Text of the determination
Case No: 259967 Determination Page 1 of 10
Case number: 259967
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim – Policy Exclusion – River Flood – Sections 11(10), 35(2) of the
Insurance Contract Act 1984 (the Act).
28 June 2012
Background
1. The Applicants insured their home building and contents under a household
insurance policy issued by the Financial Services Provider (FSP).
2. In January 2011, the Applicants lodged a claim under the policy for water
damage to their property in North Booval Queensland, said to have been
caused by the stormwater inundation on 11 January 2011.
3. The FSP declined liability on the basis the damage was caused by “river
flood”, which is excluded by the policy.
4. The Applicants remain dissatisfied with the F SP‟s decision and are seeking
complete indemnity for their loss.
Summary of Applicants ’ position
5. The Applicants are being represented by their lawyer. Accordingly,
references in this determination to the Applicants will include submissions
made on their behalf by their legal representative.
The Applicants say:
6. The FSP has failed to “Clearly Inform” them of the flood exclusion in
accordance with its obligations set out under section 35 of the Act.
7. They did not dispute receiving a Product Disclosure Statement (PDS) at
policy inception. However, they were not provided with a PDS prior to each
policy renewal.
8. The language contained within the policy is unclear and ambiguous. Thus, a
person of average intelligence and education would have great difficult y in
understanding whether the damage caused by wet weather events would be
covered under the policy.
Determination
Case No: 259967 Determination Page 2 of 10
9. The PDS, due to its inadequate drafting does not satisfy the FSP‟s obligation
to clearly inform its policy holders of the exclusions contained within the
policy pertaining to flood.
10. The flood definition is so wide that it renders the coverage provided for
„storm, rain or flash flood‟ meaningless.
11. The FSP has a duty of utmost good faith to inform them of the unsuitability of
the cover selected, particularly due to the close proximity of the property to
the river.
12. They dispute the FSP‟s conclusion regarding river flooding, contending the
damage to their property was caused by storm water.
13. It was raining heavily on 11 January 2011 and they were told to evacuate the
property at 4.00pm on 11 January 2011; we were told to leave the house
that there was flash flooding at 3.00pm. The water was already in Selwyn
Street.
14. Upon the husband‟s return to the property at about 7.30pm on 11 January
2011, the water was already in the property.
15. The FSP‟s reliance on the hydrology reports obtained by the Insurance
Council of Australia (ICA) to deny to their claim is inappropriate, given that
the reports are general in nature rather than specific to their circumstances.
Summ ary of FSP’s position
The FSP says:
16. Whether the property was located on a flood prone area is a matter better
known to the Applicants. Therefore, the responsibility is on the Applicants to
ensure that they have read and understood the policy documents, to ensure
that it met with their needs.
17. At inception of the policy, the duty of utmost good faith does not extend to
the FSP investigating the tendency of the property to suffer flood damage.
18. The policy provides a 21 day cooling off period in which the Applicants had
the opportunity to cancel the policy for a full refund if it did not meet their
needs.
19. The policy needs to be read as a whole and it would be absurd for the FSP
to outline one or more exclusions prior to the Applicants reading and
understanding th e “Insured events” and/or scope of the policy.
20. The definition “River Flood” used in the policy is broadly consistent with the
Federal government‟s definition of flood as per proposed legislation and
within current industry standards.
Case No: 259967 Determination Page 3 of 10
21. When the definition of ‘ River Flood’ and ‘Flash flood’ are read together, the
difference between the two is clear.
22. „ Flash flood’ is a particular category of flood, which occurs when there are
heavy, intense bursts of rainfall, usually during thunderstorms where so
much water falls in a very short period of time that it cannot get away quickly
enough and collects and flows into the insured property.
23. The other type is „ River flood’ , which does not fall within the standard cover.
River flood occurs when water that is normally co ntained in a water
catchment system increases because of rainfall or snow melt (whether in the
immediate region or elsewhere), or is deliberately released by an authority,
and the water overflows onto land that is not normally covered by water into
the home.
24. All the expert evidence, including the loss assessor‟s report, the area
hydrology report (commissioned by the Insurance Council of Australia) and a
Water Damage Assessment report produced by hydrologist „W‟, show
flooding being the cause of inundation t o the Applicants‟ property.
25. As river flood is excluded under the Applicants‟ policy, the FSP is entitled to
deny liability for the damage.
26. The FSP relies on the following policy provisions:
“ Definitions (The Meaning Of Some Words)
Some words and expressions in this policy have a specific meaning which is
given below. Each word is printed in bold where it appears.
...
“flash flood” means what occurs when there are heavy, intense bursts of
rainfall, usually during thunderstorms where so much water falls in a very
short time that it cannot get away quickly enough and collects and flows into
your home .
but does not include when rainwater on the site :
cannot run off into a water catchment system , because it is
overflowing in flood; and
mixes with the flood water coming from the water catchment system
and then flows into your home.
...
“rain” means water that has fallen from the sky on to your building and the
site but not water from flash flood .
“river flood” means when water that is normally contained in a water
catchment system increases because of rainfall or snow (whether in the
immediate region or elsewhere) or is deliberately released by an authority,
and the water overflows onto land that is not normally covered by water into
your home.
For example water may be deliberately released by an authority from a dam
or reservoir.
Case No: 259967 Determination Page 4 of 10
...
“water catchment system” means;
a river, creek, other natural watercourse or lake, whether they are in
their original state or have been modified, are named or unnamed, or
normally dry that only run during periods of rain;
a dam, reservoir, storm water channel or canal.
...
SECTION 1
INSURED EVENTS CAUSING LOSS OR DAMAGE TO YOUR BUILDING
AND/OR CONTENTS
...
1.12 Storm, Rain Or Flash Flood
You are insured for damage to your building and/or your contents caused
by storm, rain or flash flood .
...
We will not pay for damage caused by:
…
river flood ;”
Issues
27. Whether the Applicants were clearly informed about the river flood exclusion
contained in the policy.
28. Whether the claimed loss was caused by the excluded policy event of a river
flood (as defined) or the defined event of storm, rain or flash flood.
Reasons for decision
29. Due to the nature of the dispute, it has been directly referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service‟s (FOS) Terms of Reference.
30. The Panel consists of an Ombudsman, a representative with extensive
experience in the insurance industry and a representative with extensive
experience in consumer claims.
31. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this determination except where considered
relevant.
Case No: 259967 Determination Page 5 of 10
32. The Panel notes that the Applicants have raised multiple concerns in respect
to the FSP‟s decision to decline the claim. For the pu rpose of clarity, these
matters will be considered separately by the Panel, hereunder:
Whether the FSP breached its duty of utmost good faith
33. The Applicants submit that the FSP‟s failure to inform them of the
unsuitability of their cover is in breach of its duty to act with the utmost good
faith as per section 13 of the Insurance Contracts Act 1984. Accordingly, the
FSP should be obliged to indemnify them for their losses.
34. The Applicants contended that the FSP has failed in its duty to inform them
of the policy limitation and exclusion pertaining to “river flood” given the close
proximity of the property to the river.
35. The Panel acknowledges the Applicants‟ contention with respect to this;
however, it is well established law that the onus is on the Applicants to
identify the cover sought and to advise the FSP of the type of cover
requested. Further, there is no precedent for the proposition (either by
reference to statute, case law or good industry practice) that the duty of
utmost good faith extends to an insurer advising an insured of the suitability
of its standard policy for their insurance requirements.
36. In these circumstances, the Panel is satisfied that the FSP has not breached
its duty of utmost good faith.
Whether the FSP is required to provide a PDS prior to each policy renewal
37. The Panel notes that the Applicants did not dispute receipt of the PDS at
policy inception. However, they contended that they “ did not receive a copy
of a PDS prior to paying each premium ”.
38. In this regard, the Panel refers to section 11(10) of the Act, which states as
follows:
“11(10)...
(a) Subject to paragraph (c), where after the commencement of this Act and
at or before the original entering into, or the renewal, extension or
reinstatement, of a contract of insurance, the insurer has given
information to the insured as required by sections...,35..., the requirement
by that section to give information to the insured shall be deemed to be
satisfied at or before any subsequent renewal, extension or reinstatement
of the contract”
39. The statute is clear, in that the requirement to provide relevant information
(in this case the PDS) is deemed to have been satisfied at or before any
subsequent renewal, extension or reinstatement of the contract if that
information was provided to the insured at or before the original contract was
entered into.
Case No: 259967 Determination Page 6 of 10
40. Therefore, the Panel considers the FSP on providing the PDS at policy
inception has fulfilled its obligation to clearly inform the Applicants of the
policy terms and conditions.
Whether the drafting of the PDS satisfied the requirement to clearly inform?
41. The Applicants submit that due to the inadequate drafting of the PDS, it did
not clearly inform them of the exclusion contained within the policy pertaining
to flood.
42. The FSP refutes the above allegation and maintains that the wording in
respect to the definition and exclusion of flood cover used in the PDS is
broadly consistent with the Government‟s proposed definition of flood and
within current industry standards. Further, that the policy clearly informs an
insured of the scope of the policy and the fact that loss or damage arising
from flood is not covered.
43. The Panel has considered the wording of the policy relevant to this dispute
and notes that on page 5 of the PDS, under the heading “What yo u are not
covered for”, the policy clearly states that damage caused by the seas and
river flood is not covered.
44. The policy goes further and states on pages 29 and 30 of the PDS, under
the heading “Section 1.12. Storm, Rain or Flash Flood”, that loss or da mage
caused by river flood is not covered.
45. It is also noted that the terms “River Flood” have been clearly and
unambiguously defined in the “Glossary” on page 20 of the PDS as:
“water that is normally contained in a water catchment system increases
because of rainfall or snow melt (whether in the immediate region or
elsewhere) or is deliberately released by an authority, and the water overflows
onto land that is not normally covered by water into your home”
46. Further, on page 22 of the PDS, the terms “Water catchment system” have
been defined as:
“ river, creek, other natural watercourse or lake, whether they are in their
original state or have been modified, are named or unnamed, or normally dry
that only run during periods of rain;
a dam, reservoir, st orm water channel or canal”
47. Accordingly, the Panel finds that the wording of the policy is both clear and
unambiguous in its meaning and application.
Whether the claimed loss was caused by storm/rain water; or a river flood (as
defined)
48. The Panel notes the parties do not dispute the following:
The insured property (both building and contents) suffered damage on
or about 11 January 2011.
Case No: 259967 Determination Page 7 of 10
It rained heavily at the property during the morning of Tuesday 11
January 2011.
The Applicants evacuated the property at 4.00pm on 11 January 2011,
at which time the property had not yet been inundated.
The insured property is in close proximity to the Bremer River (approx
1km).
The highest rainfall intensity at the property was, on average,
experienced more frequently than once a year.
The policy provides indemnity for loss or damage arising from storm
and rainwater including flash flood, however, excludes from cover loss
or damage arising from the event “river flood”.
49. The parties to the dispute differ in their opinions as to the proximate cause of
the loss subject to this dispute. While the Applicants maintain that the
property was inundated by stormwater, the FSP concluded the claimed loss
was caused by river flood as defined within the policy and accordingly is
specifically excluded from cover.
50. The FSP, in support of its contention, relies upon the ICA hydrology report
and a site specific report prepared by the project engineer “SM” on behalf of
“WRM”. The relevant information provided in these reports has been
summarised below.
51. ICA hydrologist report “Volume 3 Flooding in Ipswich City LGA” provides the
following relevant information:
There were four distinct rainfall periods across Ipswich City LGA during
the period from 9 January to 13 January. These occurred at:
– around 1000 hours and 1200 hours on 9 January
– around 1500 hours to 2100 hours on 9 January
– around 0700 to 1100 hours on 10 January
– around 0600 hours to 1500 hours on 11 January.
Over the 5 days from 9-13 January moderate to heavy rain fell over
Ipswich City LGA .
Rainfall in the 24 hours to 0900 on 9 January was not significant (less
than 25mm).
The next 24 hours to 0900 on 10 January was moderate (40-80mm).
Rainfall in the 24 hours to 0900 on 11 January was significant (25-
200mm) Rainfall was heaviest in the north-western area of the LGA.
Large releases were made from Wivenhoe Dam over the period from
0600 hours and possibly as early as 0300 hours on 11 January, until
around 0300 hours on 12 January 2011.
Case No: 259967 Determination Page 8 of 10
It was concluded that the dam release flood was the immediate cause
of flooding along the reach of the Brisbane River downstream of the
dam and along tributaries through the Ipswich City LGA.
At about 0900 hours on 11 January water levels at One Mile Bridge
Alert and Ipswich Alert begin to rise rapidly due to Brisbane River water
flowing back up along the Bremer River. The peak water level at these
stations occurred on 12 January 2011 and was caused by backwater
from the Brisbane River and the Bremer River flood attempting to flow
downstream.
Uncertainties exist as to whether properties flooded by water flows also
suffered initial inundation from overland flow flooding. Initial inundation
from overland flow may have occurred, especially in properties further
away from waterways.
52. The site specific report submitted by the project engineer SM on behalf of
WRM and titled “Site Specific Inundation Assessment” provides:
Inspection of the property occurred at 2.00pm on 01 February 2012.
The Applicants advised that the initial inundation occurred between
4.00pm and 7.30pm on Tuesday 11 January 2011. The exact time of
inundation is unknown as the Applicants evacuated the property at
4.00pm on 11 January 2011.
Total rainfalls of 123mm were recorded at Bundamba Alert Rainfall
station (located 1.3km north of the property) for 9 to 11 January 2011.
Peak rainfall intensity of 16.3mm/hr occurred at approximately 1300hrs
on 11 January 2011.
Recorded rainfall intensities were not particularly severe for short
durations, with higher rainfall intensities being regularly experienced in
the area.
The maximum stormwater run-off depths would have been experienced
within 30 minutes of peak rainfall intensity.
The property is located about 950m east of the Bremer River.
The floor level of the house is located at ground level. The ground leve l
adjoining the house is about 400mm above the ground level of the
street.
Rainfalls effectively ceased after 5.00pm on 11 January 2011. Storm
water runoff would have ceased shortly after the rainfall in the area had
ceased.
The Bremer River water level was some 4m below the minimum ground
level at the subject property.
Given the low intensity of the local rainfall, the characteristics of the
local catchment and the estimated timing of initial inundation,
stormwater runoff or flash flooding could not have inundated the house
above floor level prior to the arrival of the floodwater from the Bremer
River and Bundamba Creek.
Case No: 259967 Determination Page 9 of 10
Inundation of the property to a depth of about 1.6m above ground level
was caused by floodwaters overflowing from the Bremer River that
backed up along Bundamba Creek and its tributary.
53. The parties disagree as to the time of inundation. Within his Statutory
Declaration, the male Applicant says “ I went back to the property at 7.30pm
on Tuesday evening to find that there was water already in the property. ”
54. Within the report from WRM dated 20 February 2012, SM says “ Figure 1
shows that the house at the subject property would have been initially
inundated by Bremer River and Bundamba Creek floodwater at about 5am
on 12 January, some 12 hours after rainfall ceased in the vicinity of the
subject property. ”
55. Having considered these statements in conjunction with all of the other
evidence presented, the Panel prefers the view expressed by the Project
Engineer SM.
56. In particular the Panel notes that the ground level adjoining the house is
approximately 400mm above the ground level of the street. Further, the peak
rainfall intensity occurred at approximately 1300 hours on 11 January 2011
and rainfall had effectively ceased after 5pm on 11 January 2011 (Tuesday).
57. Within the male Applic ant‟s Statutory Declaration, he says that he originally
left the property at 4pm on the Tuesday evening but makes no mention of
there being water in the property at that time. The Panel concludes that
when the male Applicant left at 4pm there was no water in the property at
that time.
58. Given that the peak rainfall had already passed and there was effectively no
rainfall after 5pm on 11 January 2011, the Panel is not persuaded that
rainfall was the effective cause of the initial inundation of the property.
59. Rather the Panel accepts the evidence of SM, that the rising waters from the
Bremer River and Bundamba Creek were the effective cause of the initial
and ultimate inundation of the Applicant‟s property.
60. The Panel is satisfied that the rising waters from the Bremer River and
Bundamba Creek are covered by the definition of flood contained within the
policy and loss and damage caused by those rising waters is specifically
excluded under the terms of the policy.
Case No: 259967 Determination Page 10 of 10
Determination
61. On the basis of the available information, the Panel determines that the FSP
is entitled to deny liability for the claimed loss in accordance with the terms
of the policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.