Claim declined for flood damage beyond 300mm of stormwater inundation

FirmFinancial Firm (Unknown - Insurer)
Decided2012-07-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$204,952
SourceAFCA PDF

Summary

The applicants' home was inundated during the 2011 Queensland floods and the FSP initially declined the claim as flood damage. AFCA held the FSP's liability limited to 300mm of stormwater inundation, already paid, and ordered interest on that settlement sum, rejecting the balance of the claim.

The policy covers stormwater runoff but excludes flood, and site-specific hydrology showed stormwater alone could not have caused inundation beyond 300mm.

Issues

Subjects and remedies

home or building damagenatural disasterpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 259269 Determination Page 1 of 8 Case number: 259269 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Inundation of Property - Flood 25 June 2012 Background 1. The Applicants held a home and contents policy with the Financial Services Provider (FSP) from 20 May 1999, providing for complete building replacement and contents cover of $52,350. 2. On 11 January 2011, the Applicants’ home in Graceville Queensland was damaged as a result of water inundation at the time of the flood events that affected significant parts of Queensland. 3. The FSP arranged for an assessor to inspect the property and later for a hydrologist to provide a desktop report. It declined the claim on the basis that the cause of the loss was flood, but later conceded that at least some damage to the lower level (300mm) was attributable to stormwater runoff. 4. The FSP agreed to indemnify the Applicants for a limited amount, being $38,722.40 with respect to building and contents damage. 5. The Applicants disagree that indemnity should be limited and seek reimbursement for their losses, estimated at over $200,000. Summary of Applicants’ position 6. The Applicants do not dispute that the FSP has agreed to pay $38,722.40 for the damage done to the building and contents as a result of the property being inundated to 300mm of water. 7. The Applicants dispute that the FSP has not paid interest pursuant to Section 57 of the Insurance Contracts Act on this amount or address the issue of compensation for non financial loss arising from the stress, anxiety and delay in resolving that aspect of the claim. 8. The Applicants maintain through their solicitors that their home was inundated by stormwater runoff on 11 January 2011 and that the FSP has failed to produce evidence in support of the polic y exclusion to suggest that the cause was flooding. Determination Case No: 259269 Determination Page 2 of 8 9. The Applicants argue that the FSP is not entitled to rely upon the hydrology as they have not produced evidence as to when the hydrology was requested despite a notice from the first assessor’s report of the need to obtain a hydrologist report. 10. The Applicants rely upon a FOS Determination 238186 to argue that the delay in obtaining a hydrologist report and in particular the delay in seeking a hydrology report until after the complaint was lodged at FOS is a breach of utmost good faith. 11. The Applicants maintain that witnesses saw water flowing from the higher land to the south and west of the property whereas Oxley Creek was to the east of the property. They further maintain that there were witnesses that also saw water escaping from what the Applicants believe to be the sewerage drain in the street. 12. Further the Applicants seek compensation for the cost of temporary accommodation required as a result of the property being inundated in accordance with the terms of the policy. Summary of FS P’s position 13. The FSP maintains that the policy is a Defined Events policy and whilst it covers damage for storm and rainwater, it does not cover damage for loss caused by flood. The FSP maintains that the Applicants’ claim was declined on the basis that the damage to the home and contents was caused by flood excluded under the terms of the policy. In denying the Applicants’ claim, the FSP took into account area hydrology prepared on behalf of the ICA. The FSP argues that rainfall data shows the most intense rainfall occurred in the vicinity of the Applicants’ property around 11am and that whilst rain continued in the afternoon, it was of short duration and less intense. 14. The FSP maintains the Applicants’ property was ultimately inundated with approximately 3 metres of water and given the timing of the inundation, the FSP did not believe inundation to the height of 3 metres could reasonably be attributed to stormwater runoff. 15. The FSP accepts that following receipt of the Notice of Referral, site specific hydrology was arranged through WRM. According to the site specific hydrology, the property had a habitable floor level above ground level varying from .05 metres to 2 metres. The report concluded that it was likely the house was initially inundated by stormwater runoff from the catchment reportedly directly to the subject property combined with flows that were diverted into the property as a result of stormwater in their pits in front of the property becoming blocked. According to the hydrology, the maximum dept h of stormwater inundation would be unlikely to have been greater than 200 – 300mm prior to the arrival of flood waters and would not have reached the habitable flow level. In view of this, the FSP maintains they agreed to pay the claim for stormwater inundation to a depth of 300mm above ground level and have made these payments to the Applicants. Case No: 259269 Determination Page 3 of 8 16. Insofar as the claim for temporary accommodation, the FSP maintains that the level of acceptable inundation (300mm above ground level) did not entitle the Applicants to temporary accommodation expenses under the terms of the policy. 17. Insofar as compensation is concerned, the FSP maintains the circumstances do not warrant an award for compensation for nonfinancial loss and submit that they have not been unduly delaye d by the FSP or its agent’s actions. Further they submit that the Applicants have not provided any diagnosis of recognised medical conditions or evidence of level of anxiety and stress in order to establish their claim for compensation. 18. The FSP relies on the following policy provisions: Pages 8-13 of the Home Building Product Disclosure Statement (Home PDS) and pages 16-21 of the Home Contents Product Disclosure Statement (Contents PDS) “ What we cover – insured events This section describes under the heading: Yes – the insured events you are covered for, No – the conditions and exclusions that specifically apply to particular insured events. ... Yes Storm and rainwater including stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy fall of rain, snow or hail. ... No Damage or loss caused by flood . Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter, because it is full or has overflowed, or is prevented from entering because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. Flood does not mean stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface.” Page 14 of the Home PDS and page 22 of the Contents PDS “ What we do not cover – general exclusions Case No: 259269 Determination Page 4 of 8 You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: ... flood...” Page 38 of the Home PDS and page 50 of the Contents PDS “ Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter (because it is full or has overflowed), or is prevented from entering (because other water has already escaped or been released from it), the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. Flood does not mean stormwater runoff from areas surrounding the site or water escaping from any water main, pipe, street gutter, guttering or surface.” Issues 19. Whether (and to what extent) the damage to the Applicants’ property was caused by stormwater and/or floodwater. 20. Whether the settlement offered by the FSP is sufficient to discharge its responsibilities under the claim. Reasons for decision 21. The Panel is satisfied that a full exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. 22. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the amount of the claim and the issues to be considered. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 23. This decision has been made by a Panel consisting of an Ombudsman, an insurance industry representative and a consumer representative. 24. A site inspection of the property was arranged for 5 June 2012 however, FOS was informed that the property has now been sold and demolished and turned into a park land. In view of this, the Determination will be based on the material that has been exchanged. Case No: 259269 Determination Page 5 of 8 25. It is not in dispute that after incepting the policy with the FSP, the Applicants were provided with a copy of the Home PDS and the Contents PDS. 26. The Panel accepts that the FSP’s policy does not extend c over to circumstances where a loss is caused by a flood. It also distinguishes between flood and stormwater runoff (which is covered). 27. The Applicants report that their home was first inundated with water on 11 January 2011. The water emanated from the higher ground situated both south and west of the property. It did not emanate from the easterly direction where the nearby Oxley Creek was situated. 28. Whilst the FSP initially rejected the claim outright, it has since conceded that at least part of the water inundation was from stormwater runoff. The FSP further concedes that the policy covers such an event and has agreed to cover the Applicants for inundation to a depth of 300mm to the lower floor of the home. To this end it has paid $15,817.40 for property damage and $22,905 for contents damage. The payment was made to them on or about 14 March 2012. 29. The Applicants accept that the payment made (subject to considerations for interest) is sufficient to discharge the FSP’s obligation for an inundation to a level of 300mm in the lower part of the home. It remains their contention that the extent of their loss exceeded this. 30. The total amount sought by the Applicants includes $143,972.17 to reinstate the home, $52,530 being the policy limit for contents, $5,450 for temporary accommodation costs and $3,000 compensation for the “stress, anxiety and delay” experienced. 31. The Applicants accept that they are not entitled for temporary accommodation costs if the extent of the loss is limited to the damage that the FSP has agreed to pay. Notwithstanding this, the Applicants remain of the opinion that the damage attributable to stormwater runoff was more extensive than the FSP concedes. 32. It is the FSP’s position that the home was totally immersed in floodwater after the minor inundation to the lower level and that such a level of inundation could not be attributable to stormwater runoff. 33. After the report of the incident, the FSP appointed an expert to investigate and report on the damage caused to the Applicants’ property. 34. The assessor, CL, inspected the property in January 2011 and confirmed that there had been water inundation to a depth of about 3m. The home was elevated about 1.5m through a lower level built into the fall of the property. CL noted: “In [the Applicants’] case damage to the home is consistent with water inundation/ flooding. Water reached 3 metres within the property. The [Applicants’ state] that water came from the North east and West.” Case No: 259269 Determination Page 6 of 8 35. The Applicants state that the inundation of the property first occurred on 11 January 2011 and that it was to approximately “shin deep” by 12.30pm. It was then reported to be “waist deep” by 6pm. 36. Based on the report from CL and its consideration of the general hydrological information from the Insurance Council of Australia (ICA) reports into the flood disaster, the FSP initially declined the claim and relied upon the exclusion for flood in the policy. This was later confirmed as part of its internal dispute resolution (IDR) process. 37. Once the matter was referred to the Service, the FSP sought the opinion of a hydrologist, WR, who provided a desktop report specific for the Applicants’ address. WR’s report revealed:  the maximum rainfall intensity of 14.8mm per hour was between 10-11am on 11 January 2011;  the peak period of stormwater runoff would have occurred within 30-60 minutes of this;  the closest rain alert station to the property was the Corinda High Alert station, which recorded no “significant rainfall” after 5pm on 11 January 2011;  the property was located about 130m from Oxley Creek;  the Applicants state that stormwater pits out the front of the property were blocked, which allowed for runoff to flow from the street onto their property;  the water level near the property peaked at a level of 9m AHD (Australian Height Datum) on 13 January 2011. The grounds at the subject property vary from 2.4m AHD to 4.4m AHD. The entire property was inundated;  the area under the house appears to be lower than ground level and allows for water to pool;  any water that entered the property after 5pm on 11 January 2011 could not have been stormwater runoff;  the flood would have reached the property in the “early afternoon on 11 January 201 1”; and  the maximum level of inundation under the house would have been up to 300mm, although it would not have reached the habitable level. 38. A witness for the Applicants, DK, confirms that heavy rain was still falling at or around 10.34am on 11 January 2011. This correlates with the period of maximum rainfall for the area. 39. A second witness, SH, confirms that at 12.16pm on 11 January 2011 water was “shin deep” by the steps at the rear of the upper level and also inside the “study [and] laundry area of the back of the house”. 40. The account of the water levels from SH appears to be prior to the arrival of the floodwater and sits reasonably favourably within the time of maximum stormwater runoff. WR notes that the floodwater did not reach the Applicants’ property until “early afternoon”. Case No: 259269 Determination Page 7 of 8 41. Almost certainly there were two separate inundation events. The Panel accepts that there was stormwater runoff which inundated the home prior to the arrival of the flood. The evidence from WR confirms that the property was later subject to area flooding and the Panel accepts that stormwater runoff alone would not have totally inundated the property. 42. The Panel notes that the property is an elevated property built on stumps with the height of the habitable floor level above ground le vel varying from .05 metres to 2 metres. In view of the hydrology information and in particular the report of 12 December 2011 and 3 February 2012, the Panel accepts that it is unlikely the stormwater could have ponded beyond the 300mm allowed by the FSP prior to the inundation of the property by floodwaters from the Brisbane River and Oxley Creek. In the Panel’s view it is unlikely that stormwater runoff or water exiting the mains, drains, street gutter or surfaces could have entered the habitable area at 0.5m ADH. 43. In the circumstances, the Panel accepts the offer to compensate the Applicants’ to a level of 300mm to be fair in the circumstances. 44. The Panel notes the Applicants have argued that the FSP should not be entitled to rely upon the hydrology as the FSP had made its original decision to decline the claim when it was clear the awareness of the lack of hydrological evidence and further that the FSP had completed its assessment and review process prior to obtaining the hydrological evidence. In making this argument, the Applicants have relied upon Determination 238186. 45. The Panel has considered this argument. The Determination referred to can be distinguished from the current circumstances in that the FSP in the previous matter had not obtained site specific hydrology prior to the matter being dealt with by the Panel. The FSP had completed its assessment and review process and had only sought to obtain the hydrological information once the matter was with the Panel. In the current dispute, the FSP obtained site specific hydrology prior to providing its Notice of Response. Whilst it may have obtained this hydrology late in the process, nevertheless, the Panel accepts that it is entitled to rely upon the hydrological information obtained. 46. Insofar as the Applicants’ request for compensation is concerned, the FSP has not explained why in this case it had not obtained site specific hydrology prior to 12 December 2011. The FSP obtained an assess or’s report in January 2011. The report does not clearly set out the design of the house, but it is reasonable to accept the report identifies that the lower level is ground level. The ICA hydrology initially relied upon recognises the possibility of stormwater runoff inundating properties. The slightly unusual wording in the policy relating to inundation through drains makes it more likely the policy would respond to initial inundation at ground level. The nature of the Applicants very detailed request for an IDR dated 25 August 2011, should have alerted the FSP of the need to obtain relevant site specific hydrology. Given that this has ultimately led to the FSP making an offer to resolve the claim, the Panel accepts in the circumstances that an Case No: 259269 Determination Page 8 of 8 award of compensation pursuant to paragraph 9.3(b)(i) of the Terms of Reference, should be considered. 47. The Panel while accepting the delay has been caused by the FSP, accepts in this case that as the FSP has paid damage assessed on the higher level of inundation at 300mm, that an award of interest on the settlement sum is sufficient. Determination 48. Based on the available information the Panel determines that the FSP’s liability is limited to damage arising from the inundation of the property to a level of 300mm above ground. 49. The Panel accepts the assessment of damage in the sum of $38,772.40 with respect to the above loss and insofar as payment is being made to the Applicants, the Panel determines an interest at the statutory rate of 7.75% per annum from 28 March 2011 being the date of the initial rejection of the Applicants’ claim to date of payment of the claim should be made. 50. Insofar as the Applicants’ claim for inundation of the property beyond the level of 300mm above ground, the Panel determines that the FSP is entitled to refuse liability based on the exclusion for flood contained in the policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.