Denial of flash flood contents claim under 48 hour exclusion
Summary
The applicants' contents were damaged by flood water in January 2011 shortly after they bought the policy by phone, and the FSP declined the claim. The Panel found the FSP clearly informed them of the 48 hour flash flood exclusion at inception, that the inundation occurred within 48 hours of inception, and that the claim was therefore not covered.
The FSP had clearly informed the applicants of the 48 hour exclusion by oral disclosure at inception, which satisfies section 35 and the section 69 protection for losses within 14 days of inception.
Issues
- Claim denial primary · not upheld
“The FSP was entitled to decline indemnity to the Applicants for their loss in line with the policy 48 hour exclusion.”
- Failure to disclose secondary · not upheld
“The FSP fulfilled its obligations under section 35 to clearly inform the Applicants of the 48 hour exclusion at inception.”
- Poor communication secondary · not upheld
“The FSP was not required to refer to the 48 hour policy term in its original decision to decline the claim.”
Subjects and remedies
natural disasterno remedy
Text of the determination
Case No: 259771 Determination Page 1 of 7
Case number: 259771
General Insurance - Domestic Insurance - Home Building - FSP Decision –
Insured Event – Policy Exclusion - Denial of claim – Section 35 Insurance
Contracts Act 1984
24 September 2012
Background
1. The Applicants insured their contents with the Financial Services Provider
(FSP). The relevant period of insurance (the policy) operated for twelve
months beginning from 10.38am on 11 January 2011. During this period, the
contents were insured for $60,000.
2. On 15 January 2011, the Applicants lodged a claim under the policy due to
extensive water inundation of their home in Barellan Point following severe
weather events in Queensland.
3. The FSP denied the claim on the basis the damage occurred within 48 hours
of policy inception which is excluded from cover.
4. The Applicants remain dissatisfied with the FSP‟s decision to decline the
claim and are seeking indemnity for their loss.
Summary of Applicant’s position
5. The Applicants‟ home was inundated during the Janua ry 2011 floods
resulting in significant loss of contents within the home.
6. The FSP advised the Applicants that on finalising its investigation into the
circumstances of the loss it had determined the loss was due to the event
„flood‟. Further, that the pol icy did not provide indemnity for loss/damage
arising due to a flood event.
7. The FSP on further investigation (the Applicants note the FSP had
previously advised them the investigation had been finalised) concluded that
the inundation of the property fell w ithin the insured event “Flash flood”.
8. However, it maintained the decision to decline the claim, on the basis that
the loss occurred within 48 hours of policy inception, a matter the FSP had
Determination
Case No: 259771 Determination Page 2 of 7
not raised previously and/or brought to the attention of the Applicants in its
original declinature of their claim.
9. The Applicants maintain that they held a previous policy insuring their
contents with the FSP which had lapsed a few months before the date of
loss.
10. Further, their home remained inundated with floodwater for over the 48 hour
exclusion period and accordingly this should entitle them to indemnity under
the policy.
Summary of FSP’s position
11. The FSP maintains:
The Applicants‟ policy was purchased at and commenced from 10.38am
on 11 January 2011.
The Applicants were „clearly informed‟ of the policy limitation in respect to
loss or damage arising from the event “Flash flood” within the first 48
hours of inception of the policy.
The relevant hydrology information confirms the inundation of the
Applicants‟ home res ulting in their loss did occur within 48 hours of policy
inception.
The FSP was not required to refer to the 48 hour exclusion in its original
decision to decline the claim as it was declined on the basis the loss was
due to the event „Flood‟, which in its elf is an event not insured under the
policy.
12. Accordingly, in line with the relevant policy provision(s) provided below the
FSP was entitled to decline indemnity to the Applicants under the claim:
Pages 14-15 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood
during the first 48 hours of the
initial period of insurance of this
Case No: 259771 Determination Page 3 of 7
policy unless we have issued it to
you:
in conjunction with your
signing a contract to
purchase the ho me; or
to replace a policy with us
or another insurer from the
date and time that other
policy expired.
...”
Relevant Law
Section 35 of the Act provides that, where a claim is made under a prescribed contract
and the event giving rise to the claim is a prescribed event in relation to the contract,
an insurer may not refuse to pay an amount equal to the minimum amount of cover set
out in the regulations made pursuant to the Act unless it can prove that before the
contract was entered into, the insurer clearly informed the insured in writing of the
relevant provisions of the contract, or that the insured knew or a reasonable person in
the circumstances could be expected to have known of such provision.
Issues
13. Whether the Applicants were clearly informed of the 48 hours policy
exclusion in relation to loss or damage arising from the event „Flash flood‟.
14. Whether the FSP was entitled to decline indemnity to the Applicants under
the policy.
Reasons for decision
15. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‟s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
16. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
17. The Panel is satisfied that it is not in dispute between the parties that:
The Applicants took out the policy with the FSP over the telephone on
11 January 2011 and covered their contents up to the sum insured
amount of $60,000.
Case No: 259771 Determination Page 4 of 7
The FSP sent and the Applicants received the relevant policy
documentation including the Product Disclosure Statement (PDS) and
Certificate of Insurance (COI).
The insured property was significantly inundated with floodwaters on 12
January 2011 causing substantial damage to the insured contents.
The policy responds to loss or damage arising from the insured event
flash flood, which has been acknowledged to be the cause of the loss.
The terms of the policy exclude from cover, loss or damage arising
from flash flood within the first 48 hours of insurance cover being
obtained.
The Applicants did not hold insurance cover for the property in question
immediately before they proceeded to obtain the policy of insurance
with the FSP, as their previous policy had been allowed to lapse.
18. The Panel notes that there are several issues to consider in respect to the
dispute between the parties and it is appropriate to consider them under the
headings below.
Clearly Inform
19. The Service notes that the FSP classifies „flash flood‟ as an insured event
under the policy. For the sake of clarity, the Panel is satisfied that although a
flash flood would reasonably be accepted to fall within the scope of the
prescribed event „Flood” (excluded under the policy), the FSP has elected to
provide indemnity for loss arising from flash flood as an exception to the
specified flood exclusion.
20. Section 35(2) of the Insurance Contracts Act 1984 (the Act) states that when
a claim is made under a “prescribed contract” for a “prescribed event”, an
insurer cannot refuse to pay the claim unless it can establish that it clearly
informed its insured of an exclusion it seeks to rely upon to decline indemnity
under a claim.
21. There is no dispute the contract of insurance covering the Applicants‟
contents was a “prescribed contract” and damage due to flash flood is a
“prescribed event”. The issue in dispute and which requires consideration is
whether the FSP had clearly informed the Applicants of the 48 hours
exclusion relied upon to decline the claim.
22. The onus is therefore on the FSP to establish that it had clearly informed the
Applicants prior to the claim that it would not cover damage caused by flash
flood in the instance the event occurs within the first 48 hours of the policy
being purchased. This is generally done by an insurer possibly verbally
informing the insured in addition to providing a copy of its policy which sets
out completely the rights and obligations of both parties under the insurance
contract.
23. The Panel notes that it is not in dispute that the FSP had provided the
relevant policy documentation to the Applicants after inception of the policy.
Case No: 259771 Determination Page 5 of 7
Further, the FSP in support of its position that the Applicants were clearly
informed of the relevant policy exclusion has made available a recording of
the policy inception telephone call.
24. Having considered the content of the telephone conversation between the
Applicant “NN” and the FSP‟s representative “K”, the Panel is satisfied that
not only did K on several occasions inform the Applicant of the 48 hour
exclusion, but NN demonstrated a clear understanding of the application of
the exclusion as well as the risks/circumstances to which it would potentially
apply. In these circumstances the FSP is entitled to avail itself of the
protection provided under section 69 of the Act in relation to a loss occurring
within 14 days of policy inception where the relevant section 35 derogation
information, is conveyed orally.
25. Accordingly, the Panel is satisfied that the FSP has established that the
Applicants were clearly informed of the 48 hours policy exclusion at inception
and prior to the date of loss, in accordance with its obligations under section
35 of the Act.
Cause of the Loss
26. The Panel notes that after its ori ginal decision to decline the Applicants‟
claim on the basis it was due to the excluded event “Flood”, the FSP altered
its stance and acknowledged that the cause of the loss fell within the insured
event “Flash flood”.
27. The FSP has made available a statement from its commissioned hydrologist
„SC‟ in an effort to establish the timing of the inundation of the Applicants‟
home which it maintains allows it to rely on the 48 hour policy exclusion to
decline the claim. The Panel has considered SC‟s statement of 24/11/11 and
notes it has been exchanged between the parties, accordingly in the interest
of brevity it will only reiterate information from this report it deems relevant in
providing this determination.
SC’s Statement dated 24 November 2011
SC considered the regional factors which led to the inundation in
Ipswich generally and also performed a site specific desk review of the
subject property to determine the time and date of inundation.
The area considered included the Ipswich catchment and in particular
the Bremer River approaching its junction with Brisbane River. A
substantial amount of rain fell over this area from around 6.00am on 11
January with the Bremer River peaking at Walloon to 31.87m at 5.00pm
on 11 January 2011.
The effect of the Brisbane River being elevated caused the level of the
Bremer River to increase (in the vicinity of the subject property) by
approximately 9.6m out of a total depth of 17.7m.
The level of the subject property varies from approximately less than
RL 1m AHD at the rear to RL 18.7m AHD at the front. The rear of the
Case No: 259771 Determination Page 6 of 7
property boundary line is on the banks of the Bremer River. The ground
level of the dwelling is RL 16m AHD.
The Bremer River would have reached a level sufficient to inundate the
dwelling at approximately 2.30am on 12 January 2011. The peak
inundation of the property occurred at approximately 4.00pm on 12
January when the river level rose to RL 18.5m AHD.
The available data shows that by 10.30am on 13 January the river
levels had receded to approximately RL 15.4m AHD which falls below
the level of the dwelling at RL16m AHD.
Accordingly, any inundation at the property would have commenced,
peaked and subsided before 10.30am on 13 January.
M’s Site Report dated 18 February 2011
The loss was caused by river flood and was estimated at approximately
$55,000.
The date of loss was 12 January 2011.
The Applicants left the property on the night of 11 January 2011.
The water that inundated the property was contaminated (sewerage).
28. The Panel is satisfied that the available information establishes that the
inundation of the insured property occurred as a result of the significant
rainfall over the relevant catchment which began at approximately 4.00am
on 11 January 2011. This resulted in the rise of the level of Bremer River in
the vicinity of the insured property and which entered the Applicants‟ home
on 12 January 2011 (within 24 hours of the heavy rainfall).
29. Further, the Panel in accepting that the property was inundated on 12
January 2011 is satisfied that this also establishes that the event giving rise
to the loss i.e. flash flood, occurred within 48 hours of the policy being
purchased by the Applicants. Accordingly, in line with the relevant 48 hour
exclusion, the Applicants‟ loss is not covered under the pol icy.
Other Issues
30. The Applicants have also raised concern in respect to the fact that the FSP
had not referred to the 48 hour exclusion in its original decision to decline the
claim, even though it claimed that it had completed all its investigations into
the claim.
31. The Panel has considered this component of the Applicants‟ submission ,
however, accepts the FSP‟s position in this regard. The policy clearly
excludes from cover loss or damage arising from the event „Flood‟, which in
itself is grounds to decline a claim for loss or damage arising from this event.
Accordingly in seeking to decline a claim on the basis of this exclusion the
FSP is not required to make reference to the 48 hour policy term.
Case No: 259771 Determination Page 7 of 7
32. However, in the alternative if the Applicants do establish a loss which falls
within an insured event (such is the case in this instance) the FSP is then
entitled to rely on the exclusions/limitations which apply to the insured event.
In this instance, although damage from the event flash flood is covered
under the policy, such cover is excluded if the damage occurs within the first
48 hours of the policy being incepted.
33. The Applicants have also made reference to their property being previously
insured with the FSP, however, that cover lapsed a few months before the
date of loss subject to this claim. The FSP accepts that the Applicants did
have their property insured under a policy held with it, however, confirms that
the previous policy lapsed effective from 30 March 2010.
34. The Panel has considered the Applicants ‟ position in respect to holding a
previous policy with the FSP. However, it is not satisfied that a policy which
lapsed over 9 months before the current policy was purchased can
reasonably be considered to establish any continuity of cover and/or that it
expired from the date and time the latter (current policy) was issued.
Determination
35. On the basis of the available information the Panel determines that:
The FSP fulfilled its obligations under section 35 of the Act to „Clearly
Inform‟ the Applicants of the exclusion from cover any loss or damage
arising from flash flood within 48 hours of inception of the policy.
The FSP was entitled to decline indemnity to the Applicants for their
loss in line with the policy.