Home / Financial Firm (Unknown - Insurer) / Determination 259242

Determination 259242

Claim denial of Goodna water inundation damage as excluded flood

FirmFinancial Firm (Unknown - Insurer)
Decided2012-06-27
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's contents claim for water inundation at Goodna in January 2011 was declined as flood, which is excluded. AFCA found the PDS clearly defined and disclosed the flood exclusion, the earlier paid claim did not bind the FSP, and the water came from backed-up drains and river flooding.

Inundation from surcharging drains and channels backed up by river flooding falls within the policy's flood definition, so the exclusion applies.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 259242 Determination Page 1 of 8 Case number: 259242 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 26 June 2012 Background 1. The Applicant holds an Accidental Damage Home Insurance Policy with the Financial Services Provider (FSP) covering contents up to $42,000 subject to an excess of $250. 2. On 11 January 2011 the Applicant‟s contents in Goodna Queensland were damaged by water inundation. 3. The FSP declined the claim on the basis the damage was caused by flood which is excluded under the policy. 4. The Applicant disputes the declinature on the basis the damage was caused by stormwater run-off. Summary of Applicant’s position 5. The Applicant has relied on Section 35 of the Insurance Contracts Act 1984 “the Act”. Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regula tions made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. 6. The Applicant declared a Statutory Declaration on 16 January 2012 from which the Panel notes the following:  On the Monday and Tuesday it was raining heavily.  The Applicant witnessed water coming from the backyard.  Water flooded the house before the river burst its banks.  The Applicant left the property on Tuesday 11 January 2011 during the day at approximately 4.00pm. The Applicant could see the water coming up at this time. Determination Case No: 259242 Determination Page 2 of 8  When the Applicant returned to the property at 6.30pm on Tuesday 11 January 2011, the water was up to the top part of the house.  The Applicant says that heavy rain and flooding affected the property on 16 December 2010 and that the FSP paid this claim without issue. Accordingly, he does not understand why the claim was not paid. 7. The Applicant states that from 9.00am Monday 10 January 2011 until 9.00am Tuesday 11 January 2011, 15.4mm rainfall occurred. Then from 9am Tuesday 11 January 2011 until 9.00am Wednesday 12 January 2011, 40mm o f rainfall occurred. This rainfall data accords with the Applicant‟s recollection of storm and flash flooding. 8. The Applicant contends the events of 11 January 2011 do not meet the definition of flood. The Applicant says that by 10 January 2011 the ground had been saturated for weeks and there was limited drainage of rainfall as a result. Then on 11 January 2011 an intense period of rainwater fell and rose quickly as it flowed towards the river. 9. The Applicant vacated the property at 4.30pm on Tuesday 11 January 2011 at which time the water was up to the floorboards on the second floor. At this time the river had not burst its banks and in fact the river did not burst its banks until late that same evening. 10. Whilst the Applicant acknowledges that his property is situated close to the river, the river flows at that point at least 40m below the top of the riverbank. 11. The storm and rainwater event caused water inundation to the insured property and this event does not fall within the flood exclusion. 12. The Applicant a cknowledges the FSP‟s submissions and material and responds as follows:  The site specific hydrology report for another insured‟s property “P” is 950m distant from his own property. Further, P‟s information was not de-identified and in any event bear no direct relevance to the inundation at the Applicant‟s property.  The site specific hydrology report for another insured‟s property “W” has been provided. W‟s information was not de -identified and it is clear W‟s property is 1.4kms by road away from the Applicant‟s property.  The Applicant disputes that P and W have identical topography and hydrological characteristics which would enable the FSP to reply on same. 13. The Applicant notes that the policy provides confirmation on page 13 that it covers against damage caused by storm, rainwater or wind. However, the definition section at page 59 of the policy provides no useful guidance as to the meaning of any of these words. As a consequence the Applicant contends the natural and ordinary meaning of the words should be applied to determine the extent of cover. The Applicant contends that pursuant to Section 35 of the Act there is a clear duty to inform a consumer regarding the extent of an exclusion. Further the case of Hams v CGU Insurance Case No: 259242 Determination Page 3 of 8 Limited (2002) NSWCA 273 supports the position that the provision of the Product Disclosure Statement alone does not satisfy this requirement and that clear communication must also be considered. 14. The Applicant submits that it was raining heavily up until 4.00pm on Tuesday 11 January 2011 in Goodna and had been raining since 6.00am according to the ICA Hydrology Report for Brisbane. The Applicant‟s property was affected by water shortly after 4.00pm and by 6.30pm the water had reached the top portion of the home. The logical explanation for the damage caused to the property and to the contents is that it was affected by runoff from the storm and rainwater that had been affecting Goodna between 6.00am and 4.00pm on Tuesday 11 January 2011. 15. As there is no site specific hydrology report, the evidence provided by the Applicant regarding the weather conditions and the time the property was inundated, is un-contradicted by the FSP. Summary of FSP’s position 16. The FSP relies on the following policy terms and conditions: “Accidental Damage Cover We will cover your buildings or contents for any accidental loss or damage. ... We will cover your buildings or contents for loss or damage as a result of storm, rainwater or wind. ... Exclusions to cover Any cover we provide is subject to the following exclusions. We will NOT cover any loss or damage as a result of, or caused by ... . Flood ... Flood The covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir, channel, canal or dam.” 17. The FSP has enclosed a site specific hydrology report for P‟s and W‟s properties. The Panel notes the following from same:  P‟s property is 150m west of Woogaroo Creek and W‟s property is 190 metres west of the Brisbane River.  The ground levels at P‟s property indicates that the street travelling east has a short incline from 11.2mAHD outside the property to 11.5mAHD before declining to the creek at a final level of 9.1mAHD. Case No: 259242 Determination Page 4 of 8 Travelling west the road declines down to approximately 10.4mAHD at the junction with Layard Street.  W‟s property is 15.8 mAHD and is on a housing estate. The housing estate appears to drain to the south east of the housing area.  The hydrologist used river level information from the Brisbane River at Moggill Alert River Gauge (0mAHD) and Jindalee Bridge River Gauge (0mAHD) as these were the most appropriate.  The river gauge information indicates the Brisbane River was first affected by catchment inflows from as early as 9 January 2011 with a gradual but steady rise until 6.00am on 11 January 2011. After this time both gauges show steeper rise in flood levels with an eventual peak of 17.8m at around 3.00pm on 12 January 2011 at Mogill Bridge and 12.9 metres at 5.00pm at Jindalee Bridge.  The flood level at P‟s property was 4 metres above ground level. It appeared most properties in the area had been flooded. The street was drained by open channels from this property down to Woogaroo Creek. W‟s property was inundated up to 0.8m above ground level.  The local catchment that drains to the site is limited and the low rainfall intensity (2-5 year ARI) occurred in the vicinity of the properties at the time of inundation. It is unlikely that there was sufficient local stormwater runoff for this to be a major contributing factor to the inundation that occurred to either property.  The peak level of the Brisbane River would have occurred at approximately 16mAHD at 4.30pm on 12 January 2011. This would correspond to a flooding depth of approximately 3.5m at the property which would correspond to the flood marks observed at the property.  The evidence indicates that rising levels in the Brisbane River would have backed up Woogaroo Creek and its tributaries and then to low lying land before the river broke its banks and inundated the properties. 18. The FSP contends that in relation to water rising from storm drains, the hydrological evidence confirms that the water could not escape into the river/creek system. The water then backflowed and discharged onto normally dry land. 19. The FSP contends that this water was either river water or a mixture of river and rain water based on the evidence of the site specific hydrology report and the ICA hydrology report. 20. The FSP submits the term flood is clearly defined in the policy of insurance. 21. The FSP further maintains that the waters released from the Wivenhoe Dam are still deemed floodwaters for the purpose of its policy wording. 22. The policy would cover stormwater inundation independent of flood water. The rainfall records indicate a 2-5ARI and a small local catchment area. Accordingly, it is unlikely to have received sufficient rainwater to cause the Case No: 259242 Determination Page 5 of 8 inundation. The property was damaged by floodwater on 11 January 2011 which did not peak until 12 January 2011. 23. In the absence of any hydrological or independent observation evidence to contradict the findings of the hydrologist, it is the FSP‟s submission that the proximate or effective cause of the loss was damage by the floodwaters as defined by the policy. 24. The FSP contends the premises were inundated by water escaping from the confines of the Brisbane River. Accordingly the Applicant is not covered under the policy for damage proximately caused by flood. 25. The FSP submits that the applicable policy wording is clear and unambiguous. 26. The FSP notes this claim is independent of any previous claim and arose from different circumstances. In particular, there was no inundation from the Brisbane River in the prior claim and accordingly it is not relevant. Issues 27. Whether the FSP is entitled to rely on the policy wording. 28. Whether the FSP is bound by the previous claim acceptance. 29. Whether the FSP was entitled to decline the claim. Reasons for decision 30. There has been an exchange of material between each party, and the Panel is satisfied each party has had an opportunity to reply to the issues raised. 31. The Panel has read each party‟s submissions and materials and will only refer to the relevant submissions and materials raised. 32. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 33. The Panel Chair Ombudsman attended on site where he met with representatives of the FSP. The Applicant was unable to attend on this occasion because of work commitments. 34. The Panel considers there are three discrete issues raised by this dispute and it will deal with each separately below. Whether the FSP is entitled to rely on the policy terms and conditions 35. There is no evidence suggesting the Applicant did not receive the PDS documentation. Section 35 in most circumstances will be satisfied where the Case No: 259242 Determination Page 6 of 8 appropriate PDS has been supplied. This has been well recognised by the courts. In certain circumstances where there is ambiguity or confusion, the provision of the PDS itself will not be sufficient. 36. The Panel has looked at the PDS. Whilst the wording of the PDS is quite broad, it is apparent from a reading of the documentation that it is indexed, has appropriate references to the various insured events and excluded events. Further, it provides a definition of flood which identifies what flood is. 37. The Panel is satisfied that the policy wording is sufficiently clear to establish that the Applicant or a reasonable person in the circumstances would have been clearly informed of the extent of the policy cover in accordance with Section 35 of the Insurance Contracts Act 1984 . 38. Accordingly, the FSP is entitled to rely on the terms and conditions set out in the policy. Whether the FSP is bound by its previous claim acceptance 39. The parties agree that the FSP previously paid a claim in December 2010. 40. The limited information before the Panel indicates that the damage was paid on the basis it arose from the insured incident of stormwater damage. Although, the Applicant indicates it was heavy rain and flooding he does not state whether the flooding was water inundation from stormwater or from river water or backed up storm drains. 41. There is no evidence from the Applicant indicating that the payment of this claim led him to believe he would be covered for flooding from the river and/or surcharging storm drains. 42. There is insufficient evidence to demonstrate that the Applicant believed he would be covered for flood as defined by the policy or that the FSP made any representation that he would be covered for flood as defined by the policy. 43. Given this, there is no basis at law to bind the FSP to its previous payment of a claim. Whether the FSP was entitled to decline the water inundation claim 44. The Applicant is of the opinion that the damage arose from stormwater inundation. The Applicant notes the peak of the river did not occur until the day after the flooding was witnessed at the property. 45. The Applicant has provided relatively general rainfall observations in support of his position. In particular the Applicant also notes that the property flooded at 4.00pm on 11 January 2011 prior to the river breaking its banks. The Applicant has indicated that water was coming from the backyard and that water was coming up at the time the Applicant left. Case No: 259242 Determination Page 7 of 8 46. In contrast the FSP has stated the damage arose from flood water as defined by the policy which had backed up and inundated the property. 47. The FSP has provided site specific hydrology reports for other insureds. The Panel notes the material was not appropriately de-identified as it should have been. 48. The Applicant has argued the site specific hydrology reports cannot be relied upon due to different topography and hydrological issues such as drainage which are not directly applicable to the insured premise. Whilst there is some merit to the Applicant‟s contention, this does not negate the utility of the site specific hydrology report. In particular the rainfall measures and the timing of the river rises are matters which have not altered between reports because they are relevant to all residences situated in this locale. 49. The Panel has referred itself to satellite imagery of the Applicant‟s insured premise together with P and W in order to obtain an idea of the distance of each property. It should be note d that the Applicant‟s residence is situated approximately 200m from the Brisbane River and less than 300m from Woogaroo Creek. In contrast, W is situated 190m from the Brisbane River and P is approximately 150m from Woogaroo Creek. The Applicant‟s residence is close to both the River and the Creek. 50. The evidence before the Panel indicates the river and tributary levels (which would include the Woogaroo Creek) were rising as of 9 January 2011. The river levels then commenced to sharply rise after 6.00am on Tuesday 11 January 2011. The river levels peaked at 17.8m at 3.00pm on Wednesday 12 January 2011 at Moggill and 12.9 metres at 5.00pm at Jindalee Bridge River Gauge. 51. It is unfortunate that neither party have given evidence as to the timing of the river actually breaking its banks. The peak river level does not necessarily equate to the timing of the river breaking its banks. The peak river level is the river level at its maximum height/flow which may be beyond the height of the banks. 52. There is no dispute between the parties that the river did in fact break its banks at some stage. The Applicant‟s contention is that the stormwater inundation of the property occurred prior to the river breaking its banks. 53. There is no evidence regarding precisely when the surcharging drains or channels in this local area commenced. However, there is evidence that the drains and channels commenced backing up prior to the river breaking its banks and inundating local residences. 54. There is evidence that the rainfall was insufficient to inundate the property in both site specific hydrology reports. 55. The Panel is satisfied that the Applicant‟s eye witnesses‟ evidence is telling, that is, that the water which inundated the Applicant‟s premises came from the rear of the property. The Panel is satisfied that the area to the rear of the property is small when considered as a catchment area, but is the area of Case No: 259242 Determination Page 8 of 8 the flow of backup water from the Woogaroo Creek and tributaries. The Panel notes that the flow of water from the creek and tributaries is confirmed by the satellite images of the flooded area. 56. Based on the evidence before it, the Panel concludes that the insured property is unlikely to have been inundated by stormwater run-off, particularly not up to the second floor level. The evidence indicates that surcharging stormwater drains and channels are the most likely sources of inundation prior to the river breaking its banks. 57. This scenario would constitute flood under the policy as the inundation has arisen from water escaping the confines of any „channel‟, canal or watercourse. There is a body of case law which has found that a channel and canal equates to stormwater drainage and this would accord with most ordinary Australians understanding of the term. Determination 58. On the basis of the available information the Panel determines the FSP is entitled to rely on the policy wording. 59. On the basis of the available information the Panel determines the FSP is not bound by the previous claim acceptance. 60. On the basis of the available information the Panel determines the FSP was entitled to decline the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.