Home / Financial Firm (Unknown - Insurer) / Determination 260392
Determination 260392
Quality and method of insurer-arranged water damage repairs
Summary
The applicant's strata unit was repaired by the FSP's nominated builder after a pipe burst, and she disputed the method and quality of the repairs and continuing dampness. AFCA found some areas of concern warranted consideration and ordered a new independent expert review at the FSP's expense, with the FSP bound to adopt its recommendations and address later problems.
Because the quality of repairs could not be definitively assessed on the material and the parties' experts disagreed, a fresh independent inspection was fair in all the circumstances.
Issues
- Repairs or contractors primary · unclear
“A new independent expert should be appointed to review and report on the individual items highlighted, at the FSP's expense.”
- Product terms interpretation secondary · upheld
“The FSP should underwrite the quality of work conducted by its agents and the guarantee period applies to any problems arising.”
Subjects and remedies
home or building damagereassess claimrepair or rectify
Text of the determination
Case No: 260392 Determination Page 1 of 5
Case number: 260392
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Dispute Over Method and Standard of Repairs
30 May 2012
Background
1. The Applicant held a residential strata plan insurance policy for her unit with
the Financial Services Provider (FSP).
2. On 4 July 2008, the unit was damaged after a ruptured water pipe flooded
several areas of the home. A claim was lodged.
3. The FSP accepted the claim and had a builder (CB) attend to the relevant
work. The Applicant was unhappy with the work done and rectifications and
other ongoing works were attempted. The FSP is now satisfied that the
Applicant‟s unit has been effectively repaired.
4. The Applicant remains unhappy with several aspects of the work done by the
FSP ‟s nominated repairer and seeks the rectification of same and an
undertaking from the FSP as to the quality of the work.
Summary of Applicant’s position
5. The Applicant says that CB has not repaired the home to an acceptable
standard and relies upon the submitted reports from her building engineer.
6. She further claims that the FSP‟s assessor (CR) has established a bias
against her and the merits of the claim
Summary of FSP’s position
7. The FSP says that the work has been completed to an acceptable standard
given the age and condition of the property.
8. It stands by CB‟s decision to use the product it nominated and refers to the
30 year guarantee issued by CB as evidence of its suitability for the job.
9. The FSP relies on the following policy provisions:
Determination
Case No: 260392 Determination Page 2 of 5
Page 31 of the Product Disclosure Statement (PDS)
“ Exclusions – what we do not insure
1 We will not pay for loss or damage:
a ...
c caused by lack of maintenance, rust, oxidation, corrosion,
Wear, Tear, fading, gradual corrosion or gradual deterioration,
concrete or brick cancer, developing flaws, wet or dry rot, or
failure to maintain Your Insured Property in a reasonably good
state of repair. ”
Issue
10. Whether the FSP has discharged its obligations for the repair of the
Applicant‟s unit.
Reasons for decision
11. I am satisfied that a full exchange of the relevant information has taken place
between the respective parties and that each party has had the opportunity
of addressing any issues raised.
12. The Applicant‟s home was partially flooded as a result of a ruptured water
pipe on 4 July 2008. The damage required fairly extensive repairs. It later
emerged that secondary issues of water dampness had affected the walls
and the parties differed on whether this was related to the claim or not.
13. It is not in dispute that the Applicant had an entitlement to claim under the
policy or that the FSP has arranged for some work to be done at the unit.
14. It is further agreed that some of this work was not to a standard that the
Applicant considered acceptable. The FSP‟s agents have since made
several visits to the unit to inspect and conduct supplementary repairs.
15. For the purposes of this Determination, I shall restrict my commentary to
only those issues which I consider pertinent to the outcome. I acknowledge
the lengthy submissions from the respective parties and numerous issues
highlighted in same, although I will not refer to all issues individually.
16. The essence of the dispute brought by the Applicant centres on:
the choice of CB to utilise a certain product in the repair work that was
non-standard and the failure of the FSP to guarantee the use of this
product;
the Applicant‟s dissatisfaction with the quality of repairs completed –
particularly in relation to the paintwork, the skirting and the door frame;
Case No: 260392 Determination Page 3 of 5
the uncertainty of the quality of the work in relation to ongoing problems
with the dampness in the walls and whether this ongoing damage is
incident related or not.
17. The FSP has clarified that the unit is tenanted and not occupied by the
Applicant and in those circumstances, there is no entitlement to storage
costs or temporary accommodation whilst the tenants are displaced for any
work conducted. The Applicant concedes this issue and it will not be further
addressed.
Guarantee for repairs
18. A major issue between the parties was the method of repair adopted by CB
which involved a “hard plaster additive” which was used to prevent moisture
progression.
19. The Applicant considers that the product used (which was not the one
recommended by her expert, NM) might compromise the integrity of the
repair. This, in turn, might allow further water problems in the future.
20. It is the Applicant‟s position that the proposed 30 year guarantee for the
product is fine, although this was proposed by the repairer and is not an offer
which is specifically endorsed by the FSP.
21. I am satisfied that the quality of any work conducted by the FSP‟s agents (of
which CB is one) should be underwritten by the FSP in the event of it not
being to a standard that is acceptable. Whilst the FSP did not actually
approve of the use of the product, it has the option to instruct the agent to
undertake the alternate method of repair if it sees fit. Ultimately, it appears
that the FSP is satisfied that the method employed was reasonable.
22. On this basis, I am satisfied that should any problems arise within the
guarantee period that the Applicant is entitled to approach the FSP to
manage the problem. The FSP will then be at liberty to instruct CB, or any
other agent as appropriate, to address the issues.
Quality of repairs
23. The Applicant‟s submission included a number of photographs illustrating
areas of repair in the home which she remains unsatisfied with. These
included the fitting and painting of the skirting boards, the unsightly fitting to
the door frame, scratches on the window frames and sill as well as issues of
sloppy paintwork in general.
24. The FSP contends that the stated repairs were to an acceptable standard
and relies upon the report from its loss adjuster, CR, to attest to this.
25. In viewing the available photographs, it is difficult to form a definitive opinion
as to the quality of the specific work as there are no areas of comparison
within the rest of the unit or „before and after‟ photographs to review. That
Case No: 260392 Determination Page 4 of 5
said, I concede that some areas of concern appear to be present as
highlighted by the Applicant and these warrant consideration.
26. It is clear from the final report tendered by NM that he is of the opinion that
the work remains of an unsatisfactory standard (noting that some of the
issues raised have since been attended to). NM and CR clearly differ in their
opinions on the quality of the work completed by CB.
27. The Applicant is entitled to raise issues of concern with the q uality of the
work and her submissions go to great lengths to highlight some of the areas
of concern. CR notes that some of these issues have been addressed and
others are not of sufficient concern to warrant further attention.
28. The opinion of CR in relati on to the Applicant‟s concerns is amply expressed
in his report of 10 August 2011. It appears that the FSP and CR were to
approve of the involvement of a third party to inspect the scene, although the
Applicant declined this offer. She explains that this was due to her loss of
faith in the parties handling the claim (including CR and CB).
29. It appears that the numerous recurring problems with the alleged poor
quality of the work and continuing damp issues have soured the relationship
between the parties. This, in turn, makes objective analysis of the provided
information difficult.
30. Given the acrimony over the repairs and the issues that the Applicant still
considers to be outstanding, her reluctance to allow CR or CB to return to
her property is not surprising or necessarily unwarranted. CR expressed in
the report of 10 August 2011 that:
“... we are of the opinion that the repairs have been carried out to a
satisfactory standard... There are no obvious issues that the writer would not
accept bearing in mind the property is far from new.”
31. However, given the apparent (although difficult to discern) problems
highlighted in the photographs from the Applicant, I am of the opinion that a
further inspection of the property is warranted, especially as it appears the
FSP and CR were happy to have a third party review the home.
32. Ultimately, in accordance with what is fair in all the circumstances, I consider
that a new independent expert should be appointed to review and report on
the individual items highlighted. Whilst the views of NM have previously been
accepted by both parties, I am of the opinion that a fresh analysis of the
damage and the work done will be of benefit.
33. The Applicant has stated that she should have been issued with an electrical
compliance certificate i n relation to certain work conducted involving
electrical appliances. The new independent expert can evaluate if this is
necessary, together with any remedial work which is required to reinstate the
unit to its pre-incident condition.
Case No: 260392 Determination Page 5 of 5
34. The independent expert may be nominated by the Applicant if she so
chooses (subject to the FSP‟s approval) and the FSP is to underwrite the
costs of the exercise and be bound by any recommendations made for
remedial action, within the terms and conditions of the policy.
Determination
35. On the basis of the available information, I determine that the Applicant and
the FSP should arrange for a new independent expert to review and report
on the work done to the property (at the FSP‟s expense) and that any
recommendations made by this expert be adopted by the FSP where
applicable under the ambit of the policy.
36. I further determine that should the Applicant encounter any problems related
to the repairs conducted (including that involving “hard plaster additive”
product), she will be at liberty to approach the FSP so that it will arrange any
inspections and/or further repairs required.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.