Home / Financial Firm (Unknown - Insurer) / Determination 260392

Determination 260392

Quality and method of insurer-arranged water damage repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2012-06-12
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's strata unit was repaired by the FSP's nominated builder after a pipe burst, and she disputed the method and quality of the repairs and continuing dampness. AFCA found some areas of concern warranted consideration and ordered a new independent expert review at the FSP's expense, with the FSP bound to adopt its recommendations and address later problems.

Because the quality of repairs could not be definitively assessed on the material and the parties' experts disagreed, a fresh independent inspection was fair in all the circumstances.

Issues

Subjects and remedies

home or building damagereassess claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 260392 Determination Page 1 of 5 Case number: 260392 General Insurance - Domestic Insurance - Home Building - FSP Decision - Dispute Over Method and Standard of Repairs 30 May 2012 Background 1. The Applicant held a residential strata plan insurance policy for her unit with the Financial Services Provider (FSP). 2. On 4 July 2008, the unit was damaged after a ruptured water pipe flooded several areas of the home. A claim was lodged. 3. The FSP accepted the claim and had a builder (CB) attend to the relevant work. The Applicant was unhappy with the work done and rectifications and other ongoing works were attempted. The FSP is now satisfied that the Applicant‟s unit has been effectively repaired. 4. The Applicant remains unhappy with several aspects of the work done by the FSP ‟s nominated repairer and seeks the rectification of same and an undertaking from the FSP as to the quality of the work. Summary of Applicant’s position 5. The Applicant says that CB has not repaired the home to an acceptable standard and relies upon the submitted reports from her building engineer. 6. She further claims that the FSP‟s assessor (CR) has established a bias against her and the merits of the claim Summary of FSP’s position 7. The FSP says that the work has been completed to an acceptable standard given the age and condition of the property. 8. It stands by CB‟s decision to use the product it nominated and refers to the 30 year guarantee issued by CB as evidence of its suitability for the job. 9. The FSP relies on the following policy provisions: Determination Case No: 260392 Determination Page 2 of 5 Page 31 of the Product Disclosure Statement (PDS) “ Exclusions – what we do not insure 1 We will not pay for loss or damage: a ... c caused by lack of maintenance, rust, oxidation, corrosion, Wear, Tear, fading, gradual corrosion or gradual deterioration, concrete or brick cancer, developing flaws, wet or dry rot, or failure to maintain Your Insured Property in a reasonably good state of repair. ” Issue 10. Whether the FSP has discharged its obligations for the repair of the Applicant‟s unit. Reasons for decision 11. I am satisfied that a full exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. 12. The Applicant‟s home was partially flooded as a result of a ruptured water pipe on 4 July 2008. The damage required fairly extensive repairs. It later emerged that secondary issues of water dampness had affected the walls and the parties differed on whether this was related to the claim or not. 13. It is not in dispute that the Applicant had an entitlement to claim under the policy or that the FSP has arranged for some work to be done at the unit. 14. It is further agreed that some of this work was not to a standard that the Applicant considered acceptable. The FSP‟s agents have since made several visits to the unit to inspect and conduct supplementary repairs. 15. For the purposes of this Determination, I shall restrict my commentary to only those issues which I consider pertinent to the outcome. I acknowledge the lengthy submissions from the respective parties and numerous issues highlighted in same, although I will not refer to all issues individually. 16. The essence of the dispute brought by the Applicant centres on:  the choice of CB to utilise a certain product in the repair work that was non-standard and the failure of the FSP to guarantee the use of this product;  the Applicant‟s dissatisfaction with the quality of repairs completed – particularly in relation to the paintwork, the skirting and the door frame; Case No: 260392 Determination Page 3 of 5  the uncertainty of the quality of the work in relation to ongoing problems with the dampness in the walls and whether this ongoing damage is incident related or not. 17. The FSP has clarified that the unit is tenanted and not occupied by the Applicant and in those circumstances, there is no entitlement to storage costs or temporary accommodation whilst the tenants are displaced for any work conducted. The Applicant concedes this issue and it will not be further addressed. Guarantee for repairs 18. A major issue between the parties was the method of repair adopted by CB which involved a “hard plaster additive” which was used to prevent moisture progression. 19. The Applicant considers that the product used (which was not the one recommended by her expert, NM) might compromise the integrity of the repair. This, in turn, might allow further water problems in the future. 20. It is the Applicant‟s position that the proposed 30 year guarantee for the product is fine, although this was proposed by the repairer and is not an offer which is specifically endorsed by the FSP. 21. I am satisfied that the quality of any work conducted by the FSP‟s agents (of which CB is one) should be underwritten by the FSP in the event of it not being to a standard that is acceptable. Whilst the FSP did not actually approve of the use of the product, it has the option to instruct the agent to undertake the alternate method of repair if it sees fit. Ultimately, it appears that the FSP is satisfied that the method employed was reasonable. 22. On this basis, I am satisfied that should any problems arise within the guarantee period that the Applicant is entitled to approach the FSP to manage the problem. The FSP will then be at liberty to instruct CB, or any other agent as appropriate, to address the issues. Quality of repairs 23. The Applicant‟s submission included a number of photographs illustrating areas of repair in the home which she remains unsatisfied with. These included the fitting and painting of the skirting boards, the unsightly fitting to the door frame, scratches on the window frames and sill as well as issues of sloppy paintwork in general. 24. The FSP contends that the stated repairs were to an acceptable standard and relies upon the report from its loss adjuster, CR, to attest to this. 25. In viewing the available photographs, it is difficult to form a definitive opinion as to the quality of the specific work as there are no areas of comparison within the rest of the unit or „before and after‟ photographs to review. That Case No: 260392 Determination Page 4 of 5 said, I concede that some areas of concern appear to be present as highlighted by the Applicant and these warrant consideration. 26. It is clear from the final report tendered by NM that he is of the opinion that the work remains of an unsatisfactory standard (noting that some of the issues raised have since been attended to). NM and CR clearly differ in their opinions on the quality of the work completed by CB. 27. The Applicant is entitled to raise issues of concern with the q uality of the work and her submissions go to great lengths to highlight some of the areas of concern. CR notes that some of these issues have been addressed and others are not of sufficient concern to warrant further attention. 28. The opinion of CR in relati on to the Applicant‟s concerns is amply expressed in his report of 10 August 2011. It appears that the FSP and CR were to approve of the involvement of a third party to inspect the scene, although the Applicant declined this offer. She explains that this was due to her loss of faith in the parties handling the claim (including CR and CB). 29. It appears that the numerous recurring problems with the alleged poor quality of the work and continuing damp issues have soured the relationship between the parties. This, in turn, makes objective analysis of the provided information difficult. 30. Given the acrimony over the repairs and the issues that the Applicant still considers to be outstanding, her reluctance to allow CR or CB to return to her property is not surprising or necessarily unwarranted. CR expressed in the report of 10 August 2011 that: “... we are of the opinion that the repairs have been carried out to a satisfactory standard... There are no obvious issues that the writer would not accept bearing in mind the property is far from new.” 31. However, given the apparent (although difficult to discern) problems highlighted in the photographs from the Applicant, I am of the opinion that a further inspection of the property is warranted, especially as it appears the FSP and CR were happy to have a third party review the home. 32. Ultimately, in accordance with what is fair in all the circumstances, I consider that a new independent expert should be appointed to review and report on the individual items highlighted. Whilst the views of NM have previously been accepted by both parties, I am of the opinion that a fresh analysis of the damage and the work done will be of benefit. 33. The Applicant has stated that she should have been issued with an electrical compliance certificate i n relation to certain work conducted involving electrical appliances. The new independent expert can evaluate if this is necessary, together with any remedial work which is required to reinstate the unit to its pre-incident condition. Case No: 260392 Determination Page 5 of 5 34. The independent expert may be nominated by the Applicant if she so chooses (subject to the FSP‟s approval) and the FSP is to underwrite the costs of the exercise and be bound by any recommendations made for remedial action, within the terms and conditions of the policy. Determination 35. On the basis of the available information, I determine that the Applicant and the FSP should arrange for a new independent expert to review and report on the work done to the property (at the FSP‟s expense) and that any recommendations made by this expert be adopted by the FSP where applicable under the ambit of the policy. 36. I further determine that should the Applicant encounter any problems related to the repairs conducted (including that involving “hard plaster additive” product), she will be at liberty to approach the FSP so that it will arrange any inspections and/or further repairs required.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.