Home / Financial Firm (Unknown - Insurer) / Determination 259717

Determination 259717

Denial of water inundation claim under flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-08-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicant's home was inundated in January 2011 and the FSP declined the building claim as flood, which is excluded. AFCA found the PDS clearly informed him of the flood exclusion and that the water was Brisbane River floodwater, so the FSP was entitled to deny the claim.

The PDS met section 35 of the Insurance Contracts Act, and the hydrology evidence showed the inundation was backflow floodwater rather than stormwater run-off or rainwater.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 259717 Determination Page 1 of 8 Case number: 259717 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Water Inundation - Flood 13 August 2012 Note the Applicant has legal representation: for ease of reference, submissions made on his behalf will appear as the „Applicant‟. Background 1. The Applicant held a home and contents policy with the Financial Services Provider (FSP) from 17 November 2009. The policy provided building cover for $267,800 and contents cover for $41,200. 2. On or about 11 January 2011, the Applicant claims his property in Fairfield was damaged as a result of water inundation around the time of the severe weather events that affected significant parts of Queensland. 3. The FSP declined the claim on the basis that it considered that the home was inundated by floodwater, which is excluded under the policy. 4. The Applicant disagrees with the decision and seeks reimbursement for his losses, noting that virtually his entire home was inundated. He further says that the FSP failed to make him aware that its policy excluded flooding. Summary of Applicant‟s position 5. The Applicant has been assisted by legal representatives and submission made on behalf of the applicant by those representatives. For the purpose of this Determination reference to the Applicant includes reference to the legal representative. 6. The Applicant says the FSP failed to clearly inform him of the ambit of the flood exclusion under the policy 7. Alternatively, the property was inundated by stormwater from nearby drains, prior to being overcome with floodwater. Determination Case No: 259717 Determination Page 2 of 8 Summary of FSP‟s position 8. The FSP says that the cause of the loss was flooding of the Brisbane River. The policy specifically excludes losses which occur as a result of flooding. 9. The actual date of inundation was the 12 January 2011 and not the 11 January, as claimed by the Applicant. 10. The Applicant was made aware of the flood exclusion verbally at the time of policy inception and through provision of the Product Disclosure Statement (PDS). This document enabled the FSP to comply with its obligations under Section 35 of the Insurance Contracts Act 1984 (the Act) and ensured the Applicant was adequately informed of the limitations of the contract. 11. Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. 12. The FSP relies upon the following policy provisions: Page 2 of Part A of the PDS “ flood – is the covering of normally dry land by water which has overflowed, escaped or been released from the confines of any natural or artificial watercourse, lake, reservoir, canal or dam.” Pages 7-9 of the PDS “ COVER PART 1 – INSURED EVENTS This section describes the insured events you are covered for, and the conditions and exclusions that specifically apply to each insured event. They should be read with the general exclusions on pages 27-29. ... Insured event We will NOT cover: 6. Storm and rainwater Including loss or damage from:  the escape of rainwater from any water pipe, drain or gutter  surface run-off rainwater from surrounding areas that occurs within 24 hours of heavy rain Including loss or damage caused by erosion, subsidence, landslide, mudslide or any other earth movement that occurs within 72 hours of  loss or damage caused by flood... Case No: 259717 Determination Page 3 of 8 a storm or heavy rain and as a result of that storm or heavy rain ...” Page 27 of the PDS “ GENERAL EXCLUSIONS APPLYINGTO THE WHOLE POLICY We will not cover: Action of the sea, high water or underground water:  loss or damage caused by flood...” Issues 13. Whether the Applicant was “clearly informed” that the policy did not provide cover for flooding, as required under Section 35 of the Act. 14. Whether the w ater that inundated the Applicant‟s property was floodwater or stormwater run-off as defined in the policy. 15. On what date the property was inundated. 16. Whether the Applicant‟s loss was covered under the policy. Reasons for decision 17. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the potential amount of the claim and the issues to be considered. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 18. This decision has been made by a Panel consisting of an Ombudsman, an insurance representative appointed by the Financial Ombudsman Service Board, and a consumer representative appointed by the Financial Ombudsman Service Board. 19. The Panel is satisfied that a full exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. Whether the Applicant was “clearly informed” of the flood exclusion 20. The Applicant does not deny that he was furnished with a copy of the PDS from the FSP or that he was informed at the time of the telephone call to incept the policy that the “policy does not provide cover for flood”. 21. Section 35 of the Act allows for an insurer to define and limit the level of cover offered for insurance on the basis that it “clearly informs” the policyholder(s). This requirement is required to be discharged in writing and Case No: 259717 Determination Page 4 of 8 no obligation is on the insurer to inform a policyholder of the limitations verbally. 22. The question of what it means to “clearly inform” was considered by the Northern Territory Court of Appeal in the matter of Marsh v CGU Insurance Ltd t/as Commercial Union Insurance [2004] NTCA 1 (the Marsh case). Mildren J wrote in relation to an insurer‟s obligations under Section 35(2) of the Act that: “... a fair reading of sec 35(2) [does] not warrant the conclusion that the result needed to go further than providing for the relevant exclusion in the policy wording in clear and unambiguous language and in a manner which a person of average intelligence and education was likely to have little difficulty in finding and understanding if that person read the policy in question.” 23. Therefore, on the basis that a PDS is written in plain English and can be understood by a person of “average intelligence and education”, the Panel is satisfied that the provision of the PDS discharges the FSP‟s obligations under Section 35(2). 24. With respect to this claim, the clarity of what is written in the PDS determines whether the FSP may limit its cover to exclude losses which are attributable to a “flood”. 25. The PDS provides a single page index on page 1 which highlights relevant sections, including “Definitions”, “Insured events” and “General exclusions applying to the whole policy”. The “Definitions” section specifies how the policy defines “flood”. “Insured events” are the circumstances under which cover is offered. In this section, under the “Storm and rainwater” event, the policy specifically identifies that cover does not extend to “loss or damage caused by flood”. “General exclusions...” confirms that the policy as a whole does not cover flood events. 26. The Panel considers that the definition of “flood” adequately conveys that the policy does not cover events where water has “overflowed, escaped or been released” from the confines of a specific water body. That definition, in the Panel‟s view, is relatively straightforward. 27. The policy does distinguish between “flood” (which is not covered) and “surface run - off rainwater” (which is covered under certain circumstances). 28. The policy is suitably indexed and the Panel is satisfied that a reasonable person who consulted it (on page 1) would be directed to “Ge neral Exclusions” on page 27 of the policy to determine that flood events are not covered by the FSP. 29. Accordingly, the Panel is satisfied that the FSP made the Applicant aware through the provision of the PDS and during the call to incept the policy that the policy did not provide flood cover. In the circumstances, the Panel is satisfied the FSP has complied with its obligation to clearly inform pursuant to Section 35 of the Act. Case No: 259717 Determination Page 5 of 8 Source and timing of the water inundation and whether the policy responds 30. There is an onus on an insured to establish on the balance of probabilities that a claim fits the definition of an insured event. Should this onus be discharged, it is then the responsibility of the insurer to establish the application of any exclusion on which it relies to deny the claim. 31. To be entitled to cover from the FSP, the onus therefore rests with the Applicant to establish that his loss fits within the scope of what is covered by the FSP‟s policy. 32. The policy provides cover for a series of defined events as outlined in the PDS. It does not provide blanket cover for all types of loss. 33. It is not in dispute that the Applicant‟s property was inundated with water following significant rainfall that affected much of Queensland in early 2011. 34. The Applicant says that he first noticed water in the streets around his home on 10 January 2011. By late afternoon he estimated that there was about 100ml of water in his backyard. He moved items out of his home during the day in anticipation of a flood and evacuated with his wife about 1am the next day. He returned in his boat later that morning and confirms that the flood peak was at about 7am on 11 January 2011. 35. He says that the inundation of the home occurred within 24 hours of the heavy rainfall on 10 January 2011 and considers that stormwater run-off was responsible and that the policy should respond. It is a matter of record that the Brisbane area was subject to significant rainfall at this time. 36. The FSP retained a hydrologist, WR, to inspect the property on 29 June 2011. The subsequent report of 12 August 2011 revealed that:  the property housed a single storey home, set about 0.8m above the ground;  the property was inundated above floor level around 3am on Wednesday 12 January 2011 (not the 11 January as claimed by the Applicant);  the property was ultimately inundated to a depth of about 3m. This was about 300mm from the peak of the home;  the Applicant stated that the stormwater drains in the area had been blocked, not from debris, but from the sheer volume of water that had fallen. A water build up in the streets had been present for a couple of days at the intersection of F Road and A Street, prior to the “widespread inundation”;  the East Brisbane Alert rainfall station was closest to the property, being 3.2km to the northeast of it. This station recorded rainfall of 100mm (in the 24 hours to 9am on 10 January), 16mm (11 January) and 38mm (12 January). Case No: 259717 Determination Page 6 of 8  38mm of rainfall was recorded between 9am and 8pm on 11 January 2011. The peak one-hour rainfall intensity for this day of 11.7mm per hour was recorded around 11am;  the recorded rainfall intensities were “not particularly severe” and higher rainfall intensities are “regularly experienced” in the area;  peak stormwater run-off would have occurred within 30 minutes after the peak period of rainfall. No rainfall was recorded after 8pm on 11 January 2011;  the Applicant‟s property is located about 200m from the Brisbane River;  ground levels at the property are lower than for surrounding levels. An open stormwater drain is located 400m west of the property;  flood levels in the vicinity of the Applicant‟s home were estimated at about 7.8m AHD (Australian Height Datum). Based on the height of inundation, the height of the home was estimated at 4.8m AHD;  based on the available information, the property would have been inundated at about 2.30am on 12 January 2011;  initial inundation would have come from floodwater exiting through the drains and this would have inundated the subject home to a depth of up to 0.2m prior to the arrival of overland floodwater;  the initial inundation of the home was up to five hours after rain had ceased; and  stormwater run- off was likely to have inundated the Applicant‟s yard to a depth of about 0.1m above ground level. Despite this, it “did not contrib ute” to the inundation of the home, which was inundated by floodwater from the Brisbane River. 37. Significantly the evidence of WR is that the inundation of the Applicant‟s home did not occur until the early hours of 12 January 2011. The Applicant alleges that it occurred 24 hours prior to this. 38. It is the FSP‟s submission that the Applicant is mistaken about the time of inundation. It has relied upon contemporaneous news reports in support of this contention as well as previous decisions from the Service regarding surrounding areas that were not inundated until 12 January 2011. 39. The Applicant has not challenged the authenticity of the contemporaneous reports supplied by the FSP. He contends that his firsthand evidence of the event should be preferred. Whilst the Panel is generally in agreement that such evidence must be given significant weight, it must be considered in the context of all available material. 40. Key to the Applicant‟s claim is that the peak level of inundation occurred around 7am on 11 January 2011. The Insurance Council of Australia (ICA) compiled reports into the flooding disasters in Queensland from this period. The reports detailed information about the rainfall, the onset of the flood and its effect on the various areas. Case No: 259717 Determination Page 7 of 8 41. The ICA noted that rainfall in the Brisbane city area was heaviest through the 6am to 4pm period on 11 January 2011. Page 41 of Volume 2 of the report notes: “Rain ceased over the Brisbane City area around 1800 hours on Tuesday 11 January, some 24-30 hours before flood levels in the Brisbane River peaked. Thus, when the Brisbane River peaked, there is no evidence that there was any „normal‟ flow of significance from the catchment areas of tributary creeks draining the Brisbane LGA [Local Government Area]. As the floodwave passed downstream along the Brisbane River, backwater flooding occurred up the tributary creeks. The peak flood level and time of peak along the tributary peaks are expected to be the same as those in the Brisbane River at the mouth of the creeks. Flooding along the mainstream of the Brisbane River and along the lower tributaries was principally caused by releases from Wivenhoe Dam (dam release flooding).” 42. This report suggests that the peak level of the flood was not until at least 6pm on 12 January 2011, being some 35 hours after the time suggested by the Applicant. It also highlights that “backwater flooding” occurred through the Brisbane River and tributary creeks. This flooding was caused by the release of water from the Wivenhoe Dam. 43. Volume 2 of the ICA report notes that: “Given that rainfall across the Brisbane City [local area] had ceased by 1800 hours on Tuesday 11 January, any flooding after this time will have been caused by waterflow inundation from the Brisbane River and its tributary creeks, it being noted that inundation along the tributaries was associated with backwater flooding from the Brisbane River (which in turn was principally caused by the dam release flood from Wivenhoe Dam).” 44. The above passage indicates that any inundation after the completion of the heaviest rainfall on 11 January was almost certainly due to flooding and not stormwater run-off. Therefore, if the time given by the Applicant for inundation was correct, it is possible that this was due to stormwater run-off and not flooding. 45. Ho wever, in the Panel‟s view the evidentiary support for this position is problematic. The Applicant contends that the home was inundated to a depth of about 3m by 7am on 11 January 2011. Based on the wider and more generally accepted evidence in respect of the Queensland floods it is unlikely that this level of inundation occurred at this locale on 11 January 2011, and even had this occurred it is unlikely that this was solely due to stormwater run-off. 46. Having carefully reviewed the hydrological evidence, p revious decisions in relation to the area and information from the public record the Panel is of the opinion that on the balance of probabilities the home was first inundated above floor level on the morning of 12 January 2011; the home was ultimately inundated to a height of approximately 3m. 47. The Panel considers that the evidence from WR is sufficient to establish that the water which inundated the Applicant‟s property was floodwater from the Case No: 259717 Determination Page 8 of 8 flooding of the Brisbane River which first occurred at this loca tion on 12 January 2011; this originated through backflow inundation of the stormwater drains. This is evidenced by the lack of rainfall after 8pm on 11 January 2011 in the area. 48. The Panel further accepts that the water from these drains was overflow from the Brisbane River and not “rainwater” as no rainfall had occurred for at least four and possibly five hours prior to inundation. 49. The FSP‟s policy specifies that flood is: “...th e covering of normally dry land by water which has overflowed, escaped or been released from the confines of any natural or artificial watercourse, lake, reservoir, canal or dam.” 50. Although it is reported that there had been stormwater runoff prior to the inundation by floodwater, the evidence supports a view that this is unlikely to have exceeded 200mm, which, given the height of the property above ground level, would not have resulted in any damage to the home. 51. The circumstances of the loss are consistent with the flooding of the Brisbane River. The Panel is satisfied on the balance of probabilities that the water from the drains was not stormwater run-off or rainwater from recent falls. It considers that it was backflow flooding from the Brisbane River and, as such, properly described as floodwater and not covered under the policy. Determination 52. On the basis of the available information, the Panel determines that the FSP is entitled to deny the Applicant‟s claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.