Home / Financial Firm (Unknown - Insurer) / Determination 259717
Determination 259717
Denial of water inundation claim under flood exclusion
Summary
The Applicant's home was inundated in January 2011 and the FSP declined the building claim as flood, which is excluded. AFCA found the PDS clearly informed him of the flood exclusion and that the water was Brisbane River floodwater, so the FSP was entitled to deny the claim.
The PDS met section 35 of the Insurance Contracts Act, and the hydrology evidence showed the inundation was backflow floodwater rather than stormwater run-off or rainwater.
Issues
- Claim denial primary · not upheld
“the Panel is satisfied on the balance of probabilities that the water from the drains was not stormwater run-off or rainwater from recent falls”
- Failure to disclose secondary · not upheld
“the Panel is satisfied the FSP has complied with its obligation to clearly inform pursuant to Section 35”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 259717 Determination Page 1 of 8
Case number: 259717
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Water Inundation - Flood
13 August 2012
Note the Applicant has legal representation: for ease of reference,
submissions made on his behalf will appear as the „Applicant‟.
Background
1. The Applicant held a home and contents policy with the Financial Services
Provider (FSP) from 17 November 2009. The policy provided building cover
for $267,800 and contents cover for $41,200.
2. On or about 11 January 2011, the Applicant claims his property in Fairfield
was damaged as a result of water inundation around the time of the severe
weather events that affected significant parts of Queensland.
3. The FSP declined the claim on the basis that it considered that the home
was inundated by floodwater, which is excluded under the policy.
4. The Applicant disagrees with the decision and seeks reimbursement for his
losses, noting that virtually his entire home was inundated. He further says
that the FSP failed to make him aware that its policy excluded flooding.
Summary of Applicant‟s position
5. The Applicant has been assisted by legal representatives and submission
made on behalf of the applicant by those representatives. For the purpose of
this Determination reference to the Applicant includes reference to the legal
representative.
6. The Applicant says the FSP failed to clearly inform him of the ambit of the
flood exclusion under the policy
7. Alternatively, the property was inundated by stormwater from nearby drains,
prior to being overcome with floodwater.
Determination
Case No: 259717 Determination Page 2 of 8
Summary of FSP‟s position
8. The FSP says that the cause of the loss was flooding of the Brisbane River.
The policy specifically excludes losses which occur as a result of flooding.
9. The actual date of inundation was the 12 January 2011 and not the 11
January, as claimed by the Applicant.
10. The Applicant was made aware of the flood exclusion verbally at the time of
policy inception and through provision of the Product Disclosure Statement
(PDS). This document enabled the FSP to comply with its obligations under
Section 35 of the Insurance Contracts Act 1984 (the Act) and ensured the
Applicant was adequately informed of the limitations of the contract.
11. Section 35 of the Act provides that, where a claim is made under a
prescribed contract and the event giving rise to the claim is a prescribed
event in relation to the contract, an insurer may not refuse to pay an amount
equal to the minimum amount of cover set out in the regulations made
pursuant to the Act unless it can prove that before the contract was entered
into, the insurer clearly informed the insured in writing of the relevant
provisions of the contract, or that the insured knew or a reasonable person in
the circumstances could be expected to have known of such provision.
12. The FSP relies upon the following policy provisions:
Page 2 of Part A of the PDS
“ flood – is the covering of normally dry land by water which has overflowed,
escaped or been released from the confines of any natural or artificial
watercourse, lake, reservoir, canal or dam.”
Pages 7-9 of the PDS
“ COVER PART 1 – INSURED EVENTS
This section describes the insured events you are covered for, and the
conditions and exclusions that specifically apply to each insured event.
They should be read with the general exclusions on pages 27-29.
...
Insured event We will NOT cover:
6. Storm and rainwater
Including loss or damage from:
the escape of rainwater from any water
pipe, drain or gutter
surface run-off rainwater from
surrounding areas that occurs within 24
hours of heavy rain
Including loss or damage caused by erosion,
subsidence, landslide, mudslide or any other
earth movement that occurs within 72 hours of
loss or damage
caused by flood...
Case No: 259717 Determination Page 3 of 8
a storm or heavy rain and as a result of that
storm or heavy rain
...”
Page 27 of the PDS
“ GENERAL EXCLUSIONS APPLYINGTO THE WHOLE POLICY
We will not cover:
Action of the sea, high water or underground water:
loss or damage caused by flood...”
Issues
13. Whether the Applicant was “clearly informed” that the policy did not provide
cover for flooding, as required under Section 35 of the Act.
14. Whether the w ater that inundated the Applicant‟s property was floodwater or
stormwater run-off as defined in the policy.
15. On what date the property was inundated.
16. Whether the Applicant‟s loss was covered under the policy.
Reasons for decision
17. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the potential amount of the claim and the
issues to be considered. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
18. This decision has been made by a Panel consisting of an Ombudsman, an
insurance representative appointed by the Financial Ombudsman Service
Board, and a consumer representative appointed by the Financial
Ombudsman Service Board.
19. The Panel is satisfied that a full exchange of the relevant information has
taken place between the respective parties and that each party has had the
opportunity of addressing any issues raised.
Whether the Applicant was “clearly informed” of the flood exclusion
20. The Applicant does not deny that he was furnished with a copy of the PDS
from the FSP or that he was informed at the time of the telephone call to
incept the policy that the “policy does not provide cover for flood”.
21. Section 35 of the Act allows for an insurer to define and limit the level of
cover offered for insurance on the basis that it “clearly informs” the
policyholder(s). This requirement is required to be discharged in writing and
Case No: 259717 Determination Page 4 of 8
no obligation is on the insurer to inform a policyholder of the limitations
verbally.
22. The question of what it means to “clearly inform” was considered by the
Northern Territory Court of Appeal in the matter of Marsh v CGU Insurance
Ltd t/as Commercial Union Insurance [2004] NTCA 1 (the Marsh case).
Mildren J wrote in relation to an insurer‟s obligations under Section 35(2) of
the Act that:
“... a fair reading of sec 35(2) [does] not warrant the conclusion that the result
needed to go further than providing for the relevant exclusion in the policy
wording in clear and unambiguous language and in a manner which a person
of average intelligence and education was likely to have little difficulty in
finding and understanding if that person read the policy in question.”
23. Therefore, on the basis that a PDS is written in plain English and can be
understood by a person of “average intelligence and education”, the Panel is
satisfied that the provision of the PDS discharges the FSP‟s obligations
under Section 35(2).
24. With respect to this claim, the clarity of what is written in the PDS determines
whether the FSP may limit its cover to exclude losses which are attributable
to a “flood”.
25. The PDS provides a single page index on page 1 which highlights relevant
sections, including “Definitions”, “Insured events” and “General exclusions
applying to the whole policy”. The “Definitions” section specifies how the
policy defines “flood”. “Insured events” are the circumstances under which
cover is offered. In this section, under the “Storm and rainwater” event, the
policy specifically identifies that cover does not extend to “loss or damage
caused by flood”. “General exclusions...” confirms that the policy as a whole
does not cover flood events.
26. The Panel considers that the definition of “flood” adequately conveys that the
policy does not cover events where water has “overflowed, escaped or been
released” from the confines of a specific water body. That definition, in the
Panel‟s view, is relatively straightforward.
27. The policy does distinguish between “flood” (which is not covered) and
“surface run - off rainwater” (which is covered under certain circumstances).
28. The policy is suitably indexed and the Panel is satisfied that a reasonable
person who consulted it (on page 1) would be directed to “Ge neral
Exclusions” on page 27 of the policy to determine that flood events are not
covered by the FSP.
29. Accordingly, the Panel is satisfied that the FSP made the Applicant aware
through the provision of the PDS and during the call to incept the policy that
the policy did not provide flood cover. In the circumstances, the Panel is
satisfied the FSP has complied with its obligation to clearly inform pursuant
to Section 35 of the Act.
Case No: 259717 Determination Page 5 of 8
Source and timing of the water inundation and whether the policy responds
30. There is an onus on an insured to establish on the balance of probabilities
that a claim fits the definition of an insured event. Should this onus be
discharged, it is then the responsibility of the insurer to establish the
application of any exclusion on which it relies to deny the claim.
31. To be entitled to cover from the FSP, the onus therefore rests with the
Applicant to establish that his loss fits within the scope of what is covered by
the FSP‟s policy.
32. The policy provides cover for a series of defined events as outlined in the
PDS. It does not provide blanket cover for all types of loss.
33. It is not in dispute that the Applicant‟s property was inundated with water
following significant rainfall that affected much of Queensland in early 2011.
34. The Applicant says that he first noticed water in the streets around his home
on 10 January 2011. By late afternoon he estimated that there was about
100ml of water in his backyard. He moved items out of his home during the
day in anticipation of a flood and evacuated with his wife about 1am the next
day. He returned in his boat later that morning and confirms that the flood
peak was at about 7am on 11 January 2011.
35. He says that the inundation of the home occurred within 24 hours of the
heavy rainfall on 10 January 2011 and considers that stormwater run-off was
responsible and that the policy should respond. It is a matter of record that
the Brisbane area was subject to significant rainfall at this time.
36. The FSP retained a hydrologist, WR, to inspect the property on 29 June
2011. The subsequent report of 12 August 2011 revealed that:
the property housed a single storey home, set about 0.8m above the
ground;
the property was inundated above floor level around 3am on
Wednesday 12 January 2011 (not the 11 January as claimed by the
Applicant);
the property was ultimately inundated to a depth of about 3m. This was
about 300mm from the peak of the home;
the Applicant stated that the stormwater drains in the area had been
blocked, not from debris, but from the sheer volume of water that had
fallen. A water build up in the streets had been present for a couple of
days at the intersection of F Road and A Street, prior to the
“widespread inundation”;
the East Brisbane Alert rainfall station was closest to the property,
being 3.2km to the northeast of it. This station recorded rainfall of
100mm (in the 24 hours to 9am on 10 January), 16mm (11 January)
and 38mm (12 January).
Case No: 259717 Determination Page 6 of 8
38mm of rainfall was recorded between 9am and 8pm on 11 January
2011. The peak one-hour rainfall intensity for this day of 11.7mm per
hour was recorded around 11am;
the recorded rainfall intensities were “not particularly severe” and
higher rainfall intensities are “regularly experienced” in the area;
peak stormwater run-off would have occurred within 30 minutes after
the peak period of rainfall. No rainfall was recorded after 8pm on 11
January 2011;
the Applicant‟s property is located about 200m from the Brisbane River;
ground levels at the property are lower than for surrounding levels. An
open stormwater drain is located 400m west of the property;
flood levels in the vicinity of the Applicant‟s home were estimated at
about 7.8m AHD (Australian Height Datum). Based on the height of
inundation, the height of the home was estimated at 4.8m AHD;
based on the available information, the property would have been
inundated at about 2.30am on 12 January 2011;
initial inundation would have come from floodwater exiting through the
drains and this would have inundated the subject home to a depth of up
to 0.2m prior to the arrival of overland floodwater;
the initial inundation of the home was up to five hours after rain had
ceased; and
stormwater run- off was likely to have inundated the Applicant‟s yard to
a depth of about 0.1m above ground level. Despite this, it “did not
contrib ute” to the inundation of the home, which was inundated by
floodwater from the Brisbane River.
37. Significantly the evidence of WR is that the inundation of the Applicant‟s
home did not occur until the early hours of 12 January 2011. The Applicant
alleges that it occurred 24 hours prior to this.
38. It is the FSP‟s submission that the Applicant is mistaken about the time of
inundation. It has relied upon contemporaneous news reports in support of
this contention as well as previous decisions from the Service regarding
surrounding areas that were not inundated until 12 January 2011.
39. The Applicant has not challenged the authenticity of the contemporaneous
reports supplied by the FSP. He contends that his firsthand evidence of the
event should be preferred. Whilst the Panel is generally in agreement that
such evidence must be given significant weight, it must be considered in the
context of all available material.
40. Key to the Applicant‟s claim is that the peak level of inundation occurred
around 7am on 11 January 2011. The Insurance Council of Australia (ICA)
compiled reports into the flooding disasters in Queensland from this period.
The reports detailed information about the rainfall, the onset of the flood and
its effect on the various areas.
Case No: 259717 Determination Page 7 of 8
41. The ICA noted that rainfall in the Brisbane city area was heaviest through the
6am to 4pm period on 11 January 2011. Page 41 of Volume 2 of the report
notes:
“Rain ceased over the Brisbane City area around 1800 hours on Tuesday 11
January, some 24-30 hours before flood levels in the Brisbane River peaked.
Thus, when the Brisbane River peaked, there is no evidence that there was
any „normal‟ flow of significance from the catchment areas of tributary creeks
draining the Brisbane LGA [Local Government Area]. As the floodwave
passed downstream along the Brisbane River, backwater flooding occurred
up the tributary creeks. The peak flood level and time of peak along the
tributary peaks are expected to be the same as those in the Brisbane River at
the mouth of the creeks. Flooding along the mainstream of the Brisbane River
and along the lower tributaries was principally caused by releases from
Wivenhoe Dam (dam release flooding).”
42. This report suggests that the peak level of the flood was not until at least
6pm on 12 January 2011, being some 35 hours after the time suggested by
the Applicant. It also highlights that “backwater flooding” occurred through
the Brisbane River and tributary creeks. This flooding was caused by the
release of water from the Wivenhoe Dam.
43. Volume 2 of the ICA report notes that:
“Given that rainfall across the Brisbane City [local area] had ceased by 1800
hours on Tuesday 11 January, any flooding after this time will have been
caused by waterflow inundation from the Brisbane River and its tributary
creeks, it being noted that inundation along the tributaries was associated with
backwater flooding from the Brisbane River (which in turn was principally
caused by the dam release flood from Wivenhoe Dam).”
44. The above passage indicates that any inundation after the completion of the
heaviest rainfall on 11 January was almost certainly due to flooding and not
stormwater run-off. Therefore, if the time given by the Applicant for
inundation was correct, it is possible that this was due to stormwater run-off
and not flooding.
45. Ho wever, in the Panel‟s view the evidentiary support for this position is
problematic. The Applicant contends that the home was inundated to a depth
of about 3m by 7am on 11 January 2011. Based on the wider and more
generally accepted evidence in respect of the Queensland floods it is
unlikely that this level of inundation occurred at this locale on 11 January
2011, and even had this occurred it is unlikely that this was solely due to
stormwater run-off.
46. Having carefully reviewed the hydrological evidence, p revious decisions in
relation to the area and information from the public record the Panel is of the
opinion that on the balance of probabilities the home was first inundated
above floor level on the morning of 12 January 2011; the home was
ultimately inundated to a height of approximately 3m.
47. The Panel considers that the evidence from WR is sufficient to establish that
the water which inundated the Applicant‟s property was floodwater from the
Case No: 259717 Determination Page 8 of 8
flooding of the Brisbane River which first occurred at this loca tion on 12
January 2011; this originated through backflow inundation of the stormwater
drains. This is evidenced by the lack of rainfall after 8pm on 11 January 2011
in the area.
48. The Panel further accepts that the water from these drains was overflow
from the Brisbane River and not “rainwater” as no rainfall had occurred for at
least four and possibly five hours prior to inundation.
49. The FSP‟s policy specifies that flood is:
“...th e covering of normally dry land by water which has overflowed, escaped
or been released from the confines of any natural or artificial watercourse,
lake, reservoir, canal or dam.”
50. Although it is reported that there had been stormwater runoff prior to the
inundation by floodwater, the evidence supports a view that this is unlikely to
have exceeded 200mm, which, given the height of the property above
ground level, would not have resulted in any damage to the home.
51. The circumstances of the loss are consistent with the flooding of the
Brisbane River. The Panel is satisfied on the balance of probabilities that the
water from the drains was not stormwater run-off or rainwater from recent
falls. It considers that it was backflow flooding from the Brisbane River and,
as such, properly described as floodwater and not covered under the policy.
Determination
52. On the basis of the available information, the Panel determines that the FSP
is entitled to deny the Applicant‟s claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.