Home / Financial Firm (Unknown - Insurer) / Determination 260849

Determination 260849

Denial of February 2011 water inundation claim under flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-08-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Owner's home was inundated in February 2011 after severe storms and the FSP denied the claim as flood damage excluded by the policy. AFCA found the water overflowing a stormwater channel because pipes could not cope was flood, and that the FSP was entitled to deny liability. Its earlier 2005 claim payment did not change this.

Water overflowing from a watercourse or channel is flood under the policy definition, and the FSP met its onus to prove the exclusion applies.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 260849 Determination Page 1 of 6 Case number: 260849 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim-Exclusion/ condition - Flood 15 August 2012 Background 1. On 11 February 2011 the Applicant‟s home was inundated with water following severe storms in the area. 2. The Financial Services Provider (FSP) denied liability for a claim under the Applicant‟s home building and home contents insurance policies on the ground the damage was caused by flood water which travelled down a tributary of Bowna Creek and water which overflowed the drain pipes under Adams Road and as such was excluded from cover provided by the policy. Summary of Applicant’s position 3. The Applicant states:  Pipes under Adams Street are designed for a low flow rate. Higher volumes of water which the channel cannot cope with, cross the road.  The hydrologist's report is therefore inaccurate and misleading in this respect. Water crossing the road does not fall within the definition of flood.  The hydrologist‟s report stating flooding has occurred at this intersection in 2003, is misleading as the previous major event occurred in 2005. Depending on the definition of flood water has crossed the road many times since 1996 when the house was built.  The tributary channel south of Adams Road referred to by the hydrologist is principally a drain where all water must flow when required. The implication that as soon as water is in this drain is considered a flood is misleading.  At the time of the February 2011 event, this drain to the south was not overflowing into other houses along its path.  The drain running alongside his property was not full or overflowing.  The home was inundated because 20 metres of drainage channel could not cope with the minimum standard as it was poorly designed and constructed. It is planned to be rectified this year. Determination Case No: 260849 Determination Page 2 of 6  The assessor advised that he could not see why the claim should not be paid given that a similar event was covered in 2005.  The definition of „flood‟ is complex as evidenced by the complicated and unnecessary jargon.  The hydrologist relies on data obtained from the nearest official weather station. However, this data is not indicative of the weather in the area of his home.  On 11 February a band of heavy rain passed over the watercourse catchment at 14:40 travelling in a northerly direction. It talks about 2 hours for a storm surge to come down the watercourse. His home was inundated at about 17:00.  As such, the inundation of his home was caused by a heavy fall of rain which is covered by the policy. The storm which occurred that afternoon caused a surge, which was more than the waterway next to his house could cope with.  Given that the FSP paid for a claim following a similar event in 2005, he believed he was covered if a similar event occurred.  Had he been informed he would not be covered he would have taken out additional cover for flood or alternatively sought insurance cover from another insurer. Summary of FSP’s position 4. The FSP relies substantially on a hydrologist report commissioned by it. 5. The FSP states:  The water inundation of the Applicant‟s home was due to the overflow of the Bowna Creek tributary or in the alternative was caused by Bowna Creek floodwater mixed with water overflow from a stormwater drain.  Even if it was accepted that stormwater runoff from the drainage system contributed to the water inundation, then based on the definition of „flood‟ and the legal principle set out in Hams v CGU Insurance Ltd (2002) ANZ Insurance Cases 61-525 (Wayne Tank principle), it would be entitled to refuse the claim.  the Applicant‟s claim in 2005 arising from similar circumstances was accepted. The decision to decline that claim was overturned as the FSP could not conclusively verify that the water inundation was floodwater. In this matter the expert report clearly and unambiguously states the inundation was a result of floodwater. 6. The FSP relies on the following policy terms: “ What you are covered for – insured events Yes Case No: 260849 Determination Page 3 of 6 Storm and rainwater including stormwater runoff surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. ... No Damage or loss caused by flood . Flood means the inundation of normally dry land by water which: escapes or overflows from, cannot enter, because it is full or has overflowed, or is prevented from entering because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. Flood does not mean stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface.” Issues 7. Whether the FSP was entitled to deny liability for the claim. Reasons for decision 8. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 9. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. 10. Prior to arriving at a determination, I have read and considered all the material submitted by the parties to FOS. 11. The FSP seeks to rely on a clause in the policy to deny the claim and therefore has the burden of establishing on the balance of probabilities that the terms of the relevant clause apply to defeat the claim. Expert report 12. The FSP commissioned an engineer to report on the cause of the inundation of the Applicant‟s home. The report dat ed 20 September 2011 contains the following relevant information: Case No: 260849 Determination Page 4 of 6  A tributary of Bowna Creek flows south to north between the Applicant‟s home and Watsons Street.  The rear of the house is about 150mm above ground level.  The floor level is about 650mm above road level.  Council advised it had altered the tributary of Bowna Creek to pipe it under Adams Street. The design allowed water to overflow the road at times of flood.  It is only when the tributary of the Bowna Creek is in flood that water would flow over the road.  The tributary channel south of Adams road is the overland flow path for major storm events and therefore is a floodway channel. The runoff through the channel is therefore considered flood. The engineer concluded: “The writer is of the opinion that riverine flooding due to the tributary of the Bowna Creek overflowing and the drainage pipes under Adams Street not being able to effectively drain the volume of water from the rainfall, and that the subject property was inundated to a depth of approximately 200mm above ground level and approximately 10mm above the flo or level of the house.” 13. Photographs included in the engineer‟s report have been helpful in understanding the configuration of the Bona Creek tributary and Adams Street junction. Consideration of the evidence 14. Photograph No 7 shows the creek drainage channel on the south side of Adams Street. Photograph No 12 shows the concrete culvert on the north side of Adams Street. It is clear from these photographs that the channel is purpose built to carry water and as such is a watercourse. 15. I do not accept in the context of an insurance claim, the engineer‟s comment that as the tributary channel on the south side of Adams Street is a floodway channel, runoff through the channel is floodwater. 16. Insurance policies generally define the meaning of „flood‟ and for the purpose of an insurance claim it has that meaning. In this matter the FSP defined „flood‟ as stated in paragraph 6, above. Hence for the water which entered the Applicant‟s home to be deemed flood water it must fall within that definition. 17. „F lood ‟ as defined by the policy principally means water covering normally dry land from a number of sources. Water contained in a channel designed to take water which overflows from another water course is not water which has covered normally dry land. It does not satisfy the policy definition until such time as the water overflows from the channel onto normally dry land. 18. However, the Appl icant‟s photographs show the level and extent of water at the time of the flood. These photos are taken looking north at the Applicant‟s Case No: 260849 Determination Page 5 of 6 property, looking south at the drainage channel and looking east at the concrete drain. 19. In each photograph a large expanse of water is clearly seen covering the ground area in each direction. In photograph No 2 water is seen overflowing into what appears to be the concrete drain. Looking at photo No1 the water can be seen at the perimeter of the Applicant‟s property and diverging to the right side past the property. 20. The photographs give weight to the view that the channel has overflowed at or before the junction with Adams Street due to the inability of the pipe system to cope with the volume. 21. The Applicant contends the heavy band of rain which passed over the watercourse catchment area at 14:40 was responsible for the surge which entered the channel, to argue the loss was caused by a heavy fall of rain and therefore covered. However, rainwater which enters a watercourse is no longer rainwater or surface runoff rainwater. It becomes water which is determined by the nature of the watercourse such as river water or creek water. 22. Hence, even if the rain which fell over the catchment was the only cause for water to be in the channel, the water once in the channel cannot be deemed to be rainwater at that time. 23. The engineer refers to rainfall data recorded at Albury for the period from 9 February to 14 February and concludes the rainfall on 11 and 12 February was sufficient to cause the flooding. 24. The engineer does not provide any information in relation to Bona Creek peak levels or whether Bona Creek overflowed and at what time this occurred. His focus was on the effect of the rainfall on the Bona Creek tributary noting it was only when the Bona Creek tributary was in flood that water would flow over the road. This overflow was largely attributed to the inability of the pipes beneath the roadway to effectively drain the volume of water. 25. The policy provides that flood means water which escapes or overflows from the normal confines of any channel. It does not mean water escaping from any pipe. 26. The question then arises as to whether the overflow from the tributary due to the inability of the pipes to cope with the high volume of water falls within the cover provided by the policy. 27. “Escape‟ as defined (in part) by Macquarie Dictionary means “to issue from a confined enclosure, as in fluid”. Hence , in order for the water to have escaped from the pipe it must first have entered or come from the pipe. It does not mean water which could not enter the pipe. On the other hand the policy clearly states that water which overflows from a watercourse or channel is flood water. Case No: 260849 Determination Page 6 of 6 28. As the water overflowed from a stormwater channel because it could not flow through the pipe system, it follows that the water which subsequently entered the Applicant‟s ho me was flood water as defined by the policy. 29. For these reasons, I consider the FSP has discharged the onus that rests with it to show the claim does not succeed. Previous claim 30. Each claim must be considered on the information available at the time. 31. According to the FSP the claim made by the Applicant in 2005 was paid as the FSP could not establish that the water inundation of the property was a result of flood water. 32. As such, the FSP's decision to accept the 2005 claim was not based on the damage having been caused by flood water. 33. In these circumstances I consider the FSP may rely on the evidence obtained by it to make an informed decision in relation to the 2011 water damage claim. Determination 34. On the basis of the available information I determine the FSP was entitled to deny liability for the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.