Text of the determination
Case No: 259269 Determination Page 1 of 8
Case number: 259269
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Inundation of Property - Flood
25 June 2012
Background
1. The Applicants held a home and contents policy with the Financial Services
Provider (FSP) from 20 May 1999, providing for complete building
replacement and contents cover of $52,350.
2. On 11 January 2011, the Applicants’ home in Graceville Queensland was
damaged as a result of water inundation at the time of the flood events that
affected significant parts of Queensland.
3. The FSP arranged for an assessor to inspect the property and later for a
hydrologist to provide a desktop report. It declined the claim on the basis that
the cause of the loss was flood, but later conceded that at least some
damage to the lower level (300mm) was attributable to stormwater runoff.
4. The FSP agreed to indemnify the Applicants for a limited amount, being
$38,722.40 with respect to building and contents damage.
5. The Applicants disagree that indemnity should be limited and seek
reimbursement for their losses, estimated at over $200,000.
Summary of Applicants’ position
6. The Applicants do not dispute that the FSP has agreed to pay $38,722.40 for
the damage done to the building and contents as a result of the property
being inundated to 300mm of water.
7. The Applicants dispute that the FSP has not paid interest pursuant to
Section 57 of the Insurance Contracts Act on this amount or address the
issue of compensation for non financial loss arising from the stress, anxiety
and delay in resolving that aspect of the claim.
8. The Applicants maintain through their solicitors that their home was
inundated by stormwater runoff on 11 January 2011 and that the FSP has
failed to produce evidence in support of the polic y exclusion to suggest that
the cause was flooding.
Determination
Case No: 259269 Determination Page 2 of 8
9. The Applicants argue that the FSP is not entitled to rely upon the hydrology
as they have not produced evidence as to when the hydrology was
requested despite a notice from the first assessor’s report of the need to
obtain a hydrologist report.
10. The Applicants rely upon a FOS Determination 238186 to argue that the
delay in obtaining a hydrologist report and in particular the delay in seeking a
hydrology report until after the complaint was lodged at FOS is a breach of
utmost good faith.
11. The Applicants maintain that witnesses saw water flowing from the higher
land to the south and west of the property whereas Oxley Creek was to the
east of the property. They further maintain that there were witnesses that
also saw water escaping from what the Applicants believe to be the
sewerage drain in the street.
12. Further the Applicants seek compensation for the cost of temporary
accommodation required as a result of the property being inundated in
accordance with the terms of the policy.
Summary of FS P’s position
13. The FSP maintains that the policy is a Defined Events policy and whilst it
covers damage for storm and rainwater, it does not cover damage for loss
caused by flood. The FSP maintains that the Applicants’ claim was declined
on the basis that the damage to the home and contents was caused by flood
excluded under the terms of the policy. In denying the Applicants’ claim, the
FSP took into account area hydrology prepared on behalf of the ICA. The
FSP argues that rainfall data shows the most intense rainfall occurred in the
vicinity of the Applicants’ property around 11am and that whilst rain
continued in the afternoon, it was of short duration and less intense.
14. The FSP maintains the Applicants’ property was ultimately inundated with
approximately 3 metres of water and given the timing of the inundation, the
FSP did not believe inundation to the height of 3 metres could reasonably be
attributed to stormwater runoff.
15. The FSP accepts that following receipt of the Notice of Referral, site specific
hydrology was arranged through WRM. According to the site specific
hydrology, the property had a habitable floor level above ground level
varying from .05 metres to 2 metres. The report concluded that it was likely
the house was initially inundated by stormwater runoff from the catchment
reportedly directly to the subject property combined with flows that were
diverted into the property as a result of stormwater in their pits in front of the
property becoming blocked. According to the hydrology, the maximum dept h
of stormwater inundation would be unlikely to have been greater than 200 –
300mm prior to the arrival of flood waters and would not have reached the
habitable flow level. In view of this, the FSP maintains they agreed to pay the
claim for stormwater inundation to a depth of 300mm above ground level and
have made these payments to the Applicants.
Case No: 259269 Determination Page 3 of 8
16. Insofar as the claim for temporary accommodation, the FSP maintains that
the level of acceptable inundation (300mm above ground level) did not
entitle the Applicants to temporary accommodation expenses under the
terms of the policy.
17. Insofar as compensation is concerned, the FSP maintains the circumstances
do not warrant an award for compensation for nonfinancial loss and submit
that they have not been unduly delaye d by the FSP or its agent’s actions.
Further they submit that the Applicants have not provided any diagnosis of
recognised medical conditions or evidence of level of anxiety and stress in
order to establish their claim for compensation.
18. The FSP relies on the following policy provisions:
Pages 8-13 of the Home Building Product Disclosure Statement (Home PDS)
and pages 16-21 of the Home Contents Product Disclosure Statement
(Contents PDS)
“ What we cover – insured events
This section describes under the heading:
Yes – the insured events you are covered for,
No – the conditions and exclusions that specifically apply to particular
insured events.
...
Yes
Storm and rainwater including stormwater runoff from areas surrounding the
site, or water escaping from any water main, drain, pipe, street gutter,
guttering or surface.
Storm means violent wind (including a cyclone or tornado),
thunderstorm or a heavy fall of rain, snow or hail.
...
No
Damage or loss caused by flood . Flood means the inundation or covering of
normally dry land by water which:
escapes or overflows from, or
cannot enter, because it is full or has overflowed, or
is prevented from entering because other water has already escaped
or been released from it,
the normal confines of any watercourse or lake, including any that
may have been modified by human intervention, or reservoir, canal,
dam or stormwater channel.
Flood does not mean stormwater runoff from areas surrounding the
site, or water escaping from any water main, drain, pipe, street gutter,
guttering or surface.”
Page 14 of the Home PDS and page 22 of the Contents PDS
“ What we do not cover – general exclusions
Case No: 259269 Determination Page 4 of 8
You are not covered under any section of the policy for damage, loss,
cost or liability caused by or arising from or involving:
...
flood...”
Page 38 of the Home PDS and page 50 of the Contents PDS
“ Flood means the inundation or covering of normally dry land by water which:
escapes or overflows from, or
cannot enter (because it is full or has overflowed), or
is prevented from entering (because other water has already escaped
or been released from it),
the normal confines of any watercourse or lake, including any that may
have been modified by human intervention, or reservoir, canal, dam or
stormwater channel.
Flood does not mean stormwater runoff from areas surrounding the
site or water escaping from any water main, pipe, street gutter,
guttering or surface.”
Issues
19. Whether (and to what extent) the damage to the Applicants’ property was
caused by stormwater and/or floodwater.
20. Whether the settlement offered by the FSP is sufficient to discharge its
responsibilities under the claim.
Reasons for decision
21. The Panel is satisfied that a full exchange of the relevant information has
taken place between the respective parties and that each party has had the
opportunity of addressing any issues raised.
22. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the amount of the claim and the issues to be
considered. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
23. This decision has been made by a Panel consisting of an Ombudsman, an
insurance industry representative and a consumer representative.
24. A site inspection of the property was arranged for 5 June 2012 however,
FOS was informed that the property has now been sold and demolished and
turned into a park land. In view of this, the Determination will be based on
the material that has been exchanged.
Case No: 259269 Determination Page 5 of 8
25. It is not in dispute that after incepting the policy with the FSP, the Applicants
were provided with a copy of the Home PDS and the Contents PDS.
26. The Panel accepts that the FSP’s policy does not extend c over to
circumstances where a loss is caused by a flood. It also distinguishes
between flood and stormwater runoff (which is covered).
27. The Applicants report that their home was first inundated with water on 11
January 2011. The water emanated from the higher ground situated both
south and west of the property. It did not emanate from the easterly direction
where the nearby Oxley Creek was situated.
28. Whilst the FSP initially rejected the claim outright, it has since conceded that
at least part of the water inundation was from stormwater runoff. The FSP
further concedes that the policy covers such an event and has agreed to
cover the Applicants for inundation to a depth of 300mm to the lower floor of
the home. To this end it has paid $15,817.40 for property damage and
$22,905 for contents damage. The payment was made to them on or about
14 March 2012.
29. The Applicants accept that the payment made (subject to considerations for
interest) is sufficient to discharge the FSP’s obligation for an inundation to a
level of 300mm in the lower part of the home. It remains their contention that
the extent of their loss exceeded this.
30. The total amount sought by the Applicants includes $143,972.17 to reinstate
the home, $52,530 being the policy limit for contents, $5,450 for temporary
accommodation costs and $3,000 compensation for the “stress, anxiety and
delay” experienced.
31. The Applicants accept that they are not entitled for temporary
accommodation costs if the extent of the loss is limited to the damage that
the FSP has agreed to pay. Notwithstanding this, the Applicants remain of
the opinion that the damage attributable to stormwater runoff was more
extensive than the FSP concedes.
32. It is the FSP’s position that the home was totally immersed in floodwater
after the minor inundation to the lower level and that such a level of
inundation could not be attributable to stormwater runoff.
33. After the report of the incident, the FSP appointed an expert to investigate
and report on the damage caused to the Applicants’ property.
34. The assessor, CL, inspected the property in January 2011 and confirmed
that there had been water inundation to a depth of about 3m. The home was
elevated about 1.5m through a lower level built into the fall of the property.
CL noted:
“In [the Applicants’] case damage to the home is consistent with water
inundation/ flooding. Water reached 3 metres within the property. The
[Applicants’ state] that water came from the North east and West.”
Case No: 259269 Determination Page 6 of 8
35. The Applicants state that the inundation of the property first occurred on 11
January 2011 and that it was to approximately “shin deep” by 12.30pm. It
was then reported to be “waist deep” by 6pm.
36. Based on the report from CL and its consideration of the general
hydrological information from the Insurance Council of Australia (ICA)
reports into the flood disaster, the FSP initially declined the claim and relied
upon the exclusion for flood in the policy. This was later confirmed as part of
its internal dispute resolution (IDR) process.
37. Once the matter was referred to the Service, the FSP sought the opinion of a
hydrologist, WR, who provided a desktop report specific for the Applicants’
address. WR’s report revealed:
the maximum rainfall intensity of 14.8mm per hour was between 10-11am on
11 January 2011;
the peak period of stormwater runoff would have occurred within 30-60
minutes of this;
the closest rain alert station to the property was the Corinda High Alert station,
which recorded no “significant rainfall” after 5pm on 11 January 2011;
the property was located about 130m from Oxley Creek;
the Applicants state that stormwater pits out the front of the property were
blocked, which allowed for runoff to flow from the street onto their property;
the water level near the property peaked at a level of 9m AHD (Australian
Height Datum) on 13 January 2011. The grounds at the subject property vary
from 2.4m AHD to 4.4m AHD. The entire property was inundated;
the area under the house appears to be lower than ground level and allows
for water to pool;
any water that entered the property after 5pm on 11 January 2011 could not
have been stormwater runoff;
the flood would have reached the property in the “early afternoon on 11
January 201 1”; and
the maximum level of inundation under the house would have been up to
300mm, although it would not have reached the habitable level.
38. A witness for the Applicants, DK, confirms that heavy rain was still falling at
or around 10.34am on 11 January 2011. This correlates with the period of
maximum rainfall for the area.
39. A second witness, SH, confirms that at 12.16pm on 11 January 2011 water
was “shin deep” by the steps at the rear of the upper level and also inside
the “study [and] laundry area of the back of the house”.
40. The account of the water levels from SH appears to be prior to the arrival of
the floodwater and sits reasonably favourably within the time of maximum
stormwater runoff. WR notes that the floodwater did not reach the
Applicants’ property until “early afternoon”.
Case No: 259269 Determination Page 7 of 8
41. Almost certainly there were two separate inundation events. The Panel
accepts that there was stormwater runoff which inundated the home prior to
the arrival of the flood. The evidence from WR confirms that the property
was later subject to area flooding and the Panel accepts that stormwater
runoff alone would not have totally inundated the property.
42. The Panel notes that the property is an elevated property built on stumps
with the height of the habitable floor level above ground le vel varying from
.05 metres to 2 metres. In view of the hydrology information and in particular
the report of 12 December 2011 and 3 February 2012, the Panel accepts
that it is unlikely the stormwater could have ponded beyond the 300mm
allowed by the FSP prior to the inundation of the property by floodwaters
from the Brisbane River and Oxley Creek. In the Panel’s view it is unlikely
that stormwater runoff or water exiting the mains, drains, street gutter or
surfaces could have entered the habitable area at 0.5m ADH.
43. In the circumstances, the Panel accepts the offer to compensate the
Applicants’ to a level of 300mm to be fair in the circumstances.
44. The Panel notes the Applicants have argued that the FSP should not be
entitled to rely upon the hydrology as the FSP had made its original decision
to decline the claim when it was clear the awareness of the lack of
hydrological evidence and further that the FSP had completed its
assessment and review process prior to obtaining the hydrological evidence.
In making this argument, the Applicants have relied upon Determination
238186.
45. The Panel has considered this argument. The Determination referred to can
be distinguished from the current circumstances in that the FSP in the
previous matter had not obtained site specific hydrology prior to the matter
being dealt with by the Panel. The FSP had completed its assessment and
review process and had only sought to obtain the hydrological information
once the matter was with the Panel. In the current dispute, the FSP obtained
site specific hydrology prior to providing its Notice of Response. Whilst it may
have obtained this hydrology late in the process, nevertheless, the Panel
accepts that it is entitled to rely upon the hydrological information obtained.
46. Insofar as the Applicants’ request for compensation is concerned, the FSP
has not explained why in this case it had not obtained site specific hydrology
prior to 12 December 2011. The FSP obtained an assess or’s report in
January 2011. The report does not clearly set out the design of the house,
but it is reasonable to accept the report identifies that the lower level is
ground level. The ICA hydrology initially relied upon recognises the
possibility of stormwater runoff inundating properties. The slightly unusual
wording in the policy relating to inundation through drains makes it more
likely the policy would respond to initial inundation at ground level. The
nature of the Applicants very detailed request for an IDR dated 25 August
2011, should have alerted the FSP of the need to obtain relevant site
specific hydrology. Given that this has ultimately led to the FSP making an
offer to resolve the claim, the Panel accepts in the circumstances that an
Case No: 259269 Determination Page 8 of 8
award of compensation pursuant to paragraph 9.3(b)(i) of the Terms of
Reference, should be considered.
47. The Panel while accepting the delay has been caused by the FSP, accepts
in this case that as the FSP has paid damage assessed on the higher level
of inundation at 300mm, that an award of interest on the settlement sum is
sufficient.
Determination
48. Based on the available information the Panel determines that the FSP’s
liability is limited to damage arising from the inundation of the property to a
level of 300mm above ground.
49. The Panel accepts the assessment of damage in the sum of $38,772.40 with
respect to the above loss and insofar as payment is being made to the
Applicants, the Panel determines an interest at the statutory rate of 7.75%
per annum from 28 March 2011 being the date of the initial rejection of the
Applicants’ claim to date of payment of the claim should be made.
50. Insofar as the Applicants’ claim for inundation of the property beyond the
level of 300mm above ground, the Panel determines that the FSP is entitled
to refuse liability based on the exclusion for flood contained in the policy.