Determination 260840

Storm damage claim partly denied for subsidence, restumping and other items

FirmFinancial Firm (Unknown - Insurer)
Decided2012-03-05
ProductGeneral Insurance · Landlord
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed$61,784
SourceAFCA PDF

Summary

The FSP partly denied a storm and stormwater runoff claim for a landlord property, citing subsidence and structural exclusions. AFCA found most of the denied items were covered and ordered the FSP to indemnify the loss by repair, but rejected cash settlement at the Applicant's builder's quote.

Subsidence caused by stormwater runoff from an insured storm is covered, and the subsidence and faulty design exclusions did not defeat the claim on the expert evidence.

Issues

Subjects and remedies

home or building damagenatural disasterpay interestrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 260840 Determination Page 1 of 8 Case number: 260840 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount 24 February 2012 Background 1. The Applicant held a landlord insurance policy with the Financial Services Provider (FSP) from 5 May 2010 and the policy was current at the time of the loss. 2. The Applicant lodged a claim with the FSP for damage sustained to the property as a result of a storm and subsequent stormwater runoff. 3. The FSP assessed the claim, accepted parts of the claim and denied other parts of the claim on the grounds that the policy excluded cover for damage caused by subsidence and structural issues of the building. 4. The Applicant believes the damage to the property was caused by an insured event and expects the FSP to reinstate the property to its pre-loss condition. Summary of Applicant’s position 5. The Applicant believes the damage to the property was caused by the storm and all parts of the claim should be accepted by the FSP. 6. He does not consider the property could be repaired to its pre-loss condition with the FSP‟s offer of settlement of $14,520.52 and says the quote by his builder (P) appears to be comprehensive amounting to $61,784. 7. The property was rented for $240 per week prior to the loss. The condition of the house passed the initial inspections, was neat, clean, tidy and functional and thereby, any damage sustained since then was a result of the storm and subsequent stormwater runoff. Determination Case No: 260840 Determination Page 2 of 8 Summary of FSP’s position 8. The FSP says the Applicant‟s builder P‟s quote is excessive and includes repairs which are not covered by the policy. 9. The FSP considers several issues are not covered by the policy, including the following:  Fence;  Restumping;  Front Deck; and  External painting. 10. The FSP relies on the following policy provisions: “ Storm If your Landlord buildings or Landlord contents suffer loss or damage caused by • a violent wind, cyclone or tornado • thunderstorm or hail which may be accompanied by rain or snow, or • a sudden, excessive run -off of water as a direct result of a storm in your local area we will under buildings insurance • repair or rebuild those parts of your Landlord buildings that were damaged • repair or rebuild that part of any gate, fence or free-standing wall that was damaged by wind, unless • they are not kept in good order and repair, that is, they are not structurally sound or well maintained ... What you are not covered for – general exclusions ... we will NOT cover Case No: 260840 Determination Page 3 of 8 • loss, damage, injury or death caused by, or arising from • faulty design or workmanship • subsidence or landslide, unless it happens immediately following an earthquake or explosion ... Things that may put your claim or cover at risk ... if you do not maintain your Landlord buildings in good repair and condition. This means your Landlord buildings must be watertight, structurally sound, secure and well maintained” 11. The FSP‟s offer of settlement of $14,520.52 is adequate to complete the repairs which fall within the policy coverage. Issues 12. Whether the FSP is entitled to deny the Appl icant‟s claim for the restumping, side fence, front deck, external painting and dog boards, floor boards, cracks in the walls, splintered lounge window sill, back wooden door of kitchen and linen press door. 13. Whether the offer of settlement is fair and reasonable and in accordance with the terms and conditions of the policy. Reasons for decision 14. Due to the nature of this dispute, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 15. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 16. In considering this claim it is important to realise the magnitude of the disaster which befell the Applicant‟s property. This was a storm of biblical Case No: 260840 Determination Page 4 of 8 proportions. Higher rainfall than ever previously recorded occurred in the Mildura district. 17. It is important to note that although the subject house was 50 years old there is no evidence of any significant problems prior to the storm. I find it is particularly helpful when dealing with such a house to remember that building standards have changed greatly since it was built. So, for example, a comment that “footings were not constructed to current standard” does not greatly assist the FSP unless it can be established that the footings were not of an acceptable standard 50 years ago. 18. Subsequent to the lodgement of the claim, the FSP appointed two repairers (C and A), a builder (S) and an engineer (G) to identify the cause of the loss and to assess the claim. Restumping 19. G‟s first report suggests the property was damaged by subsidence or heave caused by swelling of the foundation soil. It theorises that the damage to the footing and subsequent unlevelled flooring was a result of stormwater inundation as follows: “Finding: Stormwater flooding into the sub-floor space has allowed soakage into the foundation soil with consequent softening allowing subsidence or swelling causing heave or a combination of both” 20. I note G‟s comments regarding the inadequacies that may exist in the load bearing capacity of the existing stumps and soleplates in relation to the texture of the soil and the FSP denies liability for restumping on the grounds the damage was caused by faulty design or workmanship and subsidence , which are excluded under the policy. 21. However G clarifies the following: “The stump/soleplate fo otings of the Original House are considered to be of inadequate founding depth for a highly reactive site relative to current standards in a normal domestic environment. It is found that the stump/soleplates footings of the original house have subsided due to foundation softening caused by ponding of stormwater runoff from the surrounding land. However, even of the depths had been at 1000mm as required by current standards, the allowable bearing pressure under the soleplates would still have been inadequate at 30kPa to 65KPa to prevent subsidence”(sic) 22. Based on the above, I find that even if the stumps soleplates satisfied the requirements of the current building standards (which is not the required test in any event); the property would have sustained damage as a result of subsidence caused by stormwater runoff. Case No: 260840 Determination Page 5 of 8 23. Therefore, I am of the opinion the proximate cause of the loss was stormwater runoff which resulted in subsidence or heaving of the foundation soil and thereby, the loss was caused by an insured event under the policy. 24. Finally, based on G‟s recommendations, the FSP may choose the repair method of repacking of the stumps instead of restumping. Nevertheless, any stumps that require repacking in excess of 50mm should be replaced as detailed in S‟s scope of works. Fence on the property 25. The Applicant confirms that his claim relates to a side fence and not the front fence as suggested by the FSP. The fence collapsed on the garden shed as a result of the storm and subsequent stormwater runoff. 26. The Applicant‟s builder P referred to the following: “Replace 18 Lm Water Damaged Fence $2,800” 27. The FSP has denied liability on the ground „the front fence also not of great construction‟. However, it has not presented any expert opinion on this matter. The reports from G, C and A do not refer to the damaged fence. The FSP has simply disallowed this item without explanation. 28. This matter was referred to the FSP and in the absence of any response and expert evidence, I am satisfied the damage to the fence was caused by the insured event and thereby, it is not entitled to rely on the policy condition/exclusion. 29. The FSP is required to indemnify the Applicant for this loss. The Front Deck 30. The FSP wrote to the Applicant that G deemed the issues with the deck not be related to the inundation of water but rather the poor original construction of the deck. I note however that the first representative of the FSP to visit the property, notably “C” commented that the decking was unstable and damaged. 31. I do not agree with the FSP‟s posit ion, as G suggests the Applicant will not be entitled to the replacement of the deck due to the fact that it was built without sole plates. 32. G clarifies the damage was a result of inundation as below: “As the stump footings under the deck are non -compliant with acceptable building practice being without soleplates, it is considered that they are not eligible for replacement as a result of subsidence due to inundation. It is further considered that the subject stump footings are not suitable for relevelling by packing because, being without soleplates, they will continue to subside” (sic) . Case No: 260840 Determination Page 6 of 8 33. Again, if the stump footings are “non - compliant” with acceptable standards, this poses the question “were they compliant with applicable standards when originally constructe d?” 34. Since the damage to the deck was caused by subsidence as a result of inundation by stormwater runoff, the FSP is required to indemnify the Applicant‟s loss by repairing the deck to its pre -loss condition. 35. If the deck cannot be restored without the installation of the soleplates, then the Applicant should bear the cost of soleplates to enable the FSP to reinstate the deck to its pre-loss condition. Exterior Paint and Dog Boards 36. Based on the FSP‟s email to the Applicant dated 13 October 2011, I am satisfied the bottom board around the perimeter of the house sustained water damage as a result of the insured event and thereby, the FSP is required to indemnify the Applicant for this loss. 37. As to the external walls, I note the FSP says: “no allowance for extern al painting of the property (external painting of property currently incomplete in some areas and very thin in other areas)” 38. Based on the above statement, I am of the opinion that the FSP accepts storm damage to the external wall but chose to decline cover on the ground that the paint work was not complete. 39. The FSP has not presented evidence to support its decision and its expert reports do comment on the condition of the external wall, parts of which were damaged by four months of inundation. Thereby, I am satisfied the FSP is required to indemnify the Applicant for this loss. Floor boards buckling under the carpet 40. The Applicants confirm they noticed buckling of floor boards under the carpet after the storm event. 41. The FSP highlights repairer C‟s report belo w: “Our technician has noted that the Transportable house has had water damage to the entire building and the wood is swollen. The water level has not risen up above floor level but the floor boards will need replacing throughout the house” 42. Another report by repairer A states: “Storm Water has caused damage to the Stumps, floorboards and wall of the house ... Inspecting the house I found that the water had risen to a level covering the floor joists (app 500mm H) but with no water entry into the house” Case No: 260840 Determination Page 7 of 8 43. There is no evidence as to why the FSP denied this part of the claim. Furthermore, the material received from the Applicant in this regard was exchanged with the FSP and in the absence of any response or comments on this matter, I am of the opinion the FSP should indemnify the Applicant towards the replacement of the water damaged floor boards as suggested by FSP‟s repairers C and A. Cracking Walls 44. I have reviewed the material presented by the FSP and the Applicant and note the FSP has not specifically declined cover for the cracking of the internal walls. 45. G‟s report clarifies the cause of the cracking in the wall linings as follows: “It is recommended that cracking of the wall linings in the Original House be accepted as damage caused by storm water inundation and be repaired forthwith. It is recommended that any further movement of the Original house be monitored during a drying out period of 12 months and any further damage be given consideration at that time.” 46. I note the previous cracks on the walls had been repaired by the application of „No Gap‟ solution. However, based on G‟s report, there is no doubt the current cracks were caused by stormwater inundation. 47. Therefore, the FSP is required to indemnify the Applicants for this loss if not already included in the current accepted scope of works including Bedroom two. Back wooden door of kitchen (not open fully) and linen press door does not shut at all and splintered window sill 48. The Applicant has raised the above issues with the Service. These matters were referred to the FSP and in the absence of a response and following G‟s findings: “Windows and doors stick slightly” 49. I am satisfied the damage to the above relate to stormwater inundation and subsequent movement in the property. Thereby, the FSP is required to indemnify the Applicant for this loss. Offer of Settlement 50. I have not been provided with a breakup of the FSP‟s offer of settlement of $14,520.52 and I am of the view that it would involve the scope of work prepared by S, but excluding the items discussed above. 51. I have endeavoured to consider and determine the position of the parties as to the various issues upon which, as it appears to me, there is disagreement. Case No: 260840 Determination Page 8 of 8 52. I am satisfied the FSP is required to indemnify the Applicant for the loss . But it is entitled to appoint a builder of its choice to attend to the repairs. 53. The FSP is not required to make a cash settlement of the claim in accordance with the Ap plicant‟s builder P‟s quote amounting to $61,784 . Determination 54. On the basis of the available information, I determine the FSP is required to indemnify the Applicant for his losses, including: • restumping (paragraphs 23 & 24) • the fence (paragraph 29) • the front deck (paragraphs 34 & 35) • exterior paint and dog boards (paragraph 39) • buckling floorboards (paragraph 43) • cracking walls (paragraph 47) • back wooden door of kitchen (paragraph 49). 55. In the event that the FSP determines to cash settle the matter, I determine that the FSP shall pay interest to the Applicant at the statutory rate from 26/11/10 being the date of completion of its IDR process.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.