Home / Financial Firm (Unknown - Credit) / Determination 260298

Determination 260298

Break costs on refinance, settlement delay and bill rollover interest

FirmFinancial Firm (Unknown - Credit)
Decided2013-11-28
ProductCredit · Business lending
OutcomeFor the complainant in part
Amount awarded$3,000
Non-financial loss—
Amount claimed$72,598
SourceAFCA PDF

Summary

A company's sole director disputed break costs charged when the company refinanced fixed rate bills with another lender, plus settlement delay, rollover interest and account access. AFCA found the break costs payable and settlement not delayed by the FSP, but ordered a $3,000 interest refund because the FSP should have suggested placing the rolled-over funds on term deposit.

The break costs were disclosed in the facility terms and reasonable on the specialist's review, while the FSP's duty to help mitigate the rolled-over interest was breached.

Issues

Subjects and remedies

small businesspay compensation

Related

All Financial Firm (Unknown - Credit) determinations · Find similar determinations

Text of the determination

Case No: 260298 Determination Page 1 of 12 Case number: 260298 Credit - Business Finance - Commercial bills - Charges - Incorrect fees/ costs Credit - Business Finance - Commercial bills - Instructions - Delay 7 November 2013 Background 1. The Applicant is the sole director of a company (the Company) which had Commercial Bill Facilities with the FSP which were refinanced in December 2010. 2. As at November 2010, the Applicant was one of two directors of the Company. Mr RJ was the other director. At this time, the Company had the following fixed interest rate bank bills with the financial services provider (FSP) (the Bills). Type Amount Start date End date Roll over frequency Fixed (Bank Bill 1) $1,000,000 28 July 2006 28 July 2011 Monthly Fixed (Bank Bill 2) $700,000 11 July 2008 11 July 2011 Quarterly 3. The Company also had a variable interest rate bill facility for $320,000. 4. The Bills were refinanced with another FSP (the new FSP) and settlement was effected on 30 December 2010 (the Refinance). As a consequence of the Refinance, the Company incurred the following break costs (the break costs). Amount Break Cost Bank Bill 1 $10,200 Bank Bill 2 $11,150 5. In addition to the break costs, the Company incurred other fees and charges associated with the Refinance which has lead to this dispute. Determination Case No: 260298 Determination Page 2 of 12 Summary of Applicant’s position 6. On 12 October 2010, and after a verbal altercation with the then Bank Manager of the FSP ’s Preston branch, the FSP obtained an intervention order (the Order) which, amongst other things, restrained the Applicant from communicating with the FSP ’s staff. The Order had the effect of cutting the Applicant out of any dealings the Company had with the FSP, which dealt with Mr RJ from that point on. 7. In 2010, the Applicant decided to buy out Mr RJ’s share of the Company. However, because of the Order, he was unable to speak with anyone at the FSP about the Bills. 8. The Applicant contacted the FSP through his representative, Mr T, an accountant. The FSP told Mr T that it no longer wanted the Applicant’s business and, accordingly, he was forced to arrange finance with the new FSP. 9. Settlement of the Refinance was due to be effected on 27 December 2010. Due to the FSP ’s actions, the settlement was delayed until 30 December 2010. Because the settlement occurred one day after the rollover date for Bank Bill 1, the FSP charged the Company a full month’s interest of $7,248.30 (the Interest). 10. On 11 October 2010, the Company paid three months interest in advance on Bank Bill 2, meaning it had paid up interest until 11 January 2011. It has not been reimbursed the interest it paid for the period from the date of the Refinance until 11 January 2011. 11. The Applicant considers that it is unfair of the FSP to charge the Company the break costs because it was the FSP that sought to terminate the banking relationship before the expiry of the Bills fixed rate periods. 12. On 30 December 2010, the FSP debited $2 6,000 from the Company’s account without authority. 13. The interest rate the Company is paying under its loans with the new FSP is two percent higher than that which it was paying for the Bills. Additionally, the new FSP charged the Company $18,000 in fees as a result of the Refinance. 14. The Applicant considers that the FSP should be liable to reimburse or refund: a. $21,350 the Company paid for the break costs; b. $7,248.30 interest charged on Bank Bill 1 due to the FSP ’s delaying the Refinance; c. $26,000 the FSP with drew from the Company’s bank account without authority; d. $18,000 it cost the Company to refinance with the new FSP; and Case No: 260298 Determination Page 3 of 12 e. the cost to the Company resulting from the difference between the interest rate charged by the new FSP and the interest rate it was paying for the Bills (for one year). Summary of FSP’s position 15. The Applicant instigated the Refinance, not the FSP. He refinanced his primary personal/business facilities over the course of 2008 and 2009 on the basis of purported better interest rates that he obtained from other FSPs and the FSP ’s requirements that he provide it with meaningful financial data. 16. The FSP was ready to settle the Refinance on 24 December 2010, but the Company did not have the funds to do so until 30 December 2010. The new FSP sent the FSP a discharge authority on 29 December 2010 (which the Applicant had signed on 28 December 2010) asking it to discharge the Bill on 30 December 2010. To remedy the Company’s lack of settlement funds, the Applicant authorised the FSP to debit $26,000 from the Company’s bank account to enable settlement of the Refinance to be effected. 17. As the Refinance broke the fixed terms of the Bills, the break costs were payable. The break costs were duly disclosed in emails to Mr T and provisions for this liability were also contained in the contracts the Applicant signed for the Bills. 18. Bank Bill 1 was the subject of a fixed interest rate term contract which required it to be rolled over on a monthly basis. The FSP rolled Bank Bill 1 on 29 December 2010 because the Company did not have sufficient funds to settle the Refinance. Accordingly, the FSP charged the Company the Interest when it rolled Bank Bill 1, as it was entitled to do under the Applicant’s contract. 19. The Bills attracted an additional margin, that is, an acceptance fee, of 1.96% per annum. This accounts for the overall higher comparison rate than that charged by the new FSP. 20. Under the circumstances outlined above, the FSP will not compensate the Company as requested. Issues 21. FOS issued a Recommendation in relation to this dispute on 28 June 2013. The Recommendation found that: a. The terms and conditions applicable to the Bills disclosed that break costs were payable. The Applicant signed the Facility Offer dated 16 April 2008 acknowledging his acceptance of the terms and conditions. b. The terms and conditions stated that the requirement to pay break costs is determined by early repayment of the facilities, regardless of Case No: 260298 Determination Page 4 of 12 the reason for that, or whether or not there was a default under the facilities. c. It did not matter whether the FSP or the Applicant instigated the refinance, break costs were nevertheless payable. d. The break costs applied on refinance of the facilities represented a reasonable estimate of the loss suffered by the FSP and so was fair and reasonable and did not constitute a penalty. e. The FSP had provided account statements addressed to the Company’s principal place of business. f. The FSP was not required to provide internet access to the Applicant. g. As the refinance was triggered by change in control, or proposed change in control, of the Company, the FSP was under no obligation to offer finance to the re-structured entity with the Applicant as its sole director. h. This was a commercial decision for the FSP which FOS does not have jurisdiction to interfere with, whether or not the Applicant wished to remain a customer of the FSP. i. The FSP did not cause settlement to be delayed. j. The FSP was entitled to roll over the Bank Bills. However the FSP should have assisted the Applicant to mitigate the loss caused by incurring additional interest by suggesting that the funds be lodged on Term Deposit. k. Accordingly the FSP should pay compensation of $2,000 to the Applicant as an estimate of the amount the Applicant may have been able to recover had the rolled over funds been placed on Term Deposit. l. The FSP had not made an error in declining to offer a facility to the Applicant. m. The FSP had not made an error in charging break costs on the refinance of the facilities. 22. The Applicant objected to the Recommendation in his email dated 19 July 2013. The basis of the Applicant’s objections are : a. T hat the Applicant did not choose to ‘break’ the facility as: i. the FSP made it clear that it no longer wanted the Applicant as a customer, ii. the fixed rate on the facilities was .2% lower than the refinance rate with the new FSP. The 1.96% margin had been increased in June 2010. It had previously been 1%. The FSP put it up once it knew the Applicant was looking to buy out his partner. b. T he FSP’s comments that there was an initial settlement arranged as early as June 2010 is speculation, c. The FSP had total control of the Bill Facilities and rolled them over to obtain a benefit for itself. Case No: 260298 Determination Page 5 of 12 d. That he attended the settlement scheduled for 24 December 2010 and the FSP was aware of all the settlement details, the Bill Facility and the roll over date. The FSP was aware of the additional funds available in the Company account which could have been used at settlement and should have mentioned this on the day if there was a shortage of funds at settlement. e. The FSP did not inform the new FSP of the break costs in time to allow them to account for them at settlement. f. The FSP had ample time to settle on 29 December 2010 but decided on 30 December 2010 in order to obtain the additional income from rolling over the Bill Facility. 23. The FSP accepted the Recommendation and did not comment on the Applicant’s objections. Reasons for decision 24. The Applicants dispute comprises four separate but related issues: a. Was the FSP entitled to charge break costs in relation to the termination of the Commercial Bill Facilities when they were refinanced on 30 December 2010. b. Did the FSP cause settlement of the refinance to be delayed. c. Was it proper for the FSP to charge interest in advance when the Commercial Bill Facilities were rolled over on 29 December 2010. d. Did the FSP breach any obligation to the Applicant in failing to provide account information to the Applicant and online access to those accounts. The Break Costs dispute 25. It is not disputed that the Company entered into a facility agreement with the FSP dated 16 April 2008. The agreement covered three bill facilities. Two were at a fixed rate. That agreement was replaced by a new agreement in relevantly similar terms dated 5 March 2009. Under the agreement the two fixed rate bills expired on 28 July 2011. Bank Bill 1 was for $1 million and was at a fixed rate of 6.75%. Bank Bill 2 was for $700,000 and was for a fixed rate of 8.19%. 26. The Applicant refinanced the facility with the new FSP on 30 December 2010. The FSP charged break costs of $10,200 and $11,150 respectively. 27. The Applicant signed both the 2008 and 2009 agreements. Each agreement states immediately above the place for signature on each document: “By signing this document you: 1. accept the offer set out in this facility offer and the General Standard Terms Case No: 260298 Determination Page 6 of 12 2. acknowledge that: a) a legally binding contract is created between you and us b) you have made your own independent judgment and decision to enter this facility agreement and are not relying on any information given or representations made by us to you 3. make the declarations in the General Standard Terms.” 28. In those circumstances the Applicant acknowledged that he would be bound by the terms of the agreement including the General Standard Terms. 29. Clause 4 of the General Standard Terms discloses when break costs will apply: “Break costs This clause 4 applies only to facilities with a fixed interest rate or a fixed discount rate. 4.1 Whenever the interest rate or discount rate for a facility is a fixed rate a “ break costs event” is taken to have occurred if: (a) you repay early all or any part of the total amount owing for that facility before the end of a fixed interest period; or (b) the total amount owing for that facility becomes repayable because you are in default; or ... If a break costs event occurs we may suffer loss (which we call our “ break costs” ). Our break costs is an amount equal to our reasonable estimate of our loss (if any) arising from a break costs event ... 4.2 We calculate break costs using the break costs method. The break costs method is the calculation of the difference, if positive between an amount calculated by reference to rate equivalent to our cost of funds at the start of the fixed interest period ... and an amount calculated by reference to the rate equivalent to our costs of funds at the time of the break costs event, over the remainder of the fixed interest period ...This is then discounted back to the net present value at the rate equivalent to our cost of funds at the time of the break costs event. Warning Break costs can be high and increase the amount you owe us as a result, for example, of your default. You can get an estimate of applicable break costs at anytime by contacting us. 30. In the circumstances, the General Standard Terms clearly discloses that break costs would be payable and adequately discloses the method of calculation. 31. The Applicant ’ s central issue is that the company should not have incurred break costs in circumstances where it did not choose to terminate the facility, but was effectively forced to do so by the FSP. The Applicant says that he Case No: 260298 Determination Page 7 of 12 did not instigate the refinancing of the Bill facility and that the FSP made it clear that it did not want to continue with the facility. The Applicant supports his position by noting that it was commercially disadvantageous to the Company to refinance as it did so at a higher rate. 32. The FSP says this is not the case and that it was the Applicants decision to refinance. It suggests that the decision arose out of the Applicants need for additional funds in order to buy out his business partner. 33. There is a surprising lack of documentation surrounding the initial discussions between the FSP and the Applicant. It is clear that relations between the Applicant and the FSP had broken down. The Applicant had, on his own admission engaged in a very heated discussion with branch staff at the FSP resulting in an Intervention Order. The FSP acknowledges that it would not have renewed the facilities on maturity. 34. It is also clear that discussions concerning restructuring of the facility commenced in mid 2010. The bank file includes an internal note dated 30 June 2010: “Proposed refinance of B19 in full by the [new FSP] with settlement scheduled for 28.07.2010 (being the next roll over date of B19 variable rate commercial bill component). At this stage we are not privy to the sale details however [new FSP] have provided a signed discharge aut hority...”. 35. It appears that the Applicant had come to an agreement in 2010 with his then co-director, Mr RJ, to pay him out and become the sole director of the Company. The restructuring did not take place until after settlement of the refinance. In that regard Mr T sent an email to the FSP on 21 September 2010 which said: “There are a number of matters currently being discussed/negotiated between the directors of [Company] in order to effect a settlement between both Directors ... In essence, it is [G] ’s intention to keep the property and take over the debt and by doing so negotiate an appropriate settlement with the other director.” 36. It is evident from the relations between the parties that the FSP was not unhappy for the Applicant to refinance his facility elsewhere and may have made it plain that it preferred that he take his account elsewhere. However even if this was the case, and there is insufficient evidence to determine this, that does of itself not constitute conduct that breaches any legal duty to the Applicant and the Company. 37. The A pplicant says that he was ‘forced’ to refinance. However he has not provided any details of what constituted such force. There is no evidence of the FSP calling in the Bill Facility and demanding repayment or alleging a default by the Company. If that were to have occurred I would expect there to be copies of correspondence such as default notice and letters of demand which the Applicant could produce in support of such allegations. Case No: 260298 Determination Page 8 of 12 38. In that context I do note that the FSP would have been entitled to terminate the Bill facility once the Company restructure had taken place. A change in control of the Company (which occurs when a director resigns) is an act of default under clause 44 of the term and conditions of the facility. 39. Clause 7.1 of the General Conditions says: “If you in default (see clause 44): (a) we no longer need provide any facility; and ...” 40. A ccordingly the Applicant’s decision to buy out his co -Director was the trigger that resulted in the refinance. The FSP was at that time permitted to cease providing the facility due to the change in control of the company. The FSP was under no obligation to offer finance to the re-structured entity with the Applicant as its sole director. This was a commercial decision for the FSP which FOS does not have jurisdiction to interfere with, whether or not the Applicant wished to remain a customer of the FSP. 41. The method of calculating break costs is complicated and each financial institution has its own formula. FOS cannot require an FSP to use a particular formula. 42. As part of my investigation of this dispute, I referred it to FOS’s Specialist Industry Adviser to review the calculation of the break costs to ensure they are fair and reasonable. Financial institutions use their own wholesale rates for the relevant fixed rate period in their calculation of an early repayment fee. The Specialist Industry Adviser checks that the FSP’s calculation of the early repayment fee is reasonable, using the same rates used by the FSP. 43. In this dispute, the Specialist Industry Adviser has advised that according to his calculations, the break costs applied on the refinance of the facilities represented a reasonable estimate of the loss suffered by the FSP. On the basis of the Specialist Industry Adviser ’ s advice, I accept that the break costs applied by the FSP were fair and reasonable. Delayed Settlement 44. The Applicant says that the FSP caused settlement of the refinance to be delayed to 30 December 2010. This was significant because the Bill Facility rolled over on 29 December 2010. This resulted in the Applicant and the Company incurring additional interest. I note that the Applicant says settlement was delayed from 27 December 2010, however it is clear from email correspondence, including emails from Mr T, the Applicant ’ s accountant, that settlement was delayed from 24 December 2010. I note that 27 December 2010 was a public holiday 45. The Applicant says that the reason that settlement was delayed was because the new FSP was short of funds because break fees were not accounted for. In an email from the Applicant dated 30 October 2012 to FOS he says: Case No: 260298 Determination Page 9 of 12 “ The [new financier] was ready to settle, but on the day of settlement [FSP] requested a further $24,000 break fees and interest, which the [new financier] did not account for, which delayed the settlement it was rescheduled 5 days later and the funds where debited from my account which was still ongoing being the [Company] account “ “ the [FSP] had requested more funds above the original amount and it included the breaking fees and extra interest which no one was aware of until , 24 hr before that day and then a resettlement was organized for the 29th , but the bank made it for the 30th of December .. ” [sic] 46. However, the information provided shows that indicative payout figures were given to either the Applicant’s repr esentative, or the new FSP, on several occasions prior to settlement so the new FSP should have been aware that significant break costs were payable. Some of the information provided in this regard included: a. July 2010, a fax to the new FSP from the FSP: “proposed date of discharge 28/07/2010, time to be confirmed, likely to be PM. Indicative payout figure required $2,067,600 .... Please be aware that due to market volatility the indicative figure quoted above will likely vary ”. b. 9 September 2010, an email from the new FSP to the FSP which says: “Client has requested a break -down of pay- out are you able to assist?” c. 9 September 2010, in an email from the FSP to the new FSP: “Good afternoon B, breakdown as follows ... Fixed Rate Bills $1,000,000 Indicative Break Costs $20,080 Fixed Rate Bills $700,000 Indicative Break Costs $20,470” d. 21 September 2010, an email from Mr T to the FSP: “could you please advise the formula which has been used to calculate the break- costs for the Fixed Rate Bill Facilities.” e. 23 September 2010, an email from the FSP to Mr T: “Whilst not definitive, as a guide break costs are based on the difference between the fixed rate of the bill & swap rate ... on the day the bills are paid out factored on the principal amount owing over the remaining term of the fixed rate period”. f. 23 December 2010, an email from Mr T to the FSP: “I would indeed be grateful if you could let me know the banks position with respect to the break-costs as I understand settlement is scheduled to take place tomorrow.” g. 23 December 2010, an email from the FSP to Mr T: “this matter has previously been discussed with you by the centres senior manager .. as 2 fixed interest rate commercial bill contracts ... will need to be paid out early to effect the settlement, any break costs incurred in doing so will need to be passed on. .... Note that the indicative break cost as of today Case No: 260298 Determination Page 10 of 12 was $21,863 however this will be again updated tomorrow morning in rea diness for settlement”. 47. A further issue that the Applicant raises is why the FSP did not settle on the 29 December 2010, rather than 30 December 2010. This would have prevented the Bill Facility being rolled over for a further month. 48. I have sought the adv ice of FOS Industry Adviser as to whether the FSP’s conduct was unreasonable. The FOS’s Industry Adviser states that the Treasury Departments of FSPs usually need firm Fixed Rate Bill termination instructions in place the day before a proposed transaction so that they can price and enter into swap contracts to take out any exposure. 49. As 24 December 2010 was a Friday before the Christmas break the FSP would not have re-opened for business until 29 December 2010. Unless it was firmly established late on 24 December 2010 that the settlement could take place on 29 December 2010, settlement could not have been re-booked until 30 December 2010 at the earliest. 50. The FSP says that it did not receive the discharge authority until 29 December 2010. In any event, even as at 30 December 2010 the Applicant and the Company were still short of funds at settlement. The FSP’s concern in that regard was communicated to the Applicants solicitor earlier that day. The FSP proposed solution was for the shortfall to be paid from the Company’s trading account . 51. The Applicant says in response to this that this solution could have been implemented earlier at the aborted settlement on 24 December 2010. However the FSP was not acting as the Applicant ’ s financial advisor and was not under a duty to provide advice to the Applicant as to how to best manage his financial affairs. In that regard I note that the Applicant had employed an accountant to assist him. 52. In those circumstances I am of the view that the FSP was not responsible for the delay in settlement. Interest on the Rolled over Bill Facility 53. Although I am of the view that the FSP did not cause settlement to be delayed, there is still the issue as to whether the FSP should have rolled over the Bank Bill 1. In addition the Company had paid three months interest in advance on Bank Bill 2 on 11 October 2010. This meant that it had paid interest up until 11 January 2011. 54. The Applicant argues that Bank Bill 1 should not have been rolled over and seeks reimbursement of interest paid in advance on both Bills. 55. In a letter to FOS dated 21 August 2012 the FSP says: “In regard to rolling the Bank Bills (fixed rate contract) on 29.12.2010, if for instance we had matured the bill on that day, break costs still would have Case No: 260298 Determination Page 11 of 12 applied and the bill face value would have been debited to the company’s trading account incurring interest rate 20%+. Given that Mr S did not have the funds available to settle at that time we were obliged to roll the bills under the terms of the contract.” [sic] 56. The Facility Agreement says in relation to rollover: “Unless you tell us otherwise by close of the business day before the relevant rollover date, we will rollover maturing bills for bills of an equivalent face value and an equivalent term to maturity or to the end of the term (whichever is the shorter).” 57. Although I accept that the FSP strictly had authority to roll over Bill 1, the issue that arises is whether it was appropriate in the circumstances for it to do so. In that regard I have obtained advice from the FOS Banking Specialist. In his view the fixed rate facility had a set of pre-arranged rollover dates upon which the FSP was obligated to pay away funds to an investing counter-party (usually a retail money market investor) in the wholesale market. He considers that the FSP had an absolute right and obligation to rollover the bill under the contract schedule. He further notes that it was by no means certain that the Applicant would be able to meet the rescheduled date. 58. I also note that had the FSP debited the face value of the Bill to the Company’s trading account, this would have incurred interest of $5,480 per day at 20%. 59. However the Banking Specialist advises that once the Bill was re-drawn, the FSP should have made attempts to mitigate or off-set th e Applicant’s loss by suggesting that the funds be lodged on a Term Deposit or similar account that the FSP could control and apply to fully clear the account on 28 January 2011. He estimates that the Applicant would have been able to attract a Term Deposit interest rate of 4.75% for 29 days on $1million and in doing so, about $3774 of the interest paid on the rollover could have been recovered. He also notes that the FSP would have been entitled to charge a fee for the contract variation and additional documentation to perfect its security. He estimates that amount would be at least $1000. As this results in a refund more than one day’s interest at the trading account rate, the Applicant is better off. 60. The Banking Specialist also advised that the same analysis applies to Bill 2. The FSP could have taken the $700,000 upon settlement and lodged a 12 day Term Deposit to off-set the loss and estimates that this would have generated interest income of $1000- $1100. Again the FSP would have needed to vary its contract to take a formal charge over the funds and would have been entitled to charge a variation fee. In those circumstances the loss on this basis was more marginal as the FSP could have again charged a fee of about $1,000 for the variation. 61. In these circumstances it is appropriate that the FSP refund the amount of $3,000 to the Applicant. Case No: 260298 Determination Page 12 of 12 The Remaining Matters 62. The final issue is the Applicant ’ s concerns that FSP failed to provide account information to the Applicant and online access to those accounts. The Recommendation found that the FSP had sent account statements for the Company’s accounts to the Company’s principal place of business, which is also the address of the Applicant. As such the FSP has discharged its obligation in providing statements by sending them to that address. 63. With respect to the issue of online access the Relationship Manager of the FSP in a statement dated 12 February 2010 said: “S also requested direct online access to his accounts today or he would take this further ... because of a number of issues including customer grouping ... access cannot be provided in isolation ie will show all of RJ’s other accounts... and fact that [Company] is any two to sign and therefore cannot without both directors authority be linked to internet banking ... statements are forwarded to S”. 64. The Recommendation found that there was nothing in the Standard Terms for the Facilities that compelled the FSP to provide internet access. I note that the Applicant has not objected to this aspect of the Recommendation. I agree with the Recommendation that the FSP has not breached any obligation to the Applicant or the Company in this regard. Determination 65. On the basis of the available information I determine that: a. the FSP reimburse interest of $3,000, to be paid by way of cheque to the Applicant within 14 days of the Applicant accepting this Determination. b. the Applicant was liable for the break costs. c. the FSP did not delay settlement of the refinance. d. the FSP had not breached any obligation to the Applicant in relation of providing account statements or online access.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.