by heavy rain that fell no more than 24 hours prior” to the
flash flood.
23. The Applicants were not at the property when it was inundated. They
evacuated sometime after 3.00pm on 11 January 2011 and note that a
neighbour recorded 19½ inches of rain that morning. The home was situated
in fairly close proximity to the Brisbane River (albeit at a higher level) and the
Applicants did not return until around 5.30am on 12 January 2011. In
addition lightning strikes in the area had knocked down power lines.
24. After the lodgement of the claim, the FSP appointed a loss adjuster (MY) to
investigate and report on the damage caused to the Applicants ‟ property.
The report estimated that there was about $150,000 worth of building
damage and $106,000 of contents damage.
25. MY considered that the cause of the loss was “storm” and that this related to
an inundation by “rainwater” as a result of “flood and lightening strike”.
26. The FSP subsequently engaged a hydrologist, SC, to provide a report as to
the damage. SC provided a statutory declaration dated 25 November 2011
to evaluate the cause of the loss in the region surrounding and specifically
affecting the Applicants ‟ home. He found that:
The subject property was a rural dwelling located approximately 3km
from Lowood. Rainfall recorded in this area could be considered
generally representative of that which fell at the property.
Heavy rainfall fell between 4.00am and 1.00pm on 11 January 2011. The
intensity of this rainfall was “sufficient to cause localised flash flooding or
stormwater damage to some properti es”. However, he did not believe
that the Applicants‟ property was affected by this.
Case No: 261100 Determination Page 6 of 12
The Brisbane River at Lowood peaked shortly after midnight on 12
January 2011. This was just after the peak release from the Wivenhoe
Dam and implies that the two were linked.
The terrain data for the Applicants‟ home shows that the property varies
between 24m AHD (Australian Height Datum) and 46m AHD. The home
building is situated at about 44m AHD, with the northern patio level
elevated by about 0.1m.
There is a gully to the southwest of the property, which is situated at the
base of a series of hills. Drainage channels are present on both sides of
the main road through the area. A local water catchment is located
southeast of the home and any run-off from this area is diverted away
from the property and ultimately into the Brisbane River.
It is unlikely that the Applicants would have experienced significant
stormwater or run-off problems during the period.
Inundation from stormwater run- off requires “intense levels of rain” which
is sufficient to overcome the stormwater drainage system. Any such run-
off generally occurs during or very shortly after such an intense period of
rainfall.
A review of the rainwater gauge at Lowood, approximately 1.3km from
the Applicants‟ property and representative of its rainfall in the expert‟s
opinion, revealed that 113mm of rain fell over 9 and 10 January 2011,
with a further 342mm falling on 11 January 2011, the majority of which
was between 6.00am and 3.00pm. The most intense rainfall on 11
January 2011 fell between 8.00am and 9.00am when 54mm was
recorded. A further 53mm was recorded between 1.00pm and 2.00pm.
The overall intensity of the rainfall was high throughout 11 January 2011,
particularly between the aforementioned times. Notwithstanding this, the
high rainfall intensity was not responsible for the inundation of the home
due to the terrain allowing for run-off to drain into the Brisbane River and
the fact that the home had not been inundated at or around the time of
the most intense rainfall.
The rising water levels of the Brisbane River and backflow from the river
through the gully near the property would have been sufficient to
inundate the home from about 6.30pm on 11 January 2011.
The Applicants‟ property was inundated by backflow and overflow from
the Brisbane River and not stormwater run-off or flash flooding (as
defined in the policy).
27. As a result of the report from SC, the FSP denied the claim on the basis that
it considered the cause of the loss to be flooding from the Brisbane River.
28. The extremely high rainfall figures and admission from SC that “localised
flash flooding” occurred, invites the prospect that the Applicants may have
Case No: 261100 Determination Page 7 of 12
suffered some stormwater inundation prior to any flooding from the Brisbane
River. This is despite the consideration from SC that it did not happen.
However, for reasons outlined below, the Panel does not intend to pursue
this line of reasoning.
29. The Applicants have further suggested that the releases of water from the
Wivenhoe Dam on 11 January 2011 were a significant factor in the
increased water levels in the Brisbane River and that this was a major
influence in the inundation of the Applicants‟ home.
Releases from Wivenhoe Dam & Proximate Cause
30. The central issue for Determination in this dispute is whether the inundation
of the Applicants‟ home on 11 January 2011 was due to flash flood as
defined within the terms of the policy, that is whether rain that fell no more
than 24 hours prior to the inu ndation of the Applicants‟ property was the
proximate cause of the inundation.
31. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
32. At that time, the Panel noted that in relation to the approach that each
dispute would depend upon the individual and unique factors relevant to the
dispute and in that regard the parties were invited to make further
submissions in relation to disputes before FOS.
33. In view of this, the FSP provided detailed further submissions to FOS in
relation to this dispute. Included with the submissions were the following
documents:
Reference documents for disputes relating to Queensland Floods (this
is a general reference document) relating to the various submissions
the FSP makes in relation to a number of issues. Not all issues raised
in the reference document appear in the current dispute;
Letter fro m the FSP‟s hydrologist attaching a key information sheet for
the Applicants‟ property;
Hydrologist report “Investigations of January 2011 inundation event –
Brisbane”;
Further statement from SC.
34. In summary the FSP argues that the proximate cause of the inundation of
the properties, that is the real or effective cause of the damage caused to the
properties downstream of the dam, was the cumulative effect of the heavy
rainfall that commenced on 9 January 2011 (or earlier) and not simply the
rain that occurred from 4.00am on 11 January 2011.
Case No: 261100 Determination Page 8 of 12
35. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment
area and in fact parts of the Brisbane River from approximately 4.00am on
11 January 2011.
36. The FSP‟s hydrologist has relied on data from SEQWater d ated 2 March
2011 which confirms the rapid increase in releases from the Wivenhoe Dam
from 8.00am on 11 January 2011. Examination of the SEQWater report
identifies the rapid increase in the inflows to the Wivenhoe Dam
commencing from about 4.00am, 11 Janua ry 2011. The report confirms the
inflows into the dam had been decreasing from as early as 8.00am from 10
January 2011 with steady decreases from approximately 3.00pm on 10
January 2011 to 2.00am on 11 January 2011.
37. The Queensland Flood Commission of Inquiry report confirms that prior to
4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011
the dam releases were being managed at the W3 strategy. Whilst it is
accepted that the W3 strategy had led to an increase in the levels of the
Brisbane River, the W3 strategy was designed to avoid where possible
inundation of the properties below the Wivenhoe Dam by flooding from the
Brisbane River.
38. There is no dispute that there were two significant rainfall spikes with rain
that fell from 9 to 10 January 2011 being considered the first spike and rain
that commenced falling from approximately 4.00am on 11 January 2011
being the second spike.
39. There is no dispute that following the second spike that the W4 strategy was
adopted. The FSP has argued that the switch to strategy W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
W4 strategy was not taken in accordance with the Wivenhoe Dam manual.
In the Panel‟s view, the Queensland Flood Commission of Inquiry‟s final
report does not find the adoption of W4 strategy at 8.00am on 11 January
2011 was inconsistent with the manual. Although there may be issues as to
how the Wivenhoe Dam had been managed prior to this time, there is
nothing in the material that has bee n provided to the Panel to suggest that
the earlier management of the Wivenhoe Dam influenced to any significant
degree, the adoption of the W4 release strategy at 8.00am on 11 January
2011.
40. The ICA hydrology and the information provided by the FSP‟s hydro logist
confirms that the increased releases from the Wivenhoe Dam after the
adoption of the W4 strategy led to the development of a flood wave that
ultimately caused the flooding of many properties downstream of the
Wivenhoe Dam.
41. In determining the proximate cause of the inundation it is necessary to look
at the effective or dominant cause of the inundation. The Panel agrees with
the FSP‟s general submission that the proximate cause is a cause
determined by common sense evaluation of the relevant facts. In the event
that there are two or more proximate causes, one within the policy and the
other excluded, the policy does not respond. The proximate cause is not
Case No: 261100 Determination Page 9 of 12
determined by identifying the last event or final trigger but by determining
what is the dominant, effective, direct or efficient cause of the loss.
42. The FSP has maintained that the impact on the Wivenhoe Dam from the
rainfall that fell in the early hours of 11 January 2011 was only 29% while
71% of the volume of the inflow came from the rain that fell o n 9 and 10
January 2011 or earlier. The FSP maintains that to find the rainfall which had
fallen from 4.00am on 11 January 2011 is the proximate cause is without
foundation as such an approach produces an entirely artificial outcome.
43. With due respect to th e FSP‟s argument the Panel disagrees. Whilst the
Panel accepts there has been a significant impact on the levels of the
Wivenhoe Dam by the rainfall that commenced falling on or about 9 January
2011 or earlier, the Panel is satisfied having regard to the i nformation that
has been exchanged and the relevant legal principles, that the heavy rain
that commenced falling on or about 4.00am on 11 January 2011 was a
proximate or effective cause of the adoption of the W4 strategy.
44. The Panel is also satisfied that whilst the level of the Brisbane River may
have been increasing under the W3 strategy, it was the heavy rainfall from
approximately 4.00am on 11 January 2011 that caused the need to adopt
the W4 strategy at 8.00am on the same day.
The Applicants’ Inundati on
45. To assist in determining the extent and timing of the inundation the Panel
Chair Ombudsman conducted a site inspection of the property with the
Applicants and the FSP‟s representative on 4 October 2011.
46. The Applicants did not dispute the assessor ‟ s comments that the house was
subject to inundation for a period of nine to 10 hours. The Applicants
identified the level of inundation at 1.2m above floor. It did not go above the
height of the kitchen bench. The inundation caused damage to the concrete
slab veranda floor and cracking of the walls of the main residence.
47. The property included a granny flat, numerous sheds and fences. All were
significantly damaged in the floods. She could not say at what time the water
reached this peak level as she left the property around 3.00pm 11 January
2012.
48. At the time there were also lightning strikes that caused electrical damage.
This damage has been covered by the FSP.
49. SC‟s statement of 7 June 2012 indicates the effect of the W4 releases first
reached the vicinity of th e Applicants‟ property at 8.17am on 11 January
2011. He estimated that the actual property was first inundated by the
Brisbane River at 4.40pm on 11 January 2011. The river, swollen by the W4
releases, peaked at approximately 45.9m AHD and given the releva nt
benchmark level was RL 44.1 AHD (represented by a slab on ground for a
bungalow style residence), the peak inundation of the property was 1.8
metres above benchmark. In reaching this conclusion, SC abandons an
Case No: 261100 Determination Page 10 of 12
earlier site report carried out by his company on the grounds this report:
„(contains) further analysis (which) is a more accurate representation of
Brisbane River levels in the vicinity of the subject property‟.
50. The relevant benchmark level was SC‟s estimate of the lowest point of the
bungalow/granny flat. This evidence has not been refuted by the Applicants
in any manner and was supported by the site inspection. The Panel accepts
the relevant benchmark level is the floor of the bungalow/granny flat. The
Panel notes that the ultimate inundation of the property was 1.8m above the
benchmark level and this peak inundation occurred before 4.00am on 12
January 2011.
51. Although the Panel accepts the possibility that these assessments may not
be entirely accurate, the assessments are consistent with the Applicants
comments. In the circumstances the Panel is satisfied that the assessment
represent an accurate view as to the timing and cause of inundation of the
Applicants property.
52. The FSP ‟ s hydrologist has speculated that if the W3 strategy had been
maintained, then, according to the key conclusion statement, the property
would not have been inundated.
53. The Panel is of the view that this evidence strengthens the argument that the
cause of the inundation of the home was the W4 release, which occurred as
a direct result of the heavy rainfall that occurred on 11 January 2011.
54. To this extent, the Panel is satisfied that the inundation of the Applicants‟
property to the level of 1.8m above benchmark level was caused by flood
that occurred within 24 hours of the heavy rainfall.
Quantum
55. The Renewal Certificate of Insurance for the relevant period provides a sum
insured of $622,000 for the home with contents of $110,975. Pursuant to the
policy cap for the insured event of “Flash flood and stormwater runoff”, the
FSP is liable up to an amount of $311,000 for the damage to the building
and $55,487.50 for the contents.
56. Based on the information that is currently available the Panel is unable to
determine the likely cost of repairs to the building or replacement of the
contents lost.
57. Given this the Panel asks that the parties agree to a scope of work being
conducted by the FSP to determine the extent of damage to the building and
an assessment performed as to the damage to contents.
58. The Applicants and the FSP are asked to work cooperatively together to
establish the extent of the loss sustained and to reach an agreement as to
cost of repairs and replacement of the various contents lost. In the event that
the parties are unable to reach agreement as to the cost of repair and
Case No: 261100 Determination Page 11 of 12
replacement of the items lost the parties may make further submissions to
the Panel and the Panel will determine the quantum in dispute.
59. The Panel has also considered the issue of interest.
60. The FSP has argued that interest is only payable from the date from which it
was unreasonable to withhold payment. The FSP maintains that it is entitled
to a reasonable period to investigate and determine its position, and given
the complex nature of the flood disputes, the delays are not unreasonable.
Further complex situations require substantial periods of time for
independent bodies such as the Queensland Flood Commission of Inquiry
and FOS, to make conclusions on the issues in dispute.
61. The FSP maintains that it did not act unreasonably in this dispute and
therefore interest is not payable. Alternatively if some period of interest is to
be awarded it should be reduced to account for the substantial delays
through the course of the process which were not the FSP‟s fault.
62. Section 57 of the Insurance Contracts Act requires interest be paid when it
becomes “unreasonable for the insurer to have withheld payment”. An
examination of relevant case law indicates that most probably, interest will
be awarded from either when an insurer first emphatically denied liability or
disputed a matter, or from when in the normal course of events the claim
should have been paid if liability had not been disputed.
63. In this dispute the Panel accepts that the FSP was entitled to withhold
payment of the settlement monies until such time as it had properly
investigated the dispute and made its decision as to liability.
64. The FSP made its original decision to deny the claim after receiving relevant
assessment reports, hydrology reports and other information. The FSP was
aware of the terms of its policy and aware of the relevant provisions under
which liability might arise and chose to deny the claim having reviewed those
relevant provisions and the evidence available to it.
65. In the Panel‟s view, at that point the FSP has made its decision on the claim
and it is appropriate that from that time interest be paid unless it can be
established that the Applicants had withheld information from the FSP that
would have led to an alteration of its decision.
66. Accordingly, the Panel determines that it is appropriate that the FSP in this
dispute pay interest from the day upon which the FSP determined to deny
liability of the Applicants‟ claim, until payment of the claim.
67. Insofar as the FSP may have made payment of a compassionate sum to the
Applicants, FOS does not have jurisdiction to deal with this payment but
acknowledges that the FSP, given the terms on which the compassionate
payment was made, may be entitled to deduct this payment from any
settlement sum.
Case No: 261100 Determination Page 12 of 12
Determination
68. The FSP is to meet the cost of repairs incurred by the Applicants and the
cost of the replacement of items damaged as a result of the inundation of the
property to a height of 1.8 metres above benchmark level subject to the
limitations within the terms of the policy.
69. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from
3 June 2011 (being the date of rejection of the claim) to date of payment of
the claim, in accordance with Section 57 of the Act.